Thompson Home New Student Housing

Similar documents
Thompson Home CFPCA Student Housing WSU# FURNITURE SELECTIONS

G1-SD HAYDEN ELEMENTARY SCHOOL WESTMINSTER USD GENERAL ARCHITECTURE 03/29/18 ADMIN - FLOOR PLAN ADMIN - SECTIONS MPR - FLOOR PLAN

GRAND UNION CANAL UXBRIDGE WEST LONDON UB8 2GH. Accommodation schedule. Block B

CONTRACT DOCUMENTS FOR WAYNE STATE UNIVERSITY

LPC STRUCTURAL ALTERATION PERMIT

E1.1. Ebert Norman Brady. Architects ELEC. LEGEND & GEN NOTES ST. JOHNS COUNTY BUILDING SERVICES. Simes & Rosch, LLC PROJECT GENERAL NOTES

OVERVIEW DISCOVER WHAT LYNN CREEK HAS TO OFFER

HAMPTON INN AND SUITES

DOWNTOWN LOVELAND REIMAGINED

THE KHMER GENESIS PROJECT: GCT VILLA

14295 PARK MEADOW DR

The Cassidy INCLUDED ELEVATION A

Naperville Public Library 95 th Street Interior Renovation 200 W. Jefferson Naperville, IL. Furniture Bid Package #01 Haworth Library Furniture

RESIDENTIAL FLOOR PLAN

Water side Economizer WC chiller

THE CARSON SINGLE-FAMILY HOME OPTIONAL ELEVATION C. Rendering is artist s conception and may include some optional features.

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

Monthly Statistical Digest

58 th STREET 87,717 RSF. New Mixed-Use Development NEW CONSTRUCTION POSSESSION Q3 2016

THE ETHAN SINGLE-FAMILY HOME OPTIONAL ELEVATION C. Rendering is artist s conception and may include some optional features.

PROJECT DATA PROJECT ADDRESS: OWNER:

Energy Performance Information Request Timeline

THE AINSLEY SINGLE-FAMILY HOME. OPTIONAL ELEVATION C Rendering is artist s conception and may include some optional features.

THE ETHAN SINGLE-FAMILY HOME. OPTIONAL ELEVATION C Rendering is artist s conception and may include some optional features.

Sunrise Building (SNR)

Facility Conditions.

New Braunfels ISD Calendars

Dresser Wayne Ovation Grade Model B 12/3, R 13/3

HYDRAULIC SERVICES HYDRAULIC DRAWING INDEX

Caloosa Pointe Palm Beach Blvd Fort Myers, FL 33905

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018

CITY OF SOUTH HAVEN CITY OF SOUTH HAVEN 539 PHOENIX ST. SOUTH HAVEN, MI SHEET INDEX CITY OF SOUTH HAVEN OFFICIALS LOCAL UTILITIES

NEGAUNEE PUBLIC SCHOOLS

LOW BOOM FLIGHT DEMONSTRATOR (LBFD)

ECP3774T 10HP,1760RPM,3PH,60HZ,215T,0748M,TEFC,F1

Melbourne Airport Parking Signage Plan 2018

NEIGHBORING BUILDING 275' - 10" TRASH & RECYCLING VAN H/C L/T T 11' - 6 1/2" 32' - 0" 32' - 0" 53' - 6" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 27' - 0"

E333GF - WS E333GF -SA - WS E333GF -PB - WS E433GF - WS E433GF -SA - WS E433GF -PB - WS E533GF - WS E533GF -SA - WS E533GF -PB - WS

AWRF Associated Wire Rope Fabricators

Series KSG 1. Security Grilles INDEX

Measurement of induction motor characteristics

FURNITURE FITTINGS MANUFACTURER. SUPRA drawer

Shoppes of Avondale - Sidewalks

The Mayberry. Courtyard Series OPTIONAL ELEVATION B. Rendering is Artist s Conception

HARDWARE SCHEDULE SINGLE DOORS EACH DOOR TO HAVE:

LEVEL III. LEVEL II Reg/Meeting Rooms NB SB. Oversight Pedstrian Bridge UNIVERSAL BOULEVARD. Meeting Rooms/Lecture Hall.

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN

Pakenham Branch Library, Pakenham ON. Canada

Sloan & Zurn Flush Valves

ORANGE COUNTY JOHN BRIDGES COMMUNITY CENTER BUILDINGS D & F HVAC REPLACEMENT

Prediction of Bias-Ply Tire Contact Area Based on Contact Area Index, Inflation Pressure and Vertical Load

1 OF 8 LAD LAD PROJECT AREA KIMBERLY GERBER TITLE SHEET C.E.S. DWG. NO. NPN12045 SHEET INDEX

REAR +/- 94' 20' 10' 10'-4" 9'-6" 10'-3" 10' 20' 13'-2" Private Office 25. Private Office 23 Private Office 24 7'-1" Open Space 3 14'-7"

including technical specifications and seating variants

Product Information Packet CNM20134 MTR. K16AA /460V.13 HP 1725 RPM

LIGHT FIXTURE SCHEDULE TYPE DESCRIPTION LAMPS / MANUFACTURER TOTAL

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives

Campus Computing Sites Printers B254 B A B745 B727 B735 B737 B250. Printer Locations. Handicap Access RAMP CHURCH STREET

Adopted Requested Executive Position Title CG-RG FTEs Amount FTEs Amount FTEs Amount

(IF) (SDF) 50' N 34 30' N RECOMMENDED PROFILE(LOC ONLY) Final Approach Gradient 5.31%, 323 ft/nm FAF (LOC ONLY) IYSO D5.2. MAPt LOC ONLY IYSO D2.

2015%Island%City%Academy%Basketball%Schedule%

INFRASTRUCTURE DESIGN STANDARDS FIGURES SECTION 2 SANITARY SEWER COLLECTION SYSTEMS

I N D I A N S T A T I S T I C A L I N S T I T U T E

Final consumption expenditure of private households per capita at the price levels and PPPs of 1995 (billions of US dollars)

Advance Auto Parts (Tenant)

MSK-1B 1 SERVING 31 - HVAC ADDITION DALTON HIGH SCOOOL RENOVATION REL

S Straight PCB Panel Mount Plugs

Electrical Systems Existing Conditions and Building Load Summary. AE 481W Tech Report 2 Bucks County Justice Center Doylestown, PA

Water. Series VA. Air Release and Vacuum Break Valves for Water Pipelines

A-Item List Price Sheet Pricing for GO BLUE Parts

SHEET INDEX T1.0 COVER A1.0 SITE PLAN A2.0 MOUNTING & RACKING METHOD E1.0 ELECTRICAL DIAGRAM E2.0 SAFETY PLACARDS

A Gold Eagle Spread Its Wings An Innovation that Empowers the Future Universal Paper Manufacturers' Greenfield Tissue Mill, South Africa Case Study

Finish Plumbing. Effective February 1, 2017 Replaces all previous Price Lists

4th FLOOR WOOD FLOOR DESIGN

The Davey OPTIONAL ELEVATION C. This home plan was named in memory of Mark Davey, a loving son, brother, and close friend of Schell Brothers.

DOBSON COMMUNCATIONS:

The Future of Transit and Autonomous Vehicle Technology. APTA Emerging Leaders Program May 2018

Two Story from Crest. Model Description Floor Width Sq. Ft. Page

STG Donaclone Air Cleaner

COLLEGE STREET VOCATIONAL CENTER WELDING SHOP UPGRADES PROJECT NO PC 736 EAST COLLEGE STREET, LAKE CHARLES, LA DECEMBER 15, 2017

STADIUM INDUSTRIAL PARK, BLDG. 7 >> ±20,038 SF INDUSTRIAL BUILDING SOUTH VALLEY VIEW BOULEVARD LAS VEGAS, NV 89118

Product Information Packet JL1304A .5HP,1725RPM,1PH,60HZ,56J,3418L,OPEN,F1

UPS PARKING LOT IMPROVEMENTS FOR O'HARE INTERNATIONAL AIRPORT CHICAGO, ILLINOIS O' H A R E A I R P O R T

Oil cooled motor starters MOTORSTARTERS. High torque low current

Walking Mobile Excavator. Top performance. Rugged design. Superior technology. Maximum comfort.

Sample Lab Test Report. Requested By INDIA

MAN HydroDrive. More traction. More flexibility. More safety. MAN kann.

Product Information Packet JL1313A 1.5HP,3450RPM,1PH,60HZ,56J,3432LC,OPEN

As a result, the share of US in world industrial production should fall from 19.4% in 2012 to 18.5% by 2016 and decline to 17.6% by 2021.

GRIPEN FUTURE DEVELOPMENT

Mobile Walking Excavator

THE AINSLEY SINGLE-FAMILY HOME OPTIONAL ELEVATION C

UTILITY CROSSING DETAIL

ECT and A/T Indicator <2TR-FE>, Engine Control <2TR-FE> 10A IGN. Connector. Junction A65 G W G W W B V. Junction Connector A71 G W AR2 R B R B

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

Melbourne Airport Parking Signage Plan 2017

Peter Meyer Ball valves Cryogenic

PROCESS EQUIPMENT POWER PLAN ELECTRICAL - FIRST FLOOR FIRST FLOOR PROCESS EQUPMENT POWER & GROUNDING PLAN - EP1-01

GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

M E M O R A N D U M. DATE: September 13, 2012 TO: Orcutt Winslow Partnership 3003 N. Central Ave. Phoenix, AZ Tracy Lee FROM: Michael Olson, CPD

Transcription:

WAYE STATE UIVERSITY FP&M Thompson Home ew WAYE STATE PROJECT O. 504-277444 4756 Cass Ave, Detroit, MI Furniture Package 12 - AUG 27 JA 20162017 HAMILTO ADERSO PROJECT UMBER: 2013088.08 LOCATIO MAP: PROJECT COTACTS: OWER: Wayne State University FP&M p 313 577 7665 ELECTRICAL EGIEER: p 248 399 1900 WOODWARD AVE W HACOCK ST CASS AVE W FOREST AVE ARCHITECT/LADSCAPE ARCHITECT:. p 313 964 0270 MECHAICAL EGIEER: p 248 399 1900 CIVIL EGIEER: P 313 962 4442 SECURITY AD TELECOM: p 616 446 4545 PROJECT LOCATIO STRUCTURAL EGIEER: p 248 932 2010

MEDIA LAB 002 CH-8.2 CH-8.1 FIRE RISER 010.1 014 BED 2 CH-8.2 CH-8.1 CH-8.1 CH-8.2 CH-8.1 CH-8.2 MECH 010 090.03 ELEV MACH LAUDRY 020 042 044 046 CLOSET 048 WAYE STATE UIVERSITY FP&M 016 041 ALT #22: REMOVE APARTMET FROM SCOPE 090.01 BED 1 CH-7 X2 CH-8.2 CH-8.1 CH-8.2 CH-8.1 CH-8.1 CH-8.1 CH-8.2 CH-8.2 CH-8.2 CH-8.2 CH-8.1 CH-8.1 CH-8.2 CH-8.1 CH-8.1 CH-8.2 032 LAUDRY 043 045 COLLABORATORIUM 005 PRACTICE RM 001 ELEC 034 IT 036 ALT #21: O BASEMET WORK SCOPE OUTSIDE THIS AREA FURITURE PACKAGE 21 JA 2017 95% CD OWER REVIEW 27 JU 2016 13 JU 2016 BASEMET - FURITURE PLA Thompson Home ew WSU PROJECT O. 504-277444 BASEMET FURITURE PLA umber: 2013088.08 Drawing o: A7.7.5

WAYE STATE UIVERSITY FP&M LOUGE 102 DIRECTOR STORAGE 108 114 CH-6 TA-3 CH-5 TA-3 CH-5 190.02 WS-1 CH-10 CH-10 UISEX UISEX 110 112 VESTIBULE 190.05 120 LIVIG SPACE 142 190.04 VESTIBULE 190.01 BE-1 ST-1 TA-5 CH-10 BE-1 BE-1 RECEPTIO 100 APARTMET ETRY 190.08 UTILITY 143 ALT #22: REMOVE APARTMET FROM SCOPE LOUGE 101 FIRST FLOOR - FURITURE PLA CH-6 TA-3 CH-5 CH-5 MULTIPURPOSE 105 3' - 0" 133 6' - 5" 129 KITCHE 135 137 139 190.10 128 130 190.09 134 138 POWDER 145 FURITURE PACKAGE 21 JA 2017 95% CD OWER REVIEW 27 JU 2016 Thompson Home ew WSU PROJECT O. 504-277444 FIRST FLOOR FURITURE PLA umber: 2013088.08 Drawing o: A7.7.6 13 JU 2016

WAYE STATE UIVERSITY FP&M 408 412 416 CH-1 LOUGE 402 CH-7 X2 490.02 15' - 6" 8' - 10" 420 10 3/4" 3' - 2" 4' - 9 1/4" 490.01 STORAGE 415 424 TRIPLE 401 (3) (3) (3) 429 490.09 FURITURE PACKAGE 21 JA 2017 95% CD OWER REVIEW 27 JU 2016 13 JU 2016 407 FOURTH FLOOR - FURITURE PLA 413 CLOSET 417.1 417 Thompson Home ew WSU PROJECT O. 504-277444 FOURTH FLOOR FURITURE PLA umber: 2013088.08 Drawing o: A7.7.9

LOUGE 202 218 WAYE STATE UIVERSITY FP&M 208 214 CH-7 X2 CH-1 290.02 290 220 222 290.01 (3) (3) (3) 229 228 290.09 FURITURE PACKAGE 21 JA 2017 95% CD OWER REVIEW 27 JU 2016 13 JU 2016 TRIPLE 201 SECOD FLOOR - FURITURE PLA 205 209 213 233 KITCHE 235 237 239 290.10 230 234 238 Thompson Home ew WSU PROJECT O. 504-277444 SECOD FLOOR FURITURE PLA umber: 2013088.08 Drawing o: A7.7.7

CH-7 X2 CH-1 LOUGE 302 390.02 308 314 318 390 320 322 324 WAYE STATE UIVERSITY FP&M 390.01 TRIPLE 301 (3) (3) (3) THIRD FLOOR - FURITURE PLA 309 313 333 317 KITCHE 335 337 339 390.10 328 330 390.09 334 338 FURITURE PACKAGE 21 JA 2017 95% CD OWER REVIEW 27 JU 2016 Thompson Home ew WSU PROJECT O. 504-277444 THIRD FLOOR FURITURE PLA umber: 2013088.08 Drawing o: A7.7.8 13 JU 2016