Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Similar documents
Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

EV Charging Station Submittal Requirements

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

City of Perris Development Services Building & Safety

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT

Electric Vehicle Charging System Guidelines for Residential Buildings

Expedited Permitting Process for Electric Vehicle Charging Stations

RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

City of Palo Alto (ID # 8028) City Council Staff Report

STREAMLINED SOLAR CHECKLIST Owner Name:

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Managing Electric Vehicle Supply Equipment (EVSE) Installations

Application for Service Residential Subdivision / Development

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

ENGINEERING SPECIFICATION

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

CHAPTER V RESIDENTIAL WIRING

Electric Vehicle Appendix Notes

8300 Series Installation Guidelines

Electric Vehicle Charging Station

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

INSTALLATION GUIDE AND USER MANUAL

EV Charging Stations: Permitting and Inspection

INSTALLATION GUIDE AND USER MANUAL

Applicant and Site Information Job Address: Permit #:

TRANSMITTAL THE COUNCIL SEP THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. ERIC GARCET Mayor.

Photovoltaic Solar Plan Review

Please Refer to Attached Sample Form

ADVANCED CALCULATIONS

User Manual. Solar Charge Controller 3KW

Residential Application for New Electric Service

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Solar PV Standard Electrical Plan

ECET Circuit Design Motor Loads. Branch Circuits. Article 210

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Please Refer to Attached Sample Form

5300 Series Installation Guidelines

ORDINANCE NO WHEREAS, the City Council wishes to advance the use of electric vehicles; and

Electric Plug-In Vehicle/Electric Vehicle Status Report

Appendix G - Danvers Electric

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

NET METERING APPLICATION

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

HydroGenerations PROGRAM HANDBOOK

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Electric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium

City of Manhattan Beach Community Development

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

P3RC-12 SEER 2 Ton thru 4 Ton Units Cooling: 23,800 to 48,000 Btuh

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Circuit Concepts (Residential)

Micro Embedded generation

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

GE Energy Industrial Solutions. EV Charging Station. Application Guide. imagination at work

2016 California Green Building Standards Code (CALGreen)

Installation Manual & Warranty

Joint EV Charging Parties Comments

Solar PV Standard Electric Plan

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Enquiry Form for Micro and Small Generators 5MW and Less

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

INSTALLATION AND OPERATING INSTRUCTIONS

ERIC S. CASHER, CITY ATTORNEY WINSTON RHODES, AICP, PLANNING MANAGER

Pretest Module 24 Three-phase Service Entrance

INSPECTION GUIDELINES: GAS METER RELEASE

Be it ordained by the People of the City and County of San Francisco:

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Standard for Installing and Maintaining Electric Vehicle Supply Equipment (EVSE)

OWNER S MANUAL AND INSTALLATION INSTRUCTIONS

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

REBATE APPLICATION. 1. Rebate Applicant Information. 2. Dealer Information OKLAHOMA NATURAL GAS COMPRESSED NATURAL GAS (CNG)

Solar Power Installation Application

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Q3RD Series. Single Packaged Heat Pump, Single Phase TECHNICAL SPECIFICATIONS FEATURES AND BENEFITS

Electric Vehicle Charging Station Installation Best Practices: A Guide for San Diego Region Local Governments and Contractors

Municipality Generator Interconnection Application Single Meter Application Part I

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Illuminator System Series CM

City of Manhattan Beach Community Development

mandates, including the California Governor's Executive Order S calling for an 80 percent

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Transcription:

Checklist for Non-Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical plans required Level 2 Charger: 220V dedicated circuit Cut sheets for equipment are required Load calculations are required o If installing an EVSE (electric vehicle supply equipment) that is listed with a cord/plug connection, then only the cut sheets and the load calculations need to be provided. o If installing an EVSE that is hardwired with or without a time of use meter then all of the following are required: 1. Equipment cut sheets. 2. Load calculations (complete load calculations worksheet). 3. Site plan (show structures, service, EVSE, and (N) meter if applicable). 4. Single line diagram (show the service size, EV breaker size, EV conductor size, number of conductors, EVSE, time of use meter (if applicable). If the scope of work only includes installing a time of use meter for an existing EVSE then no plans are required. Verify that the original EVSE installation was permitted. Checklist for Non-Residential EVCS Page 1 of 6

Specific Requirements: CHEC K ONE Type of Charging Station(s) Proposed Power Levels (proposed circuit rating) Typical NON-RES Charging Locations Level 1 110/120 volt alternating current (VAC) at 15 or 20 Amps Commercial office building Level 2-3.3kW (low) 208/240 VAC at 20 or 30 Amps Commercial office building Public access Level 2 7.2kW (medium) 208/240 VAC at 40 Amps Level 2-10kW (high) 208/240 VAC at 50 Amps Level 2-19.2kW (highest) 208/240 VAC at 100 Amps Public access DC Fast Charging 440 or 480 VAC Large commercial office buildings or parks Hospitality & recreation Other (provide detail) PERMIT APPLICATION 1) Is the permit application complete with the following information: Project address, parcel #, builder/owner name, contractor name, valid contractor license #, phone numbers and any other requirement? Yes No 2) Does the application include electric vehicle charging station model number, manufacturer's specs and installation guidelines? Yes No ELECTRICAL LOAD CALCULATION WORKSHEET 1) Is an electrical load calculation worksheet included? (Article 220, 2016 CEC) Yes No 2) Based on the load calculation worksheet, is a new electrical service panel upgrade required? Yes No a. If yes to Q2, do plans include the electrical service panel upgrade? Yes No Checklist for Non-Residential EVCS Page 2 of 6

b. If yes to Q2, has the Healdsburg Electric Department reviewed and approved of the installation and confirmed the necessary utility work? Yes No 3) Is the charging circuit appropriately sized for a continuous load? Overcurrent protection for circuits supplying electric vehicle supply equipment shall be sized for continuous duty and shall have a rating of not less than 125% of the maximum load of the EVSE (i.e. if the maximum load of the charger is 40A then a 50A breaker is required). Yes No 4) If charging equipment proposed is a DC Fast Charging station or a Level 2-10kW station with a circuit rating of 50 amps or higher, is a completed circuit card with electrical calculations included with the single-line diagram? Yes No Not Applicable SITE PLAN & SINGLE LINE DRAWING 1) Is a site plan and electrical plan with a single-line diagram included with the permit application? Yes No Not Applicable a. If mechanical ventilation requirements are triggered for indoor venting requirements (CEC 625.29 (D)), is a mechanical plan included with the permit application? Yes No 2) Is the site plan fully dimensioned and drawn to scale? Yes No a. Showing location, size, and use of all structures? Yes No b. Showing location of electrical panel to charging system? Yes No c. Showing type of charging system and mounting? Yes No d. Is the type of mounting for charging system included if the charging system is not wall-mounted? Yes No Not Applicable COMPLIANCE WITH 2016 CALIFORNIA ELECTRICAL CODE 1) Does the plan include EVCS manufacturer's specs and installation guidelines? Yes No 2) Does the electrical plan identify the amperage and location of existing electrical service panel? Yes No a. If yes to Q2, does the existing panel schedule show room for additional breakers? Yes No b. Are sizes for the conduit and conductor included? Yes No 3) Is the charging unit rated more than 60 amps or more than 150V to ground? Yes No a. If yes to Q3, are disconnecting means provided in a readily accessible location in line of site and within 50 of EVCS? (CEC 625.23) Yes No 4) Does the charging equipment have a Nationally Recognized Testing Laboratory (NRTL) approved listing mark? (UL 2202/UL 2200) Yes No Checklist for Non-Residential EVCS Page 3 of 6

5) If trenching is required, is the trenching detail called out? Yes No a. Is the trenching in compliance with electrical feeder requirements from structure to structure? (CEC 225) Yes No b. Is the trenching in compliance of minimum cover requirements for wiring methods or circuits? (18 24 min. coverage per CEC 300) Yes No 6) Has physical protection or bollards been installed to prevent vehicle impact to equipment? (CEC 110.27 (B)) Yes No Not Applicable 7) Has the equipment been mounted with the appropriate vertical clearance at a height of 18-48 inches above the finished floor? (CEC 625.50) Yes No Not Applicable 8) Has a disconnect been installed in a readily accessible location for EVCS system that is rated more than 60 amps or more than 150 Volts to ground? (CEC 625.23) Yes No a. Is the location of the disconnect in a readily accessible location in line of site and within 50 of the EVCS? Yes No b. Are main service disconnects installed per CEC 230.71, 72? Yes No i. Are they grouped? Yes No ii. Are there more than 6 disconnect sets in any group? Yes No COMPLIANCE WITH 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE 1) Do CAL Green EV Readiness installation requirements apply to this project? Yes No 2) Do the plans demonstrate conformance with CAL Green Table 5.105.5.3.3 (below) for the minimum required number of charging stations? Table 5.105.5.3.3 Total Number of Actual Parking Spaces Number of Required EV Charging Spaces 0-9 0 10-25 1 26-50 2 51-75 4 76-100 5 101-150 7 151-200 10 201 and over 6% of total (rounded up to the nearest whole number) 3) Do the construction plans comply with the design requirements set forth in CAL Green Table 5.106.5.3.1 for single charging spaces or 5.106.5.3.2 for multiple charging stations? Checklist for Non-Residential EVCS Page 4 of 6

COMPLIANCE WITH 2016 CALIFORNIA BUILDING CODE, CHAPTER 11B ACCESSIBILITY REQUIREMENTS 1) Is there at least 1 EVCS parking stall that meets Chapter 11B accessibility dimension requirements for a van accessible parking space? Yes No 2) For parking stalls with 5 or more EVCS, does the number of EVCS stalls provided meet the requirements of Table 11B-228.3.2.1? Yes No 3) Do the construction plans comply with the design requirements set forth in 11B-812.1 through 11B-812.10 for accessible EVCS with regard to: Operable Parts? Yes No Vertical Clearance? Yes No Accessible Routes? Yes No Vehicle Spaces? Yes No Access Aisle? Yes No Identification Signs? Yes No Surface Marking? Yes No Electric Vehicle Charger? Yes No STATEMENT OF COMPLIANCE By my signature, I attest that the information provided is true and accurate. Job Address: Signature: Date: In addition to this document, you will also need to provide a copy of the manufacturer s installation literature and specifications for the Level 2 charger you are installing. Note: This is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology is at the user s risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel Checklist for Non-Residential EVCS Page 5 of 6

Electrical Load Calculation Worksheet*** 2016 C.E.C 220.82 (100 AMP Minimum) Permit # Date: Contractor/Owner: Size of service panel**: AMPS Job Address: Total SF: Phone # Email: ITEM WATTS EXAMPLES FOR A/C AND HEATER WATTS* Sq.Ft. @ 3 watts per Sq.Ft. 1) - A/C with gas heat 20 amp appliance circuits @ 1,500 watts each - compressor 20 amps Range (NPR - nameplate rating) Gas: Yes No - fan(s) 5 amps Oven (NPR) Gas: Yes No TOTAL 25 amps x 240 volts = 6,000 watts Cooking Units (NPR) Gas: Yes No 2) - A/C with 5 kw electric heater Water Heater (NPR) Gas: Yes No - compressor 20 amps Dishwasher (NPR) - fan(s) 5 amps Disposal (NPR) TOTAL 25 amps x 240 volts = 6,000 watts Washer @ 1,500 watts (min) Gas: Yes No - 5,000 watt heater x 65% = 3,250 watts Dryer @ 5,000 watts (min) - Use larger of A/C or heater - i.e. - 6,000 watts Motors (NPR) 3) - A/C with 10 kw electric heater Electric vehicle supply equipment (NPR) - compressor 20 amps Other (NPR) - fan(s) 5 amps Other (NPR) TOTAL 25 amps x 240 volts = 6,000 watts SUBTOTAL: - 10,000 watt heater x 65% = 6,500 watts - Use larger of A/C or heater - i.e. - 6,500 watts 1st 10,000 watts of SUBTOTAL @ 100% 4 ) - A/C with heat pump Remaining watts @40% - compressor 20 amps Largest of A/C or electric heater or heat pump* - fan(s) 5 amps TOTAL WATTS: SUBTOTAL 25 amps x 240 volts = 6,000 watts - 5,000 watt heat strips @ 65% = 3,250 watts TOTAL WATTS DIVIDED BY 240 VOLTS = AMPS** TOTAL 9,250 watts * Use largest of 100% of air conditioner or 65% of the heater or when residence has a heat pump, add 65% of auxiliary heat strips to 100% of air conditioner / heat pump ** The calculated load must be less than the existing electrical service otherwise the service will need to be upgraded. *** This Electrical Load Calculation Worksheet is included only as an example of a residential occupancy. It is not intended to be used for non-residential occupancies. Checklist for Non-Residential EVCS Page 6 of 6