San Antonio, Texas 78222

Similar documents
San Antonio, Texas San Antonio, Texas Well Mitigation for City of Nixon. Prepared by DYS

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

NGWA Online Buyers Guide Listing Order Form

H o l l o w S t e m A u g e r E q u i p m e n t

Right rotation. Left rotation

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Maine Turnpike Authority

Patton Hill Road (Four Inch Main), Project No

METRO Magnolia Transit Center - Bid Tab

New RepairBase Line Item additions for the Update

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Maine Turnpike Authority

DRILLING SYSTEM, WELL, ROTARY, TRUCK MOUNTED, AIR TRANSPORTABLE, 600 FEET CAPACITY MODEL LP-12 NSN

ON-SITE WASTEWATER PRODUCTS

Installation Manual. D3600- Series Duplex Grinder Systems. Contents

ADDENDUM No. 1 Prospective Bidders

MODELS 108 and 138 CRAWL SPACE PUMPING SYSTEM PREINSTALLATION CHECKLIST

Project Book Worksheet for Cost Estimation

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

City of Grand Island Tuesday, February 13, 2018 Council Session

ANNUAL UST SYSTEM INSPECTION CHECKLIST

Submersible Effluent Pump

City of Grand Island Tuesday, June 26, 2018 Council Session

Plug & Abandonment Light Drilling Workover Well Intervention

presented by Y. C. Lam & Tim Leung 21 May 2005

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

Maine Turnpike Authority

Lift Station Design Standards and Details. Summary of Revisions

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BISCAYNE POINT ROW IMPROVEMENTS

BUYERS GUIDE MARKETING KIT

Leak Detector, Red Jacket #FX1V

Steese Rd - Curb & Sidewalk Improvement

Presentation Objectives Provide a description of how Directional Boring works Cover the basics for planning a Directional Bore Discuss the advantages

OIL AND GAS SERVICE 2018 KYIV DECEMBER, 2017 NAGORNIAK YURIY

County of Los Angeles Department of Public Works BID SUMMARY

LITERS PER MINUTE GALLONS PER MINUTE

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

Pump Specifications. D3648LSG, D3648LSGX Series Omnivore 2HP Duplex Grinder Packages LITERS PER SECOND

Maine Turnpike Authority

County of Los Angeles Department of Public Works BID SUMMARY

Access Riser Fits PRO370 and PRO380 Series

TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE MANUAL

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

2460 / 2472 / Series Simplex Grinder Systems

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

Installation Manual. Q Series Quadplex Grinder Systems. Contents

Using Technology to Manage Sewer and Light Infrastructure. LED Lighting. Jerry Jongeling Light & Power Superintendent

FIBERGLASS RODS BOREHOLE EXTENSOMETER WITH GROUTABLE ANCHORS AND VW SENSORS Model BOREX-E. Roctest Limited, All rights reserved.

LITERS PER MINUTE TOTAL HEAD IN FEET TOTAL HEAD IN METERS GALLONS PER MINUTE

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

Innovative solutions creating complete drilling systems

Commercial Fats, Oils & Grease Stephen Sealey

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

STREET IMPROVEMENTS PROPOSAL BID ITEMS

Air Champ DPC-9T & DPC-11T Static Torque in Inch-Pounds. Air Pressure in PSI

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

APPROVED ALL DIMENSIONS SUBJECT TO 1/4" TOLERANCES

Albuquerque Public Schools Industrial Fencing Material and Installation on Demand BID #18-059KN. Bid Tabulation Abstract

DANDO MULTITEC 4000 MK3

Boand Arena Septic to Sewer Duplex Grinder Pumps (Commercial) Engineering Analysis

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

Federal Project No.: NHPP-967-7(083)

Federal Project No.: OC-095-1(348)

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)

SOILMEC FAR EAST PTE.LTD SOILMEC ARABIA LLC

DELETE first sentence of first paragraph that reads: REPLACE with the following:

Using Drilling Dynamics To Reduce Drilling costs

QWIK JON ULTIMA 203 SYSTEMS INSTALLATION INSTRUCTIONS PREINSTALLATION CHECKLIST

SupAnchor Rock Reinforcement Strategy Self-drilling hollow anchor systems

Technology Demonstration

S33 Sump Pump INSTRUCTIONS AND SERVICE MANUAL VERTICAL FLOAT SWITCH S33V1 & S33V1C AUTOMATIC S33P1 & S33PC-1 (CONTROL WITH SERIES PLUG) NOT SHOWN

Pyrolance, LLC SPECIFICATIONS FOR DIESEL ENGINE DRIVEN ULTRA HIGH PRESSURE PIERCING AND FIRE FIGHTING SYSTEM L 1000 W-D

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

VIBRATING WIRE SURFACE STRAIN GAUGE. Model SM-5B. Roctest Limited, All rights reserved.

Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA Phone: Fax:

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA

Pump Specifications LE100-Series 1HP Submersible Sewage Pump

HIGH PRESS. - HIGH TEMP. (HPHT) FILTER PRESS 4 - UNIT ASSEMBLY 175 ml Capacity - OFI No

Federal Project No.: HSIP-5A27(567)

Powered Rotary Steerable System Technology

INSTALLATION INSTRUCTIONS RECOMMENDED MODELS

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

TAPE EXTENSOMETER Model CONVEX-D. Roctest Limited, All rights reserved.

APPENDIX G.1 BUY-IN METHODOLOGY

CITY OF WEST PALM BEACH

Appendix C Capital Improvement Program Project Descriptions and Details

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

The most complete line of drilling rigs...

Transcription:

1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50 LF Furnish & Install #12 Submersible Cable $1.50 $75.00 2.02 200 LF Furnish & Install #10 Submersible Cable $2.00 $400.00 2.03 600 LF Furnish & Install #8 Submersible Cable $2.50 $1,500.00 2.04 50 LF Furnish & Install #6 Submersible Cable $4.50 $225.00 2.05 50 LF Furnish & Install #4 Submersible Cable $5.50 $275.00 2.06 50 LF Furnish & Install Column Pipe (Up to 1 Diameter) $1.50 $75.00 Furnish & Install Column Pipe (Greater than 1 & Up to 1.5 Diameter) 2.07 600 LF $2.50 $1,500.00 Furnish & Install Column Pipe (Greater than 1.5 & Up to 2.0 Diameter) 2.08 50 LF $3.70 $185.00 2.09 1 EA Furnish & Install 1 Check Valve $35.00 $35.00 2.10 2 EA Furnish & Install 1 ¼ Check Valve $50.00 $100.00 2.11 1 EA Furnish & Install 1 ½ Check Valve $90.00 $90.00 Page 1 of5

2.12 1 EA Furnish & Install 2 Check Valve $100.00 $100.00 (Greater than 0.5 HP & Up to 1.0 HP) 2.13 1 EA $900.00 $900.00 2.14 2 EA $1,300.00 $2,600.00 (Greater than 1.5 HP & Up to 2.0 HP) 2.15 1 EA $1,600.00 $1,600.00 Furnish & Install Control Box (Greater than 0.5 HP & Up to 1.0 HP) 2.16 1 EA $87.00 $87.00 Furnish & Install Control Box 2.17 2 EA $135.00 $270.00 Furnish & Install Control Box (Greater than 1.5 HP & Up to 2.0 HP) 2.18 1 EA $205.00 $205.00 2.19 1 EA Furnish & Install Well Seal (Up to 5 ) $40.00 $40.00 Furnish & Install Well Seal (Greater than 5 & Up to 6 ) 2.20 1 EA $50.00 $50.00 2.21 1 EA Furnish & Install Pressure Tank $1,050.00 $1,050.00 2.22 1 EA Furnish & Install New Water Storage Tank $2,500.00 $2,500.00 2.23 1 EA Furnish & Install Booster Pump (Up to 0.5 HP) $890.00 $890.00 Furnish & Install Booster Pump (Greater than 0.5 HP & Up to 1.0 HP) 2.24 1 EA $1,300.00 $1,300.00 Furnish & Install Booster Pump 2.25 1 EA $1,400.00 $1,400.00 2.26 100 LF Furnish & Install Electrical Wire (#10) $2.00 $200.00 Page 2 of5

2.27 100 LF Furnish & Install Electrical Wire (#8) $3.00 $300.00 2.28 10 LF Furnish & Install Electrical Wire (#6) $4.00 $40.00 2.29 10 LF Furnish & Install Electrical Wire (#4) $6.00 $60.00 Furnish & Install PVC Electrical Conduit & Miscellaneous Fittings 2.30 50 LF $25.00 $1,250.00 2.31 1 EA Furnish & Install Electrical Junction Box $80.00 $80.00 3.01 550 LF Drill Pilot Hole Mud Rotary $50.00 $27,500.00 3.02 1 EA Borehole Geophysical Logging $2,500.00 $2,500.00 3.03 10 LF Back Plug Pilot Hole $15.00 $150.00 4.01 460 LF Furnish & Install 6 Inch Casing $35.00 $16,100.00 4.02 40 LF Furnish & Install 6 Inch Well Screen $45.00 $1,800.00 4.03 60 LF Furnish & Install Gravel Pack $60.00 $3,600.00 4.04 440 LF Furnish & Emplace Cement Grout $36.00 $15,840.00 5.01 1 EA Well Development $5,500.00 $5,500.00 5.02 2 HR Constant-Discharge Test Pumping $150.00 $300.00 5.03 1 EA Well Disinfection & Sampling $1,000.00 $1,000.00 Page 3 of5

6.01 10 LF Furnish & Emplace #8/16 Gravel $15.00 $150.00 6.02 60 SK Furnish & Emplace Cement $15.00 $900.00 7.01 1 EA Clean & Disinfect Water Storage Tank $500.00 $500.00 7.02 25 SF Construct Concrete Well Pad $60.00 $1,500.00 7.03 1 HR Provide Crew to Jet Debris from Bottom of Well $300.00 $300.00 7.04 1 HR Provide Specialized Electrical Work $225.00 $225.00 7.05 2 HR Provide Specialized Plumbing Work $200.00 $400.00 7.06 1 HR Provide Pulling Unit & Crew $225.00 $225.00 7.07 1 HR Drilling Rig & Crew $300.00 $300.00 8.01 1 EA 8.02 1 EA Furnish & Install ¾ Reduced Pressure Principle Backflow Preventer $775.00 $775.00 Furnish & Install 1 Reduced Pressure Principle Backflow Preventer $825.00 $825.00 8.03 1 EA Furnish & Install ¾ Pressure Reducing Valve $350.00 $350.00 8.04 1 EA Furnish & Install 1 Pressure Reducing Valve $400.00 $400.00 8.05 1 EA Furnish & Install 2 gallon Thermal Expansion Tank $325.00 $325.00 8.06 1 EA Furnish & Install 5 gallon Thermal Expansion Tank $375.00 $375.00 Page 4 of5

TOTAL BID AMOUNT $112,697.00 COMPLETION DATE: November 16, 2018 [1] Page 5 of5