a. Turn the crankshaft pulley, and align its groove with the timing mark "0" of the timing chain cover.

Similar documents
VALVE CLEARANCE INSPECTION

VALVE CLEARANCE INSPECTION

VALVE CLEARANCE ADJUSTMENT EM 7

VALVE CLEARANCE ADJUSTMENT EM 8

ENGINE TUNE UP. (See steps 1 and 2 on page CO 5)

VALVE CLEARANCE (1NZ-FXE)

VALVE CLEARANCE (3ZZ FE/4ZZ FE)

VALVE CLEARANCE (1ZZ FE)

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE CYLINDER HEAD COVER SUB ASSY (a) Remove the 10 bolts, 2 nuts, cylinder head cover and gasket.

REPLACEMENT. 1. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 4 nuts and cylinder head cover No. 2.

Before performing any on-vehicle adjustments to fuel or ignition systems, ensure engine mechanical condition is okay.

VALVE CLEARANCE (3MZ-FE)

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

Page 1 of 25. Service and Repair REMOVAL SIZED FOR PRINT. Related Components

EM 6 VALVE CLEARANCE ENGINE MECHANICAL EM11I 01 ADJUSTMENT HINT:

ALLDATA Online Toyota Camry Wagon L4-2.0L (3S-FE) - Timing Belt Installat... Page 1 of 15. Timing Belt Installation. Timing Belt (3S-FE)

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

D - ADJUSTMENTS - 4-CYL

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

OVERHAUL. 1. REMOVE OIL FILLER CAP SUB ASSY (a) Remove the oil filler cap from the cylinder head cover.

Technical Service BULLETIN

2001 Toyota MR ENGINES' '1.8L 4-Cylinder

TUNE UP EG2 12 ENGINE MECHANICAL

VALVE CLEARANCE (K3-VE)

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE OIL FILLER CAP GASKET (a) Using a screwdriver, remove the gasket from the oil filter cap.

Toyota Camry CE Sedan L4-2.2L DOHC (5S-FE) MFI Timing Belt: Service and Repair

TIMING BELT COMPONENTS

EG-34 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION

TIMING BELT (3S FE) COMPONENTS

8/14/2016 8:12 PM. Bolt: Part No for Type B

1ZZ-FE ENGINE MECHANICAL ENGINE UNIT DISASSEMBLY. If you paid for the content in this manual you were screwed!

TIMING BELT (5S FE) COMPONENTS

TIMING CHAIN COMPONENTS

11. REMOVE OIL PAN SUB ASSY NO.2 (a) Remove the 18 bolts and 2 nuts.

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

CAMSHAFT INSTALLATION INSTRUCTIONS FOR NISSAN KA24DE ENGINES W/DOUBLE ROW CHAIN (SEE LAST PAGE FOR USING JWT CAMS IN KA24DE W/SINGLE ROW CHAIN)

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

TIMING BELT (4A FE) COMPONENTS

Classification: Reference: Date: VE30DE CAM TIMING

TIMING BELT COMPONENTS EM 15

EM 128 2UZ-FE ENGINE MECHANICAL ENGINE UNIT INSPECTION

Intake Manifold: Service and Repair Removal

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

Service and Repair CAMSHAFT

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

Timing Belt: Service and Repair Timing Belt Replace. Timing Belt Removal

2000 Lincoln LS Workshop Manual


2nd Timing Chain and Chain Tensioner Components S6RW0C

Toyota Truck Tacoma Extra Cab 2WD L4-2.4L (2RZ-FE) Timing Chain: Service and Repair

2.2L 4-CYL - VIN [S]

1.6L 4-CYL - VIN [E]

REPLACEMENT 1. REMOVE ENGINE UNDER COVER RH. 2. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 2 screw, 3 clips and engine under cover.

INSTALLATION. Check that the idler pulley moves smoothly.

2012 Kia Soul L4 2.0L

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

Timing Belt: Service and Repair. Toyota Truck Sienna LE V6-3.0L (1MZ-FE) 2002

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

INSTALLATION EM 21. Inward. Sensor. Plate Washer. 10 mm Hexagon Wrench SST. Fulcrum Length SST TIMING BELT ENGINE MECHANICAL 2002 AVALON (RM872U)

2005 Hyundai Tucson LX. On some models, engine is equipped with a timing belt and timing chain. Inspect timing chain when replacing timing belt.

Valves and Unit Injectors, Adjustment

2005 Saturn L ENGINE Engine Mechanical - 3.0L (L81) - L300

GENERAL SPECIFICATIONS

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

REMOVAL & INSTALLATION

Service Bulletin Trucks

REMOVAL. 1. REMOVE ENGINE UNDER COVER 2. DRAIN ENGINE COOLANT 3. REMOVE RADIATOR ASSEMBLY (See page CO 1 5) 4. REMOVE DRIVE BELT (See page 1) CH

Valve Clearance Adjustment

3/13/ :32 AM. NOTICE: Do not disconnect the hose.

IN-VEHICLE REPAIR. Timing Drive Components Camshaft Drive Cassette, LH. Special Tool(s) Holding Tool, Camshaft Sprocket (T97T-6256)

DISTRIBUTOR DISTRIBUTOR REMOVAL

2nd Timing Chain and Chain Tensioner Components S6RW0C

GM 6-Cylinder Cam Tool Set 3.0L and 3.2L Operating Instructions

CO/HC INSPECTION HINT:

CAMSHAFT ASSEMBLY. Preceding Work: Removal of cylinder head cover. Intake Camshaft and Exhaust Camshaft. Finger Follower and HLA. Camshaft Sprockets

INSTALLATION. 6. SET NO.1 CYLINDER TO TDC/COMPRESSION (a) Temporarily install the crankshaft pulley bolt to the crankshaft.

SECTION C Engine 5.4L (3V)

Timing Chain: Service and Repair With 2 Piece Tensioner (TSB A) Precaution. Removal This article has been updated with bulletin No A.

CRANKSHAFT & MAIN BEARINGS

2012 Kia Soul L4 2.0L

Valve Timing Inspection and Adjustment

Testing and Inspection. Diagnostic Procedure Step 1-2

CO/HC INSPECTION HINT:


CAMSHAFT (LH BANK) (2GR FE) ENGINE MECHANICAL 1424N 01 REPLACEMENT

6/6/2018 2ZR-FXE Engine Mechanical: Camshaft: Removal 2012 Toyota Prius V MotoLogic

BULLETIN TESTING. Article from Honda Service News. DTC P0341: CMP Sensor A and CKP Sensor Incorrect Phase Detected. Troubleshooting Flowchart

Fig. 6: Assembling Piston & Rod. NOTE: Notch must face forward Toyota Starlet CRANKSHAFT MAIN BEARINGS

INSPECTION. (b) Using a wire brush, remove all the carbon from the combustion NOTICE:

Toyota Truck Pickup 2WD L4-2.4L SOHC (22R) 1987

26/01/2017 3GR-FSE ENGINE MECHANICAL: ENGINE UNIT: DISASSEMBLY; 2006 MY GS300 [01/ ]

2001 Chevrolet Metro LSi ENGINES 1.3L 4-Cylinder - Metro & Firefly (Canadian) Fig. 3: Exploded View Of Timing Belt & Components (Typical)

ENGINE MECHANICAL EM SECTION CONTENTS

Camshaft Timing For Toyota 4e Fe Engine

Timing Drive Components

INSPECTION. (b) Clean the combustion chambers. Using a wire brush, remove all the carbon from the combustion NOTICE:

EM 27 2UZ-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

Transcription:

Adjustments ADJUSTMENT HINT: Inspect and adjust the valve clearance when the engine is cold. 1. REMOVE CYLINDER HEAD COVER 2. SET NO. 1 CYLINDER TO TDC/COMPRESSION a. Turn the crankshaft pulley, and align its groove with the timing mark "0" of the timing chain cover. b. Check that the point marks of the camshaft timing sprockets are in straight line on the timing chain cover surface as shown in the illustration. If not, turn the crankshaft 1 revolution (360 ) and align the marks as above. 3. INSPECT VALVE CLEARANCE

a. Check only the valves indicated. Using a feeler gauge, measure the clearance between the valve lifter and camshaft. Record the out-of-specification valve clearance measurements. They will be used later to determine the required replacement adjusting shim. Valve clearance (Cold): 1ZZ-FE: Intake: 0.15-0.25 mm (0.006-0.010 inch) Exhaust: 0.25-0.35 mm (0.010-0.014 inch) 2ZZ-GE: Intake: 0.15-0.25 mm (0.006-0.010 inch) Exhaust: 0.35-0.45 mm (0.014-0.018 inch)

b. Turn the crankshaft 1 revolution (360 ) and align the mark as above (See procedure in step 2). c. Check only the valves indicated as shown. Measure the valve clearance (See procedure in step (a)). 4. 1ZZ-FE: ADJUST VALVE CLEARANCE a. Set the No. 1 cylinder to the TDC/compression (See procedure in step 2). b. Place matchmarks on the timing chain and camshaft timing sprockets. c. Remove the 2 bolts and chain tensioner.

d. Remove the camshaft and timing sprocket assemblies. 1. 19 camshaft bearing cap bolts 2. 9 camshaft bearing caps (No. 1 & No. 3) 3. Exhaust camshaft and timing sprocket assembly 4. Intake camshaft and timing sprocket assembly HINT: When disconnect the timing chain from the camshaft timing sprocket, holding the timing chain. e. Tie the timing chain with a string as shown in the illustration. NOTICE: Be careful not to drop anything inside the timing chain cover. Do not allow the chain to come into contact with water or dust. f. Remove the valve lifters.

Valve Lifter Selection Chart (Intake) Valve Lifter Selection Chart (Exhaust) g. Determine the replacement valve lifter size according to these Formula or Charts:

Using a micrometer, measure the thickness of the removed lifter. Calculate the thickness of a new lifter so the valve clearance comes within the specified value. T: Thickness of used lifter A: Measured valve clearance N: Thickness of new lifter Intake:N = T + (A - 0.20 mm (0.008 inch) ) Exhaust:N = T + (A - 0.30 mm (0.012 inch) ) Select a new lifter with a thickness as close as possible to the calculated values. HINT: Lifter are available in 35 sizes in increments of 0.020 mm (0.0008 inch), from5.060 mm (0.1992 inch) to 5.740 mm (0.2260 inch). 5. 2ZZ-GE: ADJUST VALVE CLEARANCE a. Remove the adjusting shim. 1. Turn the crankshaft so that the cam lobe of camshaft on the adjusting valve points upward. 2. Using Special Service Tool (SST), press down the valve. 3. Using (SST), remove the adjusting shim.

Valve Lifter Selection Chart (Intake) Valve Lifter Selection Chart (Exhaust) 4. Determine the replacement shim size according to these Formula or Charts:

Using dial indicator, measure the thickness of the removed shim. Calculate the thickness of a new shim so the valve clearance comes within the specified value. T: Thickness of used shim A: Measured valve clearance N: Thickness of new shim Intake:N = T + (A - 0.20 mm (0.008 inch) ) Exhaust:N = T + (A - 0.40 mm (0.016 inch) ) Select a new shim with a thickness as close as possible to the calculated values. HINT: Shim are available in 41 size in increments of 0.020 mm (0.0008 inch), from 2.000 mm (0.0787 inch) to 2.800 mm (0.1102 inch). 6. 1ZZ-FE: REINSTALL CAMSHAFT a. Reinstall the valve lifters. b. Align the crankshaft pulley groove with the timing mark "0" of the timing chain cover. c. Hold the timing chain, and place the intake camshaft and timing sprocket assembly. d. Align the matchmarks on the timing chain and camshaft timing sprocket. e. Reinstall the camshaft and timing sprocket assemblies. f. Check that the point marks of the camshaft timing sprockets are in straight line on the timing chain cover surface as shown in the illustration. g. Check that the matchmarks on the timing chain and camshaft timing sprockets. h. Install the chain tensioner. i. Recheck the valve clearance. j. Check the valve timing. 7. REINSTALL CYLINDER HEAD COVER