(3) 2-Loop B&W PWR s Unit 1- Commissioned 7/5/1973 Unit 2- Commissioned 9/9/1974 Unit 3- Commissioned 12/16/ MW per unit for a total of 2880 MW

Westinghouse SG Tube Sleeve Designs and Installation. Jesse Baron, PE Principal Engineer

Key-Words : Eddy Current Testing, Garter Spring, Coolant Channels, Eddy Current Test Coil Design etc.

5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS

ESTABLISHMENT OF ULTRASONIC TESTING IN UNIQUE DESIGNED PARTIAL PENETRATION END PLUG OF HEADER IN BOILERS.

Ageing Management, In Service Inspection and Exceptional Maintenance. D. Dallery J.J. Nicolay (Nuclear Operations Division, EDF - France)

Differential Expansion Measurements on Large Steam Turbines

November 6, TAEK-CHO Yoon Wolsong NPP-2, KHNP, Korea / 1

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

SONGS Unit 2 Return to Service Report ATTACHMENT 5. MHI Document L5-04GA571, Screening Criteria for Susceptibility to In-Plane Tube Motion

Module 09 Heavy Water Moderated and Cooled Reactors (CANDU)

Current Status in Korean NPPs ALARA mini-workshop , Hamaoka, Japan

Evolving Bump Chip Carrier

JIS G4051 Carbon steel for Machine Structural Use

*TATSUYA KUNISHI, HITOSHI MUTA, KEN MURAMATSU AND YUKI KAMEKO TOKYO CITY UNIVERSITY GRADUATE SCHOOL

Improving predictive maintenance with oil condition monitoring.

Investigations into methods of measuring the state of health of a nickel-cadmium Industrial Battery

Experience on Deterioration Survey of Aged 550 kv GIS and Optimized Evaluation Model in Thailand

ENRICHMENT TECHNOLOGY COMPANY TECHNOLOGICAL PLATFORM. URENCO & AREVA STATE & DEVELOPMENT FORECAST

AECL participation in the Argentine Nuclear Generation Program Simposio LAS-ANS ANS June 25th 2009 CNEA Buenos Aires

Detection and evaluation of rail defects with nondestructive

Evaluation of sealing performance of metal. CRIEPI (Central Research Institute of Electric Power Industry)

for building an automation systems in Driver s s licenses test center

Ultrasonic and Magnetic Particle Testing of New Railway Wheels

Not Reviewed by WMSymposia, Inc. Soil Washing Experiment for Decontamination of Contaminated NPP Soil

Fuel Reliability: Achieving Zero Failures and Minimizing Operational Impacts Rob Schneider, Senior Engineer/Technologist, Global Nuclear Fuel

Advanced Digital Valve Controller

Scientech Stresswave SRV Leak Detection Scientech Symposium 2015

Inspection & Maintenance of Spring Rail Frogs

Rosemount 485 Annubar Pak-Lok Assembly

SPV Series Slides OPERATING MANUAL. Table of contents 1 Introduction Compliance with the EC Directives Names of parts...

ADVANCED INSPECTION TECHNIQUE FROM INSIDE SURFACE FOR DISSIMILAR METAL WELD OF STEAM GENERATOR NOZZLE

NHP SAFETY REFERENCE GUIDE

Positron Insulator Testers for High Voltage Live Line Testing

IGNITION COIL - 2.4L SPARK PLUG

HIGH LEVEL WASTE TANK CLOSURE PROJECT AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY

Workshop I. Tuning LNB s and OFA Systems

ISCORMA-3, Cleveland, Ohio, September 2005

Influence of Decontamination

Installation, Operation and Maintenance

The Feasibility of Fill-for-Life Turbine Oils. Greg Livingstone Fluitec

Pipework Integrity. Deterioration Management. Neil Henry Senior Consultant ABB Engineering Services. OPERA Meeting. March. 2006

NRC Non-Destructive Examination Research

1: CANDU Reactor. B. Rouben McMaster University Nuclear Reactor Physics EP 4D03/6D Sept-Dec September 1

STEAM TURBINE MODERNIZATION SOLUTIONS PROVIDE A WIDE SPECTRUM OF OPTIONS TO IMPROVE PERFORMANCE

Super-Critical Water-cooled Reactor

TITLE: EVALUATING SHEAR FORCES ALONG HIGHWAY BRIDGES DUE TO TRUCKS, USING INFLUENCE LINES

Hydro Plant Risk Assessment Guide

The mechanism that generates mist (moisture) Principles of water removal valve operation

SOLID CONSTRUCTION PTFE STEP FACE GASKETS FOR IMPROVED SEALING PERFORMANCE IN MONDI PIPING

PIPE WHIP RESTRAINTS - PROTECTION FOR SAFETY RELATED EQUIPMENT OF WWER NUCLEAR POWER PLANTS

LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco

Custom Tailored Gasifier Feed Pumps

DRIVEABILITY - GAS. All symptoms listed above are diagnosed using the same tests. The title for the tests will be P0300-MULTIPLE CYLINDER MIS-FIRE.

PETroleum CARBON FUEL (PCF)

Inspection Testing Repair

ALBA Power Supplies Activities. R. Petrocelli D. Alloza

CORROSION LOGGING BY EMPULSE TECHNOLOGY

Presentation Macko Fuel Filter, Fuel Water Separator

Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

APPLICATION NOTE. Package Considerations. Board Mounting Considerations. Littelfuse.com

Electric barrel pump EFP-1 and EFPM-2 General, Fields of application und types of systems

Centro América Application of EMI Diagnostics to Diesel Generators

Passive Vibration Reduction with Silicone Springs and Dynamic Absorber

ABB Power Products Medium Voltage MV SERVICE. Florence, SC Napa, CA Coral Springs, FL. ABB Inc. -1- March, 2007

C627, C628, C631, C656, C657, C658, C671 and C680 Alternator Troubleshooting Guide

EQ tests of electrical equipment used in Japanese NPP

Signature: Date: April

DEVELOPMENT OF VIBRATION CONDITION MONITORING SYSTEM APPLYING OPTICAL SENSORS FOR GENERATOR WINDING INTEGRITY OF POWER UTILITIES

Development of GE4i Cylindrical Grinder

Significance of Each Test. 1. Color (Visual)

1. INTRODUCTION XA SLIGHTLY ENRICHED URANIUM FUEL FOR A PHWR

AN ANALYSIS OF DRIVER S BEHAVIOR AT MERGING SECTION ON TOKYO METOPOLITAN EXPRESSWAY WITH THE VIEWPOINT OF MIXTURE AHS SYSTEM

Pump Division MSP Vertical, In-line, Medium Speed Pump

Eddy Current Introduction. Products & capability overview

CNS Fuel Technology Course: Fuel Design Requirements

INSTRUCTION MANUAL. Braking Resistor

V-series. LED Module. Features& Benefits. Applications. Indoor Lighting:

Linear Σ Series. Linear Servo Motor. Installation Manual

Feedwater Reg Valve Internal Erosion OR17 Fall 2015

Sohn Suk-Whun

World Scientific Research Journal (WSRJ) ISSN: Multifunctional Controllable and Detachable Bicycle Power Generation /

Integrity Evaluation of Steam Line Using Complimentary NDE Methods (Acoustic Emission and Ultrasonic Testing)

Urea Reactor Height Extension to Increase Capacity

AN EVOLUTIONARY DESIGN OF NO SPIN DIFFERENTIAL USING THE AXIOMATIC APPROACH -- FOCUSING ON BETTER STEERABILITY

Inlet House Air Filters Presented By: Zahi Youwakim

Evaluation of a Gearbox s High-Temperature Trip

Ignition System Inspection and Component Testing (Distributor Vehicle)

NUCLEAR FUEL RELIABILITY IN NPP KRŠKO

SECTION Exterior Lighting

Mack T-12 EGR Engine Oil Test. Report Packet Version No. Conducted For

Agilent N2763A Rack Mount Kit for 4000 X-Series Oscilloscopes

PRESSURE EQUIPMENT ENGINEERING SERVICES, INC.

Session Four Applying functional safety to machine interlock guards

Shift Solenoid "A" Performance (Shift Solenoid Valve S1)

PERFORMANCE IP67 (IEC60529, JIS C 0920) Silver contact: Max.50 mω (6 to 8 Vdc, energizing current 1A, measured by voltage drop method) Gold alloy cros

S-8209B Series Usage Guidelines Rev.1.5_02

Transcription:

Steam Generator Tube Inspection and Foreign Object Retrieval in Wolsong NPP Lee, Jeong Uk ( jwlee357@khnp.co.kr ) Wolsong NPP1 Chemistry Dep t KOREA HYDRO & NUCLEAR POWER CO., LTD. South Korea Wolsong NPP1 1

Diagnostic Program for S/G Reliability Recently, To enhance integrity of secondary side tube of steam generator(s/g) is strengthening the requirements of non-destructive inspection ECT FOSAR(Foreign Object Search and Retrieval) CANDU type steam generator tube is hardly defective But results of a diagnostic program may be affected by Structural characteristics of S/G model Retention of optimized equipment, Operation period Inspection evaluation Foreign substance characteristics (Especially) Wolsong NPP1 2

Foreign Object Effect in S/G In steam generator with many years of operation, Equipment access restriction due to hard sludge Difficult to access for foreign objects inspection ECT Detectivity effect : Co-existence of non-contact non-magnetic foreign objects and sedimentary sludge Effect of Foreign Object remaining between tubes Increase the tube defects probability by flow, vibration Complementary relationship for Foreign Object detection ECT FOSAR Wolsong NPP1 3

Wolsong NPP Condition Item Unit 1 (1) Unit 2, 3, 4 Manufacturer Foster Wheeler Bobcock & Wilcox Quantity 4 4 Tube 3,558 3,530 Tube Material Alloy 800 Alloy 800 2 nd Side Handhole 3 (2 1ea, 4 2ea) 4 (2 1ea, 4 2ea) 2 nd Side Manway 1 1 Tube Gap 4.74mm 5.02mm Sludge Lancing No (2) Yes (4) In-Bundle FOSAR Yes (3) Yes (4) Tube ECT Yes Yes (1) Continued Operation after license extension (2) No sludge lancing after first by B&W in 2001 (3) First In-Bundle FOSAR in 2016(After Equipment Development) (4) Sludge lancing & FOSAR(2 S/G) for Every outage since 2008 Wolsong NPP1 4

NDT Requirement : Performance for S/G Unit 1 (24th Outage, 16.3) Inspection Methods Item SGMP Requirement Performance S/G #1 #2 #3 #4 Bobbin Full Length 100% / 60EFPM - 100% - 100% MRPC Sludge Depth H/L 100% / 60EFPM 10.5% 100% 10.5% 100% Remarks C/L - - 9.6% - 9.6% 3 Col. of Annulus H/L - 100% - 100% Once / 5 period C/L - 20% - 20% Sludge Lancing H/L Once / 4 period - - - - No equipment FOSAR H/L Once / 4 period 50% 50% 50% 50% Hard sludge effect Unit 2 (15 th Outage, 15.11) Inspection Methods Item SGMP Requirement Performance S/G #1 #2 #3 #4 Bobbin Full Length 100% / 60EFPM 100% - 100% - MRPC Sludge Depth H/L 100% / 60EFPM 50.7% - 50.3% - C/L - - - - - H/L 100% - 100% Once / 5 period C/L 20% - 20% Remarks Sludge Lancing H/L, C/L Once / 4 period 100% - 100% Once / 2 period FOSAR H/L, C/L Once / 4 period 100% 100% 100% 100% Once / 2 period Wolsong NPP1

Development of FOSAR equipment FOSAR Mock-Up Simulation and Training Moving magnetized Rail assembly to the annulus area of S/G 2.95mm Sword video probe(ge custom application) inspection Guide Tube (Inspection) 2.95mm Sword probe by GE (Monitoring) MVIQ by GE Wolsong NPP1 6

Development of FOSAR equipment S/G Structural characteristic and FOSAR Equipment Wolsong NPP1 7

Inspection Results ECT & FOSAR Unit 1&2 : No signal of degradation mechanism besides DSI(1) Unit 1 : A number of ECT PLP signal Detection : ECT 81(404 signals) + FOSAR 146 = Total 227 Removal : FOSAR 108 Residue : 119 Access restriction area of FOSAR equipment because of sludge Prevention Maintenance according to the evaluation results Tube plugging : 1 tube (Remaining lifetime : 1.2 yr) ECT PLP evaluation was proved as FOSAR performance In previous outages it was evaluated as deposit After development of FOSAR equipment, it was confirmed foreign objects Unit 2 : ECT PLP (1) but FOSAR result was a hard sludge Wolsong NPP1 8

Inspection Results ECT & FOSAR Unit 1 : Foreign object 108(73.9%) of 146 were removed Most foreign objects were thin plate type, Processing chip (Mn 0.38%, Si 0.60% : Corroded carbon steel) Applying the development(r&d) of FOSAR Equipment S / G Location Detection Removal Non Removal #1 #2 #3 #4 소계 In bundle 30 25 5 Annulus 0 0 0 No tube lane 2 2 0 In bundle 50 38 12 Annulus 0 0 0 No tube lane 0 0 0 In bundle 48 34 14 Annulus 1 1 0 No tube lane 1 1 0 In bundle 14 7 7 Annulus 0 0 0 No tube lane 0 0 0 In bundle 142 104 38 Annulus 1 1 0 No tube lane 3 3 0 Influx Route : S/G moisture separator remodeling work in 1984 Wolsong NPP1 9

Inspection Results ECT : DSI(Distorted Support Indication) of Unit 1 +Point MRPC performance for Anti-Vibration Bar 6th Result : Wear defect 8% (Plugging Criteria : 40%) [23th Outage] [24th Outage] Wolsong NPP1 10

Inspection Results Sludge Depth & Sludge Lancing Unit 1 : Steadily increase & distribution around hot leg center Date S/G Sludge Depth(inch) Sludge Lancing (kg) Max Avg Remarks #1 15 th ( 01.09) #2 B&W 30 #3 Canada #4 : : : : : : #1 6.25 2.46 21 th ( 10.06) #2 6.73 3.20 #3 7.36 2.85 #4 7.96 3.00 22 th ( 12.07) 23 th ( 15.03) 24 th ( 16.03) #2 7.49 3.13 #4 8.61 3.33 #1 8.56 3.13 #3 9.93 3.51 #2 8.33 3.00 #4 9.19 3.24 Refurbishment ( 09.4~ 11.7) Wolsong NPP1 11

Inspection Results Sludge Depth & Sludge Lancing Unit 2 : Slightly increase Sludge Depth(inch) Date S/G Max Avg Sludge Lancing (kg) Remarks 12 th ( 12.02) 13 th ( 13.05) 14 th ( 14.07) 15 th ( 15.10) #2 2.94 1.00 4.3 #4 2.02 1.08 1.7 #1 1.29 0.68 2.6 #3 2.02 0.76 2.5 #2 3.12 1.04 2.6 #4 2.27 0.99 2.4 #1 1.72 0.87 3.0 #3 2.32 0.77 1.9 Wolsong NPP1 12

Conclusions In Unit 1, many foreign objects present inside S/G were removed through the FOSAR S/G Reliability was proved by performing the residue evaluation Developed FOSAR system was identified the performance Field test was successful and some improvement is needed ECT signal evaluation should be cautious if it s an old plant and FOSAR has not been performed for a long time For next, to overcome the access restriction area of FOSAR system Development of Sludge Lancing system required(proceeding, ~ 17.9) (First) Sludge Lancing (later) FOSAR Wolsong NPP1 13

Thank you ( jwlee357@khnp.co.kr ) Wolsong NPP1 14