Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability?

Similar documents
Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers

Selective Coordination

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Service Entrance Methods

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS

MOLDED CASE CIRCUIT BREAKER BASICS. David Castor, P.E.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

Selective Coordination Enforcement:

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Selective Coordination Compliance Methods for Evaluation and Mitigation

Selective Coordination

TRANSMISSION SYSTEMS

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy

Selective Coordination Requirements

ACHIEVING MAXIMUM BENEFITS WITH A FUSE PROTECTED MOTOR CONTROL CENTER

Evaluating Selective Coordination Between Current-Limiting Fuses And Non Current-Limiting Circuit Breakers

Evaluating Selective Coordination Between

A. Submit manufacturer's literature and technical data before starting work.

Overcurrent Protection According to the 2011 NEC

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals?

Engineering Dependable Protection

www. ElectricalPartManuals. com Engineering Dependable Protection

Electrical safety and reliability: Selective coordination. Protect with selective coordination

Enhancing Short Circuit Selective Coordination with Low Voltage Circuit Breakers

Alternator protection, part 1: Understanding code requirements

Busway Construction. Bus Bars

Design Standards NEMA

Grounding Of Standby & Emergency Power Systems

Appendix C. Interval Every 2 Year. Functional Test Weekly Monthly Quarterly. Semi. Every 3. Engineering Studies

SECTION MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS. This section is organized as indicated below. Select desired Paragraphs.

ECET Distribution System Protection. Overcurrent Protection

Overcurrent Protection (2014 NEC) (Homestudy)

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

4-Day Power System Analysis, Coordination, System Studies

Specification made simple for selective coordination in a compact size

Understanding Arc Flash Hazards. White Paper

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Busway. Siemens STEP 2000 Course. STEP 2000 Courses distributed by

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

A. Provide a complete system of overcurrent protective devises as indicated on the drawings, and as specified herein.

3.0 Radial Distribution Systems

Now - Up To 400A Mains!

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

Recommended Procedures

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

Protectors. Manual motor. Types MS116, MS132, MS45x, MS49x. MS Series. Manual motor protectors. Type MS116. Type MS132. Type MS45x.

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

EE 741 Over-voltage and Overcurrent. Spring 2014

Fused Coordination Panelboard

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

Published for electrical engineers by EPOWERENGINEERING and available at The ABC s of Overcurrent Coordination

Applying Interrupting Rating: Circuit Breakers

Applying Interrupting Rating: Circuit Breakers

TERMS AND DEFINITIONS

Load Side PV Connections

Outdoor Distribution (15 kv through 25 kv) S&C Fault Tamer Fuse Limiter

Motor Protection. Presented By. Scott Peele PE

ECET Circuit Design Motor Loads. Branch Circuits. Article 210

MAGNETIC MOTOR STARTERS

Arc flash hazard mitigation

FUSERBLOC CD. The universal Fuse Combination Switch FROM 20 TO 1250 A. Industrial Switching & Protection Systems

SECTION MOTOR CONTROL

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

BRANCH CIRCUIT PROTECTION FUSED COORDINATION PANELBOARD

Transformer Protection

Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear

Low Voltage Fuses For Motor Protection

ASCO Low Voltage Automatic Transfer Switch Systems

Low Voltage Automatic Transfer Switch Systems

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR

Learning Module 10: Loadcenters. 101 Basic Series

A NEW FUSE-SAVING PHILOSOPHY

GE 8000-Line Motor Control Centers Mains, Feeders, Incoming Lines C-1

Arc-Flash Mitigation Technologies. Dennis Balickie

S&C Fault Tamer Fuse Limiter. Outdoor Distribution (15 kv through 25 kv)

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

3.2. Current Limiting Fuses. Contents

Electrical Safety and Overcurrent Protection

Quick Start Guide TS 910 & TS 920

Shippensburg University

Functional Overview and Operating Principles for the AR-OH and AR360 Overhead AutoRANGER Fault Indicators

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Transfer switch OTEC open or delayed transition

Fuseology. Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression. Optima Fuse Holders & Overcurrent Protection Modules.

Design considerations for generator set mounted paralleling breakers

Power Break II Switchboard

Devices for Branch Circuits and Feeders

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

NEW SERIES OF ETIBREAK EB2 IN VIEW OF SELECTIVITY

MEDIUM VOLTAGE PRODUCTS

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified.

Don t Discriminate: The importance of selective coordination in electrical installations

Quick Start Guide TS 910

Transcription:

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability? The 2005 NEC has new sections that require people transporting equipment such as elevators and escalators, Emergency, Standby, and Essential Systems to be selectively coordinated. This requirement has radically affected the way engineers and electricians design these systems. Today s systems use fuses and circuit breakers to provide protection to the cables, transformers, panelboards, switchboards, and other equipment. Fuses are relatively easy to selectively coordinate in the system. However, elevator coordination panels, fused lighting and distribution panels are not always desired by the owner. This is due to their physical size and thirty ampere maximum branch size for panelboards. Fuses can also cause single phasing issues and the need to wear Arc Resistant PPE to replace a fuse. Most circuit breakers have an instantaneous trip unit or trip function that makes selective coordination difficult to achieve. To achieve this selective coordination, the circuit breaker trip units must have instantaneous trip function removed, defeated, or set above the available fault current. When the instantaneous trip function is removed, the breaker trip time is increased and this will increase the arc flash energy and electrical hazard. It is very expensive to eliminate the breaker instantaneous settings for many locations. In many places, large framed breakers with high instantaneous overrides must be. These larger and more expensive framed breakers are forcing the design engineers to design systems that use less protective devices. They are eliminating panelboard main breakers and using fed through lugs on power risers. With this design, a fault in a panelboard will instead trip out the riser feeder breaker in the main switchboard. For panelboard maintenance or new circuit/circuit breaker installation, it requires electricians to de-energize the entire feeder or work in the Panelboard while energized. This new design actually makes the distribution system less reliable and more electrically hazardous than previous designs. There are various NEC sections referenced below that require selective

coordination: Article 100 Coordination (Selective) - Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the choice of overcurrent protective devices and their ratings or settings. Section 620-51(a) Coordination The fuses or circuit breakers provided for in the disconnecting means shall be selectively coordinated with any and all other supply side overcurrent-protective devices. Article 700.27 Coordination - Emergency system(s) overcurrent devices shall be selectively coordinated with all supply side overcurrent protective devices. Article 701.18. Coordination - Legally required standby system(s) overcurrent devices shall be selectively coordinated with all supply side overcurrent protective devices. Properly sized upstream and downstream fuses can be selectively coordinated for all levels of fault current. Usually, it is impossible to have selective coordination between devices that have instantaneous characteristics (i.e. circuit breakers and relays). 1) All molded case circuit breakers (MCCB) and insulated case circuit breakers (ICCB) must have an instantaneous setting. a) The instantaneous can be adjustable (usually 5 to 10 times the trip rating) b) The instantaneous can be fixed and equal to trip before the breaker short time rating is exceeded. (usually between 10,000 to 40,000 amperes) c) MCCB and ICCB are less expensive and are more compact than the larger power circuit breakers. More compact means smaller switchboards and electrical rooms. 2) Only Power Circuit Breakers (PCB, metal framed breakers i.e. GE Type AKR) can have a solid state trip unit without an instantaneous setting. a) These are very expensive. b) These require switchgear class equipment versus cheaper switchboard class. c) PCB and switchgear are physically bigger. (Bigger electrical rooms and elevator rooms are needed.) d) A PCB installed in switchboards must have an instantaneous setting (fixed or adjustable). 3) Not all fuses can coordinate with each other.

a) There must be at least a 2:1 size difference between the upstream and downstream fuse. b) This ratio varies from manufacture and type of fuse. c) If the ratio is not correct, fuses will not coordinate in the instantaneous region. 4) Circuit breakers with instantaneous settings and fuses usually do not coordinate in the instantaneous region. 5) When breakers have an instantaneous setting. a) They are not selectively coordinated in the area of overlap. b) They can only be coordinated if the level of fault current between the upstream and downstream breakers is great enough to prevent overlapping. c) They usually can be selectively coordinated in the long time, short time, and some part of the instantaneous region. 6) The fixed instantaneous override setting for MCCBs and ICCBs vary from breaker type and manufacturer. a) GE MCCB Spectra breakers with MVT Plus trip units do not have a fixed instantaneous override option. b) Square D s molded case circuit breaker fixed instantaneous settings vary from 10,000 amperes to 40,000 amperes. c) Siemens varies as well. 7) Is this a real problem or a perceived problem? Looking at the device time current curves will show overlapping in the instantaneous region. However, our experience performing over 1,800 power system studies have shown that devices not tripping in sequence is extremely rare. When it does happen, usually a protective device study was not performed or the breakers were not set to the recommended settings listed in the study. The manufacturers ship the breakers and relays with the settings at minimum. When devices are set to minimum, they tend to over lap in the long, short, and instantaneous regions. 8) Most faults are lower Line-to-Ground. Most faults are not the three phase bolted faults producing the maximum available fault current. Many studies and experience has shown that the faults are line-to-ground faults which result in much lower fault currents. When fault currents are lower in magnitude, the phase protective devices will trip in the short time or long time delay region, not in the instantaneous region. They tend to trip in sequence in these regions. However, if the main breaker has ground fault protection and

the feeder breakers do not, the main may trip first. This is because the NEC limits the maximum ground fault trip functions and relays pickup to 1,200 amperes and 0.5 second delay. In many cases, this makes the main breaker much more sensitive to line-to-ground faults than the feeder breakers. 9) Our experience has shown.. a) It is extremely difficult to obtain total selective coordination in the instantaneous region for all levels of fault current. b) That if the fault current is above 35,000 amperes, most common MCCB and ICCB with fixed instantaneous override, can not be used the instantaneous regions will overlap. c) Fuses are not the answer because: i) They have a problem with coordination between them and circuit breakers ii) There must be a ratio (typically 2:1) between upstream and downstream fuse sizes. iii) iv) They have a single phasing problem only one phase blowing. When a fuse blows and it must be replaced, the maintenance personnel are exposed to the energized line side of the switch. They must wear the appropriate PPE to protect themselves from Arc Flash hazards. 10) It is our opinion that the NEC code has required something that is extremely difficult and expensive to obtain. It their attempt to increase system reliability, they are actually systems less reliable and more hazardous. A COMPROMISE IS NEEDED!!!!!

About the Author Bob Fuhr graduated with a B.S.E.E. from the University of Wisconsin in 1980. Before graduating, Mr. Fuhr worked for Madison Gas and Electric in Madison, WI and Tennessee Valley Authority in Knoxville, TN. After graduation, he worked for General Electric Company from 1980 to 1986 as a Field Engineer performing commissioning and start up tests on a multitude of power distribution equipment. From 1986 to 1989 he worked as a Senior Facilities Engineer at the University of Washington. There he re-commissioned the electrical power distribution system for University Hospital. In 1986, he established Power Systems Engineering, a consulting firm that specializes in power systems studies, power quality services, and commissioning services. He also teaches classes in electrical safety, short circuit calculation, protective device coordination, arc flash hazard assessment, power factor correction, harmonics, and filter design. Mr. Fuhr is a Professional Engineer registered in Alaska, Arizona, California, Colorado, Nevada, Oregon, and Washington. Bob has been involved in IEEE and the Industrial Applications Society since 1986. He has served as an officer for IAS from 1988 to 1992. He was the 1991-92 Chairperson of IAS. He was a Member-at-large for the Seattle Section of IEEE for 1992-93. He is an IEEE Senior Member. He is also member of the Electric League of the Pacific Northwest.