IVCC ENGINEERING (PVT) LTD. SUMMARY OF PILING WORKS COMPLETED

Similar documents
HVDC MATIARI -LAHORE TRANSMISSION PROJECT ABDUR RAZZAQ CHEEMA, EX-GENERAL MANGER (GRID SYSTEM CONSTRUCTION PROJECTS) NTDC

Country Scenario - Pakistan

National Electric Power Regulatory Authority

LAHORE RING ROAD SOUTHERN LOOP LAHORE RING ROAD PROJECT COMMUNICATION & WORKS DEPARTMENT GOVERNMENT OF THE PUNJAB PROJECT MANAGEMENT UNIT

National Electric Power Regulatory Authority

VISIT REPORT National Transmission and Despatch Company Limited

OIL AND GAS REGULATORY AUTHORITY ************

CLIENT LIST OF KISSAN ENGINEERING

The Role of Natural Gas in the Transport Sector for Sustainable Development

Summary of Projected Power Purchase Price of CPPA Pool FY

Driving license lahore pakistan. Driving license lahore pakistan.zip

ENERGY PROJECTS UNDER CPEC

Personal Information: Use CAPITAL letters and leave spaces between words.

GROWTH WEEK SESSION JUNE 01 JUNE A PRESENTATION BY KHAWAJA HAIDER LATIF CEO, LAHORE TRANSPORT COMPANY GOVERNMENT OF PUNJAB, PAKISTAN

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY INTERIM POWER PROCUREMENT (PROCEDURES AND STANDARDS) REGULATIONS, 2005

OIL AND GAS REGULATORY AUTHORITY ************

TIR/GE5583/JGE CIRCULAR LETTER No 4 - Geneva, 6 April 2018

ROAD SAFETY SITUATION IN PAKISTAN

TOTAL PARCO PAKISTAN LTD Prices Effective From

DHA CNG STN PVT LTD DFS Y BLOCK

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Applicable Retail Prices of MS, HSD & HOBC at Shell Pakistan Petrol Pumps Effective October 2014

DEVELOPMENTS & STATUS IN PAKISTAN WITH CASE STUDY OF

SITUATIONS VACANT. No. of Post. Name of Post. Required Qualification & Post-Qualification Experience

Appendix VII Bank Wise ATMs Locations As on 31st December 2007

Poor lane disciple and bad driving behaviour, Lack of understanding of traffic rules, particularly priority ;

Applicable Retail Prices of MS, HSD at Shell Pakistan Petrol Pumps Effective December 01,2018

Applicable Retail Prices of MS, HSD at Shell Pakistan Petrol Pumps Effective August 01,2018

Applicable Retail Prices of MS, HSD at Shell Pakistan Petrol Pumps Effective April 01,2018

COGEN SYSTEMS FROM ENGR KHALID SAEED JUL ============================== 1 TO 5 MWE HFO FIRED POWER PLANTS ==============================

Applicable Retail Prices of MS, HSD, Shell V-Power at Shell Pakistan Petrol Pumps Effective July 01, 2017

Plot No , F BLOCK, M.A JOHAR TOWN MAIN BOULEVARD LAHORE LAHORE AMEER SUPER

Applicable Retail Prices of MS, HSD at Shell Pakistan Petrol Pumps Effective January 01,2018

I. WATER RESOURCES. Leading position in water formation in Amu Darya and Syr Darya Basins. in average 64km 3 per year

Engines Jacket Heat looses 20% Gas Bill, Recovering jacket heat run Air Conditioning

PAK SUZUKI MOTOR CO. LTD. suzukipakistan

Total Fuel Costs Adjustment

LESCO POWER MARKET STRUCTURE

TOTAL PARCO PAKISTAN LTD Prices Effective From

CABLE TRAY SYSTEM. Perfect designing Long term economy Easy installation & replacement Cable trays as an engineered product

TOTAL PARCO PAKISTAN LTD Prices Effective From MS Retail Price (R/L)

TOTAL PARCO PAKISTAN LTD Prices Effective From HOBC Retail Price (R/L) - 1st. HOBC Retail Price (R/L) - 14th Nov. MS Retail Price (R/L)

Bus Rapid Transit System (BRTS) Yellow Line Project

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

TOTAL PARCO M. Petrol Pump

REGIONAL MEETING ON SUSTAINABLE ENERGY

ATTOCK PETROLEUM LIMITED Applicable Retail Prices of Pumps w.e.f January 16, 2017

By: Muhammad Usman Arshad Khan Head of Projects and Policy

MUSKRAT FALLS PROJECT OVERVIEW

Dia. Area Yield Ultimate Yield Stress Ult. Stress Load Load Calculated Nominal. nominal area) (according to

The impact of TIR implementation in Pakistan on trade corridors in the region

Safety of Land Transport System in Pakistan By A.R.Qureshi

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER

This are the pictures from the Stockholders Report

National Electric Power Regulatory Authority

Pakistan Second 220KV Guddu-Sibbi-Quetta Transmission Project

OPERATIONAL CNG STATIONS Status of Operational CNG Stations. 2 2 M/s. Gas Care Near Bus Stand, Havelian Road, Abbottabad. Abbottabad 29/12/2001

National Electric Power Regulatory Authority Islamic Republic of Pakistan

3/31/2008 Let nature energize our world. 1

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

APPLICATION FOR REQUESTING LICENSE PROPOSED MODIFICATION UPTO 40 M GENERATION FOR HI-TECH PIPES & ENGINEERING INDUSTRIES AT PLOT NO.

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

(April 7, 2012) KARACHI MASS TRANSIT CELL, KMC

Supplement to the Histelect News No. S58 December 2014 CHINA S THREE GORGES DAM HYDRO-ELECTRIC POWER PLANT

Contracts Awarded for Loan Projects Goods & Civil Works (July 2012)

Siemens BRI Summit 2018 Country Pavilion CC China

12th PAKISTAN AUTO SHOW th - 5th - 6th March, 2016 Lahore International Expo Centre

Generating Electricity with Biomass: Experience from Bangka Belitung. Albert Maknawi Chief Operations Officer KENCANA Agri

C, , vc_frc-r- ) t,id (±) APPLICATION FOR MODIFICATION OF GENERATION LICENSE NO. SGC/45/2008 ISSUED TO JDW SUGAR MILLS LIMITED

Inter State Bus Terminal

Puma Energy Pakistan (Private) Limited Formerly Admore Gas (Private) Limited

Puma Energy Pakistan (Private) Limited Formerly Admore Gas (Private) Limited

Puma Energy Pakistan (Private) Limited

بتروتك للمقاوالت PETROTEC

US 10 Corridor Performance

The Present and the Future of the Stainless Steel Market in India. Ramesh R. Gopal General Manager Nickel Institute Executive Director I S S D A

THE WAY WE MOVE LRT FOR EVERYONE

Road Traffic Injury Research & Prevention Centre Half yearly Report From Jan 09 to June 09

BAKRI TRADING COMPANY PAKISTAN (PVT) LTD.

PERFORMANCE EVALUATION REPORT. PUBLIC SECTOR GENCOs PERFORMANCE STANDARDS (GENERATION) RULES (PSGR) FY and

DART Priorities Overview

REMINISCING ABOUT WELLAND. Courtesy of the. City of Welland Heritage Advisory Committee. and the. Welland Historical Museum

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Project Site Afghanistan Nepal Pakistan India

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

ARTERIAL BRT OVERVIEW

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

Business opportunities and major projects in India

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

Home Electrical Wiring. Getting the electricity from the main power lines to a location in the house

Tender Information. Overseas Information

Derrick Boltt Southern Region Hydro Generation Eskom South Africa

PVC INSULATED WIRING FLEXIBLE AND CONTROL CABLES

PAKISTAN UTILITY EXECUTIVES EXAMINE AUSTRALIA SAFETY PRACTICES

Community Meeting Station Elements

Decentralized Electrification of Suyuek in Xinjiang

The SAARC Power Grid Nepal s Perspective

Northwich - grouting using 1,000,000 tonnes of conditioned PFA from Drax Power Station

Designated Network Loads and Resources Load Served by Company Owned Resources

Electric Utility Power Systems. Generation of Electricity

Renewable and Distributed Energy Resource Technologies

Transcription:

1966 47 HYDERABAD-KOTRI, TRAMISSION LINE. 5,901 Dir Gen. Barrages WAPDA & BICC Ltd. Lahore. 49-50 CHINIOT AND MALAKWAL, SUI GAS PIPELINE. 2,008 Motherwell Bridge Contracting Co. Ltd. Karachi. 1969 66 GUDDU, THERMAL POWER STATION. 1,200 The Chief Engineer (Construction) WAPDA, Lahore. 1970 77 80 MIRPUR (AZAD KASHMIR), ROPEWAY. LAHORE- RIVER RAVI, 220 KV T/L CROSSING. 911 1,344 R.E. AK Logging & Saw Mills Ltd., Mirpur (AK). WAPDA & Imperial Electric Co. Ltd. Lahore. 1972 88 GUJRANWALA, SUI GAS PIPELINE. 211 Sui Northern Gas Pipelines Ltd., Lahore. 91 TAUNSA, 132 KV TRANSMISSION LINE. 560 Chief Engineer, GSC, WAPDA, Lahore. 1974 108 BHIMBER NULLAH, 220 K.V. T / LINE. 1,296 WAPDA & Societa Anonima Elect. (SAE), Italy. 109 PALKHU NULLAH, 220 KV T / LINE. 300 Chief Engineer, GSC, WAPDA, Lahore. 1978 142 WAH CANTT, SPECIAL FOUNDATIONS. 1,560 Chief Engineer (Works) POF Wah Cantt. 1979 162 CHENAB RIVER CROSSING. 5,748 WAPDA & Greaves Cotton Lahore. 1981 183 RIVER JHELUM, 132 KV TRANSMISSION LINE. 2,000 Project Director GSC,WAPDA Lahore. 1982 196 KHAIRPUR, GRAIN SILOS. 140,000 National Logistic Cell (NLC) GHQ, Rawalpindi. 1985 231 PIPRI, PAKISTAN STEEL. 1,000 Pakistan Steel,MacDonald Layton&Co.Ltd.,Karachi. 233 LAHORE - PIA SALES OFFICE. 9,700 PIA/NCL. 234 TARBELA-FAISALABAD 500 KV T/LINE. 7,383 WAPDA/ICC Lahore. 1986 249 KANDKOT - GUDDU, GAS PIPELINE. 600 WAPDA & Petrocon (Pvt) Ltd., Lahore. 1987 266 LAHORE, 132 KV TRANMISSION LINE. 800 Project Director GSC,WAPDA, Lahore. 1990 307 GHAZI GHAT, TRANSMISSION LINE TOWERS. 1,450 General Manager T & G, WAPDA, Lahore. 308 MANGLA, TRANSMISSION LINE TOWERS. 922 General Manager T & G, WAPDA, Lahore. 1993 320 GHAZI GHAT, TRANSMISSION LINE TOWERS. 1,680 WAPDA/ICC (Pvt) Ltd., Lahore. 1993-94 321-322 PAKISTAN (LAHORE-ISLAMABAD) 62,631 National Highway Authority. & 325 MOTORWAY PROJECT. Daewoo Corporation (South Korea). 1995 IVCC ENGINEERING (PVT) LTD. 327 QADIRPUR GAS DEVELOPMENT PIPELINE. 2,893 OGDC Islamabad/Filippo Fochi Group (Italy). Page 1

1996 332 FAROOQABAD, PARCO-MFM PIPELINE. 1,034 Willbros-Techno J.V. Lahore/PARCO. 1997 334 PEZU (D.I.KHAN) LUCKY CEMENT PLANT. 3,740 Lucky Cement Ltd., Islamabad. 335 DERA MURAD JAMALI, UCH POWER PLANT GAS & STEAM TURBINE FOUNDATIONS. 336 DERA MURAD JAMALI, UCH POWER PLANT TRANSFORMER AND DUCT SUPPORT (PH. II) 337 PEZU (D.I.KHAN) LUCKY CEMENT PLANT, COOLER BUILDING. 340 DERA MURAD JAMALI, UCH POWER PLANT BOUNDARY WALL. 1998 343 THIRD JAMSHORO-GUDDU 500 KV T/LINE (KOT MITHAN-CHACHRAN) BED OF THE INDUS RIVER NEAR RAJANPUR. PILE FOUNDATION. 20,185 Harbin Power Engineering Co. Ltd. of China/Uch 23,289 Harbin Power Engineering Co. Ltd. of China/Uch 3,455 Lucky Cement Ltd., Islamabad. 18,106 Harbin Power Engineering Co. Ltd. of China/Uch 73,600 Potential Engineers (Pvt) Ltd., Lahore/WAPDA. 344 BELA TOWN (BALUCHISTAN) (N-25) BRIDGE ON PORALI RIVER:MAIN KARACHI-QUETTA RD. 2001 354 CHASHMA RIGHT BANK CANAL INDUS HIGH- WAY PROJECT PHASE-II (N-55): 4 BRIDGES. 2003 364 FAQIR PLAZA:6-CHATTERJEE ROAD, NEW URDU BAZAR LAHORE. 365 PARK LANE TOWERS: 72 TUFAIL ROAD, LAHORE CANTT. 2004 373 JINNAH BARRAGE LAKE: SECONDARY T/LINES AND GRID STATIONS PROJECT (PACKAGE-I) 220 KV L/LINE DAUDKHEL-BANNU - TOWER NO. 8 374 KARACHI: CREEK VISTAS AT CREEK CITY PHASE-VIII, DHA. 2005 378 ISKANDERABAD, DISTT. MIANWALI MAPLE LEAF CEMENT FACTORY LTD: TEST PILES. 2,976 Sadullah Khan & Brothers (SKB) Karachi/National 11,391 Hyundai Engineering & Construction Co. Ltd., of South Area/National Highway Authority, Islamabad. 5,934 Kingcrete Builders (Pvt) Ltd., Lahore. 2,034 Kingcrete Builders (Pvt) Ltd., Lahore. 951 Sichuan Electric Power Import & Export Corporation (SEPC) of China / WAPDA. 106,012 Associated Constructors Ltd., (ACL)/DHA, Karachi. 1,250 Maple Leaf Cement Factory Ltd., Lahore. 2006 384 KASUR BULLEH SHAH FACTORY PROJECT. 48,931 Packages Ltd., Lahore. 385 ISKANDERABAD, DISTT. MIANWALI MAPLE LEAF CEMENT FACTORY LTD: WORKING PILES. 237,862 Maple Leaf Cement Factory Ltd., Lahore. Page 2

386 ISLAMABAD: GOLDCREST DHA, PHASE-II. 151 Al Ghurair Giga Pakistan (Pvt) Ltd., Islamabad. 387 KARACHI: POWER & DESALINATION AND DESALINATION PLANT PROJECT AT DHA. 388 CENTURY PAPER & BOARD MILLS LTD., 67 KM LAHORE-MULTAN ROAD DISTRICT: KASUR. 391 KARACHI: KORANGI THERMAL POWER STATION. 2007 393 LAHORE: MABARAK CENTRE FEROZEPUR ROAD NEAR KALMA CHOWK. 10,424 Siemens Pakistan Ltd.,/ DHA Cogen Ltd., Karachi. 27,824 Century Paper & Board Mills Ltd., Lahore. 203 Siemens Pakistan Ltd., / Karachi Electric Supply Corporation (KESC) 414 Taavun(Pvt) Ltd., Lahore / PM Turner Construction International - LLC Lahore 394 KASUR BULLEH SHAH FACTORY PROJECT. 2,882 Packages Ltd., Lahore. 395 KARACHI: CREEK MARINA RESIDENTIAL DEVELOPMENT PROJECT IN DEFENCE HOUSING AUTHORITY. 2008 158,423 Creek Marina (Pvt) Limited, Karachi. 400 KHEWRA: ICI 65 KPTA SODA ASH FACTORY. 2,982 ICI Pakistan Limited, Lahore. 2009 401 ISLAMABAD: AVARI HOTEL PROJECT. 17,968 Avari Hotels Limited, Karachi. 402 LAHORE: SUNDAR INDUSTRIAL ESTATE. TETRA PAK PAKISTAN LTD., LAHORE 2 PROJECT. 50,929 Tetra Pak Pakistan Limited, Lahore. 2011 406 KOHALA-MUZAFFARABAD(AK)-CHAKOTHI ROAD (C-17) PROJECT: BRIDGE AT CHAINAGE 50+00. 1,162 HQ 491 Engineer Group FWO Abbottabad / National 2012 409 KOHALA-MUZAFFARABAD(AK)-CHAKOTHI ROAD (C-17) PROJECT: PASHI AVALCHANCHE SHELTER. 410 KOHALA-MUZAFFARABAD(AK)-CHAKOTHI ROAD (C-17) PROJECT: CHINARI BRIDGE 3,432 HQ 491 Engineer Group FWO Abbottabad / National 1,490 HQ 491 Engineer Group FWO Abbottabad / National Page 3

411 LAHORE-BUS RAPID TRANSIT SYSTEM (BRTS) FOR LAHORE-FEROZEPUR ROAD CORRIDOR FROM QARTABA CHOWK TO MAO COLLEGE (PACKAGE-3) PROJECT. 412 LAHORE: BUS RAPID TRANSIT SYSTEM (BRTS) FOR LAHORE-FEROZEPUR ROAD CORRIDOR FROM QARTABA CHOWK TO QADDAFI STADIUM PROJECT. 2013 414 CHAKDARA BRIDGE NEAR BATKHELA AT KM 88 ON NATIONAL HIGHWAY (N-45) IN KHYBER PAKHTUNKHWA PROVINCE ON RIVER SWAT, DISTRICT DIR: Piling and a Test Pile for Construction of New Bridge at Chakdara. 2014 418 JHIKA GALI MURREE: Piling Work and Construction of Pile Caps, Beams and Walls. Installation of an Inclinometer System, Drilling of Boreholes & Installation of Seepage Wells for Restoration of Landslide. 420 RAWALPINDI: METRO BUS PROJECT (PACKAGE- II) FROM COMMITTEE CHOWK TO 6TH ROAD RAWALPINDI (CHAINAGE 4+200 TO 6 + 100): Piling Work. 2015 422 RAWAT-MURREE PIPELINE (AT MP34.33): TREATMENT OF LAND SLIDING PROBLEM FOR 325MM DIA. SUI GAS PIPELINE. Piling and other works. 423 RAWALPINDI - ISLAMABAD METRO BUS PROJECT (PACKAGE ISB-II) AT PEWSHAWAR MORR INTERCHANGE: Piling Work. 424 MAKHAD BRIDGE: HIGH LEVEL BRIDGE OVER SOAN RIVER BETWEEN DISTRICT: MIANWALI & ATTOCK: Piling, Sheet Piling and Dewatering Works. 21,919 Zahir Khan and Brothers J.V. Lahore/TEPA Development Authority Lahore. 805 Albayrak-SKB J.V. Lahore / TEPA Deveopment Authority Lahore. 2,221 Mohmand Construction (Pvt) Ltd., Peshawar / National 9,833 National Logistics Cell (NLC) Rawalpindi/ Communcation and Works (C&W) Deptt.Lahore. 51,909 National Logistics Cell (NLC) Rawalpindi / Rawalpindi Development Authority (RDA). 430 Sui Northern Gas Pipelines Limited Lahore. 3,101 National Logistics Cell (NLC) Rawalpindi / Rawalpindi Development Authority (RDA). 8,497 Sh. Abdur Razzaq & Co. (Pvt) Ltd. / National Logistics Cell (NLC) / C&W Punjab Highway. 425 GULEHRA GALI MURREE PATRIATA ROAD AT RD 91 TO 92: Piling Work and Construction of Pile Caps for Remedial Measures of Landslide 1,843 National Logistics Cell (NLC) Rawalpindi / C&W Department Punjab Highway Circle Rawalpindi. Page 4

2016 426 PATRIND VILLAGE DISTRICT MUZAFFARABAD (AK) : 150 MW PATRIND HYDROPOWER PROJECT ON KUNHAR RIVER: Construction of Secant Piles for Temporary Downstream Coffer Dam at Weir Site. 1,719 Daewoo Engineering & Construction Co. (E&C) Ltd. Korea. 432 PORT QASIM KARACHI 2X660 MW COAL FIRED POWER PLANT PROJECT (PACKAGE-B) CONTRACT NO. PK001-SS-005-00: Piling Work. 151,835 SEPCO III Electric Power Construction Corporation/ Sinohydro Resources Ltd./Port Qasim Coal Fired Electric Power Co. Ltd. 433 MAPLE LEAF CEMENT FACTORY ISKANDERABAD, DISTRICT: MIANWALI 40 MW COAL FIRED POWER PLANT: Piling Work. 42,915 Maple Leaf Cement Factory Iskanderabad, District: Mianwali. 434 TREET BATTERY PROJECT FAISALABAD INDUSTRIAL CITY FIEDMC PHASE-II AT M-3: Piling Work. 54,793 First Treet Manufacturing Modaraba (FTMM) 72-B, Kot Lakhpat Industrial Area Lahore. 2017 438 PORT QASIM KARACHI 2X660 MW COAL FIRED POWER PLANT PROJECT (PACKAGE-B) CONTRACT NO. PK001-SS-085-00: Part of the Piling Work. 39,628 SEPCO III Electric Power Construction Corporation/ Sinohydro Resources Ltd./Port Qasim Coal Fired Electric Power Co. Ltd. 441 MAPLE LEAF CEMENT FACTORY ISKANDERABAD, DISTRICT: MIANWALI CONSTRUCTION PHASE STUDIES, GREY CEMENT PLANT LINE-III (Phase 1, II & 132 KV GRID STATION) : Trial Piles 442 CHERAT CEMENT COMPANY LTD. NOWSHERA (KPK): Piling & Pile Load Test Works for Installation of New Cement Plant at Line-3. 538 Maple Leaf Cement Factory Iskanderabad, District: Mianwali. 28,436 Cherat Cement Company Ltd. Nowshera (KPK). 443 1100-1400 MW RLNG BASED COMBINED CYCLE POWER PLANT IN PUNJAB AT JHANG, PUNJAB: Test Pile Construction & Load Test. 263 Punjab Thermal Power (Pvt) Ltd. (PTPL), Government of Punjab / National Engineering Services (Pvt) Ltd. (NESPAK) Lahore. TOTAL PILING FOOTAGE 1,511,817 Page 5