PROUT UPAT Product Update ulletin 2015-04 Title: Update Manual S rive omp Upgrade 2 to 2 Models Affected: AS IH AFX 8010,7120-9120 ate: Sept 23, 2015 Problem: 1. High load causing drive belt failure. Solution: 1. Replace existing 2 rive system with stronger 2 rive by ordering Kit Part # S410K. Kit ontents (S410K): - RP160 Pulley Idler Flat 8.0Fd 2.7Fw.625id Yzd (2 rive Only) qty 2 - RP789 ushing Taper SF 2.188 id qty 2 - S244Z Spacer 16mm id x 43mm L qty 1 - S410-01 Sheave ase 2 rive qty 1 - S260-01 Hub ase rive Sheave qty 1 - S205-01 Shim ase Idler 6 od x 3.5 in id qty 4 - RP585 Sheave SF 2 16.0 pd qty 2 - RP233 Sheave 2 11.0 pd SF qty 1-2124K Velt 2 124L Kevlar qty 1-2132K Velt 2 132L Kevlar qty 1 - RP389 ushing Taper SF 50mm id qty 1 - S758 Arm ase 20S Idler lack qty 1 - RP226 Spring-.218 Wr 1.000od 6.50L qty 1 - RP233 Sheave SF 2 11.0 pd qty 1 - H146Z Spacer M16 X.78L - YZ qty 2 - S146Z Spacer M16 X 2.25L - YZ qty 2 - S761Z Spacer.84 id x.147w x 2L YZ qty 1 - S588 Indicator Spring Length 5.75L lack qty 2 - S497Z Washer AFX rive Sheave Yzd qty 1-11M-16180 olt Hex M16 x 180 8.8 YZ qty 1-11M-1245 olt Hex Head 8.8 M12 x 45 qty 6 - N21M-16 Nut Flange M16 qty 1 - W11M-12 Washer Flat M12 x 32 x 3.5 Yzd qty 1 - W51M-12 Washer Nord-Loc M12 qty 6 - W11M-16 Washer Flat M16 x 32 x 3.5 Yzd qty 3 Tools required: - Laser Alignment Tool - lamp or essie lamp - Meter wrench + socket sets - Jack - Pliers - locks (to reach from jack to bottom jackshaft mount) - 13/32 drill bit - Angle drill 1 of 8
PROUT UPAT Product Update ulletin 2015-04 Title: Update Manual S rive omp Upgrade 2 to 2 If you not sure which type of belt do you have 2 or 2 rive measure it up by using following dimensions. 2 rive 2 rive 1: - Remove drive shield (A) to get access to jackshaft mount; - Remove both belts () by loosening tension links (); A 2 of 8
PROUT UPAT Product Update ulletin 2015-04 Title: Update Manual S rive omp Upgrade 2 to 2 2: - Take down jackshaft pillar assembly by unbolting upper and lower brackets; - Unbolt top jackshaft upper mount bracket (F) by taking 4 bolts M12x25 away (hardware will be re-used); - Unbolt lower bracket (S) by taking 4 bolts M12x25 away along with bracket (T) by taking 2 x Flange olts 8 x 16 (U) and Flange Nuts M8; (hardware will be re-used); F F J1 S S T 3 of 8
PROUT UPAT Product Update ulletin 2015-04 Title: Update Manual S rive omp Upgrade 2 to 2 3: - Remove 6 idler () (hardware will be re-used) with idler 8 (RP160); 4 of 8
PROUT UPAT Product Update ulletin 2015-01 Title: Update Manual S rive omp Upgrade 2 to 2 4:- Replace sheave (A) with PR233 Sheave; - Replace sheave () with PR585 Sheave; - Replace bushings () and () by RP789 ushings; A 5 of 8
PROUT UPAT Product Update ulletin 2015-04 Title: Update Manual S rive omp Upgrade 2 to 2 5: - Loose and slide over shaft sheave (); - Replace old Idler arm with new one (1); - For upper lug tightening re-use exisitng hardware (1); - For lower lug use following hardware: 1 pc. - S146Z Spacer M16 X 3L (1) 2 pcs. - H146Z Spacer M16 X.78L (1) 1 pc. - 11M-16180 olt Hex M16 x 180 (F1) 3 pcs. - W11M-16 Washer Flat M16 x 32 x 3.5 (G1) 1 pc. - N21M-16 Nut Flange M16 (H1) If you would like to harwest corn or sunflower please move Spacers (1) at front of new idler (1), which is going to slide pulley (I1) futher. H1 1 1 I1 1 G1 F1 6 of 8
PROUT UPAT Product Update ulletin 2015-01 Title: Update Manual S rive omp Upgrade 2 to 2 6: - Remove current 2 rive sheave; - Assemble hub () into sheave () before mount it on combine chopper drive. Use the shims (F) (usually two required piesces only) to align pulley with the factory triple banded belt; F F 7 of 8
PROUT UPAT Product Update ulletin 2015-01 Title: Update Manual S rive omp Upgrade 2 to 2 7: - Place jackshaft assembly back by re-tighten all bolts from.- y using laser alingment tool check that chopper sheave is square to driver sheave on combine gearbox. - Square chopper if required by loosening bolts on chopper mount flange. Retighten once square; - Install 2 upper belt (2132K) () and lower 2 drive belt (2124K) ; - Re-install all tension links () and (2) and re-tention idlers. For (2) tension link use S761Z (3) Spacer; - heck bottom drive sheaves alignment with laser tool; - If vertical alignment is required loosen rotor bearings and move rotor up or down as required. Tighten bearing bolts and adjust sheaves in or out as required; - Re-install shield (A); 2 2 V V 2 1 Use the laser alignment tool to square jackshaft sheave to combine gearbox sheave 8 of 8