By: Muhammad Usman Arshad Khan Head of Projects and Policy

Similar documents
Scaling Successful Mini-grid Programs: Experience of Bangladesh

Success Story Scaling Up Energy Efficiency An Indian Experience

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Scheme of Control Agreement

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank

Session 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA CHHE LIDIN

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

KCB GROUP PLC INVESTOR PRESENTATION. Q FINANCIAL RESULTS

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

40KW Solar System for Apple Sauce Co

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

Economic and Air Quality Benefits of Electric Vehicles in Nevada

1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results

The first successful concessioner

irap Innovation Workshop 2016 Maximising Travel on 3-Star or Better Roads

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

MONTHLY PERFORMANCE DASHBOARD

FY2/18 (March 2017~February 2018)

FY2/17 3Q(March 2016~November2016)

WinnCompanies Community Solar Photovoltaic to Benefit Affordable Housing Darien Crimmin Vice President of Energy & Sustainability

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka

December 2018 RenewableGenerations Monthly Report

FY2/17 (March 2016~February 2017)

REGIONAL MEETING ON SUSTAINABLE ENERGY

Darebin Solar Saver Program

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Electric Vehicle Program

Presented by Eric Englert Puget Sound Energy September 11, 2002

Electricity Access in Lao PDR

Strategy for Promoting Centers of Excellence (CoE) Activities

ECONOMIC BULLETIN - No. 42, MARCH Statistical tables

Alternative Energy Development Board February 2019

MONTHLY PERFORMANCE DASHBOARD

Graph #1. Micro-Generation Generating Units in Alberta 20

FY2/16(March 2015~February 2016)

This presentation was given as part of a workshop on February 7, Presenters were:

India-Japan Energy Forum 2017 "Conference"

MONTHLY PERFORMANCE DASHBOARD

Rep. John Szoka, NC House September 28, 2017

Australian Solar Cooling Interest Group (ausscig) Conference Queensland Solar City

Montana Renewable Energy Association

New Jersey Solar Roundtable

FY2/18 2Q(March 2017~August 2018)

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Solar PV based lighting in South Asia region: Institutional and Technological Trends

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

CREDIT UNION ESTIMATES

ABB Innovation & Technology Day

National Grid's Electric Revenue Decoupling Mechanism ("RDM") Reconciliation Filing for the Year Ending March 31, 2013 Docket No.

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

Energy Produced by PV Array (AC):

Hybrid Electric Solution for OEM Commercial Vans and Trucks Dr. Edward Lovelace

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford

FY2/15(March 2014~February 2015)

MONTHLY PERFORMANCE DASHBOARD

CREDIT UNION ESTIMATES

CREDIT UNION ESTIMATES

NJ Solar Market Update As of 6/30/15

Months Investor Presentation

This presentation was given as part of a workshop on November 14, Presenters were:

General Overview. Ernesto Macias ARE President MUNICH Copyright Alliance for Rural Electrification. All rights reserved.

Rural Energy Access: Promoting Solar Home Systems In Rural Areas In Zambia A Case Study. O.S. Kalumiana

First half (2014/3/1~2014/8/31)

Regulatory Status and Road Map for Wind Energy in Namibia

CREDIT UNION ESTIMATES

Glendale Water & Power Smart Grid Project

Case Study: From Manufacturing to Microfinancing. by Rural Women of Bangladesh

SolarPACE + Storage Expanding Opportunities and Improving Project Economics. Presented By:

2016 UC Solar Research Symposium

CREDIT UNION ESTIMATES

Storage in the energy market

CREDIT UNION ESTIMATES

Locomotive Building Project

Green Power Feasibility Study Econet Lesotho

ANALYST BRIEFING FOR THE THIRD QUARTER ENDED NOV 2016

CREDIT UNION ESTIMATES

TVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies. Gerald Johns, P.E. Power Utilization Engineer, TVA

CREDIT UNION ESTIMATES

Multi- Family Solar Event

Retro-commissioning for Peak Electric Demand Reduction in New York City. Kim Lenihan , ext.

Lessons from Indonesia

Facilities Energy Report Fiscal Year 2016 Third Quarter

If I had asked people what they wanted, they would have said faster horses. Henry Ford. The role of public transport buses in the energy transition

ELENA Introduction and Update. European Investment Bank

FINANCING OPTIONS FOR SOLAR PV

Introduction of tractor based rural road maintenance approaches in Zambia

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems

MALDIVES ENERGY SECTOR & SREP IP 4 TH DECEMBER 2017, ABUJA, NIGERIA. Ministry of Environment and Energy Republic of Maldives

Global Monthly March 2019

MONTHLY PERFORMANCE DASHBOARD

Irrigation energy efficiency How to analyse your energy costs. Nick Bullock The Energy Guys

Overview of S.L Competitive Energy Solutions for North Carolina

3/31/2008 Let nature energize our world. 1

Cellulosic Biofuels and Energy Grasses Energy Policy Issues Committee March 21, 2012

THE TRES AMIGAS PROJECT

ANCR CRU Statistics February 2007 to December 2007

Transcription:

By: Muhammad Usman Arshad Khan Head of Projects and Policy

Introduction to SME Business Support Fund Sharing of results Pre Audit conducted at Quaid-e-Azam (Kot Lakhpat) Industrial Estate Lahore Overview of the SME Energy Efficiency Outreach, Research and Demonstration Support Services Program Way forward

ORIGIN OF BSF Loan Agreement Established in 2005 A Guarantee Ltd Company under Section 42 of Companies Ordinance 1984 9 Board Members Total Outlay of USD 5.7 M (For grant allocation)

A successful model of Public-Private Partnership. (Govt. owned and managed by private sector professionals 1700 SMEs graduated to a higher level of competitiveness, innovation and profitability 400 export-based SMEs were supported 100 SMEs initiated exports through BSF funded projects

1 2 3 Developing new enterprises Supporting existing enterprises through Business Development Service Providers (BDSP) Inculcating business processes/models in developing rural enterprises

Making SMEs competitive and sustainable through innovation and efficiency

Demand Driven Sector based program lending SMEs are willing to pay for the services Utilize services of professionals in form of BDSPs Unique

DEVELOPING NEW ENTERPRISES FRANCHISING PAKISTAN PROGRAM CEL (CENTER FOR ENTREPRENEURSHIP AND LEADERSHIP) PELP(PAKISTAN ENTREPRENEURSHIP AND LEADERSHIP PROGRAM) YELP ( YOUNG ENTREPRENEURSHIP AND LEADERSHIP PROGRAM)

SUPPORTING EXISTING ENTERPRISES BSF SMART BORROWER PROGRAM SME STAFF TRAINING PROGRAM HR PLUS PROGRAM SME DEVELOPMENT CENTER BSF SMART ENERGY PROGRAM

INCULCATING BUSINESS PROCESSES IN DEVELOPING RURAL ENTERPRISES PEACH, PEACE & PROSPERITY PROGRAM ENTERPRISE DEVELOPMENT CENTER VEGETABLE VALUE CHAIN PROGRAM

BSF Joint Venture with Smart Systems (Smc-Pvt) ltd (leading Engineering firm) led by an eminent consultant Prof Dr. Zahir Fikri JV formed in February 2011 Objective was to carry out research studies on energy efficiency outreach communication and research Development of innovative energy retrofit solutions, which could result in substantial savings in energy consumption and reduction of demand within the SME sector

Under this JV, Pre Energy Audit was started in March,2013 In six months, JV carried out Pre Energy Audit of 150 SMEs in the Quaid-e-Azam Industrial Estate, Kot Lakhpat which accounts for 46 MV connected load Detailed audits along with Power Factor Correction of 10 SMEs were also carried out to determine actual savings in selected industries.

TOTAL CONNECTED LOAD DISTRIBUTION TABLE 20. KLIE. TOTAL CONNECTED LOAD DISTRIBUTION NO. TYPE LOAD (KW) % OF TOTAL LOAD 1 TOTAL MOTOR LOAD 30206 65 2 TOTAL LIGHTING LOAD 796 2 3 TOTAL OTHER LOAD 15488 33 TOTAL CONNECTED LOAD 46490 100 FIGURE 5. KLIE. TOTAL CONNECTED LOAD DISTRIBUTION 2% 65% 33% TOTAL MOTOR LOAD TOTAL LIGHTING LOAD TOTAL OTHER LOAD

TOTAL MOTOR LOAD/MAIN SECTOR NO. TABLE 29. KLIE. TOTAL MOTOR LOAD/MAIN SECTOR SECTOR LOAD (KW) % OF TOTAL MOTOR LOAD 1 Manufacturing 16592 55 2 Textile 8113 27 3 Food 2896 10 FIGURE 18. KLIE. TOTAL MOTOR LOAD PER MAIN SECTOR 27% 10% 55% 6% 2% Manufacturing Textile Food Pharmaceutical Services 4 Pharmaceutical 1947 6 5 Services 658 2 Total 30206 100

MOTORS IN KLIE Motor Horse Power Analysis has been shown in the following graph: KLIE. GROUPING ACCORDING TO TOTAL HP 3% 5% 16% 6% 3% 25% 16% 12% 14% 0.1-5 HP 5.5-10 HP 11-20 HP 21-30 HP 31-40 HP 41-50 HP 51-100 HP 101-150 HP 151-500 HP

0.5 HP 5 HP 1 HP 2 HP 3 HP 10 HP 25 HP 0.25 HP 7.5 HP 15 HP 30 HP 20 HP 1.5 HP 0.35 HP 40 HP 6 HP 2.5 HP 5.5 HP 7 HP 4 HP 50 HP 60 HP 75 HP 100 HP 12 HP 6.5 HP 97.5 HP 3.75 HP 9 HP 150 HP 35 HP 0.08 HP 4.75 HP 32 HP 0.75 HP 22 HP 13 HP 70 HP 135 HP 1.25 HP 80 HP 8 HP 14 HP 65 HP 21 HP 54 HP 90 HP 113 HP 120 HP 180 HP 200 HP 220 HP 500 HP (%) OF TOTAL NO. OF MOTORS FIGURE 21. KLIE. MOTOR HORSE POWER ANALYSIS 16 14 12 10 8 6 4 2 0

TOTAL LIGHTING LOAD/MAIN SECTOR TABLE 38. KLIE. TOTAL LIGHTING LOAD/MAIN SECTOR FIGURE 28. KLIE. TOTAL LIGHTING LOAD PER MAIN SECTOR NO. SECTOR LOAD (KW) % OF TOTAL LIGHTING LOAD 1 Textile 332 42 2 Manufacturing 281 35 35% 12% 42% 9% 2% Manufacturing Textile Food Pharmaceuticals 3 Food 96 12 Services 4 Pharmaceutical 75 9 5 Services 12 2 Total 796 100

40 FL 50 FL 25 FL NO. OF LIGHTS LIGHTING DISTRIBUTION W.R.T TUBE LIGHTS KLIE. TOTAL NO. OF TUBE LIGHTS 12000 11,127 10000 8000 6000 4000 2000 0 461 35

400 IL/M 40 IL/M 100 IL/M 60 IL/M 500 IL/M 20 IL/M 200 IL/M 220 IL/M 1000 IL/M NO. OF LIGHTS LIGHTING DISTRIBUTION W.R.T OTHER LIGHTS KLIE. TOTAL NO. OF OTHER LIGHTS 70 65 60 50 40 30 52 47 35 35 29 20 10 5 3 2 0

LIGHTING LOAD DISTRIBUTION TYPE KLIE. LIGHTING LOAD DISTRIBUTION LOAD (KW) % OF TOTAL LOAD Tube Lights 268 64 Energy Savers 470 34 Others 57 2 TOTAL 796 100 34% KLIE. LIGHTING LOAD DISTRIBUTION 2% 64% Tube Lights Energy Savers Others

TOTAL OTHER LOAD/MAIN SECTOR NO. TABLE 43. KLIE. TOTAL OTHER LOAD/MAIN SECTOR SECTOR LOAD (KW) % TOTAL OTHER LOAD 1 Manufacturing 9926 64 FIGURE 34. KLIE. TOTAL OTHER LOAD PER MAIN SECTOR 28% 3% 3% 2 Textile 4384 28 3 Food 464 3 4 Pharmaceuticals 430 3 5 Services 284 2 Total 15488 100 64% 2% Manufacturing Textile Food Services Pharmaceuticals

KLIE. OTHER LOAD DISTRIBUTION TYPE KW % OF TOTAL OTHER LOAD Others 10487 67.71 Boilers 1992 12.86 AC 1839 11.88 Compressors 706 4.56 Fans 402 2.60 Computers 41 0.27 Furnace 21 0.14 TOTAL 15488 100 12% 13% KLIE. OTHER LOAD DISTRIBUTION 4% 3% 0% 0% 68% Others Boilers AC Compressors Fans Computers Furnace

Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan % ENERGY DISTRIBUTION (2010) MONTHS MWH W.R.T HIGHEST Dec 3,400 56 Nov 3,770 62 Oct 4,295 70 Sep 4,054 66 Aug 6,123 100 Jul 5,703 93 Jun 5,549 91 May 5,478 89 Apr 4,455 73 Mar 4,281 70 Feb 3,709 61 Jan 2,144 35 Maximum 6,123 100 Minimum 2,144 35 Average 4,414 72 Total 52,962 865 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 KLIE. ENERGY DISTRIBUTION (2010) 3,770 3,400 4,295 4,054 6,123 5,703 5,549 5,478 4,455 3,709 4,281 2,144 MWH

CAPACITOR APPLICATION ON 20 MOTORS IN KLIE Pilot Test For SME Operating in the Knitting Sector

STUDY OF DEMAND AND POWER FACTOR OF 135 SMIS IN KLIE Existing power factor of various SMEs in KLIE studied.

CAPACITOR APPLICATION STUDY Separate study for industrial power factor correction in KLIE Lahore. Capacitor installed on 20 motors Range of motor size 3.73 KW to 29.84 KW Capacitor sizes tested KVAR 2.5 5 10 12.5 15 50% to 70% improvement in power factor 40% reduction in electric current recorded.

BSF assisted by the joint venture partner Smart Systems has developed a PC1(SME Energy Efficiency Outreach, Research and Demonstration Support Services) Total Outlay of PC 1 is Rs. 8,035 Million ($81 Million). PC 1 has been submitted to Planning Commission through Ministry of Finance. PC-1 Proposes 30% resource mobilization from local investment banks and 70% from foreign donors.

The project aims at developing an effective out reach, research and demonstration program that makes possible to introduce to the SME s (37,400) both commercially available technologies and new methods. An energy investment fund has been proposed that would provide PKR 2.25 million financing per SME with 50% as grant To achieve sustainability of BSF S free energy support service, an endowment fund has been proposed The funding for the endowment fund will be obtained from the donors and other NGOs

The overall objectives of this program are: i. Reduction of Power demand ii. Reduction of Energy Consumption iii. Achieving environmental sustainability iv. Reduction of cost of energy v. Introduction of renewable technologies vi. Reducing cost of industrial production vii. Making SMEs competitive for achieving export targets The program components are summarized as under: i. Detailed measurements and design ii. Support programs for retrofits iii. Research and Demonstration programs

iv. Demonstration Centers v. Outreach and communication programs v vi. Energy Portals for dissemination of energy efficient solutions vii. Research on new technologies viii. Online Publications ix. Surveys and market research for energy efficient solutions x. Training of energy service companies in energy efficient solutions xi. Energy Investment fund xii. Energy Endowment fund xiii Program implementation unit xiv. Infrastructure and facilities

Under this PC-1 An energy investment fund of $22 Million has been proposed that would provide PKR 2.25 million financing per SME with 50% as grant Energy investment fund aims at providing capital investment to the SMEs with part of the investment as grant. Funding for the Energy Investment fund shall be obtained preferably interest free with 50% non-returnable grant from the donors. The target is to provide 50% of the retrofit cost as grant to the SMEs. The retrofits will be offered with 10 year repayment plans of the 50% loan part of the program. Such support programs do not yet exist for the SMEs in Pakistan.

Under this PC-1 An energy Endowment fund has also been proposed The objective of the endowment fund is to generate income to cover the cost of free energy support services to the SMEs To meet operating expenses of the operating unit of the program. It is estimated that free energy services can be provided to 500 SMEs per year.

The program has focused on a number of solutions which can result in substantial energy reductions. Some of the solutions are: i. Convert lighting to Energy Saver or LED lighting, saving 30 to 50%, ii. Convert motors to high efficiency motors, iii. Use Variable Frequency drives to reduce speed to match with load, iv. Capacitors, saving 30 to 50% of demand, v. Use free cooling and insulation for AC loads saving 60% to 85%,

vi, Re-engineer your industrial processes, saving 30% to 50% vii. Retrofit and Convert boilers and furnaces saving 20 to 30% viii. Recover 90% of waste heat and use. Other solutions may include integrated energy systems maximizing free sources of heating, cooling and light, Converting the existing electricity based heating and cooling systems to solar based heating and absorption systems etc. Most of the mentioned technologies are already commercially available. Some of these including PV cells have become affordable due to the increasing cost of electricity gas and oil.

Two studies were carried out in support of PC-1 Lighting Measurement Analysis and calculations showed that the present lights being used in the industry are not energy efficient The lighting efficiency of the building can be improved considerably. Fan Measurement Analysis and conclusions have shown that the present fans being used in the industry are not energy efficient It was concluded after retrofitting the fans, 60-70 % of the energy consumption can be reduced

The project encompasses Punjab, Sindh, KPK & Balochistan This project will place low tension (LT) capacitors on induction motors of 15,300 selected SME s in Pakistan This intervention will yield quick measureable results by reducing power demand, energy consumption and energy bills The implementation time for the project will be five years The total cost of this component is $ 66.4 million The total reduction in demand will be 707 MVA

PROJECT SUMMARY ITEM UNIT COMPONENT TOTAL I II III IV No. SMIs No. 10,000 2,700 2,100 500 15,300 Capacitors No. 140,000 37,800 29,400 7,000 214,200 Project Cost $Mill. 42.3 10.1 8.1 5.9 66.4 Retrofit Cost $Mill. 28.2 6.4 4.9 1.9 41.20 IU Cost $Mill. 12.3 3.3 2.9 2.9 21.20 FIRR % 148% 243% 213% 117% 203% Payback Yrs 0.67 0.41 0.47 0.85 0.49 BC Ratio No. 2.29 2.70 2.61 2.42 1.87 Reduction in Demand MVA 462 125 97 23 707

Possibility of Commercial Financing for Energy Efficiency Regular Training Programs for SMEs on in-house energy conservation Promotion of low-cost energy efficiency products e.g. AirconMiser, Euro Energy Sheild etc. Registration of BDSPs specializing in energy efficiency for providing services to the SMEs

64B D/1, Ghalib Road, Gulberg III, Lahore Tel: 042 99268150-53 Fax: 042 35871318 Email: info@bsf.org.pk Website: www.bsf.org.pk