INSTALLATION MANUAL (cod )

Similar documents
MOUNTING AND CONNECTING INSTRUCTIONS 1. GATE ARRANGEMENT ENGLISH

TECHNICAL DATA HYDRAULIC UNIT

FITTING AND CONNECTION INSTRUCTIONS

INSPECTIONS AND MAINTENANCE

INSTALLATION MANUAL ENGLISH ALPHA 200 ALPHA 330. L C (stroke) 960 mm 1160 mm

FEATURES AND SPECIFICATIONS

VELA INDUSTRIAL INSTALLATION MANUAL

VERG 24V BARRIER. English

SCUTI INSTALLATION INSTRUCTIONS FOR AUTOMATING COUNTER BALANCED DOORS USING THE SCUTI OPERATOR

SLIDE NEW CONTROL BOARD

Installation manual ASTER AUTOMATION FOR SWING GATES 11_16

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

Automatic concealed bollards 275 H600 and 275 H800 with pit

BAYT 980. Oil-hydraulic OIL-HYDRAULIC BARRIER FOR TRAFFIC CONTROL INSTALLATION MANUAL. code 4425 Post with fixing base. POLO 44 - optional -

MEKO OPENER FOR RACK-DRIVEN SLIDING MOTOR

ARACHNE 230V 24V- 12V

SARGON S - M - L. All rights reserved INSTALLATION MANUAL

INSTRUCTIONS FOR INSTALLATION

Installation manual. English. mystrike OPENER FOR RACK-DRIVEN SLIDING MOTOR

Typical Installation Schematic

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

L /2012 rev 0 BISON 45 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

L /2012 rev 0 BISON 30 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Instructions manual. Below ground oil-hydraulic operator for swinging gates. pages 17-32

AUTOMATIC BOLLARD ASSEMBLY AND OPERATING MANUAL

GROUND GROUND - ( ) Interrati elettromeccanici ISTRUZIONI PER L INSTALLAZIONE. Electromechanical underground INSTRUCTIONS FOR INSTALLATIONS

ECONOMISER SERIES E2T USER MANUAL

L /2013 rev 0 BISON 35 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Oil-hydraulic operator for swinging gates

IRREVERSIBLE OPERATOR FOR SWING GATES AND DOORS

GB Instructions Manual

HYDRAULIC OPERATOR FOR SWING GATE FULL TANK. SEA S.r.l. Zona Ind. S.Atto TERAMO Italy Tel Fax

NYOTA 115. Electro-mechanical sliding gate operator. Instruction manual

USE AND INSTALLATION HANDBOOK

DRIVE 700 OVERALL DIMENSIONS

AUTOMATION SYSTEM FOR SWING GATES FROG SERIES INSTALLATION MANUAL SUPERFROG

BISON 20 OM BISON 25 OTI

Electromechanical gear motor for sliding gates ACHILLES

FITTING AND CONNECTION INSTRUCTIONS

D Vers. 03 ELECTROMECHANICAL AUTOMATION FOR SWING GATES

Contents. EC DECLARATION OF CONFORMITY FOR MACHINES... p. 10. WARNINGS FOR THE INSTALLER... p. 10

EMUJC Series. Electronic actuator. Technical Data Sheet. WattsIndustries.com

UNDERGROUND OPERATOR FOR SWINGING GATES. WARNING!! Before installing, thoroughly read this manual that is an integral part of the pack

Dry installed pump type LANDY BTP.

TITANO 400V SLIDING GATE OPENER

Automatic concealed bollards 275 H600 and 275 H800 Control station

ASW-400. Installation Manual. Downee

ENGLISH MF-7500(D)/UT37

Mod: KLD6-12/35XLAS-N

SLIDE & OL USER'S AND INSTALLER'S MANUAL V1.0 REV. 06/2017

E R A I GATE AUTOMATION DIVISION

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) WARNINGS FOR THE INSTALLER

ELLIPTICAL PUMP MODEL GAMMA 180

IN-GROUND OPERATOR FOR SWING GATES FROG SERIES INSTALLATION MANUAL FROG-A 230V

Ditec PWR50H/HV/HR Automation for swing gates

Compact System NRGS 11-2 NRGS Original Installation Instructions English

RETRACTABLE BOLLARD PILOMAT PASS PM 127/P-800 A TECHNICAL INSTRUCTIONS. Manuale tecnico PILOMAT 127P-800 A PZ.doc Pagina 1 di 22

I - Libretto di istruzioni GB - Instructions manual F - Notices de montage

GENERAL WARNING. General instructions. Technical assistance. Doseuro S.r.l. Liability

ABS lifting station Synconta

Automation Swing Gate Opener

INSTALLATION MANUAL GB

BULL 424 ESA BULL 624 ESA

Ditec LUXO Swing gates automation (Original instruction)

Ditec PWR25H/35H Automation for hinged gates

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE

Type Operating Instructions. Angle Seat Motor Valve Compact. BM24C, BM24C/I BM24C/IOS, BM230C/IOS with and without spring return

BIG Pressure switch. Products. Functioning. The device change the electric contact condition on the working characteristic pressure be attainment.

ALPHA 200 PLUS ALPHA 330 PLUS INSTALLATION MANUAL

/ S. Warhawk Road, Conifer, CO /

1-24. Oil-hydraulic. Oil-hydraulic road barrier for traffic control from 3 to 8 metres

CHECKING AND MAINTENANCE:

BARRY BARRIER GATE AUTOMATION

Installation Manual. Swing Gate System. Leading the way...

E R A I Gate Openers Department

DRIVER MOS-FET UNIDIRECTIONAL AM** SERIES. Instruction Manual for use

FROG KIT. Installation Instructions for a Pair of gates... TECHNICAL HELPLINE THE FROG-P KIT CONSISTS OF:

EC DECLARATION OF CONFORMITY

FORCE 250 N - MAXIMUM STROKE 360 MM

RISING BOLLARDS SECURITY BARRIERS

Pneumatic actuator Assembly & maintenance procedures

OMATION FOR SLIDING GATES LINESTAR INSTALLATION MANUAL

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC)

YG101 SWING GATE OPENER OWNER S MANUAL

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER S MANUAL HATO 120/200 SECTIONAL DOOR OPERATOR USER S MANUAL

MANUAL FOR USE AND MAINTENANCE OF THE MACHINE GALAXY

JOINT INSTALLATION MANUALS AND SAFETY INFORMATION

Instruction Manual for the. E-SL 450 Series

FORCE SPD 800/1500/2000

EL5600 Series Electric Linear Actuators Installation and Maintenance Instructions

M OTO R. The electric motor. DC - direct current voltage.

INSTALLATION MANUAL ACE. Gearmotor for swing gates 01_17

BELT CONVEYOR PNL/4 Series User and maintenance manual

INSTALLATION MANUAL FOR SWING SHUTTERS KAF212. FACE S.r.l. Viale delle Industrie, Dosson di Casier Treviso Italy

Operating Instructions Type MPT 53

B.M.P. DOORS LTD INDUSTRIAL RAPID DOORS

INSTALLER AND USER S MANUAL. v4.0 REV. 01/2019

MOTOR. The electric motor. DC - direct current voltage.

USER INSTRUCTIONS FOR SLIDING DOORS

DEFENDER SERIES. 5 Gallon, Double Walled, Field Replaceable Spill Container Model Series INSTALLATION, OPERATION, & MAINTENANCE

Transcription:

is a bollard designed for the management of traffic areas, parkings and protection of public and private accesses. It has an hydraulic system is engineered in our factory to achieve minimum noise and maximum long term reliability. The hydraulic unit is self contained for ease of installation. The release mechanism allows for manual operation in case of power failure. is also equipped with 24V LED lights and audible alarm. DIMENSIONS (mm) Ø 275 MAIN PARTS NAMES 80 1 Foundation plate 2 Hole for electric cables passage 3 Underground cylinder 4 Manhole cover 5 Movable column Light signals 7 Release system 8 Lifting hook 9 Hydraulic unit 10 Movable manhole cover 550 8 10 550 1200 7 5 Ø 325 4 9 1 2 3 HYDRAULIC UNIT Hydraulic pump capacity Medium working pressure Maximum adjustment pressure Working temperature Hydraulic oil Protection degree HYDRAULIC PISTON Exit time of the rod Working stroke of the rod Rod diameter Piston diameter Max tractive force during rod extension Max tractive force during rod retraction Obstruction light (led) power supply ELECTRIC MOTOR Power supply Absorbed current Absorbed motor power Capacitor Rotation speed Frequency of use 4 liters/min 2.2 MPA (22 bar) 4.5 MPA (45 bar) -20 C +55 C SEA IP55 seconds 720 mm 1 mm 30 mm 275 Kg 147 Kg 24V 230Vac - 50 Hz 1.5 A 330 W 12.5 mf 2800 rpm 30% /25

1. DIGGING Sistemi elettronici 1.1. Proceed with excavation using the measurements that you find in Fig. 1 one. Dig in the ground where you intend to install the bollard Fig. 1 30 cm Ø 80/90 cm 1.5. Insert a flexible duct into the PVC pipe to allow for passage of the electric supply cables. 1.. Fill all the space between ground and PVC pipe with high strength concrete. 1.7. Before the concrete has fully set, make sure that the PVC pipe is perfectly vertical and that the foundation plate in perfectly horizontal. Use a level for this operation. NOTICE: the foundation plate must be positioned 10 mm max beneath finished floor level. (Fig. 3). Road level Level Ø 0 cm min. 130 cm min. Concrete 10 mm 90 Tube for electric cables passage Level 1.2. Fill the hole with stones for 30 cm to allow for water drainage. 1.3. Intall a plastic flexible Duct (40 mm diameter) to the mains sewer pipe, if possible. 1.4. Insert a PVC (optional) pipe (external diameter min 40 mm) in the hole and fit the foundation plate. (Fig. 2) 12710350 Discharge Tube for rainwater Stones Fig. 3 Fig. 2 2. BOLLARD INSERTION Foundation plate 2.1. Remove the movable access cover unscrewing the three screws as in Fig. 4. This operation allows access to the lifting hook which must be used to insert the bollard in the housing pipe that has been previously prepared. Movable manhole cover 115 cm PVC pipe (Optional) Lifting hook Discharge tube for rainwater 40 cm Stones Fig. 4 7/25

2.2. Using the lifting hook, insert the bollard in the housing (Fig. 5). NOTICE: make the electric cables pass carefully in the appropriate pipe without shortening or stretching them. Fig. 5 2.3. Lower the bollard until it touches the foundation plate, taking care that the electric cables are positioned at the bottom of the tube (Fig. ) 2.4. Fix the bollard to the foundation plate using the manhole cover and the 4 screws provided (Fig. ). Afterward mount the upper manhole cover. (Fig. ) Fig. Lifting hook Top cover Manhole cover Electric cables exit To the control unit At this point the installation is completed. For electrical connections, refer to the appropriate control unit instruction manual. 8/25

3. RELEASE SYSTEM The manual release system allows you to lower the bollard in case of emergency or power cut. In order to release the bollard act as follows: 3.1. Unscrew the cover of the release using the appropriate hexagonal key in equipment(fig. 7). 3.3. When the bollard has completely gone down, relock the bollard rotating the key clockwise and re-screw the protection cover (Fig. 9). Fig. 9 Fig. 7 NOTICE: don t leave the bollard down with the disabled lock. 4. TYPICAL INSTALLATION 3.2. Insert the same key in the release hole and unscrew (rotate it counterclockwise) until the bollard starts to descend slowly (Fig. 8). DO NOT OVER ROTATE. Fig. 8 1- bollard 2-Control unit 3-Key pushbutton 4-Radio receiver 5-Flashing light -Photocells 1 5 3 4 7 2 5. PERIODICAL MAINTENANCE The following maintenance activities can be executed opening the manhole cover. NOTICE: this operation allows the bollard only to go down Not to go up. Check that the bollard movement is always linear and doesn t meet any obstacle. Check the light system (led) Check the release functionality Check the limit switches efficiency (micro-switch) Lubrificate the rods with water resistant grease mnths mnths mnths mnths 1-2 years All the above described activities must be executed exclusively by an authorized installer. 9/25

DECLARATION OF CONFORMITY SEA declares under its responsibility that the operator meets all the essential requirements as provided by the following European laws and later modifications (where applicable): 89/392/CEE (Machines Directive) 89/33/CEE (Electromagnetic Compatibility Directive) 73/23/CEE (Low-tension Directive) WARNINGS : The electric installation and the functioning logic choice must agree with the laws in force. In all cases a 1A breaker with a 30mA differential switch must be fitted. Keep the power cables (motors, power supply) separate from the command cables (push buttons, photocells and so on). In order to avoid any interference it s preferable to always use separate cables and ducts. USE DESTINATION: bolalrd has been designed to be used exclusively as management equipment for public and private accesses. REPLACEMENTS: Any request for spare parts must be sent to: SEA s.r.l. - Zona Ind.le, 4020 S.ATTO - Teramo - Italia or SEA UK Limited Tel: 0121 70 929 SAFETY AND ENVIRONMENTAL COMPATIBILITY: Please dispose of the packaging materials of products and / or circuits in an environmentally friendly manner. Materials handling must be undertaken with appropriate vehicles. DISINSTALLATION AND MAINTENANCE: The disinstallation and/or putting out of service and/or maintenance of bollard must be made only and exclusively by authorized and qualified staff. NOTICE: THE MANUFACTURER IS NOT CONSIDERED RESPONSIBLE FOR DAMAGE CAUSED BY IRREGULAR, WRONG OR UNREASONABLE USE. SEA reserves the right to make any required modification or change to the products and/or to this manual without any advanced notification. 10/25