Centerwide System Level Procedure

Similar documents
City of Palo Alto (ID # 6416) City Council Staff Report

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

APPROVE ESE OFFICE WORK INSTRUCTIONS

INCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Certification Memorandum. Approved Model List Changes

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018

Microgeneration Installation Standard: MCS

Notification of a Proposal to issue a Certification Memorandum. Approved Model List Changes

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Equipment Strategy for Stand By Diesel Generators Strategy

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Consumer Guidelines for Electric Power Generator Installation and Interconnection

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Terms of Reference (ToR) Trade & Traceability Standing Committee (T&T SC)

ABB life cycle services Uninterruptible power supplies

Certification Memorandum. Additive Manufacturing

Economic and Social Council

Certification Memorandum

Suggested Administrative Procedure to Deliver Supported Program Feature. Community- driven Program

PUD ELECTRIC SYSTEM INTERCONNECTION

Unit level 4 Credit value 15. Introduction. Learning Outcomes

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

NORTH AMERICAN STANDARDS FOR LOW-VOLTAGE FUSES

PRINTING OF BMI WHEELS

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

Request for Proposals. Verifiable Carbon Offsets Generated in North Carolina, South Carolina or Virginia

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

Manufacturing Implications within. new DODI (Dec 8, 2008) Summary for Industry. National Center For Advanced Technologies.

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard

Measurement made easy. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Audit Follow-up. Fleet Fuel Operations (Report #0801, Issued October 18, 2007) As of March 31, Summary. Report #0811 June 20, 2008

Commercial Driver s License Drug and Alcohol Clearinghouse Frequently Asked Questions

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

QUESTION / CLARIFICATION

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Rider 11 Partial Requirements Service (PRS)

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session

PRE-RELEASE VERSION (FDIS)

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

CITY OF MINNEAPOLIS GREEN FLEET POLICY

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Publishable Executive Summary (M1-M48)

THE MINISTER OF INDUSTRY AND TRADE, b. that for this purpose, it is necessary to issue a decree of the Minister of Industry and Trade.

QQ-A-250/11F August SUPERSEDING QQ-A-250/GEN. August 27, 1971 FEDERAL SPECIFICATION SHEET ALUMINUM ALLOY 6061, PLATE AND SHEET

Installation of parts and appliances without an EASA Form 1 in European Light Aircraft

June Safety Measurement System Changes

VERIFICATION REGULATIONS. CAS_Doc_31_4C Verification Regulations_v2.2

Renewable Fuels Regulations. Performance Report: December December 2012

Hydro Plant Risk Assessment Guide

Economic and Social Council

Contextual note SESAR Solution description form for deployment planning

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability

Fleet Safety Initiative Status Summary

QUALITY REQUIREMENTS FOR JUST IN TIME SERVICE PROVIDER (JIT S.P.) PROGRAM: ALL

POSITION PAPER Version 3.0

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

VOLUNTARY CODE OF PRACTICE FOR ELECTROMAGNETIC COMPATIBILITY (EMC) OF MOTOR VEHICLES (13 October 2014)

ANNEX 7. RESOLUTION MEPC.182(59) Adopted on 17 July 2009

Lloyd s Register Type Approval System Test Specification Number GT04

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING, URBAN DEVELOPMENT AND PUBLIC WORKS

Notification of a Proposal to issue a Certification Memorandum. Rotor Drive System Gearbox TBO Development

2. General Information on Recharge Centers

FEDERAL SPECIFICATION METHANOL (METHYL ALCOHOL) 1.1 Scope. This specification covers three grades and four unit quantities of methanol.

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

CMMI Opens the Gate: The Practical Relationship between CMMI and Stage- Gate Decision Models

Internal Audit Report. Fuel Consumption Oversight and Coordination TxDOT Internal Audit Division

Peninsula Corridor Electrification Project (PCEP)

Interconnection System Impact Study Report Request # GI

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015

ANNEX 7 RESOLUTION MEPC.199(62) Adopted on 15 July GUIDELINES FOR RECEPTION FACILITIES UNDER MARPOL ANNEX VI

RSPO Standard for Group Certification. Final approved July 2010

Seventh Framework Programme THEME: AAT Breakthrough and emerging technologies Call: FP7-AAT-2012-RTD-L0 AGEN

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

MMP Investigation of Arthur Kill 2 and 3

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

FEDERAL SPECIFICATION ETHER, PETROLEUM; TECHNICAL GRADE. 1.1 Scope. This specification covers technical grade petroleum ether to be used as a solvent.

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PATH Integrated Railcar and Signal System Replacement Program

Independence- Freedom- Happiness No.: 96/2012/TT-BTC

Methodology Validation Report for United Technologies Corporation

Safety Assessment & Approval System of Shanghai Maglev Demonstration Line and its Practice

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

Senior Substation Project Lead Engineer

RSPO PalmTrace - Book and Claim Terms and Conditions

Introduction to General Requirements for CORSIA. Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat

Enhancing T&E and SE Alignment Using Database Driven Documentation

Transcription:

5.ARC.0004.2 1 of 10 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release J. Hanratty 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-029). Major rewrite. 2 Clarifications based on 11/98 DNV Audit (DCR 98-058) M. Hines 9/25/98 R. Serrano 12/18/98 Revised referenced AHB document (DCR 99-047) M. Hines 10/7/99 Document Number AHB 500.1 REFERENCE DOCUMENTS Document Title System Safety, Reliability and Quality Assurance Manual 5.ARC.0000 Ames Research Center Quality Manual, Section 4.4 5.ARC.000 5.ARC.0004.1 5.ARC.0004. 5.ARC.0006 5.ARC.0007 5.ARC.0009.2 5.ARC.0009.4 5.ARC.0010 5.ARC.0011 5.ARC.0012 5.ARC.001 5.ARC.0014 5.ARC.0016 5.ARC.0019 Acceptance and Amendment of Customer Agreements Project Management for the Design, Development, and Maintenance of Software Configuration Management Purchasing Management of Customer-Supplied Material and Supplies Management and Performance of Research Program and Project Management Inspection and Testing Control of Inspection, Measuring, and Test Equipment Inspection and Test Status Control of Nonconforming Product Corrective and Preventive Action Quality Records Servicing

5.ARC.0004.2 2 of 10 Documents referenced in this procedure are applicable to the extent specified herein. 1. Purpose This procedure establishes the process for the design and development of systems and hardware that are delivered to Ames Research Center (ARC) customers in accordance with the ARC Quality Manual. 2. Scope This procedure applies to organizations that design or develop and/or deliver systems and hardware for ARC customers. The requirements of this procedure may be tailored as appropriate based upon the size and complexity of a particular design/development effort. Any modifications of the process steps must be documented in the systems/hardware project plan. Approved systems/hardware project plans become the baseline requirements for the systems/hardware project. Systems and hardware produced in support of research, or as part of the research, but not in and of itself a unique deliverable to the customer does not have to be designed and developed in accordance with this procedure. See 5.ARC.0009.2 for requirements governing research systems and hardware.. Definitions and Acronyms.1 Baseline Design Design of such detail as to be able to develop the initial cost estimate and schedule, identify areas of risk, and provide a basis for the systems/hardware project plan.2 Concept Design Design that is of such detail as to be able to determine the feasibility of the design/development effort and that is consistent with the systems/hardware program/project/product requirements. Customer Any organization or individual that enters into a formal agreement with ARC for delivery of ARC products or services.4 Design and Development or Design/Development Process of translating user or customer requirements into a final product

5.ARC.0004.2 of 10.5 Design Verification Activity performed at appropriate stages of the design to ensure that design-stage output meets the design-stage requirements. Verification may consist of design review, calculations, analysis, simulation, inspection, and/or testing..6 Elements These include, but are not limited to, components, sub-assemblies, and/or software that will be integrated into the final deliverable.7 Firmware Hardware that contains a computer program and data that can not be changed in its user environment. The computer program and data contained in the firmware are classified as software. The circuitry containing the computer program and data is classified as hardware..8 Hardware Electronic, optical, electromechanical, structural, and mechanical devices and systems, including any embedded software.9 Integrate (Integration) Process of combining software elements, hardware elements, networks, personnel, and/or procedures into an overall system.10 Life Cycle Cost (LCC) The total of the direct, indirect, nonrecurring, and other related expenses incurred, or estimated to be incurred, in the design, development, verification, production, operation, maintenance, support, and retirement of a system over its planned life span.11 Requirements Document Document that clearly defines the technical requirements, including performance requirements, safety requirements, constraints, acceptance criteria, and quantities.12 Responsible Manager Person having the responsibility and authority to accomplish/implement a specific activity or process (includes organizational line managers, project managers, etc.).1 Software Intellectual creation comprising the programs, procedures, rules, and any associated documentation pertaining to the operation of a computer system. Software exists independent of any medium on which it may reside.

5.ARC.0004.2 4 of 10.14 System Combination of elements that function together to produce the capability required to meet a need. The elements may include hardware, software, equipment, personnel, and the processes and procedures needed for this purpose..15 Systems/Hardware Project Manager Individual responsible for the administration and technical direction of a systems/hardware project. Responsibilities typically include planning, organizing, directing, controlling, and managing the systems/hardware project..16 Validate (Validation) Activity normally performed on the actual hardware at the system or integrated systems level but may also be conducted at earlier stages prior to product completion. Validation may consist of examination and/or testing to produce objective evidence that the end product will accomplish its purpose. 4. Flowchart There is no flowchart required for this document. 5. Responsibilities 5.1 Responsible Manager shall:? review and approve customer requirements and the systems/hardware project plan, and? select the systems/hardware project manager. 5.2 Systems/Hardware Project Manager shall: 6. Procedure? develop, implement, approve, and update the systems/hardware project plan,? plan, design, implement, and manage the systems/hardware project,? conduct design reviews,? track systems/hardware project metrics,? inform customer of systems/hardware project progress, and? maintain systems/hardware project records and control the changes to those records and plans, including obtaining appropriate approvals when changes affect the overall cost, schedule, or performance of the systems/hardware project. 6.1 The systems and hardware design and development process is divided into five phases:

5.ARC.0004.2? Planning and System Analysis? Design? Procurement? Manufacturing, Fabrication, and Integration? Test, Certification, and Activation 5 of 10 6.2 All systems/hardware project elements of design/development do not have to proceed in parallel through the process flow. The systems/hardware project may be divided into elements or work packages, each of which can proceed through the process flow described in the systems/hardware project plan. 6. Planning and System Analysis Phase The systems/hardware planning process commences when a customer makes an inquiry or an invitation to bid for work which includes the design and development of systems or hardware by ARC. When systems/hardware are identified as being an element of the project development, section 6. of this procedure is used to supplement 5.ARC.0009.4 and will be followed to create a systems or hardware project plan. 6..1 This phase s activities will include: 6..1.1 Review systems/hardware project and product requirements for clarity, completeness, accuracy, and consistency. 6..1.2 Perform trade studies among candidate systems/hardware project concepts that consider affordability, technology, content, risk, and potential acquisition strategies. 6..1. Develop technical performance requirements and identify performance values, physical requirements, operational requirements, and resource constraints. 6..1.4 Identify appropriate design reviews and associated Quality Records. These Quality Records shall be documented and controlled in accordance with 5.ARC.0016. 6..1.5 Identify other requirements, such as safety (per AHB 500.1), environmental, regulatory, export control, etc. 6..1.6 Develop a preliminary assessment of risks and risk-mitigation actions. 6..1.7 Develop the Life Cycle Cost estimate of the product. 6..1.8 The Responsible Manager or the Program/Project Manager shall perform a review of the customer agreement (in accordance with 5.ARC.000) to ensure that:? Systems/hardware project and product requirements are

5.ARC.0004.2 6 of 10 identified,? ARC responsibility for subcontracted work is defined,? ARC has the capability to meet the customer requirements,? Intellectual property rights are protected,? A problem resolution mechanism is specified, and? The terminology and acceptance criteria used are understood by both parties. 6..1.9 The systems/hardware project manager shall define how the requirements for quality will be met. This quality planning shall be consistent with all systems/hardware project constraints. The results of this planning effort shall be documented in the systems/hardware project plan. 6..1.10 The systems/hardware project manager shall identify and plan manufacturing, fabrication, integration, and servicing (in accordance with customer agreement requirements) processes that directly affect quality. 6..1.11 The systems/hardware project manager shall use ARC Quality System processes (e.g., procedures and work instructions) in the design, development, manufacture, and delivery of systems and/or hardware. 6..2 Requirements Review This review shall be conducted to determine if the documented technical requirements/specifications meet all needs and requirements of the customer and are consistent with all design constraints, including budget and schedule. 6.. Requirements Approval As appropriate, the customer, the Responsible Manager, and the systems/hardware project manager shall approve and sign the requirements document, schedule, and budget. This process may be a part of or subsequent to the requirements review or a Concept Design Review. 6..4 Systems/hardware project planning activities are as follows: 6..4.1 Develop a baseline design (or designs) in accordance with the requirements/specifications of the systems/hardware project to provide a basis for the systems/hardware project plan. 6..4.2 The systems/hardware project plan shall document the technical and managerial approach for the systems/hardware project in accordance with the requirements of this procedure. Design

5.ARC.0004.2 7 of 10 and development of software and firmware shall be performed in accordance with 5.ARC.0004.1. 6..4. The systems/hardware project plan shall document the organizational and technical interfaces between different organizations/groups that provide input into the design process. It shall also describe how this information is documented, transmitted, and regularly reviewed. 6..4.4 The systems/hardware project plan shall define the design input and output requirements for each phase of the systems/hardware project. It shall also identify any applicable regulatory requirements. It will describe how design outputs are verified against design-input requirements. The plan shall describe how design outputs are reviewed and approved prior to their release for further development work. 6..4.5 For level 2 or level projects supporting ARC programs, the Program Manager and Project Manager shall approve and sign the project plan. For other projects, the project manager and the Responsible Manager shall approve and sign the project plan. 6..5 Concept Design Review or Preliminary Engineering Review activities are as follows: 6..5.1 Conduct a Concept Design Review (CoDR) for system and/or hardware design/developments. The review objective is to investigate one or more design concepts and evaluate key characteristics that would affect performance, manufacturing, or operations. Note: These types of reviews are conducted during the planning phase or early in the design phase of a systems/hardware project. 6..5.2 Evaluate technical merit, budget, and schedules. 6..5. Perform an assessment of the proposed design/development to evaluate the likelihood of success for the proposed design/development effort. The assessment will include a risk assessment, safety analysis, identification of developmental technologies, and any other factors deemed critical to the particular design/development. 6..5.4 Select a design concept for further development. 6..6 Long Lead-time Procurements Approval may be sought during the planning and system analysis phase

5.ARC.0004.2 6.4 Design Phase 8 of 10 to initiate procurement of long lead-time items and to establish manufacturing/fabrication/integration contracts. Procurements shall be made in accordance with 5.ARC.0006. 6.4.1 Design to Next Level Consistent with Systems/Hardware Project Plan The systems/hardware project shall design the products consistent with the approved systems/hardware project plan and product specifications, although systems/hardware project elements or work packages may progress through the design phase at different rates. 6.4.2 As the design evolves, the systems/hardware project plan shall be updated based on the following: 6.4.2.1 Prepare revisions to the systems/hardware project plan, as needed, to adequately deal with any issues (such as technical, risks, resource, schedule, etc.) that may have arisen in the course of the design/development process. 6.4.2.2 Ensure a revised systems/hardware project plan is approved by the same individuals or responsible organizations that performed the original approval. 6.4.2. Retain revisions to the systems/hardware project plan. 6.4. Design reviews shall be performed as follows: 6.4..1 Conduct design reviews at appropriate phases of the design, as defined in the systems/hardware project plan. 6.4..2 Include in design reviews representatives from all organizations that perform a key function in the development, implementation, or operation of the system or hardware. 6.4.4 Design verification activities shall be performed as follows: 6.4.4.1 Perform design verification to ensure that the design-stage output meets the design-stage requirements. 6.4.4.2 Perform design reviews, calculations, analyses, tests, simulations, and inspections (of prototypes and models that may have been developed) as specified in the systems/hardware project plan. These activities are done to verify that the final design can meet the customer requirements and systems/hardware project specifications. 6.4.4. Document and control all verification records as Quality Records in accordance with 5.ARC.0016.

5.ARC.0004.2 9 of 10 6.4.5 Design Change Control Perform design change control in accordance with 5.ARC.0004.. 6.5 Procurement Phase Procurement of materials and/or establishment of manufacturing contract activities shall be performed as follows: 6.5.1 Conduct materials procurement and establishment of manufacturing/fabrication contracts in accordance with 5.ARC.0006. 6.5.2 Receive, test, and/or inspect procured materials in accordance with 5.ARC.0010. 6.5. Where traceability is a specified requirement, implement it in accordance with systems/hardware project plan requirements. 6.6 Manufacturing, Fabrication, and Integration Phase Manufacturing, fabrication, and integration activities will be conducted in accordance with the systems/hardware project plan. 6.6.1 Customer-supplied product shall be controlled in accordance with 5.ARC.0007. 6.6.2 System and hardware inspections and tests shall be performed in accordance with 5.ARC.0010. 6.7 Test, Certification, and Activation Phase Test, certification, and activation phase activities are as follows: 6.7.1 Validation of Performance 6.7.1.1 Perform tests, analyses, demonstrations, and inspections to validate the integrated (or partially integrated) hardware or system in accordance with the systems/hardware project plan. 6.7.1.2 Perform validation activities to ensure that the products conform to the defined customer requirements. Note: Validation is normally performed on the final product but may be necessary in earlier stages of product completion. 6.7.1. Calibrate equipment used to accept or validate customer performance requirements in accordance with 5.ARC.0011. 6.7.1.4 Conduct validation activities as specified in the systems/hardware project plan and in accordance with 5.ARC.0012. 6.7.2 Certification

5.ARC.0004.2 7. Metrics 10 of 10 Certification of systems or hardware shall only be performed when required by customer requirements. When required, certification requirements will be defined in the systems/hardware project plan. 6.7. Control of Nonconformance Handle all nonconforming results from tests and validations in accordance with 5.ARC.001. 6.7.4 Corrective and Preventive Action Problems requiring corrective action shall be documented in accordance with 5.ARC.0014. 6.7.5 Activation Activate systems or hardware with in-the-field training as well as preparation and implementation of maintenance and operations manuals, as required by the customer and documented in the systems/hardware project plan. 6.7.6 Final Documentation and Turnover to Customer 6.7.6.1 Prepare final documentation as specified in the systems/hardware project plan. 6.7.6.2 Formally turn over to the customer final documentation together with the completed system or hardware. 6.7.6. If the systems/hardware project plan includes support during operations, final close out of documentation and financial issues may be delayed until the end of the systems/hardware project. 6.7.7 Servicing When required by customer agreement, servicing shall be performed in accordance with 5.ARC.0019 and documented in the systems/hardware project plan. There are no metrics required for this document.

5.ARC.0004.2 8. Quality Records 11 of 10 The following Quality Records shall be generated and managed in accordance with 5.ARC.0016. Required Record Design Review (includes list of attendees, documents reviewed and approved, and list of action items) Design Verification (includes inspection or test results, reports, or project memo) Custodian Systems/Hardware Project Manager Systems/Hardware Project Manager 9. Form(s) There are no forms required for this document.