Portland-Milwaukie Light Rail Project Johnson Creek Boulevard

Similar documents
Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Eagle Landing Traffic Impact Study

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo

Chapter 4. Transportation. Portland-Milwaukie Light Rail Project SOUTH CORRIDOR PROJECT

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Lacey Gateway Residential Phase 1

V. DEVELOPMENT OF CONCEPTS

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

Transit City Etobicoke - Finch West LRT

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

NEWS RELEASE November 8, 2017

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

Evaluation of Renton Ramp Meters on I-405

Volume 2 Appendix Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. June 18, 2018

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Strategies to keep people and goods moving in and through Seattle

4.1 Traffic, Circulation, and Parking

IMPROVEMENT CONCEPTS

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

Traffic Engineering Study

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Sepulveda Pass Corridor Systems Planning Study

I-225 Rail Line Iliff and Florida Stations Information Meeting

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

King Soopers #116 Thornton, Colorado

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

HIGHWAY 28 FUNCTIONAL DESIGN

Troost Corridor Transit Study

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

INDUSTRIAL DEVELOPMENT

Attachment F Transportation Technical Memorandum

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

Traffic Impact Analysis for 2171 Rosecrans Avenue

INTERSECTION CONTROL EVALUATION

IV. REVISIONS TO THE DRAFT IS/MND

Environmental Assessment Derry Road and Argentia Road Intersection

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Mineola Village Green

Final Interchange Justification Report

2.0 Development Driveways. Movin Out June 2017

Section 5.8 Transportation and Traffic

RTE. 1 at RTE. 637 & RTE. 639

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Proposed Commercial Service at Paine Field Traffic Impact Analysis

Appendix H: Construction Impacts H-2 Transportation

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

Develop ground transportation improvements to make the Airport a multi-modal regional

Transportation & Traffic Engineering

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRANSPORTATION REVIEW

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

Doran Street and Broadway/Brazil Grade Separation Project

4.14 TRANSPORTATION AND CIRCULATION

TRAFFIC IMPACT ANALYSIS

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

APPENDIX A Interstate 26 Widening Traffic Analysis Report

Foster Ave and Harlem Ave. RLR Crash Data and Analysis

APPENDIX E. Traffic Analysis Report

Committee Report. Transportation Committee. Business Item No

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

Metropolitan Freeway System 2007 Congestion Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

Sepulveda Pass Corridor Systems Planning Study Update

TRAFFIC IMPACT STUDY FOR

Oakbrook Village Plaza City of Laguna Hills

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

Project Working Group Meeting #5

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Transcription:

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard EXISTING AND FUTURE OPERATIONS AND POTENTIAL MITIGATIONS Presented by Alan Snook DKS Associates October 12, 2009 1

AGENDA Traffic 101 Study Area Ownership and Functional Class Existing Traffic Data Trip Distribution Future Conditions Potential Mitigation Discussion 2

TRAFFIC 101 Peak Hour Level of Service Volume to Capacity Ratio Queuing No Project vs. Project Trip Generation Mitigation 3

STUDY AREA AND INTERSECTIONS 99E SB on/off ramp 32 nd Ave 17 th Avenue 99E SB off ramp 99E NB on/off ramp 36 th Ave 42 nd Ave 45 th Place Study Area Intersection Study Corridor N 4

CORRIDOR/INTERSECTION OWNERSHIP Tacoma Street 32 nd Ave 36 th Ave 42 nd Ave 17 th Avenue N City of Portland Ownership/Jurisdiction City of Milwaukie Ownership/Jurisdiction Oregon Department of Transportation Ownership/Jurisdiction 5

Existing 2009 Conditions 6

EXISTING TRAFFIC DATA 99E SB on/off ramp 32 nd Ave 17 th Avenue 99E SB off ramp 99E NB on/off ramp 34 MPH 36 th Ave 34 MPH 42 nd Ave 45 th Place 1200 1000 800 Number of cars a day = 13,550 Westbound Eastbound 600 400 200 0 1200 1000 800 600 Number of cars a day = 13,700 Westbound Eastbound N 12:00 AM 06:00 AM 12:00 PM 06:00 PM 11:00 PM 400 200 0 PM Peak meets Jurisdiction Standard PM Peak does NOT meet Jurisdictional Standard 7 12:00 AM 06:00 AM 12:00 PM 06:00 PM 11:00 PM

CURRENT AM PEAK USERS OF JOHNSON CREEK BOULEVARD 35% Downtown Portland 20% North of Sellwood Bridge 17% Portland 25% South of Sellwood Bridge 5% Milwaukie 69% Clackamas County 15% South 14% Milwaukie N 8

CURRENT PM PEAK USERS OF JOHNSON CREEK BOULEVARD 18% Downtown Portland 38% North of Sellwood Bridge 21% Portland 12% South of Sellwood Bridge 24% South 8% Milwaukie 34% Milwaukie 45% Clackamas County N 9

Future 2015 Conditions 10

PARK AND RIDE SCENARIOS EVALUATED - Is in need of some improvement 11

MOTOR VEHICLE TRIP GENERATION AND DISTRIBUTION <1% 2% 12% 6% 17 th Avenue 20% Park and Ride 30% 10% 20% 1% 5% 7% 50% 32 nd Ave 36 th Ave 7% 25% South of 224 25% to 224 42 nd Ave N X% - Park and Ride Motor Vehicle Distribution 12

17 TH AVENUE/TACOMA STREET QUEUING Existing and Future PM Peak 17 th Avenue/Tacoma Street Tacoma Street Signal Timing Adjustments Existing 2015 No Build 17 th Avenue N 2015 With Project No Mitigation 2015 With Project Mitigated 13

99E SOUTHBOUND OFF RAMP/TACOMA STREET QUEUING Existing and Future PM Peak 99E Southbound/Tacoma Street Nehalem Street Two Stage Left Turn Tenino Street Existing N 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 14

99E NORTHBOUND ON-OFF RAMP/TACOMA STREET QUEUING Existing and Future PM Peak 99E Northbound/Tacoma Street NO MITIGATION NECESSARY Eastmoreland Golf Corse Proposed Park and Ride Existing N 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 15

32 ND AVENUE/JOHNSON CREEK BOULEVARD QUEUING Existing and Future PM Peak Eastmoreland Golf Corse 32 nd Ave/Johnson Creek Blvd Signalize Add westbound left turn 32 nd Ave Existing 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 16

36 TH AVENUE/JOHNSON CREEK BOULEVARD QUEUING Existing and Future PM Peak 36 th Ave/Johnson Creek Blvd Remove east/west stop control 36 th Ave Existing 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 17

42 ND AVENUE/JOHNSON CREEK BOULEVARD QUEUING Existing and Future PM Peak 42 nd Ave/Johnson Creek Blvd Signalize intersection 42 nd Ave Existing 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 18

45 TH PLACE/JOHNSON CREEK BOULEVARD QUEUING Existing and Future PM Peak 45 th Place/Johnson Creek Blvd 45 th Place Signal Timing Adjustments Existing 2015 No Build 2015 With Project No Mitigation 2015 With Project Mitigated 19

SUMMARY OF POTENTIAL MITIGATION STRATEGIES 17 th Ave/Tacoma Street 99E Southbound/Tacoma 32 nd Avenue/JCB 36 th Avenue/JCB 42 nd Avenue/JCB 45 th Place/JCB Signal Timing Adjustments Two stage left turn Signalize intersection Add Westbound Left Turn Remove east/west stops Signalize intersection Signal Timing Adjustments 20

JOHNSON CREEK BOULEVARD PM PEAK HOUR COMPARISON Volumes Eastbound Westbound Existing 2015 No Project 590 430 750 590 2015 With Project No Mitigation 800 580 2015 With Project With Mitigation 870 610 Vehicle Speed 34 mph 27 mph 27 mph 33 mph Emissions (CO 2 ) 5.1 kg 10.7 kg 10.5 kb 5.9 kg Travel Time Eastbound Westbound 5 min 45 sec 3 min 10 sec 9 min 30 sec 4 min 15 sec 9 min 45 sec 4 min 15 sec 6 min 00 sec 3 min 30 sec Fuel Consumed 73 gal 153 gal 150 gal 85 gal 21

Next Steps/Discussion 22