UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM A August 5, 2016

Similar documents
UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM B August 19, 2016

Qty Description Catalog Number Finish Mfr 6 EA HINGE 5BB1 4.5 X 4.5 NRP 630 IVE 2 EA SURFACE BOLT SB360 12" T 604 IVE 1 EA STOREROOM

SECTION AXIAL HVAC FANS

ADDENDUM No. 1 Prospective Bidders

Metering and Service Installation:

Q: I saw a WCB on the schedule but cannot find it in any of the drawings? A: Refer to Addendum to the Project Drawings

BISCAYNE POINT ROW IMPROVEMENTS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION HVAC POWER VENTILATORS

1. GENERAL BIDDING: For clarification, the sealed bids shall be marked as follows:

SECTION CENTRIFUGAL HVAC FANS

SECTION DUCTWORK ACCESSORIES

Door Types SECTION A DESIGN REQUIREMENTS

10 Commercial, Industrial, Agricultural Services

Door Types SECTION SUPPLEMENTAL DESIGN REQUIREMENTS

B. Fabricate in accordance with ASHRAE handbooks and SMACNA duct manuals. A. Submit in accordance with Division-1 and Section

Air Handling Unit Construction Checklist

COMMERCIAL QUICK REFERENCE

University of Delaware

Automatic Roof Door Vents

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND

Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)

View Point Terrace Apartments SECTION DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY

DESIGN!!GUIDELINES!!!!!

A. This section includes unit capacitors for power factor correction.

Application Guide TABLE OF CONTENTS: I. Introduction II. LHK Description III. Applications IV. Suggested Specification

ADDENDUM NO. ADD-01 Page 1 Rio Vista Security System Upgrade Door Locks Project Santa Clarita, California May 30, 2017

AMCA International. Guide for Commissioning and Periodic Performance Testing of Fire, Smoke and Other Life Safety Related Dampers

City of Manhattan Beach Community Development

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A Look at the 2017 NEC Significant Changes

Model ND-2 Specification

SMOKE DAMPERS SMOKE DAMPERS SMOKE DAMPERS

THE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS

Generator Fire Safety: Generator assemblies should be located outside the building.

System Verification Checklist

SECTION GENERAL-SERVICE AIR COMPRESSOR PART 1 - GENERAL

1 OF 8 LAD LAD PROJECT AREA KIMBERLY GERBER TITLE SHEET C.E.S. DWG. NO. NPN12045 SHEET INDEX

ARCHITECT S SUPPLEMENTAL INSTRUCTIONS

626 FAL REQUIRED 1 EA STOREROOM LOCK T581 Q X IC - F2 MECH & 626 FAL

UNIVERSITY OF CALIFORNIA, SAN DIEGO

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

FLORIDA DEPARTMENT OF TRANSPORTATION

When Time Matters! listed Fire Damper

HARDWARE SCHEDULE SHELDON CHILD CEVELOPMENT CENTER TOPEKA PUBLIC SCHOOLS PART OF ADDENDUM NO. 2 ITEM NO

EXTRUDED ALUMINUM BALANCED DOORS AND ENTRANCES

UTILITY CROSSING DETAIL

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

OPTEVA 923 IN LOBBY TELLER (ILT) PLAN mm (60") WIDE PLAN - STAND ALONE FRONT VIEW SIDE VIEW PAGE 1 OF 5 CALL NOTE:

AMENDMENT ELECTRIC SERVICE MANUAL 2014

ACSI MODEL 1406BB-04-AO POWER SUPPLY INSTALLATION INSTRUCTIONS

ADA Entrance Accessibility

1. Field verify measurements and circuiting arrangements as shown on as-built drawings.

Modified Downdraft Paint Booth Nut and Bolt Assembly Pre-Punched Panel Flanges

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession.

DIVISION 16 - ELECTRICAL SECTION 16xx0 MANUFACTURED WIRING SYSTEM ACCESS FLOOR

PDI PowerWave 2 Bus System

SECTION AIR TERMINAL UNITS

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

ENGINEERING SPECIFICATION

The Premium Quality Fan Coil Units for Horizontal Application Hydronic or Electric Heat

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

A. Hardware for new doors. B. Keying of new hardware into existing hardware keying system.

TELETOM PREINSTALLATION MANUAL

FIRE/LIFE SAFETY CLOSERS/HOLDERS SERIES

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

City of Manhattan Beach Community Development

LABORATORY FUME HOODS OF 5

CFSD Series. Product Description

INSTALLATION MANUAL. Melink Corporation (513) Revision

AUDIO-VISUAL EQUIPMENT

Architect s Guide for Detailing & Specifying Access Floor Air Plenums

5. Contractor Information 3M Model 2300 Series System Layout Checklist

East Central College

2520- EC Motor Speed Controller

Standard Installation Fire/Smoke Damper Models: FR1, FR2 Smoke Damper Models: SR1, SR2

FOR SALE OR LEASE PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II SITE. NE 172nd Place & NE 170th Place, Gresham, Oregon

JUNE 9, 2017 SECTION SECTION DOOR HARDWARE

Installation Instructions

MODELS TSX AND TSX-S SINGLE DUCT ROUND AIR TERMINALS

SINGLE DUCT AIR TERMINAL UNITS

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

Eagle Mountain-Saginaw Independent School District REQUEST FOR COMPETITIVE SEALED PROPOSALS (RFCSP)

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

HAMPTON INN AND SUITES

South Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.

IN2 Enclosed Switches and Circuit Breakers

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

American Safe Room, Inc. Installation and Operation Manual for the ASR-101-BV 7-Bar Double Acting Automatic Blast Valve

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

MODELS SGX AND SSX SINGLE DUCT ROUND AIR TERMINALS

S U B M I T T A L T R A N S M I T A L

EXTRUDED ALUMINUM TEMPERED GLASS BALANCED DOORS AND ENTRANCES

Door/Hardware Index. Page 1 of 1

ADDENDUM NUMBER 2 (DATED May 7, 2012) TO THE CONTRACT DOCUMENTS AND CONSTRUCTION SPECIFICATIONS FOR WINDSOR CRUDE OIL TERMINAL

Transcription:

UNLV Animal Care Facility University of Nevada Las Vegas ADDENDUM A August 5, 2016 Owner: Architect: To: University of Nevada Las Vegas 4505 S. Maryland Parkway Las Vegas, Nevada 89154 Tate Snyder Kimsey Architects 303 S. Water Street, Suite 230 Henderson, NV 89015 (702) 456-3000 All Plan Holders of Record This addendum forms a part of the Contract Documents and modifies the original Construction Documents dated June 17, 2016, as noted below. Acknowledge receipt of this Addendum on the Bid Form. Failure to acknowledge receipt of addendum may result in disqualification of bidder. Addendum No. A consists of 61 items and 58 attachments CHANGES TO SPECIFICATIONS: ITEM 1 SECTION 08710 DOOR HARDWARE: Section 3.9 Door Hardware Schedule: Add the following door hardware set: HW SET 09 POWER SUPPLY, ELECTRIC STRIKE, DOOR CONTACT, AND WIRING, BY OWNER SUPPLIED SECURITY CONTRACTOR-VVLS. For use on mark/door #(s): 028 Qty Description Catalog Number Finish Mfr 4 EA HINGE 5BB1 5 X 4.5 652 IVE 1 EA STOREROOM LOCK L9080HD 06A 626 SCH 1 EA SFIC PERMANENT CORE KEYMARK-VERIFY KWY W UNLV LOCKSHOP 0-BIT w/2 keyblanks 626 MED 1 EA ELECTRIC STRIKE 1006 SERIES 630 HES -SUPPLIED AND INSTALLED BY VVLS 1 EA SURFACE CLOSER 4040XP RW/PA TBWMS 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE 1 EA WALL STOP WS406/407CCV 630 IVE 1 EA GASKETING 188S-BK S-Bk ZER August 5, 2016 () Page 1

1 EA MULTITECH READER MT15 -SUPPLIED AND INSTALLED BY VVLS BLK SCE ITEM 2 ITEM 3 SECTION 08800 GLAZING. Section 2.2 Flat Glass Materials: 1. Removed Type callouts from the beginning of paragraph 2.2A, 2.2B, 2.2C, 2.2D, 2.2E. SECTION 16208 PACKAGED ENGINE GENERATOR SYSTEMS: 1. Page 4: changed generator voltage to 208Y/120V to match project requirements. CHANGES TO DRAWINGS: ITEM 4 SHEET C1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Revised sheet index to reflect new detail sheets 2. Revised NFPA 24-2010 section 4.1.3 to NFPA 24 section 4.1.3 ITEM 5 ITEM 6 ITEM 7 ITEM 8 ITEM 9 ITEM 10 ITEM 11 SHEET C2.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Saw-cut limits revised to reflect utility revisions. SHEET C4.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Rotated 6 RPDA 90 degrees and moved it East to accommodate PIV installation. 2. Re-routed pipes for previous revisions and to avoid water piping under the proposed generator. 3. Under water construction notes added a bullet note to see sheets C6.01 & C6.02 for UDACS standard plates and specifications called out below. 4. Added water note 15 install PIV w/tamper switch. 5. Revised construction type under fire flow calculations to match architectural plans. 6. Added a block definition for PIV block. 7. Fire Department Approval block removed. SHEET C5.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Saw-cut limits and existing FG elevation tags revised to reflect utility revisions. SHEET C6.01: Insert new sheet, dated August 5, 2016, attached to this 1. Added UDACS section 2.22, UDACS standard plates 30, 31, and 34. SHEET C6.02: Insert new sheet, dated August 5, 2016, attached to this 1. Added UDACS standard plates 40 and 56. SHEET G0.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated Index of Drawings to show Addendum #1 Sheets. 2. Updated Code Analysis. 3. Updated list of Required Deferred Submittals. SHEET G0.02: Insert new sheet, dated August 5, 2016, attached to this 1. Added UL details. August 5, 2016 () Page 2

ITEM 12 ITEM 13 ITEM 14 ITEM 15 ITEM 16 ITEM 17 ITEM 18 ITEM 19 ITEM 20 ITEM 21 SHEET G0.03: Insert new sheet, dated August 5, 2016, attached to this 1. Added UL details. SHEET G1.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated detail 1 front obstructed reach range. 2. Updated detail 7 floor clearance dimensions at water cooler. SHEET G1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated Exiting Plan. SHEET AS1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added existing and new accessible routes. 2. Added fire department connection location per Civil drawings. SHEET A1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Updated legend. 3. Updated (2) hour CMU wall at Storage 028. 4. Added fire department connection location per Civil drawings. 5. Added ADA clearance dimensions at Enlarged Restroom Plan. SHEET A2.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated door hardware for Door 028. 2. Updated size of doors 019, 020, 021, and 022. SHEET A2.30: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added head of wall UL information to Partition Type F1. 2. Updated text note for gypsum board at Partition Type F2. SHEET A2.40: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Updated signage types in Signage Schedule. 3. Added sign type details. 4. Updated Signage Plan. SHEET A2.50: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Revised details 3, 4, and 8. 2. Added detail 14 Gas Cylinder Restraints. SHEET A3.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added exit signs at Enclosure 158. August 5, 2016 () Page 3

ITEM 22 ITEM 23 ITEM 24 ITEM 25 ITEM 26 ITEM 27 ITEM 28 ITEM 29 ITEM 30 ITEM 31 SHEET A3.10: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated notes on details 5 and 6. 2. Updated text note for gypsum board at details 4 and 8. SHEET A5.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Added signage to details 4, 6, 16, and 21. SHEET A5.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Added countertop dimensions to details 1 and 3. SHEET A5.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Added countertop dimension to detail 1. 3. Revised gas cylinder restraints and added detail callout. SHEET A5.03: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Updated sizes of doors in elevations 1 and 3. 3. Added signage to elevations 1, 3, and 4. 4. Added countertop dimensions to details 9 and 11. SHEET A5.04: Replace sheet with revised sheet, dated August 5, 2016, attached to this SHEET A6.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added fire department connection location to elevation 1. SHEET A7.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added signage at Elevation 3 and Section 5. SHEET S0.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Updated sheet list. 2. Updated title block information/dates. 3. Revised general note 13 to clarify that structural observation is not required. 4. Expanded Quality Assurance and Special Inspection Notes to clarify frequency of testing (continuous, periodic, etc.) SHEET S0.03: Insert new sheet, dated August 5, 2016, attached to this 1. Added new sheet to include tables referenced in expanded Quality Assurance and Special Inspection Notes. Refer to S0.01. August 5, 2016 () Page 4

ITEM 32 ITEM 33 ITEM 34 ITEM 35 ITEM 36 ITEM 37 ITEM 38 ITEM 39 ITEM 40 ITEM 41 SHEET S0.04: Insert new sheet, dated August 5, 2016, attached to this 1. Added new sheet to include tables referenced in expanded Quality Assurance and Special Inspection Notes. Refer to S0.01. 2. Added notes for post-installed anchors in concrete and masonry. SHEET S1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. 1/S1.01: revised generator max. weight to 10,000 lbs. 2. 2/S1.01: Revised water tank max. weight to 6,000 lbs. SHEET S5.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. 11/S5.01: Revised bottom mat reinforcing at equipment base and clarified maximum pad thicknesses. 2. 12/S5.01: Revised bottom mat reinforcing at thickened slab below water tanks. SHEET S5.03: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. 7/S5.03: Revised callout for bond beam to be 2 courses and for the anchors at the bearing plate to be centered in the wall. 2. 10/S5.03: Added callout for tie sets. SHEET M0.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Energy Compliance Report removed. Inserted new sheet M0.04 with full Energy Compliance Report. SHEET M0.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Rooftop heat recovery schedule corrected to 180-140 deg. F. 2. Laboratory Supply Air Valve Schedule: Reheat coil selection corrected. SHEET M0.03: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Space Air Balance Schedule: minimum airflow for general exhaust valve, GEV-025, serving Clean Storage (025) is corrected. SHEET M0.04: Insert new sheet, dated August 5, 2016, attached to this 1. Inserted new sheet with full Energy Compliance Report. SHEET M1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Plan 1: location of diffuser/grille is coordinated with reflected ceiling plan A3.01 (typ.) 2. Plan 1: cable operated remote damper is shown in locations with hard lid ceilings. SHEET M1.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Plan 1: corrected 1-1/2 dia. Heating hot water supply and return risers for unit AC-V1 to 2. 2. Plan 1: Piping changed to 2 in M1.01. August 5, 2016 () Page 5

ITEM 42 ITEM 43 ITEM 44 ITEM 45 ITEM 46 ITEM 47 ITEM 48 ITEM 49 ITEM 50 ITEM 51 ITEM 52 ITEM 53 SHEET M4.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Minimum of 14 ft. height was added for exhaust fan discharge height. SHEET M5.00: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Detail A and B: Added wyes-strainer with drain valve, hose end connection and cap to detail SHEET P0.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 2. Energy Compliance Report removed. Inserted new sheet P0.03 with Full Energy Compliance Report. SHEET P0.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Potable Water Pipe Sizing Calculation Schedule: shown missing make-up airflow for reverse osmosis system. SHEET P0.03: Insert new sheet, dated August 5, 2016, attached to this 1. Inserted new sheet P0.03 with full Energy Compliance Report. SHEET EG1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added entire ComCheck report, see sheet E6.02. 2. Removed switched from the emergency ballast note 3. Defined PT in receptacle symbols. PT is also used on single lines as Potential Transformer and is defined in the single line diagram symbols/abbreviations. SHEET ES0.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Lightened background, darkened work. SHEET ES1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added keynote 5 indicating transformer pad to be installed per NVE drawings. SHEET E1.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added one Type-B fixture to room 013. SHEET E1.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added one Type-B fixture to room 013. SHEET E2.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Relocated Fire Alarm Panel. 2. Fume hood receptacles replaced with junction boxes. SHEET E2.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this August 5, 2016 () Page 6

1. Fume hood receptacles have been removed and replaced with a junction box, see E2.01 ITEM 54 ITEM 55 ITEM 56 ITEM 57 ITEM 58 ITEM 59 ITEM 60 ITEM 61 SHEET E3.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Symbols updated to show strobes/horns to match legend. 2. Note added to indicate the fire alarm system is design/build by the fire alarm contractor. 3. Smoke detector added to room 004. SHEET E3.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Revised keynote 2 to indicate that door hardware/card reader must meet building code requirements. 2. Fire alarm panel moved, adjacent to the door. SHEET E4.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Detail 1 - updated to show connection to structure above. 2. Detail 4 changed keynote 2 to clarify one circuit per receptacle, no shared neutral. SHEET E4.02: Insert new sheet, dated August 5, 2016, attached to this 3. Added duct-bank sections 4. Added fire penetration details SHEET E5.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Ground to Neutral bond added at switchboard. 2. Added keynote 3 for grounding electrode. 3. Added keynote 4 for ground rod. SHEET E6.01: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Revised circuit breakers for HP-1 and HP-2 to 30/3. 2. Added load information for even circuits 2-12. SHEET E6.02: Replace sheet with revised sheet, dated August 5, 2016, attached to this 1. Added complete IECC report. SHEET E6.03: Insert new sheet, dated August 5, 2016, attached to this 1. Moved fixture/transformer schedules from E6.02 to E6.03 to make room for IECC report. 2. Added mounting height for fixture type-d. 3. Removed battery requirement from fixture type-x. 4. Removed the Lutron driver requirement for Type-B fixture. August 5, 2016 () Page 7

ATTACHMENTS: SHEETS C1.01, dated 08/05/16 C2.01, dated 08/05/16 C4.01, dated 08/05/16 C5.01, dated 08/05/16 C6.01, dated 08/05/16 C6.02, dated 08/05/16 G0.00, dated 08/05/16 G0.02, dated 08/05/16 G0.03, dated 08/05/16 G1.00, dated 08/05/16 G1.01, dated 08/05/16 AS1.01, dated 08/05/16 A1.01, dated 08/05/16 A2.00, dated 08/05/16 A2.30, dated 08/05/16 A2.40, dated 08/05/16 A2.50, dated 08/05/16 A3.01, dated 08/05/16 A3.10, dated 08/05/16 A5.00, dated 08/05/16 A5.01, dated 08/05/16 A5.02, dated 08/05/16 A5.03, dated 08/05/16 A5.04, dated 08/05/16 A6.00, dated 08/05/16 A7.00, dated 08/05/16 S0.01, dated 08/05/16 S0.03, dated 08/05/16 S0.04, dated 08/05/16 S1.01, dated 08/05/16 S5.01, dated 08/05/16 S5.03, dated 08/05/16 M0.01, dated 08/05/16 M0.02, dated 08/05/16 M0.03, dated 08/05/16 M0.04, dated 08/05/16 M1.01, dated 08/05/16 M1.02, dated 08/05/16 M4.00, dated 08/05/16 M5.01, dated 08/05/16 P0.01, dated 08/05/16 P0.02, dated 08/05/16 P0.03, dated 08/05/16 August 5, 2016 () Page 8

EG1.01, dated 08/05/16 ES0.01, dated 08/05/16 ES1.01, dated 08/05/16 E1.01, dated 08/05/16 E1.02, dated 08/05/16 E2.01, dated 08/05/16 E2.02, dated 08/05/16 E3.01, dated 08/05/16 E3.02, dated 08/05/16 E4.01, dated 08/05/16 E4.02, dated 08/05/16 E5.02, dated 08/05/16 E6.01, dated 08/05/16 E6.02, dated 08/05/16 E6.03, dated 08/05/16 END OF ADDENDUM A August 5, 2016 () Page 9