Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

Similar documents
. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Blue Quick Seal Connection

Wedge 533 / 503 / 553

22. TenarisHydril Blue Thermal Liner Connection

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

MS & MS XT/XC Connections

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

Handling / Lift Plugs

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

Blue Series and Legacy Series Make up Acceptance

Initial Running Guidelines

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

JFEBEAR RUNNING MANUAL

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

Running Procedure. VAsuperior. Rev.:2.

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

Running Procedure. Rev.:2 VAGT.

RECOMMENDED PRACTICE TKC FJ-150

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

Running Procedure. VAxplorer. Rev.:1.

RECOMMENDED PRACTICE SEAL-LOCK HT

SEAL-LOCK APEX ANCILLARY

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

Drill Pipe Connection Care and Handling

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

Wedge /8" TO 13 5/8"

INSTRUCTION MANUAL IM-422 For HTC/COUPLING ASSEMBLY HC-8088

INSTALLATION INSTRUCTIONS ELEVATION REAR BUMPER FORD F150

Fishing Bumper Sub. Manual D450

Running Procedure for Casing with GB Drilling with Casing Connections

EURO BEAD BREAKER MODEL # Instruction Manual Parts Breakdown

15. Bearing Handling Storage Fitting A-97

Operating Procedures for GripTight High Pressure Test Plug

Operating Procedures for 2 SCH 160 through 10 SCH 120 GripTight Long Radius Elbow Test Plug

SEAL-LOCK HT ANCILLARY SPECIFICATION

Stuck Draft Gear Procedure Manual Derived from AAR Manual of Standards and Recommended Practices Book B-II, RP , Pages 57 98

DINAN by Brembo BRAKE KIT INSTALLATION NOTES

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

TOYOTA TUNDRA SKID PLATE Preparation

GM B-Body Street Grip

ZE ZE ZE. Simplex expanding wedge brake Assembly and Maintenance Instructions

INSTALLATION INSTRUCTIONS

BEAM CLAMP INSTRUCTION MANUAL

Blue 2 3/8" TO 13 5/8"

Operating Procedures for 4 to 24 GripTight Isolation Plugs

Explanatory Information (NOT PART OF ANSI STANDARD)

HUB & WHEEL INSTALLATION

GT-200 GATE VALVES PN16, Screwed end

MS2200, MS2500, and MS3000 Suspension Installation Manual ON/OFF HIGHWAY SUSPENSION SYSTEM

Operating Procedures for 4 to 24 Double Block and Bleed Test and Isolation Plugs

CP2000 Ballast - Replacing Thyristor Instruction Sheet

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

INSTALLATION INSTRUCTIONS ELEVATION FRONT BUMPER DODGE RAM

Two-way cable interlock kit for Magnum fixed circuit breakers

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

Contents. RE PS Revision 5

(2) License Plate Plugs

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

Installation Guide 2016 Kawasaki ZX10-R Exhaust Kit

Installation Instructions

BAG 3 (2) 2.25 x 1 Sleeves (4) 1/4 Nylock Nuts (4) 1/4 x 2 Bolts (4) 3/8 Nylock Nuts (4) 3/8 Flat Washers (2) 3/8 U-Bolts

Blue 2 3/8" TO 13 5/8"

GOOD CONDITION GUIDE SHOGUN

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

I. General Safety Precautions

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL

All Cirrus Design SR22 aircraft equipped with a Tornado Alley Turbo Inc. Turbonormalizing System installed per STC SA10588SC and SE10589SC.

EST GROUP DC /05 REV4 05/09 PAGE 1 OF 6 OPERATING PROCEDURES FOR DOUBLE BLOCK AND BLEED PLUGS - INTERNATIONAL

GOOD CONDITION GUIDE. Suzuki Financial Services

HYDRAULIC PALLET TRUCK. MODEL No: PTE550 PART Nos OPERATION & MAINTENANCE INSTRUCTIONS

TOYOTA TUNDRA SKID PLATE Preparation

Installation Instructions

Instruction Manual for HSPA Take-Up Units

CONCEPT 10.5 DUAL DISC INSTALLATION INSTRUCTIONS

Kits 75559, & Universal Air Spring-Over-Strut

Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire.

RIDGID Wrenches 1.1. Page. Wrench Type

POWER FOR TOMORROW. Motive Power. Network Power. Chargers. Bloc Batteries. Accessories. Service

GM G-BODY LSD INSTALLATION

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Check Valve (Next Generation) A-180 and A-183 Series. Installation, Operation & Maintenance (IOM) Manual. P/N: A-180/A-183, Rev. 6.

Installation and Maintenance Instructions Falk Wrapflex (Page 1 of 7) 1. General Information. 2. Safety and Advice Hints DANGER! Type 10R.

Updates to Maintenance Manual MM-0409 (Revised 02-11): Wheel-End Components/Meritor Conventional and Unitized Wheel Ends

Fluid-O-Tech ROTOFLOW ROTARY VANE PUMP REBUILD MANUAL

SCION tc BIG BRAKE KIT Section I - Installation Preparation

PowIRtab Mounting Guidelines

TECHNICAL REFERENCE CLEANING POWER GUIDELINES TANKJET TANK CLEANER OVERVIEW BY TANK DIAMETER OPTIMIZING TANK CLEANING OPERATIONS

ROYAL LOW-PROFILE ACCU-LENGTH CNC COLLET CHUCKS

LEXUS IS 250 Front Performance Brake Kit Section I - Installation Preparation

INSTALLATION INSTRUCTION 88088

Transcription:

IDM Code GDL00376/3 / March 2018 TenarisHydril Wedge 623 Connection Scope These guidelines apply specifically to the use of TenarisHydril Wedge 623 connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable to the running of all TenarisHydril premium connections. References. TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD-00.0002.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG 13-005. Equipment, Material & Documents 1. Latest version of the specific Product Data Sheet can be obtained from Tenaris web site. In case this is unavailable, request the data sheet from the local Technical Sales representative or contact-tenarishydril@tenaris.com. TenarisHydril RUNNING MANUAL 1

TenarisHydril RUNNING MANUAL Pre-Running 1. Never move or handle pipe without the correct thread protectors securely in place. 2. Ensure connections are clean and free of all debris and / or contaminants, cleaning methods employed should conform to the recommendations contained within the TenarisHydril Running Manual. 3. Visually inspect thread and seal areas prior to running, ensuring no damage is evident. 4. Verify all pipe and accessories have genuine TenarisHydril manufactured connections. 5. Verify the compatibility of the Wedge 623 connection with any accessories such as cement heads, safety valves, cross-overs, etc. 6. Check condition of both pin and box Dopeless coating ensuring no peel off or degradation has occurred. 7. Connection weight interchange compatibility is indicated in the TenarisHydril premium connections catalogue. 8. Verify material grade of all accessories ensuring compatibility with main string. 9. Check availability, compatibility and condition of handling plugs, minimum of 3 to ensure efficiency of process. 10. Ensure handling plugs are genuine TenarisHydril connections and are marked as Wedge 623. 2

IDM Code GDL00376/3 / March 2018 11. Wedge 523 handling plugs cannot be used. 12. Note part number and maximum load rating stamped on flange. 13. Never exceed maximum load rating. 14. Ensure handling plug OD / weight is compatible with the pipe connections, Wedge 623 has limited same OD / weight interchange capability. 15. Ensure the single joint elevators to be used with the handling plugs have adequate clearance to move over the expanded box connection and fit securely against the plug flange. 16. Refer to the TenarisHydril running manual for the care and use of handling / lift plugs. Inspection 1. Inspection criteria for all Wedge Series 600 connections is as outlined in the Field Service Operative Guideline FSOG 13-005. 2. Pay particular attention to seal areas. 3. Ensure the pin seal saver has no deformation or dents which cause material to protrude. 4. Ensure the cylindrical area between the last thread and the external seal of the pin has no tearing or raised areas which may contact the corresponding box external seal during make up. 5. Check box connections for mashes or ovality caused by transportation, handling or storage. RUNNING MANUAL TenarisHydril 3

TenarisHydril RUNNING MANUAL Wedge 623 Configuration Gap from Box Face to Run out area Seal Saver 4

TenarisHydril RUNNING MANUAL IDM Code GDL00376/3 / March 2018 External Seal Cylindrical Area internal Seal Seal Saver 5

TenarisHydril RUNNING MANUAL Wedge 623 Dopeless 1. Minor rust or discolouring of the pin connection can be removed with the use of a clean, dry rag ensuring the Dopeless coating remains intact. 2. Minor rust or discolouring of the box connection can be removed with the use of a non abrasive plastic scouring pad and a clean, dry rag ensuring the Dopeless coating remains intact. 3. Dopeless connections do not require the application of thread compound for assembly. 6

IDM Code GDL00376/3 / March 2018 Thread Compound Application Wedge 623 Dopeless If for whatever reason dope has to be applied to Wedge 623 Dopeless connections, whether both pin and box are Dopeless or when mixing a doped connection with a Dopeless one apply thread compound as indicated below. Non Dopeless pin into Dopeless box. Apply a thin coating of thread compound on all pin threads, seals and pin nose.. Ensure the area of the pin end from the last thread to the external seal area is completely and evenly covered with thread compound.. Apply a thin coat of thread compound to box internal and external seal area. Dopeless pin into standard box. Apply a very thin coating of thread compound on all pin threads only.. Do not dope pin seals or box connection. Dopeless pin into Dopeless box. Apply a very thin layer of thread compound on all pin threads only.. Do not dope pin seals or box connection. Non Dopeless Box Dopeless Box Dopeless Pin Dope Pin Threads Only Dope Pin Threads Only Non Dopeless Pin Dope Threads and Seals of Pin on Carbon. Dope threads and Seals of Pin and Box on Chrome. Dope Pin Threads & Seals. Dope Box Seals. RUNNING MANUAL TenarisHydril 7

TenarisHydril RUNNING MANUAL Thread Lock Application Non Dopeless Connections 1. Ideally when running a Dopeless string the connections to be thread locked should be non Dopeless with the connections cleaned of thread compound and completely dried, then thread lock and dope applied as below: Connections must be clean and dry when applying thread lock. 2. Thread lock should be applied to the threads furthest from the pin nose, approximately 50% of the threads should have thread lock applied. 3. Running compound should then be applied to the threads at the back of the box connection and internal seal. 4. Thread compound should also be applied to the pin external seal and area from last thread. 8

IDM Code GDL00376/3 / March 2018 Wedge 623 Dopeless Thread Lock 1. When thread locking Dopeless connections remove the Dopeless coating from the threads on the pin connection where the thread lock is to be applied prior to the application of thread lock. 2. Leave the Dopeless coating on the pin seals and threads where no thread lock is to be applied. 3. Dopeless boxes should be washed with hot water then dried prior to thread locking. 4. Thread lock should be applied to the threads furthest from the pin nose, approximately 50% of the threads should have thread lock applied as per diagram on page 8. 5. Do not apply thread lock to seal areas. 6. The application of thread compound is not required. Torque Application 1. Set tong dump valve at optimum torque then test on pipe body. 2. If dope is to be applied to Dopeless, double bump the first connection make up:. Apply Dopeless torques as per appropriate data sheet.. Once optimum torque has been attained relax the tong and re-apply optimum torque.. If movement over ½ is witnessed re-apply optimum torque +20%. RUNNING MANUAL TenarisHydril 9

TenarisHydril RUNNING MANUAL. Repeat process, checking to ensure no other factors are absorbing the applied torque.. Often the issue is caused by excessive application of thread compound.. Continue making up further joints applying higher torque if required.. For connections 10 ¾ double bump every make up when dope is applied.. Refer to the TenarisHydril Running Manual torque application section. 3. Do not apply the thread compound manufacturers friction correction factor. 4. Do not apply thread lock manufacturers friction factor, apply optimum torque + 20% then double bump the connection. 5. Computer make up equipment is not mandatory for Wedge 623 connections in carbon steel however it is recommended. 6. Computer make up equipment is highly recommended for Wedge 623 connections in chrome material. 7. Graph analysis for Wedge 623 is similar to that of Wedge 625 and Wedge Series 500, refer to the TenarisHydril Running Manual make up acceptance section for further explanation. 10

IDM Code GDL00376/3 / March 2018 8. If computer equipment is used to monitor connection make up, the graph profile should be similar to the ones below: TORQUE TORQUE 120 100 80 60 40 20 0 0 120 100 80 60 40 20 OPT 77,000 ft.lbs MAX. 112,000 ft.lbs MIN. 64,000 ft.lbs 2 4 6 8 10 TURNS OPT 77,000 ft.lbs MIN. 64,000 ft.lbs TenarisHydril RUNNING MANUAL -1 0.00 0.50 1.00 2.50 3.00 3.50 4.00 TURNS 9. Wedge 623 connection has limited same size / weight interchange capability, if mixing weight / grade ensure compatibility of design and apply the higher torque values of the two connections. 10. Wedge 623 is not compatible with Wedge 523. 11

TenarisHydril RUNNING MANUAL 12 Running 1. The use of a stabbing guide is strongly recommended. 2. The use of slip type elevators are recommended. 3. The use of a safety clamp is strongly recommended when running Wedge 623 connections. 4. The use of a weight compensator is strongly recommended for chrome, large OD and heavy weight pipe. 5. Prior to stabbing ensure the rubber anti corrosion protection rings have been removed with the protectors and are not on the connection. 6. To avoid cross threading stab pipe in a smooth controlled fashion ensuring the pipe is vertical when doing so, continue to support and stabilise the pipe throughout the stabbing and make up operation. 7. For chrome material pipe spin in by hand with the use of a strap wrench. 8. Upon commencement of initial rotation use low RPM (5 RPM or below) in order to ensure the pipe has not cross threaded during stabbing. If cross threading is evident, immediately reverse rotate the pipe slowly. 9. Apply power tong at low RPM (do not exceed 5 RPM) for final make up. 10. Do not exceed 15 RPM during spin in. 11. Ensure back up tong is located below the box expanded area to prevent distortion of the connection. 12. Upon attainment of optimum torque there should be a slight gap between the box face and the start of the machined run out area.

IDM Code GDL00376/3 / March 2018 Pulling 1. Automatic stabbing system or stabber is highly recommended to maintain the pipe in a vertical position. 2. The use of a stabbing guide is recommended to assist in centralising the pin to prevent hang up. 3. Apply the back up tong jaw well below the expanded area of the box. 4. Apply power tong in low RPM (3-5 RPM) to break out the connection, ensuring the pipe is stabilized during the break out process. 5. Once the connection is broken release back up jaws and spin out below 15 RPM. 6. For Chrome material pipe, once the connection is broken spin out by hand with the use of a strap wrench. 7. It is recommended the stabbing guide is used when lifting the pin from the box to prevent hang up of the threads. 8. Visual inspection is recommended to classify the thread condition. Any rejected connections should be clearly marked and segregated for further investigation. 9. Apply clean, dry thread protectors. 10. Ensure clean, dry, Dopeless protectors with seal rings correctly in place are installed. 11. For long term storage of Dopeless connections, refurbishment by qualified personnel is recommended. RUNNING MANUAL TenarisHydril 13