RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION

Similar documents
City of Perris Development Services Building & Safety

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

EV Charging Station Submittal Requirements

City of Palo Alto (ID # 8028) City Council Staff Report

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Application for Service Residential Subdivision / Development

CHAPTER V RESIDENTIAL WIRING

ADVANCED CALCULATIONS

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

UPFRO. Residential Electric. Voltage & Amperage

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

Spring Test 10 due 05/11/2013

Expedited Permitting Process for Electric Vehicle Charging Stations

Electric Vehicle Appendix Notes

Electric Vehicle Charging System Guidelines for Residential Buildings

Components for your PV Solar Electric System

OWNER S MANUAL AND INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS

Spring Test 7 due 05/03/2013

City of Manhattan Beach Community Development

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Chapter 4 Utility Systems Electrical

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

POWER INVERTER 700 WATT / 1800 WATT PEAK

Electricity 1

Please Refer to Attached Sample Form

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Standby Electric Generators for Alaskan Residences. Advice & Installation

STREAMLINED SOLAR CHECKLIST Owner Name:

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

G R E E N B U I L D I N G R E A C H C O D E U P D A T E S

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

QSSE, QSSEX INDUSTRIAL Battery Chargers

Electric Plug-In Vehicle/Electric Vehicle Status Report

Even When the Power s Out.

What is included in a circuit diagram?

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

WATER SYSTEM SIZING Introduction Residential Water System Sizing

MOBILEHOME PARK CONVERSION PROGRAM APPLICATION

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

1000 Watt Power Inverter INSTRUCTION MANUAL HT87112-AUOXY

Electrical Equipment and Terminology

Driving to Net Zero. County of Santa Clara Office of Sustainability. Submitted to: Santa Clara County Submitted by: ICF

Electrical Tech Note 106

BUILDING PERMIT FEES BUILDING VALUATION DATA

City of Manhattan Beach Community Development

ELECTRICAL CONSISTENCY MEETING

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

POWER INVERTER 1,000 WATT / 2,000 WATT PEAK

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Rebate Program Application

2. There are 2 types of batteries: wet cells and dry cells.

OWNER S MANUAL PORTABLE POWER COMPACT & ROBUST

ATD WATT INVERTER

Circuit Concepts (Residential)

12.7 Power in Electric Circuits

OWNER S MANUAL. Please read installation and operation instruction before using this Power inverter.

QPET, QPETXU Battery Chargers

Residential Energy Audit (Electrical) Internal Lighting Annual kwh Entertainment Equipment Annual kwh Laundry Annual kwh Tel: (03)

A Homeowner s Guide to Natural Gas Service

Please Refer to Attached Sample Form

ATD WATT INVERTER

OBE, OBEXU, ON BOARD Battery Chargers

City of San Juan Capistrano Agenda Repo_rt

Volume 2 Charts, Formulas, and Other Useful Information

GENERAL INFORMATION 1.01 PURPOSE

OBAE, OBAEXU, ON BOARD Battery Chargers

Electric Service Guide. Residential

Motor and Drive Efficiency Motor Rebate Application

Installation and Construction Notes for EVSE4

Managing Electric Vehicle Supply Equipment (EVSE) Installations

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code

Power InverterTM Watt. Continuous. User's Manual. WAGAN Corp. Limited Warranty Registration Form. Item no

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

Go Power! Manual. GP-1750HD Inverter GP-2500 Inverter

12VDC TO 230VAC INVERTERS

Is Your Wiring System Safe and Energy Efficient?

Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw

User Manual HomeGrid 5000 HD

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

EV Charging Infrastructure

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Please Refer to Attached Sample Form

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

For technical questions and replacement parts, please call

GP-1000 Inverter. Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4 Tel: Fax:

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Electricity Merit Badge

Elegance Electrician s Installation Guide

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Transcription:

RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION The purpose of this guideline is to assist homeowners and contractors in streamlining the permitting and installation process for home EV Charging Stations Thank you for considering the use of electricity as an alternative fuel source for your next vehicle. There are 2 basic types of EV Chargers for home use (Level 1 and Level 2). Level 1 Chargers are smaller units that plug directly into a standard 120 volt receptacle outlet. These types of Chargers typically require a longer period of time to recharge the vehicle. As long as the receptacle outlet being used to plug-in the Level 1 Charger is existing, there is no requirement to secure a permit from the Building and Safety Division. On the other hand, if you will be installing a new 120 volt receptacle outlet for the Charger, you will need to obtain a permit but you will not need to provide any plans or electrical load calculations as would be required for the more powerful Level 2 type Charging systems. A Level 2 EV Charging system requires 240 volts and charges the vehicle much faster than a Level 1 Charger. Level 2 Charger installations require a permit from the City. In order to obtain the permit you will need to provide the City with some basic information to show that your existing electrical service can handle the added load. If a service upgrade is necessary, please contact the Utilities Department for the required meter spot report. What information do I need to provide the City in order to obtain the permit? The City of Anaheim has developed this EV Charger Installation Guideline in order to streamline the permit and installation process. In most cases, you or your contractor merely need to fill-in the blanks on this document, attach the manufacturer s installation instructions and Charger specifications, and submit it to the Building Division for an over-the-counter review and permit issuance, or complete the application online. If all of the information is provided and the proposal complies with the applicable codes, the review and approval process will only take a few minutes. Once the permit is issued the installation may begin. Upon completion of the installation, an inspection will need to be scheduled to inspect the work performed. The inspection request will need to be scheduled through the Anaheim Building Division and is requested and scheduled by the customer. Inspections are typically performed on the work day following your request for inspection. Please keep in mind that someone will need to be present during the inspection so that the Building Inspector can access the location of the EV Charger, which is typically located in the garage. Approval must also be granted by the Utilities Department for the EV Charger installation. Installing a Level 2 EV Charging System often requires changes to building wiring and Utility electric services. Before installing charging equipment and associated infrastructure, talk to your EV manufacturer Page 1 of 5

for information about what you need to charge your vehicle. If separate Contractors are used for the infrastructure wiring and the EV installation, separate permits will be required for each portion. When installing your EV Charger, be sure to use a licensed Electrical Contractor whose license is current for electrical work. The Contractor shall follow the guidelines of the manufacturer and all necessary Code requirements. When mechanical ventilation is required for the EV Charger, an additional mechanical permit will be required. Why is the Electric Utility concerned about your EV Charger installation? Although an individual Level 2 EV Charger may have a negligible impact on the Public Utilities electric system, the combined effect of several EV Chargers in the same area could result in overloads on Utility secondary wires and transformers. It is crucial that the City of Anaheim be notified of any Level 2 Charger installations to ensure the Utility electrical system components are adequately sized to maintain high levels of service reliability. For more information, please contact the City of Anaheim s Public Utilities Department at 714-765-7438. This information can also be accessed on the Public Utilities webpage at www.anaheim.net or you can visit Public Utilities Electrical Engineering, located on the 7 th floor at 201 South Anaheim Blvd., Anaheim, CA. 92805. LEVEL 2 ELECTRIC VEHICLE CHARGER SERVICE LOAD CALCULATION INSTRUCTIONS: Review the list of electrical loads in the table below and check all that exist in the home (don t forget to include the proposed Level 2 EV Charger). For each item checked, fill-in the corresponding Watts used (refer to the Typical Usage column for wattage information), then add up all the numbers written in the Watts Used column. Write this number in the Total Watts Used box at the bottom of the table and proceed to the next page. Page 2 of 5

EXISTING MAIN CIRCUIT BREAKER SIZE: AMPS *(Loads shown are rough estimates; actual loads may vary for a more precise analysis, use the nameplate ratings for appliances and other loads and consult with a trained electrical professional). Check All Applicable Loads Description of Load Typical Usage* Watts Used GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS Multiply the 3 watts/sq.ft. Square footage of house X 3 KITCHEN CIRCUITS Kitchen circuits 3,000 watts Electric oven 2,000 watts Electric stove top 5,000 watts Microwave Garbage disposal under kitchen sink Automatic dish washer 3,500 watts Garbage compactor Instantaneous hot water at sink LAUNDRY CIRCUIT Laundry circuit Electric clothes dryer 4,500 watts HEATING AND AIR CONDITIONING CIRCUITS Central heating (gas) and air 6,000 watts conditioning Window-mounted A/C Whole-house or attic fan 500 watts Central electric furnace 8,000 watts Evaporative Cooler 500 watts OTHER ELECTRICAL LOADS Electric water heater (storage type) 4,000 watts Electric tank less water heater 15,000 watts Swimming pool or spa 3,500 watts Other: (describe) ELECTRIC VEHICLE CHARGER CIRCUIT Level 2 Electric Vehicle Charger rating* *Use nameplate rating in watts or calculate as: (Ampere rating or circuit X 240 volts = Watts) (Add-up all of the watts for the loads you have checked) TOTAL WATTS USED Page 3 of 5

INSTRUCTIONS: Apply the Total Watts Used number from the previous page to the table below to identify if the existing electrical service panel is large enough to handle the added electrical load from the proposed Level 2 EV Charger. If your electrical service is NOT large enough, then you will need to install a new upgraded electrical service panel. Total Watts Used Before Adjustments Total Watts Used Check the appropriate line Minimum Required Size of Existing 240 Volt Electrical Service Panel (Main Service Breaker size) 100 amps Up to 48,000 48,001 to 63,000 125 amps 63,001 to 78,000 150 amps 78,001 to 108,000 200 amps 108,001 to 123,000 225 amps Please note that the size of your existing service must be equal to or larger than the minimum required size identified in the table above or a new upgraded electrical service panel will need to be installed (a separate permit is required for new service). Please note that approval from the Utilities Department will be required for the installation of the new electrical service panel. CAUTION: This table is NOT to be used to determine the size of a NEW UPGRADED electrical service panel if your existing panel is too small or overloaded according to the table above. In order to determine the size of a NEW or UPGRADED service panel, there is a completely different load calculation methodology that applies. Sizing of a NEW or UPGRADED electrical service panel should only be done by a qualified Electrical Contractor or Electrical Engineer. STATEMENT OF COMPLIANCE By my signature, I attest that the information provided is true and accurate. Job Address: (Print job address) Signature: (Signature of applicant) (Date) Please note that this is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology and forms is at the user s risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel. Page 4 of 5

OTHER HELPFUL INFORMATION FOR EV CHARGER INSTALLATIONS: The table below illustrates the type and size of wire and conduit to be used for various electric vehicle chargers based on 75 degrees Celsius termination provisions. Size of EV Charger Circuit Breaker Required Minimum Size of Conductors (THHN Wire) Electrical Metallic Tubing (EMT) Type and Size*** Rigid Schedule 40 (RNC) Flexible Metal (FMC) 20 amps #12 1/2" 1/2" 1/2" 30 amps #10 1/2" 1/2" 1/2" 40 amps #8 3/4" 3/4" 3/4" 50 amps #8 3/4" 3/4" 3/4" 60 amps #6 3/4" 3/4" 3/4" 70 amps #6 3/4" 3/4" 3/4" ***Based on 4 wires in the conduit (2 current carrying conductors, 1 grounded conductor, 1 equipment ground). As an alternate, Sheathed Cable (aka: Romex Cable or NMC) may be used if it is protected from physical damage by placing the cable inside a wall cavity or attic space which is separated from the occupied space by drywall or plywood. The table below illustrates the required supports for various types of electrical conduit or cable. Intervals Maximum Distance from Box to Electrical Metallic Tubing (EMT) Rigid Schedule 40 (RNC) Flexible Metal (FMC) Sheathed Cable (NMC) 10 3 4-1/2 4-1/2 3 3 1 1 In addition to the above noted requirements, the currently adopted version of the California Electrical Code contains many other provisions that may be applicable to the installation of a new electrical circuit. Installers are cautioned to be aware of all applicable requirements before beginning the installation. For additional information or guidance, consult with the Building Division staff or a qualified and experienced electrical contractor. Page 5 of 5