C A B E. Part No Description Item

Similar documents
ASSEMBLY INSTRUCTION Colorado / Canyon 1950 QL GPA-HDA Tray

SUT-250-S (These instructions are used for SUT-250-SCLC also)

Introduction Date: October 2007 Pt No INSTRUCTION KIT JOINER RF 1 KIT COMPONENTS

H15P. Toyota Hilux A-DECK Dual Cab

C15C C15C. Page 1 of 20

Ref Qty Part Description Part Number -1- Kit ( ) Contents:

P/N Rev 01 04/14-1- NOTE: If you are ordering hinges for your rear doors, order and/or

FITTING KIT No s : BULL BAR WINCH ( P/No ) BULL BAR NON WINCH ( P/No )

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

Installation Guide. Stowe Cargo Management System. Table of Contents

Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

ELECTRIC START KIT KIT P/N

Z-Gate Universal Shifter

ARB TOYOTA 100 SERIES IFS REAR STEP TOW BAR

Q15P. Mitsubishi MQ Triton Dual Cab

IPSCO STS (Short Throw Shifter) Installation Instructions (GEN II) Dodge Viper WARNING

Stowe Cargo Management System

06-15 ECU, Battery and Washer Bottle Relocation

A B C D E F. Tools Required (supplied by others)

SUT-450-I ASSEMBLY REQUIREMENTS

Installation Instructions Z-Gate Shifter

2014+ FORD FIESTA ST DIRECT-FIT OIL COOLER KIT PARTS LIST AND INSTALLATION GUIDE CAUTION PARTS INCLUDED NOTE TOOLS NEEDED INSTALL PROCEDURE

Installation Instructions Supertop NX Twill

BLACKBIRD INSTALLATION SUPPLEMENT

ASSEMBLY INSTRUCTIONS FOR CHARGER AND THE BOSS QUICK ATTACH GRASS BAGGER

2005+ Roll Bar (Mm5RB-20.1 to -20.6) Recommended Center punch 1/8" pilot drill 1-3/4" Hole saw 2" Hole saw

WARNING TAKE NOTE OF THE FOLLOWING: THIS PRODUCT MUST BE INSTALLED EXACTLY AS PER THESE INSTRUCTIONS USING ONLY THE HARDWARE SUPPLIED.

Installation Instructions Vanishing Lid Bracket

M-9603-FST FOCUS ST COLD AIR INTAKE KIT INSTALLATION INSTRUCTIONS

Mahindra Pikup (2009 Production Onwards)

COMBAR G/BAR CHEROKEE KJ SRS NFO

Times-2 Speed Files INSTALLATION INSTRUCTIONS

WARNING. When installed in accordance with these instructions, the front protection bar does not affect operation of the SRS airbag.

Installation Instructions

EVO-1162 EVO Tailgate Tire Carrier

INFINITY MULTA SERIES

D40C HINGE # x Support Plate x M8 Bolt 8 x M8 Washer 6 x M6 20mm Bolts 6 x M6 Washers 19 x Screws

FORD TERRITORY TOWBAR FITTING INSTRUCTION Part # VEHICLE YEARS OF MANUFACTURE - From May

Assembly Manual. Assembly Instructions Read Carefully 2.1. Parts included: Tools suggested: Electric Drill

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

L/6.7L DODGE CUMMINS

INSTALLATION INSTRUCTIONS FORD F-150 2WD & 4WD RETAINS FACTORY TOW HOOKS PART #P3063

Tonneau Cover Fitting Instructions Ford PX Ranger XL Dual Cab With HeadBoard June Current

Installation Instructions I - Sheet Number I-TVR-01 Rev. A

BBK LONG TUBE HEADERS (99-04 GT, Mach 1, Bullitt)

Product Deluxe Combination Winch and Non Winch Bull Bar, Flare and Non Flare Description: Suited to Nissan D40T Navara XC DC SC 2008 ON WARNING

Marlon Xplore II / Xplore Pro II Deck Installation & Assembly Instructions

Ground Effects, P/N: (V6), (V8)

PLEASE READ THIS INSTRUCTIONS CAREFULLY, BEFORE YOU START INSTALLATION

Assembly & Installation Instructions

MODEL 2604 WARNING <THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> Custom 5th Wheel Hitch Mounting Rail Installation Instructions

LANCER EVOLUTION (2008 ) MUD FLAP MZ531356EX (Black with aluminum plate) MZ531357EX (Black standard) INSTALLATION AND HANDLING INSTRUCTIONS

Air Conditioner for M915 A0/A1 Truck

L DODGE CUMMINS BD FLOWMAX LIFT PUMP KIT

LAND ROVER DISCOVERY 3 ARB BULL BAR AND WINCH BAR WARNING

INSTALLATION INSTRUCTIONS FORD F-150 2WD & 4WD RETAINS FACTORY TOW HOOKS PART #P3063

Easy Cover. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

HAYMAN REESE PART No: 03099RW BMW X4 F26 Series May 2014 Onwards INSTALLATION INSTRUCTIONS

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

Assembly Instructions

COMBAR G/BAR CHEROKEE KJ SRS 8/9 NFO

Type 2 Push-Through 37 Ton Log Splitter. Assembly Manual

NIS NAV AM (MY15 >) - Aluminium Tonneau Cover ATC0051 (silver) ATC0052 (Black) Installation Time: Approx. 60 Minutes WARNING!

Factory Five Racing, Inc. 818 Kit Assembly manual revision 1J update

Jeep JK Wrangler XHD Rear Tire Carrier

AutoDeploy with Radar. Installation Manual

WESTWOOD GARDEN TRACTORS PARTS CATALOGUE CONTENTS

MAZDA BT-50 (October 2011 Production Onwards) 1 & 3 PIECE HARD TONNEAU REMOTE LOCKING KIT INSTALLATION INSTRUCTIONS

MOUNT BRACKET PARTS and HARDWARE: Installation parts with * come loose in hardware kit bag. Other parts are preassembled

XRT300 AND XRT350 BA XR6 TURBO UPGRADE KIT FITTING INSTRUCTIONS

Factory Five Racing, Inc. Roadster Complete Kit Assembly manual revision 3p update

TRAYS FOR THE ULTIMATE IN PRACTICALITY.

CARGO DIGGER PLANT TOUGH AND DURABLE INTELLIGENT AND USEFUL

Contact Us Best Bars Limited Phone: Fax: Web: ALUMINIUM UTE TRAYS

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

Automatic Roof Hatch Opener

Hayes TrailTrac Kit Installation Guidelines Polaris Rush / Pro-R / Indy

TABLE OF CONTENTS. Ram Assembly

Parts Manual Rev. A

Technical Support (707)

INSTALLATION & OWNER S MANUAL

Thompson Automotive Products

ITEM PART NO. DESCRIPTION QTY BODY - SNORKEL (SS1410HP) " AIR RAM ASSEMBLY BRACKET - UPPER MOUNTING 1

HYUNDAI IX35 / TUCSON. (2010 Production Onwards) INTEGRATED SIDE STEP INSTALLATION INSTRUCTION. 60 Minutes

CARGO ALL PLANT TILTBED A SPECIALIST WITH A LOW APPROACH

Do not have any open flame or heat sources close to the installation

KUBOTA BX-1500/1800/2200 HARD SIDED CAB (p/n 1KBXAS) SOFT SIDED CAB (p/n 1KBXSS)

VOLKSWAGEN AMAROK 1 & 3 PIECE HARD TONNEAU REMOTE LOCKING KIT INSTALLATION INSTRUCTIONS

Super Duty Front Air Bag Installation Instructions

For Kioti Mechron Caution: Before using this product, read this manual and follow all safety instruction. Defender Cab Owner s Manual.

Additional Instructions for 6" Drop

INSTALLATION & OWNER S MANUAL

WARNING. When installed in accordance with these instructions, the front protection bar does not affect operation of the SRS airbag.

RSA FJ CRUISER LONG RANGE TANK GET ORGANIZED. INSTALL TIME: 1.5 hours

K9-F17 INSTALLATION INSTRUCTIONS K9 Kit for FORD INTERCEPTOR SEDAN

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

Marlon Xplore / Xplore Pro Deck Installation & Assembly Instructions

Installation instructions, accessories - Rear Seat Entertainment

INSTALLATION INSTRUCTIONS

2005+ Drag Race Roll Bar (Mm5RB-20)

Transcription:

Installation Time: 1hr 30 mins (approx) Important: Unpack each of the 4 kits to ensure all components are available. Read instructions carefully and fully before fitting. Check that all tail lights are working before commencing work. C A B E D F Part No Description Item 9PATZ. Tray Body A 9PAH. Headboard B 9PAD. Dropside set C 9PBKH30 Body Kit D 9PMKH30 Mount Kit E 9PRRK01 Rope Rail Kit F 9PMF Mudflaps Please open all packs before commencing work and check off components against the bills list attached to the packaging material. Please advise if any shortages by calling 1800 773 030. You require all packages as listed to complete the tray installation. After checking dispose of packaging material 1 2 E clip 3 Latch Hinge pin 6 Mudguard Washer 7 Saddle Clamp 5 9 Fuel Filler Bracket 4 Mudguard Mudguard Brackets Tools Required Electric drill with 6mm bit Air or electric impact wrench with impact sockets 10, 12, 13, 14, 15, 19mm Spanners: 10mm to 19mm Screwdrivers: 8mm blade and No 2 Phillips Hammer, side cutters / pliers, clamp / vice grips and builders square. Issue Version 1: 1.0 1/11/2001 17/02/2003 Rodeo SC Al Page 1 of 5

Main Bearer Connecting Panel Front Floor Plank Diagram (1): Headboard Assembly and Connecting panel (side view) 2nd Rear mount 2nd Front mount Square Washer Spacer Washer Diagram 2a. Mount washer position for middle mounts Diagram 2b. 105/130 int with RH mains brace with mount rail fitted 1 Fitting Headboard 1.1 Remove connecting panel (taped to headboard) 1.2 Place the connecting panel into the track on the first floor plank of tray as shown in diagram 1. 1.3 Place headboard into position by tilting top of headboard to rear of tray permitting interlock with connecting panel, then return to the upright position. 1.4 Place washers on M10 bolts and secure headboard. Important: Ensure Headboard is square before tightening. 2 Preparing Vehicle (If removing styleside refer Supplement A section S1) 2.1 Remove Tail Light assemblies from the chassis. Wrap in a clean cloth and put aside 2.2 Remove The Number Plate lights from the assembly on the rear of the chassis. 2.3 Remove light bracket assembly and discard. 2.4 Remove Fuel Filler Neck Support Bracket and discard. 3 Assembling Mounts 3.1 Assemble the second mount using the longer (1218) mount rail and two 105/130 ext mount bases as shown in diagram 2a. Secure using two M12 x 25 bolts and nyloc nuts. 3.2 Assemble the second last mount using the shorter mount rail, 105/130 int mount bases as shown in diagram 2a. Secure using two M12 x 25 bolts and nyloc nuts. 3.3 Assemble the rear mount using the shorter mount rail, 105/130 int mount bases and two mains braces as per diagram 2b. 3.4 Loosely secure with two M12 x 40 bolts and nyloc nuts with a square washer between the nut and the mains braces. Refer diagram 2b for correct assembly. 4 Fitting Mounts and Body 4.1 See diagram 2a to see the difference between spacers and washers. 4.2 Secure mounts to chassis using M12 x 40 bolts with square washers under bolt head and square washers under the nyloc nut. 4.3 Hammer mount washers into the upper slot on the two rear mounts and the lower slot on the two forward mounts as seen in diagram 3a. Diagram (3a): Mount Assembly and mount washer position Version 1.0 17/02/2003 Rodeo SC Al Page 2 of 5

Diagram (3b): Mount Layout 5 Mounting Tray 5.1 Place tray body on the transverse mounts so main bearers are sitting on the lugs of the mount washers. Leave a 40mm gap between headboard uprights and cabin at closest point. 5.2 Place front leg mounts onto chassis mount pads using three 3mm packers under each mount as seen in diagram 3b. 5.3 Important: Ensure leg mounts are sitting flush against the main bearer. 5.4 Secure leg mounts to chassis using M12 x 50 bolts with square washers under bolt head and nyloc nut. 5.5 Secure mounts to main bearers. Place M12 x 40 bolts through the mount washers and fit a square washer and M12 nyloc nut on the inside of the main bearer. The mount washers can move side to side to align with the pre-punched holes in the main bearers. 5.6 Secure the two main braces top and bottom as seen in diagram 3a and 3b using M12 x 40 bolts and nyloc nuts with square washers under bolt heads and nyloc nuts. Hinge pin Rope rail 6 Fitting Hinge Pins and Rope Rails 6.1 Attach hinge pins to the side coamings using M6 x 20 bolts and nyloc nuts. 6.2 Attach hinge pins to the rear starter panel using M6 x 25 bolts and nyloc nuts. Important: The dropside and tailgate can be used as a guide for hinge pin positioning. The short roperail is to be fitted at the right hand side front of the tray for fuel filler access. Diagram (4): Hinge Pin and Rope Rail 6.3 Place rope rails up under the side of the tray so that the tongue locks into the channel in the extrusion. 6.4 Secure using M6 x 20 bolts and nyloc nuts. Guard Rails Guard Bracket 7 Fitting Mudflaps 7.1 Place mudflap on the inside of the 2 pre-punched mudguards as seen in diagram 5. 7.2 Secure using M6 x 20 bolts from the outside of mudguard through guard and mudflap. 7.3 Important: Ensure the mudguard washers are positioned between the mudflap and nut before tightening. Diagram (5): Mudflap and Mudguard Assembly. Important: Note left and right guard brackets as shown in diagram 5 Version 1.0 17/02/2003 Rodeo SC Al Page 3 of 5

Roperail 30mm Deck Guard rail Guard bracket Main bearer 8 Assembling Mudguards 8.1 Attach the guard bracket to the guards using M6 x 20 bolts and nyloc nuts as seen in diagram 5. 8.2 Attach guard rails to body so the 1st rail hole is positioned on the 6th floor plank as seen in diagram 6b. Note direction of guard rails in diagram 6a. Secure using M6 x 20 bolts and nyloc nuts. Guard Diagram (6a): Mudguard Assembly from front of tray Important: Bolt must be inserted up through the Add text further explaining rail and floor to allow clearance for the guard installation method brackets. 8.3 Fix front guard assembly between the guard rails under tray using M6 x 20 bolts and nyloc nuts. Position front guard bracket approximately 90 to 130 mm from tyre. 8.4 Fix rear guard bracket between the guard rails under tray using M6 x 20 bolts and nyloc nuts. Position rear guard bracket approximately 90 to 130 mm from tyre. Warning: Mudguards must not touch the chassis or the exhaust pipe and should be approximately 90-130mm away from the tyre. Diagram (6b): Guard and Rail Positioning 9 Fuel Filler 9.1 Using a 6mm drill bit drill out the top hole in the fuel filler neck flange. 9.2 Secure the bracket to the underside of the tray using a M6 x 20 bolt and nyloc nut. 9.3 Secure fuel filler to the bracket using M6 x 20 bolt and nyloc nut. Warning: Ensure fuel filler pipe is not kinked. Diagram (7): Fuel Filler Assembly 10 Fitting Number Plate Light (If vehicle was fitted with styleside body refer Supplement A section S2) 10.1 Fit number plate lights to bracket supplied using original screws. 10.2 Secure number plate light assembly using prepunched holes in the underside of the rear extrusion with M6 x 20 bolts and nyloc nuts. Refer diagram 8. Diagram (8): Numberplate light assembly Version 1.0 17/02/2003 Rodeo SC Al Page 4 of 5

11 Fitting Tail Lights 11.1 Fit tail lights to new galvanised brackets as seen in diagram 9. Important: Drain holes to be at the bottom of the light assembly when fitted. Diagram (9): Right Hand side Tail Light and Numberplate light positioning (rear view) 11.3 Attach assembly to rear extrusion using M6 x 20 bolts and nyloc nuts as seen in diagram 9. 11.4 The harness from the tail lights is to be secured to the underside of the main bearers of the tray. Warning: Ensure that the harness cannot chafe through on any sharp edges. There must be a small amount of slack in the harness between all light assemblies and their first retainer. All other places should be free of slack. 12 Front Latches 12.1 Insert front latches into headboard corner T s. See diagram 11 12.2 Assemble using two 3/8 flat washers, one 3/8 spring washer and one 3/8 conelock nut to secure. 13 Dropsides and Tailgate 13.1 Attach hinge straps to dropsides using M6 x 20 bolts and nyloc nuts. (refer to tailgate for correct assembly). Important: Observe assembly of rear latches in dropsides for guide to correct assembly Diagram (11): Fitting front latches into headboard T 13.2 Slide dropsides and tailgate onto hinge pins and close latches. 13.3 Adjust the 3/8 conelock nuts on the handles to ensure catches do not rattle. The spring washer only needs to be compressed by 1-2mm. 13.4 Place E clips on the hinge pins, one on each dropside and two on the tailgate. BUSH PLAIN WASHERS NUT SPRING WASHER HEADBOARD NYLON WASHER LATCH 14 Completion Important: Do not over tighten latches. Hinges may need adjusting backward or forward slightly to make dropsides close. 14.1 Check that all nuts and bolts are secure, that all components are fitted correctly and that all lights work. 14.2 Clean tray and work area. Diagram (12): Drivers side dropside latch assembly looking through headboard infill. Version 1.0 17/02/2003 Rodeo SC Al Page 5 of 5