Hand winch with worm gear Type WH 7 S in accordance with DIN EN 13157

Similar documents
OPERATING INSTRUCTIONS (Translation) Hoisting crane

Service instructions. Contents AMD Hz 3~

JSK 34. Installation and operating instructions

ENGINE WINCHES from 300 to 5000 kg - TS and TD Series

O P E R A T I N G M A N U A L

The unique operating principle of the TREIBMATIC / 7

Direct Shift Gearbox (DSG) Mechatronic unit J743, removing and installing. - Loosen bolts - arrows - of oil pan - A - in diagonal sequence and remove.

Lifting device for standard removable versions

Self-Recovery Winch WARNING. General Safety Precautions

COME.UP DV-15. Instruction manual.

ATV WINCH. Thank you for purchasing a

Declaration of Conformity as per Directive 97/23/EC

WARNING. Electric Recovery Winch. General Safety Precautions

STÜTZVORRICHTUNG MODUL

Adjustable Speaker Mount GRAVIS 8

Adjustable Speaker Mount GRAVIS 12

HYDRAULIC WINCH LV-HV200kN. Manual OPERATION INSTRUCTION

Installation and Operating Instructions Electric Vibrators HV/VFL Series

Maintenance and Repair Instructions TM 89/03

Edition Manual Chapter Page Workshop Manual, Stiga Park 5 Belts 11

Operating Instruction

Installation, Operating and Maintanance Instructions for Backstop FCBM 72 SF

maintenance of the winch. All information in this publication is based on the latest production information available at the time of printing.

Demag DH hoist units. The solution to meet special requirements

BR 31a Rack-and-pinion Actuator,

INSTRUCTION MANUAL FOR SPRING BALANCER

I. General Safety Precautions

Alpine geared cable winches. Profiable technology for the private forestry industry

HST -LS Interlocking device (Translation of Original Manual)

I. Safety Requirement WARNING. ATV/UTV Winch

Technical data Hydraulic crawler crane HS 875 HD

Tug Compact. Operating Manual

AU DU PONT DE LUTTRE BRUSSELS BELGIUM PHONE: FAX: OPERATING MANUAL. Electric Fully Automatic Floor Saw FS 1218 EX

SERVO MOTORS BRUSHLESS SERVO MOTORS OPERATING INSTRUCTIONS 2016

PACKING, HANDLING, TRANSPORTING AND STORING MOTORS

Operating instructions POWER LIFTKET Electric chain hoists

RUFNEK 80 DESIGN SERIES 001 SERVICE MANUAL INTRODUCTION AND THEORY OF OPERATION...2 ASSEMBLY NUMBER EXPLANATION...2 WINCH MODEL CODES...

Product Information Overspeed governor GB 260

16K HYDRAULIC PLANETARY CAPSTAN DRIVE

2. Crane standing on firm, horizontal ground.

Demag DH hoist units. The solution to meet special requirements

40JP Hydraulic Winch Instruction Manual. Assembly & Operating instructions

Electric chain hoists O p e r a t i n g i n s t r u c t i o n s

T R A N S L A T I O N Declaration of Conformity as per Directive 2014/68/EU

Operating instructions for worm gear boxes

Single Sluice Gate Drive Type 1211/ / / ,5 1211/

back to main page Type: Butterfly valves Instructions and Operation Manual Warning! Warning! Danger for life! 1. Intended use Danger for life!

series BUTTERFLY VALVE DOUBLE ECCENTRIC FLANGED FAF 3800 PRODUCTION STANDARDS DN100 DN2000 PN Design EN 593 EN ISO Flanged

SELF PRIMING CHEMICAL SERVICE PUMPS

Technical data Hydraulic crawler crane HS 885 HD

MODEL HD-234 AIR SHIFT INDUSTRIAL LOW-MOUNT WINCHES OPERATING, SERVICE AND MAINTENANCE MANUAL

Ground bearing pressure 1.14 kg/cm 2. Main boom (No xx) max. length High reach (1311.xx and 1008.xx) 83 m Luffing jib (No xx) max.

ELECTRIC CHAIN HOIST. O p e r a t i n g i n s t r u c t i o n s. Issue April 2011

W BW GW. Workshop manual. Mechanical suspensions BPW, series ECO Cargo W / BW / GW. BPW-WH-W-BW-GW e

THE HARRINGTON THEATRICAL CHAIN HOIST

Powerful, versatile and reliable. Planetary Plug-in Gearboxes by Liebherr

6. Working radii are measured from centre of swing and under load.

Ground bearing pressure 1.08 kg/cm 2. Main boom (No xx) max. length High reach (No xx and 1309.xx)

D58 Series Brake Instructions

Service instructions. MAGNA Series 2000

5. For max. wind speed please refer to lift chart in operator s cab or manual.

Mounting Tools 2 Checking Clearances 3 Components 4-5 Mounting 6-21 Correct Method of Tensioning the Chain 22 Adjusting The Overall Dimension 23-24

Hoists & Winches. :: Electric Chain Hoists 26 :: Manual Hoists 30 :: Pneumatic Hoists 31 :: Winches 32 :: Beam Trolleys 34

3 Axles and brakes. 3.1 Function and construction of the axles Construction Function

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

Industrial flue gas probes. Instruction manual

TSCHAN - TORMAX VSG. Installation and Operation Manual TSCHAN Highly flexible shaft coupling BAWE 009-GBR-0 05/2004

Operating instructions STAR LIFTKET Electric chain hoists

Operating Manual for Disc Brake Type: SB 8.11

Installation and Operating Instructions for ROBA -ES couplings Type 940. _. _ Sizes 14-48

4. MAINTENANCE MANUAL

Sisu S-Cam Drum Brakes

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Repair manual for. JSK 26 D fifth wheel coupling

Directive (Ml20l7) E-mai I : d edm smai l.com ; dma. emai l. com P.O.Box: 194. Tel: 095 -l Fax:

Montage- und Betriebsanleitung Sattelkupplung JSK 26 D 5. Installation and operating instrutions for fifth wheel coupling JSK 26 D 17

MEYER-Rotating Fork Positioners are attachments used to transport loads and replace

Operating and Maintenance Instructions. Abteilung TB, Schell Seite 1 8 SERIES 56

MY-TE. OPERATION and MAINTENANCE. Winch and Hoist. Provided by: Model AC 36B OF MAX AC VOLT AC

Installation and Operating Instructions Magnetic Vibrator MR 1

SHERPA 4x4 OWNER'S MANUAL

Operating Instructions Flexdip CYA112

BEAM CLAMP INSTRUCTION MANUAL

Operating instructions LIFTKET Electric chain hoists

Heavy Duty Hoist WARNING. General Safety Precautions. Thank you for purchasing a

Winch Trouble Shooting Guide

General Instructions and Inspection Instructions for Crane

USER INSTRUCTIONS FOR OPERATION & MAINTENANCE 4068 Pneuma c / Hydraulic Installa on Tool

Installation, Maintenance and Operation manual 4 Submersible sand fighter pump. Type: SSFP - Series

SMA. Automatic Minimum Flow System PN 250-PN 400 ANSI look at info overview. 180 bar < < 400 bar

Operating Instructions

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Installation and Operational Instructions for EAS - HTL housed overload clutch Sizes 01 3 Type 490._24.0

Instruction manual and installation guide Traction sheave brake TSB TSB

Technical data Hydraulic crawler crane HS 835 HD

A-320 Balanced 1st Stage

SERVICE BULLETIN No. 1088

1. Remove the crankshaft pulley, engine coolant pump pulley and drive belt. 2. Remove the timing belt cover.

T R A N S L A T I O N Declaration of Conformity as per Directive 2014/68/EU

Operating Instructions Garlock Butterfly Valves DN : mm / 2-24

Transcription:

This original user manual must be read before start-up and be available to the user at all times. Hand winch with worm gear Type WH 7 S in accordance with DIN EN 357 Do not use for! Intended use: In acc. with BGV C (stages and studios) Moving persons Technical Data for WH 7 S Raising and lowering loads Motorised operation Usage in acc. with Atex Total load: 750kg Cable diameter: 8 mm Gear unit: Bm Maximum cable take-up: 49 m Minimum load for safe friction disc brake operation 0 kg Ambient temperature range -0 C to +50 C Detailed specifications WH 7 S WH 7 S No. of cable layers 4 Load capacity last cable layer 6 kg Drum diameter (ungrooved) 65 mm Load raising per crank turn st 0 mm cable layer Drum length 8 mm Load raising per crank turn last 5 mm cable layer Flanged wheel diameter 40 mm Length of hand crank raising 440mm arm Winder diameter, st cable layer 73 mm Force on crank at rated load in 6 kg Winder diameter, last cable layer 5 mm st cable layer at rated load Winder ratio.4 Dyn. test load during factory acceptance 904kg Mounting position and cable payout Mounting position always vertically on the wall; cable payout always vertically downwards Wire cable specification Only use cables with a safety factor of at least 3 times the minimum breaking strain at the rated total load! Pay out the cable correctly Recommended: Minimum breaking force 36,8 kn WH7 S /7

Cable attachment 50-60 mm 3 SCHRAUBE FEST Tighten screw ANZIEHEN Caution - Danger! The cable must always be laid in the correct direction of rotation. Failure to do this will render the friction disc brake ineffective and the load will fall. Note the directional arrows on the winch for raising and lowering. Operation Do not release crank suddenly during rotation or wind on rapidly Look out for total load change through multi-layer winding Always leave to 3 spare turns on the drum Large load Long lever Small load Short lever Undo the Allen screw () Adjust the crank () Tighten the Allen screw The winch must only be used by suitable and trained persons! The cable must be visually inspected prior to use! Always wear gloves!!all repairs must be carried out by the manufacturer or an authorised workshop! Maintenance The brake and gearbox of the winch are subject to use-related wear and tear. This cannot be completely prevented by regular inspection and maintenance. A general overhaul of the winch is required after 0 years at the latest, as prescribed in FEM 9.755, in order to ensure the required safety for you. WH7 S /7

Initial commissioning Gearbox Do not fill with oil until after installation Pull out the dipstick () Fill with 0-5 cm³ of SAE 80 gearbox oil Replace the dipstick Check oil level (+ too much/- too little oil) Hand crank Move from the transport position to the operating position Wire cable Selected for normal operation, see name plate 3 4 Knock out the locking pin (4) and loosen the Allen screw () Take hold of the crank head (3) and pull out the crank () Crank head can fall off Turn the crank and push into the crank head Tighten the Allen screw and hammer the locking pin into position Special safety requirements by the user User tasks Check brake and cable regularly. A raised load must not drop over a 0 minute period Check the cable for damage and discard if necessary. Technician's tasks Inspection before start-up Inspect at least once a year, keep a record. We recommend an inspection log for winches, lifting and towing gear. Lubricate depending on the application (use in accordance with driving gear group Bm (DIN 500) in a temperature range of - 0 C to + 50 C) 3. DRUM BEARING Lubricate approx. every 5 operating hours, at least every 6 months or prior to operation after a longer standstill. Factory filling: Shell Alvania EP. DRUM GEAR AND GEARBOX Check oil level approx. every 6 months or according to type of operation too much / - too little oil). Recommended: Gear oil SAE 80 ALWAYS DRAIN THE OIL BEFORE DISMANTLING OIL IS A HAZARD TO THE ENVIRONMENT COMPLY WITH THE REGULATIONS FOR SUBSTANCES HAZARDOUS TO WATER WH7 S 3/7

Faults and fault remedying Load is not held > Cable put on in wrong direction Put on cable correctly > Stopper does not engage (no noise when hoisting) Stopper/bolts rusty Compression spring defective Unscrew locking screw () and remove it from the housing Pull locking screw and mushroom head rivet out of the housing Check locking screw and mushroom head rivet, replace if damaged Check stopper (visible from above) for free movement and knock it gently to loosen it if necessary Repairs to the stopper may only be carried out by the manufacturer or an authorised repair shop Reassemble in reverse order Function check Load is not lowered > Insufficient load Pulley stiff Too much dead rope Increase load (e.g. weight on hook) > Brake stiff Not lubricated Winch has been overloaded > Check oil level Maintenance Maintenance of the winch is the responsibility of the user; in particular check the wire rope and brakes The winch brakes and gearbox are subject to use-related wear and tear. This cannot be completely prevented by regular inspection and maintenance. We recommend a general overhaul of the winch after 0 years at the latest, as prescribed in the FEM 9.755, in order to ensure the required safety for you. BRAKE MAINTENANCE / REPAIR MUST ONLY BE CARRIED OUT BY THE MANUFACTURER OR AN AUTHORISED REPAIR SHOP Spare Parts Spare parts may only be ordered from Köster. Only original parts are approved. The winch order number and the description of the spare part are needed when ordering spare parts. We would be pleased to provide you with telephone assistance in the event of any problems. Spare part lists are included with the user manual. The serial number can be found on the nameplate or the order confirmation. At least the last six digits are always required. Please indicate in each order Type Year of manufacture Serial No. WH7 S 4/7

Details of testing by the manufacturer and the user Parameter Explanation Value Nominal load Load capacity in the first cable layer 750 kg Static test load.5 times 5 kg Dynamic test load. times nominal load 85 kg Testing by the manufacturer Each winch is dynamically tested by the manufacturer with a test load of 904 kg. This load is raised and lowered 5 times through approximately.5 m. Testing by the user Before commissioning After repair or refitting After an extended period of no use At least once a year The results of the tests must be recorded in a test log. The test should be carried out with a static test load for 0 minutes. In doing so, the safe holding of the load must be checked by means of a mark on the cable drum. When carrying out the dynamic test, attention must be paid to the magnitude and uniformity of the cranking force and to any noise. Life The cable winch has a safe operating period of 8 h (driving gear group Bm/M3, heavy load spectrum). A general overhaul must be carried out by the manufacturer after not more than 0 years. WH7 S 5/7

Spare parts list for the WH 7 S WH7 S 6/7

Dimension drawing WH 7 S WH7 S 7/7