Instructions for Miniature Ball Rail Systems

Similar documents
Mounting Instructions for Ball Rail Systems

Courtesy of CMA/Flodyne/Hydradyne Motion Control Hydraulic Pneumatic Electrical Mechanical (800)

Miniature Ball Rail Systems

Ball Screw Assemblies eline. The Drive & Control Company

Ball Screw Assemblies

The Easiest Way to Build a Custom Handling System

New Fixed Displacement Industrial Hydraulic Power Packs

Electromechanical Cylinder EMC

Miniature Linear Modules MKK/MKR The Drive & Control Company

Standard Power Packs Variable Displacement

R310EN 2211 ( ) The Drive & Control Company

DKR Intelligent Digital AC Vector Drives 35 to 330 hp (26 to 245 kw)

eline Ball Screw Assemblies

All From One Source Hydraulic Closed Loop Control Systems for Gas and Steam Turbines

Ball Rail Systems RE / The Drive & Control Company

The DPC Digital Clamp Controller

eline Profiled Rail Systems

Guides, Brakes and Valves

The DPQ Series 2X Digital Injection Process Controller

RE / STAR Tolerance Rings STAR Ball Knobs, Knob and Lever Type Handles

R310EN 2302 ( ) The Drive & Control Company

Compact Modules CKK/CKR 9-70

Instruction Manual for HSPA Take-Up Units

MINIRAIL Profiled miniature guideway

ENGINEERING DATA. Quick Reference Chart. Variable Volume Vane Pumps Models SV-20 & SV-25 Flange & Subplate Mounted. Industrial Hydraulics

Linear Bushings and Shafts

Hydraulic Drive Technology for Woodworking Machinery

ORIGA SYSTEM PLUS Guides, Brakes and Valves for Modular Linear Drive Systems OSP Appendix to the Operating Instructions

PowerMaster NFPA Pneumatic Cylinders Index

...components in motion. Miniature Linear Guideways

Precision in motion. Linear motion solutions from Bosch Rexroth.

Attention! Installation and Maintenance THK LM-guides Series GSR. Unpacking the LM-Guide

Precision Modules PSK

NEW Linear Motion GoTo Items

In area - A -, a proper seal must be made against the top of the window glass.

ECODRIVE Cs compact, dynamic and flexible. The Drive & Control Company

Profiled Rail Systems

Linear Bushings and Shafts. The Drive & Control Company

CERTAIN 2005 MODEL YEAR FIVE HUNDRED, MONTEGO AND CERTAIN 2005 AND 2006 MODEL YEAR FREESTYLE VEHICLES DOOR LATCH WATER PROTECTION

Ceram 4-way Pneumatic Directional Control Valve Tough enough to survive, no matter where in the world you send it.

Tooling Assistance Center

DB4604 GMR-SD and GMR40-SD Disc Brake Caliper - Spring Applied, Air Released

GMR-S and GMR40-S Disc Brake Caliper - Spring Applied, Air Released

Precision Modules PSK. The Drive & Control Company

Linear Bushings and Shafts

Precision Modules PSK

lifgo & lean SL Instructions for Installation, Commissioning & Maintenance LEANTECHNIK AG Version /

Vickers. Overhaul Manual. Vane Pumps. Small and Large Series Combination Pumps VC(K)(S)-**-(*)*D*-6(1) VC(K)(S)-**-(*)-*-*D*-5(1)

4/2 servo solenoid valves with positive overlap and position feedback (Lvdt AC/AC)

RexMover Series 277 & 297 Rodless Shuttle Cylinder

DISASSEMBLY We suggest the vehicle be allowed to cool for an hour or two before you begin since you will be working around the exhaust system.

Instruction Manual for the LM Guide

Servo solenoid valves with on-board electronics (OBE)

LINEAR RAIL BALL CHAIN TYPE

TECHNICAL SERVICE MANUAL

Linear Guideways HG Series

SAI GM Series Piston Hydraulic Motor Crankshaft Design Radial Piston Motors

Cross Roller Guide/Ball Guide General Catalog

KONEX Pneumatic Modular Gripping System KONEX Gripping force Torque Piston force (extended)

GoTo Products Focused Delivery Program

C 01_1 Headline_36pt/14.4mm

REMOVAL & INSTALLATION

Linear Guide System PS 4-15 Notes on Use and Installation

Operation and Maintenance Instructions

Boston Gear LOR Series

Pressure reducing valve, direct operated

Linear Guideways ov -linear -guidew ays-divider - U pdated

Service Manual for Hydraulic Cylinder

4/2 servo solenoid valves with on-board electronics (OBE), positive overlap and position feedback

Single-end Porting Head 1 ITEM A/R 2 A/R A/R A/R

Instruction Manual for PTI Split Block Bearing Units For SAF, SDAF, SN, SNG, SNHF, S3000K & SD Series Housings

MM Rear Coil-Over Kit - Bilstein Shocks (MMCO-3)

General Technical Data and Calculations

Servo solenoid valves with positive overlap and on-board electronics (OBE)

LOR Series Trig-O-Matic Lite Overload Release Clutch

Any reproduction, even partial, is allowed only by written permission by Rollco.

FUNCTION OF A BEARING

DESCRIPTION Acura TSX SUSPENSION Front - TSX. NOTE: For system description and component location, see Fig. 1.

SECTION SAFETY AFTERMARKET PRODUCT GUIDE SAFETY

RA / Internal Gear Pump Model GP3, Series 3X Fixed Displacement. Typical application:

Holley GM LS1/2/6, LS3, and LS7 Hi-Ram Modular Intake Manifold Kits

INSTALLATION GUIDE CRF150R Manual Revision:

Electric Mini Slides MSC-EL

2-1 HG Series - Heavy Load Ball Type Linear Guideway

...components in motion. Linear Guideways

Introduction. Pressed Shaft Flowmeter. Flowmeter Service Kits. Disassembly. Idler Shaft Removal

DODGE USAF 200/300 Direct Mount Pillow Block Bearings

Service Manual for Hydraulic Vane Pumps Flange Mounted

Linear Motion Technology Handbook. The Drive & Control Company

Hydraulic Hand Pallet Trucks

Profile rail guides LLT

Product overview. 10 Bosch Rexroth Corporation Compact Modules R310A 2602 ( ) Compact Modules CKK. Compact Modules with ball screw drive (CKK)

4/3 4/2 Directional valve elements with or without secondary relief valves, and with or without LS connections

Times-2 Speed Files INSTALLATION INSTRUCTIONS

RA / Internal Gear Pump Model GP2, Series 2X Fixed Displacement. Typical application:

INSTALLATION GUIDE. Kawasaki KLR Manual Revision:

Mounted Instrument Head

ACRO USER MANUAL BELT-DRIVEN S SERIES

Linear Bushings and Shafts Inch Series

2987 NH3 MAGNUM _REV_M 02/2017

Transcription:

Industrial Hydraulics Electric Drives and Controls Linear Motion and Assembly Technologies Pneumatics Service Automation Mobile Hydraulics Instructions for Miniature Ball Rail Systems The Drive and Control Company Mounting Start-up Maintenance

. Safety, Cross-References and Symbols. Safety notes and their symbols. Cross-referencing symbols. Symbols. Overview, Miniature Ball Rail Systems. Overview of components and accessories. How to order components, accessories, catalogs and instructions. Mounting the guide rails 4. Shipment 4. Preparing composite guide rails for mounting 5. Removing the rail seal 5.4 Mounting the guide rails 6.5 Parallelism of the mounted guide rails 7.6 Vertical offset 8.7 Mounting the rail seal 9 4. Mounting the runner blocks 0 4. Preparing for the mounting procedure 0 4. Sliding on the runner blocks 0 4. Fixing the runner blocks 4.4 Removing the runner blocks 5. Mounting the accessories 5. Mounting the N-seals for sizes 7, 9/M, 9/M, 5. Mounting the N-seals and longitudinal seals for sizes 5, 0, 9/M B, B, 5 B 6. Start-up 5 6. Lubricating equipment 5 6. Individual initial lubrication with grease 6 6. Individual initial lubrication with oil 7 7. Maintenance 7 7. Cleaning 7 7. In-service lubrication 7. Safety, Cross-References and Symbols. Safety notes and their symbols The following symbols are used to identify safety notes:. Cross-referencing symbols The symbols below are used to refer to repeat or follow-on work operations:!.5 See Section.5!.5. See Figure.5. (Figure in Section.5) Note, recommendation. Symbols WARNING! Risk of injury! Caution! Risk of damage to Miniature Ball Rail System or adjoining structure! Caution! Keep Miniature Ball Rail System clean! If necessary, protect with a cover! Screw

. Overview, Miniature Ball Rail Systems. Overview of components and accessories Miniature Ball Rail Systems can be assembled from the following components and accessories: Guide rails with mounted rail seals Guide rails Wide guide rails 4 Rail seals 5 Runner blocks 6 Wide runner blocks 7 N seals 8 N seals and longitudinal seals Each component and accessory can be individually ordered and stocked. See Miniature Ball Rail Systems catalog for exact data and dimensions. 5 4 These instructions will help appropriately trained experts to mount Miniature Ball Rail Systems. 6 7 8.. How to order components, accessories, catalogs and instructions For details of how to order components and accessories, see the Miniature Ball Rail Systems catalog. The catalog supplements these instructions and should therefore be kept handy for easy reference. Please order the latest publications from your local sales partner..

. Mounting the Guide Rails. Shipment One-piece guide rails: One-piece guide rails are shipped packed in a tubular polyethylene bag (). If a Rail Seal is also ordered, the guide rail will be shipped with the Rail Seal already clipped on..... Composite guide rails: Matching sections of a composite guide rail are identified by a label on the packaging. The guide rails () are shipped in their own packaging, irrespective of the Rail Seal also possibly ordered. The Rail Seal is supplied in one piece, matching the overall length, in its own packaging (). This packaging is marked with the same production job number as the guide rail labels. Q Unpacking Do not recycle packaging until mounting has been completed! The packaging can protect not yet mounted guide rails or Rail Seals while mounting work is in progress. Carefully remove guide rails from the packaging. Cut open the tubular polyethylene bag... 4

. Preparing composite guide rails for mounting The joints () are numbered consecutively (). STAR 00 00 Stamp shown on both sections STAR All sections of a guide rail comprising three or more sections have the same number (). Sort sections. for example STAR 96 96 96 STAR 00 00 00 00 96 STAR Stamp shown on both end sections.. Removing the Rail Seal Before the rails can be mounted on the base any pre-assembled Rail Seals have to be temporarily removed. A Rail Seal can be removed and remounted up to four times. Risk of injury! The Rail Seal has sharp edges. Wear gloves! Starting at one end, carefully ease up and remove the Rail Seal. Do not bend the Rail Seal!. 5

h.4. r Size (mm) h r max (mm) 7, -0, 0, 9/M,5-0, 0, 9/M,5-0, 0,,5-0,5 0, 5,8-0,5 0,5 0 6, -0,5 0,5 9/M B,8-0, 0, B,8-0,5 0,5 5 B,8-0,5 0,5.4 Mounting the Guide Rails Tap holes in the supporting structure to mount the guide rails. Thouroughly clean adjoining surfaces for the guide rails. Check corner radii r, heights of fittiedges h, and supporting and reference surfaces. For size 7, an undercut () can be machined instead of the corner radius r. Size O ISO 476 [DIN 9] 7 Mx5 9/M Mx6 9/M Mx8 Mx8 5 Mx0 0 M5x4 9/M B Mx8 B M4x0 5 B M4x The end faces of the guide rails must be chamfered and free from burrs () to slideonto the runner blocks. Check supporing and reference surfaces of the guide rails. Contamination, out-of-flatness (material displaced by damage to the surface) or burrs are not permitted. Select and line up screws ready to mount the guide rails..4. M A (Nm) Strength class A-70.9 M 0,5 0,50 M,, M4,0 4,6 M5,9 9,5 O Press guide rail against the fitting edge () and tighten screws lightly. Guide rails are to be aligned straight and parallel, preferably using a straight-edge. Tighten the screws to the appropriate tightening torque M A. For composite guide rails, ensure flush rail surfaces at joints..4. 6

.5 Parallelism of the mounted guide rails // P Check the parallelism of the mounted guide rails before installing the rail seals. The parallelism offset P causes a slight rise in the preload on one side. As long as the values specified in the table are met, the effect of this on the service life can generally be neglected..5. The part numbers on the runner blocks indicate whether the runner block has clearance or a ready-adjusted preload. Part numbers with a 9 in sixth place (e.g. 044-79-0 ) will have clearance. Part numbers with a in sixth place (e.g. 044-7-0 ) will have a preload. Part number.5. In Miniature Ball Rail Systems with preload, the preload is adjusted such that the clearance between the guide rail and the runner block is just no longer perceptible. Size Clearance // P (mm) Preload 7 0,004 0,00 9/M 0,005 0,00 9/M 0,005 0,00 0,008 0,004 5 0,07 0,008 0 0,05 0,06 9/M B 0,00 0,004 B 0,04 0,006 5 B 0,08 0,0.5. 7

a S.6 Vertical offset Check the actual vertical offsets S and S, before mounting the rail seals. Provided the vertical offset is kept within the permissible limits for S and S, its influence on the service life can generally be neglected..6. S = a Y Clearance* Preload* Y,0 0-4,5 0-4 *!.5 Permissible vertical offset in transverse direction S S = permissible vertical offset (mm) a = distance between the guide rails (mm) Y = calculation factor The permissible vertical offset S already takes account of the tolerance for dimension H as given in the Ball Rail Systems, Miniature Version catalog, Technical Data section. S Permissible vertical offset in longitudinal direction S S = permissible vertical offset (mm) b = distance between runner blocks (mm) S = b 7 0-5 b The permissible vertical offset S already takes account of the tolerance for max. difference in dimension H on the same rail as given in the Ball Rail Systems, Miniature Version catalog, Technical Data section..6. 8

.7 Mounting the Rail Seal Thoroughly clean the mounting base and the surrounding work area. Thoroughly clean the guide rails..7. If necessary, re-oil the rail surface to preserve it (). Risk of injury! The Rail Seal has sharp edges. Wear gloves! Do not bend the Rail Seal! Discard any bent rail seals. Carefully remove the Rail Seal from its packaging () and lay it down flat on a clean surface..7. When mounting the rail seal, start at the end of the rail where the runner block is to be slid on! Position the rail seal at the rounded rail end (). Clip on the first 0 to 50 mm (4). Check that the seal fits snugly. Smooth the Rail Seal down along the guide rail. Both edges must snap into the grooves on either side of the rail (5). 4 0 50 5 Check that the seal sits tight all along the rail!.7. 9

4. Mounting the Runner Blocks 4. Preparing for the mounting procedure Do not remove the mounting arbors from the runner blocks, otherwise balls may be lost! Tap holes in the guided load for runner block mounting. Thoroughly clean mating surfaces for the runner blocks. Check heights of fitting edges h, corner radii r, and supporting and reference surfaces. Select and line up screws ready for mounting the runner blocks onto the guided load. r h O 5 h r O 5 Size min. max. ISO 476 (mm) (mm) [DIN 9] 7, 0, Mx5 9/M,5 0, Mx6 9/M,5 0, Mx8,5 0,5 Mx8 5 4,5 0,5 Mx8 0 6,5 0,5 M4x 9/M B,5 0, Mx8 B,0 0,4 Mx8 5 B 4,5 0,5 M4x0 4. 4. Sliding-on the runner blocks Clean the guide rails. To slide on the runner blocks, the end faces of the guide rails must be chamfered and free from burrs (). Slide on runner blocks only over Rail Seal ends pre-fabricated () at the factory, not over ends which you have machined or cut to length yourself! At one end of the guide rail, the Rail Seal will be flush with the end face (). Slide the runner block on at this end! Position the runner block with the mounting arbor still inserted at the head of the guide rail. Carefully slide the runner block onto the guide rail (4). This will push the mounting arbor out of the runner block. Keep the mounting arbor for later use! Check parallelism.!.5 Check vertical offset.!.6 4 4. 0

5 4. Fixing the runner blocks Position and press fitting edge () of the guided load () against the fitting edges () of all the runner blocks on the one guide rail (4). Tighten screws (5) to tightening torque M A. Fix all the runner blocks (6) on the second guide rail (7), tightening screws to torque M A. 6 7 4 M A (Nm) Strength class A-70.9 M 0,5 0,50 M,, M4,0 4,6 4. 4.4 Removing the runner blocks Never remove a runner block from the guide rail without using its mounting arbor, otherwise balls may be lost! Position the mounting arbor at the head of the guide rail. Carefully slide the runner block off the rail and onto the mounting arbor. 4.4

5. Mounting the Accessories 5. Mounting the N-seals for sizes 7, 9/M, 9/M, Do not remove the runner block from its arbor (), but simply shift it slightly. Use a screwdriver to lever off the redbrown L-seals () at both ends. Recycle the seals. Lay the black N-seals () down flat. Position the runner block on the seal from above and press it down into place. 5.

5. Mounting the N-seals and longitudinal seals for sizes 5, 0, 9/M B, B, 5 B Do not remove the runner block from its arbor (), but simply shift it slightly. Use a screwdriver to lever off the redbrown L-seals () at both ends. Recycle the seals. 5.. 4 Align the longitudinal seals () with the runner block. The sealing lips (4) must point inward. 4 5.. Press the tab of the first side sealing strip against the runner block so that the hole (5) snaps into place around the stud (6). 5.. 5 6

Mounting the N-seals and longitudinal seals for sizes 5, 0, 9/M B, B, 5 B (cont d) Press down the tab at the other end of the side sealing strip () so that the hole snaps into place around the stud on the runner block. The longitudinal seal is not yet flush with the runner block. It has a slight bulge (). 5..4 Smooth the longitudinal seal down until you feel the studs on its underside engage with the runner block. Mount the second longitudinal seal. 5..5 Align the black N-seals with the runner block ends and press them into place. 5..6 4

6. Start-up If the Miniature Ball Rail Systems used are not factory pre-lubricated, each runner block has to be individually lubricated before use! Do not allow guide rails or runner blocks to come into contact with waterbased coolants! 6.. 6. Lubricating equipment A special grease-filled syringe is available on order: Part number 049-090-0. Sizes 7, 9/M, 9/M, 9/M B,, B Use the special syringe for the lube holes.! 6.. 6.. Sizes 5, 5 B, 0 Use a grease gun for the lube nipples at the end faces. Use the special syringe for the lube holes at the sides.! 6.. 6.. 5

6. Individual initial lubrication with grease We recommend a grease lubricant to DIN 585: Lithium soap grease, consistency class NLGI 00 to DIN 588 Follow the manufacturer s instructions. This grease can be ordered together with a special syringe (). Part number: 049-090-0 The lubricant can be applied either at the front () or back () end of the runner block. 6.. Runner blocks of sizes 5, 5 B and 0 can be greased as follows: I. Apply the quantity of grease specified in the table to one lube nipple (4). II. Slide the runner block in the direction of the lube nipple used to transport grease into the interior of the runner block. III. Check that a film of grease is visible on the guide rail. 6.. 4 Size Quantity of grease (cm ) 5 0,080 0 0,090 5 B 0,090 All runner blocks can be greased as follows: I. Apply a partial quantity of grease as specified in the table to a lube hole on one side (5). II. Slide the runner block in the direction of the lube hole used to transport grease into the interior of the runner block. III. Apply a partial quantity of grease as specified in the table to a lube hole on the other side (6). IV. Slide the runner block in the direction of the lube hole used to transport grease into the interior of the runner block. V. Check that a film of grease is visible on the guide rail. 5 5 6 6 Size Partial quantity (cm ) 7 0,05 9/M 0,00 9/M 0,00 0,075 5 0,040 0 0,045 9/M B 0,040 B 0,075 5 B 0,045 6.. 6

6. Individual initial lubrication with oil We recommend oils that satisfy the minimum requirements for CLP lubricant oils (DIN 557, Part ) or HLP hydraulic oils (Din 554, Part ). These oils must have a viscosity of 00 mm /s at 40 C. Follow the manufacturer s instructions. Always check that the oil will be able to reach all rolling elements in any installation position! Apply oil until excess emerges. Apply the entire quantity of oil to the runner block in one shot without any interruption! 6. d d d d 7. Maintenance 7. Cleaning Dirt can settle and encrust on the guide rails, especially when these are not enclosed. This dirt must be removed to protect the seals. Always run a cleaning cycle before shutting down the machine. 7. 7. In-service lubrication Initial lubrication (long-term lubrication) is sufficient for 5,000 km travel where F < 0. C V m = 0.65 m/s 90 mm stroke low-friction seals For in-service lubrication with grease or oil, follow instructions as for initial lubrication.! 6. The service conditions are unknown to the manufacturer. Users can only determine the in-service lubrication intervals with certainty by conducting in-house tests or by careful observation. The in-service lubrication intervals depend on ambient conditions, loading and type of load. Ambient conditions include: swarf, metallic and other abrasion, solvents and temperature. Types of load include: vibrations, impacts and tilting. 7. 7

Bosch Rexroth Corporation Linear Motion and Assembly Technologies 400 South Lakes Drive Charlotte, NC 87 Telephone (800) 48-598 Facsimile (704) 58-05 www.boschrexroth-us.com Bosch Rexroth Corporation Corporate Headquarters 550 Prairie Stone Parkway Hoffman Estates, IL 609-707 Telephone (847) 645-600 Facsimile (847) 645-60 Bosch Rexroth Corporation Industrial Hydraulics 5 City Line Road Bethlehem, PA 807- Telephone (60) 694-800 Facsimile (60) 694-8467 Bosch Rexroth Corporation Electric Drives and Controls 550 Prairie Stone Parkway Hoffman Estates, IL 609-707 Telephone (847) 645-600 Facsimile (847) 645-60 Bosch Rexroth Corporation Pneumatics 95 Mercer Road Lexington, KY 405-0 Telephone (859) 54-80 Facsimile (859) 8-49 Bosch Rexroth Corporation Mobile Hydraulics 700 Old Mansfield Road Wooster, OH 4469-094 Telephone (0) 6-00 Facsimile (0) 6- RE 8 7