SPEAKMAN SHOWER VALVES

Similar documents
1 - S-2251 Showerhead 6 - S-2288 Showerhead AP - Anchor Plate (S-2280 Showerhead Only)

SM Valve Installation

SPEAKMAN CPT SentinelPro Thermostatic/Pressure Balance Valve Trim FEATURES: AVAILABLE FINISHES: ADD SUFFIX TO MODEL # WARRANTY: SPECIFICATION

SB-1821-E. Instructions for Models: What You Need To Know: Tools: Required: Need Help? For additional assistance or service call: Helpful:

Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL IMPORTANT CONSIDERATIONS TECHNICAL INFORMATION. Tools you may need

Installation Instructions

Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION MANUAL IMPORTANT CONSIDERATIONS TECHNICAL INFORMATION. Tools you may need

Installation Guidelines

Installation Instructions

Installation Instructions 1662SG SG.222

SPEAKMAN. SEF-1800-CA, SEF-1800-CA-TW, SEF-1800-CA-8, SEF-1800-CA-8-TW Installation, Maintenance & Operation Instructions EYESAVER FAUCET

Installation Instructions

Installation Instructions

Installation and Maintenance Instructions

FOR TECHNICAL ASSISTANCE

INSTALLATION INSTRUCTIONS

Installation Instructions 1662SG SG.224

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Guidelines

Model 1001/1001HPS Drinking Fountain

Instructions. Certifications Chrome less spray Chrome with spray 10-K82-WNCH-AD-Z Chrome less spray 10-K82-WYCH-AD-Z Chrome with spray

Installation Guide. Engineering Excellence. Single Handle Tub & Shower Valve Set: 4020B

Installation Instructions 1662SG SG.223

Installation Instructions

Dia. Installation and Service Instructions. Tub-Shower Systems 3520-B, 3521-B, 3522-B Series

INSTALLATION, OPERATION & SERVICE INSTRUCTIONS

Installation Instructions

ROMAN TUB 3 VALVE LONG STEM AND TRIM INSTALLATION INSTRUCTIONS Valve Body No Trim Kit for Model No s: 1047, 1707, 1727

INSTALLATION INSTRUCTIONS

Installation Instructions

Instructions. Certifications. Two Handle Kitchen Faucet. Tools Required. Maintenance. Safety Tips. Important Points. Things You May Need.

INSTALLATION, OPERATION & SERVICE INSTRUCTIONS

Installation Instruction for Valve: DFPHY.ID Trim Application: Pressure Balance Tub & Shower

Dia. S Shower Valve System. S-3500TS-X... Valve includes stops. Arm and flange 300S. Screwless escutcheon kit RTS-011, brass RTS-012, plastic

Installation Instructions

OPTIMUS SE-1200 SE-1250 SE-1255

Installation Guidelines

Installation Instructions for Pressure Balancing Valve Set with Volume Control. Limited Lifetime Faucet Warranty

INSTALLATION INSTRUCTIONS

Installation Instructions

Supplies Required. Teflon Tape Allen Key Wrenches Screwdriver 1/2" NPT Brass Pipe Plug Adjustable Wrench IMPORTANT!

Installation Instructions

INSTALLATION INSTRUCTIONS

Operating Manual for Hands-Free Wall Mounted Sinks Models 607D and 607D-0.5

DISCONTINUED. Installation. Aerada 900 Series Futura Faucet. With Accu-Zone (AZ) Infrared Control

Installation Instructions

Operating Manual for Hands-Free Wall Mounted Sinks Models 504 and

Installation Guide. Single-Control Bath and Shower Trim A K K K 12021

Degas. Installation and Service Instructions. Tub-Shower Systems S-5400, S-5401, S-5402 Series

Installation Instructions

Single Lever Pull-Out Kitchen Faucet

Installation Instructions

Steam/Water Washdown Units Safety and Operation Installation and Maintenance Instructions

Installation Instructions To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.

PILLOWS DECK-MOUNT BATH FAUCET WITH FLUME SPOUT

Degas Shower Valve System 5400-X... Valve includes stops 5400-TRM... Trim only

S-9100, S-9200, S-9300, S-9400, S-9700, S-9800

Used for Safety Shower combination stations: SE-603 SE-616 SE-690 SE-693 SE-695 SE-697

Installation Instructions

Installation Guidelines

Installation Instructions

INSTALLATION INSTRUCTIONS FOR SLOAN SF ELECTRONIC SENSOR ACTIVATED LAVATORY FAUCETS

Appendix E D791 and T791 Head and Valve Holddown Assembly Details

CW-2651 (WL1100) CB-2651 (BL1100)

Installation Instructions

INSTALLATION INSTRUCTIONS STUDIO S

THREE-VALVE BATH & SHOWER Cast Brass Body

STUDIO S BATH ACCESSORIES TOWEL BARS

Parts List Recessed Laboratory Units

INSTALLATION GUIDE KPF Single Lever Kitchen Faucet With Pull-Out Sprayer

EBF-750 Deck-Mounted Battery Powered Sensor Operated Gooseneck Faucets

Installation Instructions

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

INSTALLATION INSTRUCTIONS FOR DECK TUB SETS with HAND SHOWER Valves Numbered: &

E-Mini Thermostatic Valve with Shut-Off or with Positive Shut-Off 2-Way Diverter

Series T2000 Wall Mounted Emergency Eye & Eye/Face Wash

INSTALLATION INSTRUCTIONS

Installation Instructions

Installation Instructions

SPEAKMAN SAFETY PRODUCTS Installation, Maintenance & Operation Instructions SEF-1000 EYESAVER FAUCET DESCRIPTION

Installation Instructions

Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Instructions

RSV16 Retro-Fit Cartridge Acorn Controls SV16 Valve Cartridge

INSTALLATION, OPERATION & SERVICE INSTRUCTIONS

SERIN MONOBLOCK LAVATORY FAUCET with

Installation Instructions Series Series

INSTALLATION INSTRUCTIONS

Installation. Aerada 1200 Series CS Faucet S Battery-Operated Capacitive Sensing Gooseneck Faucet IMPORTANT

INSTALLATION INSTRUCTIONS PATIENCE

See Installation Guide

Transcription:

SPEKMN SHOWER VLVES What are the different types of shower valves? (-P) PRESSURE BLNCED (-T) THERMOSTTIC (Not yet available) (-TP) GEN 1 THERMOSTTIC/ PRESSURE BLNCED (-TP) GEN THERMOSTTIC/ PRESSURE BLNCED CPV-P-IS Water is nearly constant in temperature despite pressure fluctuations in either the hot or cold supply lines via pressure balance piston. Blends hot water with cold water to ensure constant and safe temperatures, preventing scalding via thermostatic shuttle element. CPV-5000 Combines both pressure balance and thermostatic technologies to provide superior tepid water management and scalding protection. CPV-TP Combines both pressure balance and thermostatic technologies to provide superior tepid water management and scalding protection. What is the standard for shower valves in the US? What are the pros and cons of each style of valve? 01 IPC SHOWER VLVE TEMPERTURE REQUIREMENT: PROS CONS.3 Individual shower valves. Individual shower and tub-shower combination valves shall be balanced-pressure, thermostatic or combination balanced-pressure/thermostatic valves that conform to the requirements of SSE 10 or SME 11.18.1/CS B15.1 and shall be installed at the point of use....valves required by this section shall be equipped with a means to limit the maximum setting of the valve to 10 F (9 C), which shall be field adjusted in accordance with the manufacturer s instructions. In-line thermostatic valves shall not be utilized for compliance with this section. PRESSURE BLNCED THERMOSTTIC Nearly constant temperatures Durable brass body Diverter option available Integral stops Cold water failure (shut down) reduces flow to 0.5 gpm or less Prevents scalding Durable brass body Temperature limit stop (TLS) Integral stops Does not prevent scalding Sweat only connections Only rated to work with shower heads down to.0 GPM Valves are susceptible to debris within the supply lines Temperature Limit Stop (TLS) THERMOSTTIC/ PRESSURE BLNCED Generation 1 & Prevents scalding Durable brass body Pressure balance piston backup Temperature limit stop (TLS) Integral stops Retrofit to pressure balance valve body Rated to work with shower heads from.5 gpm to 1.5 gpm djustable temperature limit stop Cold water failure (shut down) reduces flow to 0.5 gpm or less Valves are susceptible to debris within the supply lines PRODUCT TRINING PG. 1

(-P) PRESSURE BLNCED CPV-P, CPV-P-IS, CPV-P-DV, CPV-3000-IS, CPV-300 Features SME 11.18.1/CS B15.1 ND SSE 10 certified Built-in check valves in cartridge Temperature limit stop allows installer to set maximum water temperature Integral stop allows user to shut water off at valve 5 year limited warranty BENEFITS Pressure Balance Valve ensures users are protected from spikes in pressure, which may cause thermal shock and scalding water. Performs to SSE 10 standards at flow rates down to.0 gpm. nti-scald feature regulates water temperature from ever becoming scaling-hot. Glass-filled bonnet provides strength and product durability. Solid-brass body exemplifies unrivaled durability. PISTON TECHNOLOGY Piston style pressure balancing element. The stainless steel piston is always submerged in water, preventing calcification. TLS FCTORY SETTING Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. PRESSURE BLNCED CRTRIDGE (CPV-3000-IS, CPV-300) SHOWER DIVERTER (CPV-P-DV, CPV-300) SWET S INTEGRL STOP SOLID BRSS BODY TEMPERTURE LIMIT STOP (TLS) GLSS FILLED BONNET PRESSURE BLNCED CRTRIDGE (CPV-P, CPV-P-IS, CPV-P-DV) For use with trim models: CPV-P-IS CPV-P-DV CPV-3000-IS CPV-300 CPT-1000-P CPT-6000-P CPT-7000-P CPT-8000-P CPT-10000-P CPT-11000-P CPT-000 CPT-100-P CPT-600-P CPT-700-P CPT-800-P CPT-1000-P CPT-1100-P CPT-00-DV CPT-3000 CPT-300 PRODUCT TRINING PG.

(-TP) GEN 1 THERMOSTTIC/PRESSURE BLNCED CPV-5000, CPV-500 Features SME 11.18.1/CS B15.1 ND SSE 10 certified Temperature limit stop allows installer to set maximum water temperature Integral spring check stops allows user to shut water off at valve 5 year limited warranty BENEFITS Ideal valve for use with low flow shower heads; performs to SSE 10 at flow rates as low as 1.5 gpm and has been tested at flow rates as low as 0.5 gpm. Dual element system utilizes a pressure balance piston to protect against scalding and a thermostatic element regulates temperature and prevents scalding. Value price compared to Leonard and Powers T/P Valves. SentinelPro T/P cartridges can be retrofit into existing Speakman pressure balancing valve bodies with spring check stops. DUL ELEMENT Stainless steel balancing piston & wax filled thermostatic element. The Balance Pressure Element provides protection from pressure variances between hot and cold supplies, while the Thermostatic Element provide protection from scalding. TLS FCTORY SETTINGS hot water temperature setting adjustment (Temperature Limit Stop (TLS)) of the valve has been factory set at 110 F. Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. HIGH TEMPERTURE CRTRIDGE MTERILS SHOWER DIVERTER (CPV-TP-DV) SOLID BRSS BODY TEMPERTURE LIMIT STOP (TLS) GLSS FILLED BONNET DUL ELEMENT CRTRIDGE PISTON STYLE PRESSURE BLNCING ELEMENT SWET S INTEGRL SPRING CHECK STOPS For use with trim models: CPV-5000 CPV-5000 CPT-5000 CPT-1000-TP CPT-1300-TP CPT-500 PRODUCT TRINING PG. 3

(-TP) GEN THERMOSTTIC/PRESSURE BLNCED CPV-TP, CPV-TP-DV Features SME 11.18.1/CS B15.1 ND SSE 10 certified Built-in check valves in cartridge Temperature limit stop allows installer to set maximum water temperature Integral spring check stops allows user to shut water off at valve 5 year limited warranty BENEFITS Ideal valve for use with low flow shower heads; performs to SSE 10 at flow rates as low as 1.5 gpm and has been tested at flow rates as low as 0.5 gpm. Dual element system utilizes a pressure balance piston to protect against scalding and a thermostatic element regulates temperature and prevents scalding. Value price compared to Leonard and Powers T/P Valves. DUL ELEMENT Stainless steel balancing piston & wax filled thermostatic element. The Balance Pressure Element provides protection from pressure variances between hot and cold supplies, while the Thermostatic Element provide protection from scalding. TLS FCTORY SETTING hot water temperature setting adjustment (Temperature Limit Stop (TLS)) of the valve has been factory set at 110 F. Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. SHOWER DIVERTER (CPV-TP-DV) HIGH TEMPERTURE CRTRIDGE MTERILS ROUGH-IN TEMPLTE TEMPERTURE LIMIT STOP (TLS) INTEGRL SPRING CHECK STOPS PISTON STYLE PRESSURE BLNCING ELEMENT SOLID BRSS BODY SWET S ND MLE THREDED S GLSS FILLED BONNET DUL ELEMENT CRTRIDGE For use with trim models: CPV-TP CPV-TP-DV CPV-TP CPT-5000 CPT-500 CPT-1000-TP CPT-1300-TP PRODUCT TRINING PG.

(-P) PRESSURE BLNCED VLVE INSTLLTION How to install INSTRUCTIONS FOR MODELS TOOLS ND SUPPLIES CPV-P-IS CPV-P-DV CPV-3000 CPV-3000-IS CPV-300 Pencil Keyhole Saw djustable IMPORTNT 1 Be sure to read instructions thoroughly before beginning installation. Referencing the supplied rough-in dimensions (located at the end of this manual), determine the preferred location of valve. lign the supplied rough-in template with this location and trace outline of template onto wall. Be sure to have properly adjusted the Temperature Limiting Stop (TLS) as outlined in this Installation Manual. Inspect all connections after installation of valve. This valve has an operating range of 0-80 Psi. Solder Kit This valve is designed to be used in conjunction with a shower-head rated at.0 gpm (7.5 L/min) or higher flow rate. Measuring Tape 1-9 (533mm) TO CENTERLINE OF (FOR TUB INSTLLTION) NOTE: This installation manual covers several models of valves. While the appearance of your valve may differ from those shown, the installation method is the same. 9/ Deep Well 13/ Deep Well -6 (1.m) INSTLLTION) SFETY TIPS Cover your drain to prevent loss of parts. Be sure to wear eye protection while cutting pipe. Using a keyhole saw or similar tool, cut along traced line and remove this section of wall. MINTENNCE HELPFUL TOOLS & SUPPLIES: Thread Seal Tape Phillips Screwdriver For additional assistance or service please contact: Tubing Cutter Your new Shower/Bath Valve is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. The use of harsh chemicals and abrasives on any of the Speakman custom finish products may damage the finish and void the product warranty. Please be sure to only use approved cleaners. Please contact Speakman for any clarification of acceptable cleaners. SPEKMN Company 00 nchor Mill Road New Castle, DE 1970 Safety Glasses 800-537-107 customerservice@speakmancompany.com Level WRRNTY dditional warranty information can be found at: www.speakmancompany.com www.speakmancompany.com 9-CPV-P-R 3 PRODUCT TRINING PG. 5 If your model of shower valve has Integral Stops, unthread and remove them using a 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper

(-P) Safety Glasses Level WRRNTY dditional warranty information can be found at: PRESSURE BLNCED VLVE www.speakmancompany.com INSTLLTION How to install 3 If your model of shower valve has Integral Stops, unthread and remove them using a socket wrench equipped with a 9/ deep well socket. 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper depth. The distance from the centerline of the inlet/outlet ports of the valve assembly to the finished wall MUST be between ½ - 3½. See images below for reference. MINIMUM MOUNTING DEPTH MXIMUM MOUNTING DEPTH 9/ Deep Well THE BCK EDGE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR INSIDE THE VLVE CCESS HOLE. SHOWER OUTLET THE FRONT SURFCE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR OUTSIDE THE VLVE CCESS HOLE. SHOWER OUTLET If your Shower Valve is equipped with an integral diverter, remove the Diverter Nut using a socket wrench and a 13/ deep well socket. Remove Diverter Cartridge to prevent damage during soldering. TUB OUTLET TUB OUTLET ROUGH-IN TEMPLTE ½ MINIMUM MOUNTING DEPTH ROUGH-IN TEMPLTE 3½ MXIMUM MOUNTING DEPTH FINISHED WLL SURFCE FINISHED WLL SURFCE 13/ Deep Well PRODUCT TRINING PG. 6

(-P) PRESSURE BLNCED VLVE INSTLLTION How to install 6 If your installation is for a shower only, apply thread seal tape to the included ½ Pipe Plug and install into the lower port of the shower valve. tighten. 8 Make piping connections for all accessories. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 10 If your Shower Valve is equipped with an integral diverter, reinstall the Diverter Cartridge taking care to align mounting posts of cartridge with the corresponding holes in the valve body. Install Diverter Nut and tighten with a Ratchet and 13/. Take care to not over-tighten connections. 11 Your Shower Valve has the ability to be mounted back-to-back with another Valve in a shared space. This means the hot and cold inlets may be reversed. Please see the following steps to adapt your valve for back-to-back mounting or reversed inlet supplies. If you are performing a Standard Installation, please proceed to Step 1 OR 13/ Deep Well If you are performing a Back to Back Installation, or have reversed inlet supplies, please proceed to Step 1 7 Ensure Valve is positioned plumb and level. Remove Rough-In Template from Valve. Plumb and solder all joints and fittings. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 9 If your model of shower valve has Integral Stops, reinstall them using a socket wrench equipped with a 9/ deep well socket or crescent wrench. 1 BCK-TO BCK INSTLLTION To adapt your shower valve for back to back installation, remove spindle O-ring, TLS plate, and four () Bonnet Screws. Then remove Bonnet and Cartridge ssembly from valve body. 9/ Deep Well Phillips Screwdriver PRODUCT TRINING PG. 7 13 BCK TO BCK INSTLLTION 15 TEMPERTURE LIMIT DJUSTMENT

Phillips Screwdriver PRESSURE BLNCED VLVE INSTLLTION (-P) 9/ Deep Well How to install BCK TO BCK INSTLLTION 13 Rotate Valve Cartridge 180 and reinstall into Valve Body. The H marking on the blue Valve Cartridge cover should now be on the right hand side. Reinstall Bonnet and four () Bonnet Screws, making sure the Large Bonnet O-Ring is in place within the Valve Body. Reinstall TL S Plate and Spindle O-Ring. 15 TEMPERTURE LIMIT DJUSTMENT To limit the maximum hot water temperature the valve delivers, adjust the valve s temperature limit stop (TLS) plate. Slip the retaining O-ring and the TLS plate towards the end of the spindle. With the water supplies on, rotate the valve spindle clockwise to the maximum desired hot water temperature. Position the TLS plate so it contacts the lug on the valve bonnet and therefore restricts the clockwise rotation of the spindle. Slip the retaining O-ring back into the groove of the spindle to hold the TLS plate in place. Rotate the spindle counter clockwise to the Off position. Phillips Screwdriver ROTTE 180 TLS PLTE BONNET LUG 1 Ensure the Valve is in the OFF position. Turn ON water supplies and check all connections for leaks. O-RING PRODUCT TRINING PG. 8 Reinstall Rough-In Template over Valve to protect it during final wall preparation.

(-P) PRESSURE BLNCED VLVE Repair Parts Diagram CPV-P-IS / CPV-P-DV / CPV-3000 / CPV-3000-IS / CPV-300 REPIR PRTS SPEKMN ITEM NO. PRT NO. DESCRIPTION RPG05-0718 RPG05-088 RPG05-083 RPG9-0005 RPG9-0076 RPG9-016 RPG05-0876 RPG05-0897 SCREWS, BONNET, ND BONNET O-RING REPLCEMENT CRTRIDGE FOR MODELS CPV-P-IS, CPV-P-DV REPLCEMENT CRTRIDGE FOR MODELS CPV-3000, CPV-3000-IS, CPV-300 CRTRIDGE LOWER QUD RINGS SPINDLE O-RINGS LRGE BONNET O-RING INTEGRL STOP REPIR KIT REPLCEMENT DIVERTER CRTRIDGE PRODUCT TRINING PG. 9 CPV-P-IS ROUGH-IN DIGRM SPEKMN

(-P) PRESSURE BLNCED VLVE INSTLLTION Rough-in Diagrams CPV-P CPV-P-IS ROUGH-IN DIGRM SPEKMN SPEKMN COMPLINCE: SME 11.18.1/CS B15.1 CPV-P-IS CPV-3000-IS Sweat Sweat ection ons) 6'-6" [ METERS] Shower Valve SSE10 5 1 S: " SHOWER RM Hot/Cold Inlets: ½ Female Copper Sweat 10mm Shower Outlet: ½ Female Copper Sweat VLVE CCESS Tub Outlet: ½ NPT Threaded Connection (Plug included for Shower Only Connections) 6'-6" [ METERS] 5 1 " 10mm VLVE CCESS SHOWER RM 6'-6" [ METERS] 5 1 " 10mm VLVE CCESS SHOWER RM junction.5 L/min) t '-6" [1. METERS] INSTLLTION ONLY) This valve is designed to be used in conjunction with a shower-head rated at.0 gpm (7.5 L/min) or higher flow rate 1/ NPT FEMLE Contractor to supply necessary inlet connections. " [10mm] TO TOP OF 3 7 " 87mm '-6" [1. METERS] - MIN INSTLLTION [6mm] ONLY) 3- MIN " [10mm] TO TOP OF (DJUSTMENT) 1/ NPT FEMLE 3 7 " 87mm '-6" [1. METERS] - MIN INSTLLTION ONLY) [6mm] 3- MIN " [10mm] (DJUSTMENT) TO TOP OF 1/ NPT FEMLE 3 7 " 87mm - MIN [6mm] 3- MIN (DJUSTMENT OTICE. DG, NSI 117.1, ND STTE REGULTIONS. DIMENSIONS SUBJECT TO CHNGE FOR D MOUNTING LOCTIONS, CONSULT DG, NSI 117.1, ND STTE REGULTIONS. PRODUCT TRINING PG. 10

(-P) PRESSURE BLNCE VLVE INSTLLTION Rough-in Diagram (Diverter Models) CPV-P-DV CPV-300 6'-6" [ METERS] 5 1 " 10mm VLVE CCESS SWET SHOWER RM SWET 6'-6" [ METERS] 5 1 " 10mm VLVE CCESS SWET SHOWER RM SWET M T TION SWET 15 " 1 '-6" [1. METERS] INSTLLTION ONLY) " [10mm TO TOP OF 1/ NPT FEMLE '-6" [1. METERS] INSTLLTION ONLY) " [10mm TO TOP OF 1/ NPT FEMLE LE -MIN [6mm] 3-MIN (DJUSTMENT) Pressure Balanced Service Instructions: MINTENNCE INSTRUCTIONS This type of valve must be cleaned and maintained on a regular basis. Periodic maintenance should be performed at least every 1 months or after any changes have been made to the building s plumbing system. This maintenance should include removing and cleaning the spring check stop components. Make sure the stop poppet in each stop moves freely. The Valve Cartridge Quad Rings with Integral Screens (located at the base of the Valve Cartridge) should be removed and cleaned during this maintenance cycle. Valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. PRODUCT TRINING PG. 11

(-TP) GEN 1 THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION How to install INSTRUCTIONS FOR MODELS TOOLS ND SUPPLIES CPV-5000 CPV-500 Pencil Keyhole Saw djustable IMPORTNT 1 Be sure to read instructions thoroughly before beginning installation. Referencing the supplied rough-in dimensions (located at the end of this manual), determine the preferred location of valve. lign the supplied rough-in template with this location and trace outline of template onto wall. Be sure to have properly adjusted the Temperature Limiting Stop (TLS) as outlined in this Installation Manual. Inspect all connections after installation of valve. This valve has an operating range of 0-80 Psi. This valve is designed to be used in conjunction with a shower-head rated at 1.5 gpm (5.7 L/min) or higher flow rate. Solder Kit Measuring Tape 1-9 (533mm) TO CENTERLINE OF (FOR TUB INSTLLTION) NOTE: This installation manual covers several models of valves. While the appearance of your valve may differ from those shown, the installation method is the same. -6 (1.m) INSTLLTION) Maximum water pressure: 15 PSI static; minimum water pressure: 0 PSI flowing; minimum cold supply temperature: 0 F; maximum hot supply temperature: 0 F; minimum hot supply temperature: 5 F above set point. SFETY TIPS 9/ Deep Well 13/ Deep Well Cover your drain to prevent loss of parts. Be sure to wear eye protection while cutting pipe. MINTENNCE customerservice@speakman.com This type of valve must be cleaned and maintained on a regular basis. Periodic maintenance should be performed at least every 1 months or after any changes have been made to the building s plumbing system. This maintenance should include removing and cleaning the spring check stop components. Make sure the stop poppet in each stop moves freely. The Vavle Cartridge Quad Rings with Integral Screens (located at the base of the Valve Cartridge) should be removed and cleaned during this maintenance cycle.valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. www.speakman.com WRRNTY Phillips Screwdriver For additional assistance or service please contact: SPEKMN Company 00 nchor Mill Road New Castle, DE 1970 Safety Glasses 800-537-107 PRODUCT TRINING PG. 1 Unthread and remove the Integral Stops using a socket wrench equipped with a 9/ deep Tubing Cutter dditional warranty information can be found at: www.speakman.com 9-CPV-5000-R1 3 Level Using a keyhole saw or similar tool, cut along traced line and remove this section of wall. Your new Shower/Bath Valve is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. The use of harsh chemicals and abrasives on any of the Speakman custom finish products may damage the finish and void the product warranty. Please be sure to only use approved cleaners. Please contact Speakman for any clarification of acceptable cleaners. HELPFUL TOOLS & SUPPLIES: Thread Seal Tape 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper

00 nchor Mill Road New Castle, DE 1970 (-TP) GEN 1 customerservice@speakman.com the base of the Valve Cartridge) should be removed and cleaned during this maintenance cycle.valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. www.speakman.com WRRNTY Safety Glasses Level THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION 800-537-107 dditional warranty information can be found at: www.speakman.com 9-CPV-5000-R1 How to install 3 Unthread and remove the Integral Stops using a socket wrench equipped with a 9/ deep well socket. 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper depth. The distance from the centerline of the inlet/outlet ports of the valve assembly to the finished wall MUST be between ½ - 3½. See images below for reference. MINIMUM MOUNTING DEPTH THE BCK EDGE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR INSIDE THE VLVE CCESS HOLE. SHOWER OUTLET MXIMUM MOUNTING DEPTH THE FRONT SURFCE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR OUTSIDE THE VLVE CCESS HOLE. SHOWER OUTLET 9/ Deep Well If your Shower Valve is equipped with an integral diverter, remove the Diverter Nut using a socket wrench and a 13/ deep well socket. Remove Diverter Cartridge to prevent damage during soldering. TUB OUTLET TUB OUTLET ROUGH-IN TEMPLTE FINISHED WLL SURFCE 13/ Deep Well PRODUCT TRINING PG. 13 ½ MINIMUM MOUNTING DEPTH ROUGH-IN TEMPLTE FINISHED WLL SURFCE 3½ MXIMUM MOUNTING DEPTH

(-TP) GEN 1 THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION How to install 6 If your installation is for a shower only, apply thread seal tape to the included ½ Pipe Plug and install into the lower port of the shower valve. tighten. 7 Ensure Valve is positioned plumb and level. Remove Rough-In Template from Valve. Plumb and solder all joints and fittings. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 8 Make piping connections for all accessories. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 9 Reinstall the Integral Stops using a equipped with a 9/ Deep Well or Crescent. 9/ Deep Well 10 If your Shower Valve is equipped with an integral diverter, reinstall the Diverter Cartridge taking care to align mounting posts of cartridge with the corresponding holes in the valve body. Install Diverter Nut and tighten with a and 13/ Deep Well. Take care to not over-tighten connections. 11 Your Shower Valve has the ability to be mounted back-to-back with another Valve in a shared space. This means the hot and cold inlets may be reversed. Please see the following steps to adapt your valve for back-to-back mounting or reversed inlet supplies. BCK-TO BCK INSTLLTION STEP 1 1 To adapt your shower valve for back to back installation, remove spindle O-ring ❶, TLS plate ❷, TLS Stop Ring ❸, and four () Bonnet Screws❹. Then remove Bonnet ❺, and Cartridge ssembly ❻ from valve body. If you are performing a Standard Installation, please proceed to Step 1 OR If you are performing a Back to Back Installation, or have reversed inlet supplies, please proceed to Step 1 13/ Deep Well Phillips Screwdriver 13 PRODUCT TRINING PG. 1 BCK TO BCK INSTLLTION STEP 1 Ensure the Valve is in the OFF position. Turn ON water supplies and check all connections for leaks.

If you are performing a Back to Back Installation, or have reversed inlet supplies, please proceed to Step 1 Phillips Screwdriver THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION (-TP) GEN 1 13/ Deep Well How to install BCK TO BCK INSTLLTION STEP 13 1 Ensure the Valve is in the OFF position. Turn ON water supplies and check all connections for leaks. Reinstall Rough-In Template over Valve to protect it during final wall preparation. Rotate Valve Cartridge ❻180 and reinstall into Valve Body. The H marking on Valve Cartridge cover should now be on the right hand side. Reinstall Bonnet ❺ and four () Bonnet Screws ❹, making sure the Large Bonnet O-Ring is in place within the Valve Body. Reinstall TL S Stop Ring ❸, TLS Plate ❷, and Spindle O-Ring ❶. ROTTE 180 Phillips Screwdriver 15 TEMPERTURE LIMIT DJUSTMENT The maximum hot water temperature setting adjustment (Temperature Limit Stop (TLS)) of the valve has been factory set at 110 F. Important- Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. To lower the limit of the maximum hot water temperature the valve delivers, adjust the valve s temperature limit stop (TLS) plate. Slip the retaining O-ring and the TLS plate towards the end of the spindle. TLS PLTE With the water supplies on, rotate the valve spindle counter clockwise to the maximum desired hot water temperature. Position the TLS plate so it contacts the lug on the valve bonnet and therefore restricts the counter-clockwise rotation of the spindle. Slip the retaining O-ring back into the groove of the spindle to hold the TLS plate in place. Rotate the spindle clockwise to the Off position. PRODUCT TRINING PG. 15 LUG O-RING

Copper Sweat Shower Outlet: ½ Female Tub Outlet: ½ NPT Threaded Connection (Plug included for Shower Only Connections) COMPLINCE: Contractor to supply necessary inlet connections. S: Hot/Cold Inlets: ½ Female Copper Sweat '-6" [1. METERS] 5 " 58.80mm 1/ NPT FEMLE 3 7 " 87mm THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION (-TP) DIMENSIONS SUBJECT½ TO CHNGE Shower Outlet: Female Copper Sweat 6'-6" [ 11.18.1/CS METERS] SME B15.1 HOLE FOR FOR D MOUNTING LOCTIONS, CONSULT DG, NSI 6'-6" [ METERS] GEN 1 INSTLLTION ONLY) 117.1, ND STTE REGULTIONS. SHOWER RM 5 TO FLOOR This valve is designed to be used in conjunction Tub Outlet: ½ NPT Threaded Connection 5 1 " Shower Valve SSE10 Connections) SWET " [10mm] with a shower-head rated at 1.5 gpm (5.7 L/min) (Plug included for Shower Only 10mm 10mm TO TOP OF or higher flow rate TUB LEDGE VLVE CCESS VLVE CCESS This valve is designed to be used in conjunction S: 7 "(5.7 L/min) with a shower-head rated at 1.5 3gpm Contractor to supply necessary inlet Hot/Cold Inlets: ½ Female Copper Sweat or higher flow rate 5 " 87mm connections. Rough-in SPEKMN 58.80mm Shower Outlet: ½ Female Copper Sweat - MIN [6mm] SHOWER RM 3- MIN 1/ NPT FEMLE SWET IN '-6" [1. METERS] SHOWER OUTLET SWET (DJUSTMENT) SWET IN INLETS () 7 INSTLLTION ONLY) 3 " 87mm " [10mm] 95. TO TOP OF 3 7 " TUB OUTLET NPT FEMLE 53" 87mm CPV-5000 1/ NPT FEMLE DIMENSIONS TO CHNGE Tub Outlet:SUBJECT ½ NPT Threaded Connection Contractor to supply necessary inlet '-6" [1.MOUNTING METERS] FOR (Plug D CONSULT DG, NSI included forloctions, Shower Only Connections) '-6" [1. METERS] CPV-500 connections.rough-in DIGRM 117.1, STTE REGULTIONS. TO ND FLOOR - MIN INSTLLTION ONLY) [6mm]ONLY) 6'-6" [ METERS] INSTLLTION HOLE FOR 3- MIN FLOOR This TO valve is designed to be used in conjunction DIMENSIONS SUBJECT TO CHNGE TUB SPOUT " [10mm] SHOWER RM 5 " [10mm] FOR D MOUNTING LOCTIONS, CONSULT DG, NSI atof with a shower-headto rated 1.5 gpm (5.7 L/min) 3 7 " TOP 117.1, ND STTE REGULTIONS. (DJUSTMENT) SWET TO TOP OF COMPLINCE: or higher flow rate TUB 10mm 87mm LEDGE 3" 3 SME 11.18.1/CS B15.1 95. VLVE CCESS Shower Valve SSE10 53" 16.05mm 1/ NPT FEMLE 5 " 58.80mm SWET IN SHOWER OUTLET 6" 151.85mm - MIN [6mm] 3- MIN (DJUSTMENT) SWET IN INLETS () 6'-6" [ METERS] 6 7 " 3.35mm SERVICE INSTRUCTIONS SPEKMN Caution- ny repair or servicing of the valve may affect the maximum hot temperature setting of the valve. fter working on the valve, make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. 6" 3" SWET IN 8 SHOWER OUTLET 60.55mm TUB OUTLET NPT FEMLE - MIN [6mm] 3- MIN3 " 8 60.55mm (DJUSTMENT) CPV-5000/CPV-500 Service Instructions: 16.05mm 6" 151.85mm 6 7 " 3 7 " 3.35mm 87mm 5 10mm VLVE CCESS 151.85mm T/P CRTRIDGE REMOVL SWET IN INLETS () SWET 1. Shut off the hot & cold water SHOWER RM supply integral stops at the valve. Remove handle 3" index button & handle. Remove index retaining ring & index. Remove wall plate 58.80mm 8 screws () & wall plate.60.55mm Remove the trim sleeve. TUB OUTLET SWET CPV-500 ROUGH-IN DIGRM NPT FEMLE SPEKMN 53" 6 7 " OFF position, remove the retaining O-ring and TLS plate. With the valve in the S: DIMENSIONS SUBJECT TO CHNGE 16.05mm 3.35mm 15 " NPT FEMLE FOR D MOUNTING LOCTIONS, CONSULT DG, 1/ NSI Remove the TLS ring from the valve cartridge. Remove from the valve spindle. Hot/Cold Inlets: ½ Female Copper Sweat 117.1, REGULTIONS. '-6" ND [1. STTE METERS] 6" 1 6" the () valve bonnet screws and carefully remove the bonnet. The cartridge 151.85mm SWET IN SWET 151.85mm SWET IN Shower Outlet: ½ Female Copper Sweat SHOWER OUTLET SHOWER OUTLET CPV-500 ROUGH-IN - DIGRM may come out with the bonnet. MIN SPEKMN COMPLINCE: INSTLLTION ONLY) [6mm] SWET IN SWET IN 3. If necessary remove the cartridge from the valve body by pulling on the valve HOLE FOR Tub Outlet: ½ NPT Threaded Connection INLETS () SME 11.18.1/CS B15.1 INLETS () 7 " 3- MIN 3 7 " (Plug included for Shower Only Connections) "3[10mm] 1/ NPTspindle FEMLE of the cartridge. Make sure the lower rubber quad rings () are 87mm '-6" [1. METERS] 87mm TO TOP OF -MIN Shower 3" 3" (DJUSTMENT) 3 3 " Valve SSE10 SWET 3 " installed in the bottom of the cartridge and not in the valve body. Inspect 8 6'-6"3 [ METERS] 8 [6mm] 5 95. SHOWER RM 95. 60.55mm COMPLINCE: TO 60.55mm FLOOR Quad Rings with Integral Screens to verify they are debris free. If debris is TUB OUTLET 3-MIN TUB OUTLET NPT FEMLE INSTLLTION ONLY) 3 NPT FEMLE 7 " 5 3 "in conjunction 5 " This valve is designed to be 10mm 6 used SME 11.18.1/CS B15.1 6 7 " present, remove Quad Rings and clean Screen material. 16.05mm with a shower-head rated3.35mm at 1.5 gpm (5.7 L/min) 16.05mm (DJUSTMENT) "3.35mm [10mm TUB SPOUT SWET or higher flow rate. Replace the necessary parts with new parts. When replacing the T/P cartridge, VLVE CCESS TO TOP OF Shower Valve SSE10 SWET S: 6'-6" [ METERS] 5 " 1 " LEDGE 15 make the rubber quad-rings () are properly installed in the recesses 5TUB SHOWER RM sure that " 58.80mm Hot/Cold Inlets: ½ Female Copper Sweat CPV-500 ROUGH-IN DIGRM on the bottom of the cartridge. These quad-rings seal over the hot & cold inlet SPEKMN SPEKMN 10mm1 SWET holes inside the body. When replacing the cartridge, refer to Figure #1 for Shower Outlet: ½ Female Copper Sweat Contractor to supply necessary inlet SWET VLVE CCESS 5 " proper positioning of cartridge in the valve body. connections. S: 15 " 58.80mm Tub Outlet: ½ NPT Threaded Connection 6" 5. Make sure the large bonnet O-ring seal is installed and seated properly in the Hot/Cold Inlets: ½ Female Copper Sweat (Plug included for Shower Only Connections) 151.85mm 1/ NPT FEMLE SWET IN COMPLINCE: 1 the valve bonnet, making sure the UP on the bonnet '-6" [1. METERS] SHOWER OUTLET valve body. Reassemble -MIN DIMENSIONS SUBJECT TO CHNGE SWET 6" Shower Outlet: ½ Female CONSULT Copper SweatNSI SME 11.18.1/CS B15.1 FOR D MOUNTING LOCTIONS, DG, SWET IN 151.85mmTighten the () bonnet screws. Reassemble the TLS [6mm] SWET IN is in the up position. 117.1, ND REGULTIONS. INLETSSTTE () SHOWER OUTLET 3-MIN 3 7 " INSTLLTION ONLY) ring onto the cartridge, so that the ring s lower lug (with hole) is positioned This valve is designed to be used in conjunction Tub Outlet: ½ NPT Threaded Connection Shower Valve SSE10 SWET HOLEFOR FOR 87mm HOLE 6'-6" SWET 1'-9" [533mm] HOLE(Plug FORincluded for Shower [ METERS] 1[10mm 6'-6" METERS] rated1 at 1.5 gpm (5.7 L/min) Only Connections) with a[ shower-head (DJUSTMENT) 3" 1/ NPT FEMLE " 5 " between the bonnet lugs (). Important- djust the valve s maximum hot SHOWER RM 5 " TUB SPOUT SHOWER RM 8 '-6" [1. METERS] FLOOR or TO higher flow rate -MIN TO TOP OF 95. 60.55mm SWET IN water temperature to the recommended setting of 110 F. See Step #15 of the 10mm TUB OUTLET 10mm INLETS () [6mm] TUB LEDGE NPT FEMLE 53" 6 7 " 3-MIN for the TLS adjustment instructions. installation instructions SWET INSTLLTION ONLY) 16.05mm VLVE CCESS ThisSWET valve is designed to be 3.35mm used in conjunction VLVE CCESS HOLE6.FOR 3" Turn ON the hot & cold water supply integral stops. Check valve for leaks S: 8 with a shower-head rated at 1.515 gpm (5.7 L/min) 15 (DJUSTMENT) " [10mm " 95. " 60.55mm Contractor to supply necessary inletsweat or higher flow rate Hot/Cold Inlets: ½ Female Copper TUB OUTLET 7. Reassemble the trim parts, reversing the above procedure. 5 TO TOP OF 3 Contractor to supply necessary inlet 5 " connections. 3 7 " 5 " 58.80mm 87mm 95. CPV-500 15 " 1 connections. " 1 58.80mm SWET Shower Outlet: ½ Female Copper Sweat DIMENSIONS SUBJECT TO CHNGE Connection TubD Outlet: ½ NPT Threaded FOR MOUNTING LOCTIONS, CONSULT DG, NSI Contractor 1'-9" Only [533mm] (PlugND included Shower Connections) 117.1, STTEfor REGULTIONS. to supply necessary inlet connections. 1/ NPT FEMLE '-6" [1. METERS] '-6" [1. METERS] -MIN [6mm] SUBJECT TO CHNGE DIMENSIONS 3-MIN INSTLLTION ONLY) This valve is designed INSTLLTION ONLY) to be used in conjunction FOR D MOUNTING LOCTIONS, CONSULT DG, NSI HOLE FORND STTE REGULTIONS. with a shower-head rated at 1.5 gpm (5.7 L/min) 117.1, " [10mm SWET HOLE FOR (DJUSTMENT) " [10mm TUB SPOUT [flow METERS] or 6'-6" higher rate TO TOP OF SHOWER RM TO5TOP OF 95. 10mm 15 " 1 VLVE CCESS Contractor to supply necessary inlet connections. 5 " 58.80mm 53" 16.05mm SWET 15 " 1 1/ NPT FEMLE SWET IN SHOWER OUTLET 5 " 58.80mm SWET IN INLETS () TUB OUTLET NPT FEMLE 5 " 58.80mm PRODUCT TRINING PG. SWET DIMENSIONS SUBJECT TO CHNGE FOR D MOUNTING LOCTIONS, CONSULT DG, NSI 5 " 16.05mm SPEKMN SWET 6" 95. 53" 16.05mm SWET IN TUB 1 LEDGE NPT FEMLE 6 7 " 3.35mm SPRING CHECK STOP PRTS REMOVL 6" 1. Shut off hot and cold water supply valves to the integral stops of the valve. 151.85mm Remove handle index button & handle. Remove index retaining ring & index. -MIN Remove wall plate screws () & wall plate. [6mm] 3-MIN. CLOSE integral stops by turning the stop spindles clockwise. Unscrew the 6" SWET IN stop s retaining151.85mm nut with wrench. Carefully remove the retaining nut (DJUSTMENT) SHOWER OUTLET w/spindle, spring, and poppet assembly. Clean and/or replace the necessary 3" 8 parts. Reassemble the parts, reversing the above procedure. Repeat procedure 60.55mm SWET IN on ()the other stop. INLETS 6 7 " 3. OPEN the integral stops by turning the stop spindles counter clockwise. 3.35mm 3 " water supply valves. Check for leaks. Turn on the hot and cold 8 60.55mm TUB OUTLET. Reassemble the trim parts, reversing the above procedure. NPT FEMLE 15 " 1 6" 151.85mm 6 7 " 3.35mm

(-TP) GEN 1 THERMOSTTIC/PRESSURE BLNCED VLVE How Repair to Parts install Diagram CPV-5000 / CPV-500 REPIR PRTS SPEKMN ITEM # PRT # DESCRIPTION 1 RPG9-016 BONNET O-RING RPG05-0868 BONNET, SCREWS (), & O-RING REPIR GROUP 3 RPG05-0860 T/P REPIR CRTRIDGE (COMPLETE w/spindle) RPG9-0006 LOWER QUD RINGS WITH INTEGRL SCREENS () FOR T/P CRTRIDGE 5 RPG05-0897 VOLUME CONTROL/DIVERTER CERMIC REPIR CRTRIDGE 6 RPG05-086 CHECK STOP REPIR GROUP (REPIRS BOTH STOPS) 7 RPG9-0076 SPINDLE O-RINGS PRODUCT TRINING PG. 17

(-TP) GEN THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION How to install INSTRUCTIONS FOR MODELS TOOLS ND SUPPLIES CPV-TP CPV-TP-DV Pencil Keyhole Saw djustable IMPORTNT 1 Be sure to read instructions thoroughly before beginning installation. Referencing the supplied rough-in dimensions (located at the end of this manual), determine the preferred location of valve. lign the supplied rough-in template with this location and trace outline of template onto wall. Be sure to have properly adjusted the Temperature Limiting Stop (TLS) as outlined in this Installation Manual. Inspect all connections after installation of valve. This valve has an operating range of 0-80 Psi. This valve is designed to be used in conjunction with a shower-head rated at 1.5 gpm (5.7 L/min) or higher flow rate. Solder Kit Measuring Tape 1-9 (533mm) TO CENTERLINE OF (FOR TUB INSTLLTION) NOTE: This installation manual covers several models of valves. While the appearance of your valve may differ from those shown, the installation method is the same. -6 (1.m) INSTLLTION) Maximum water pressure: 15 PSI static; minimum water pressure: 0 PSI flowing; minimum cold supply temperature: 0 F; maximum hot supply temperature: 0 F; minimum hot supply temperature: 5 F above set point. SFETY TIPS 9/ Deep Well 13/ Deep Well Cover your drain to prevent loss of parts. Be sure to wear eye protection while cutting pipe. MINTENNCE Phillips Screwdriver For additional assistance or service please contact: SPEKMN Company 00 nchor Mill Road New Castle, DE 1970 Safety Glasses 800-537-107 customerservice@speakman.com PRODUCT TRINING PG. 18 This type of valve must be cleaned and maintained on a regular basis. Periodic maintenance should be performed at least every 1 months or after any changes have been made to the building s plumbing system. This maintenance should include removing and cleaning the spring check stop components. Make sure the stop poppet in each stop moves freely. The Lower Cartridge Seal with Integral Screens (located at the base of the Valve Cartridge) should be removed and cleaned during this maintenance cycle.valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. dditional warranty information can be found at: www.speakman.com 9-CPV-TP-01 Unthread and remove the Integral Stops using a socket wrench equipped with a 9/ deep Tubing Cutter WRRNTY www.speakman.com 3 Level Using a keyhole saw or similar tool, cut along traced line and remove this section of wall. Your new Shower/Bath Valve is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. The use of harsh chemicals and abrasives on any of the Speakman custom finish products may damage the finish and void the product warranty. Please be sure to only use approved cleaners. Please contact Speakman for any clarification of acceptable cleaners. HELPFUL TOOLS & SUPPLIES: Thread Seal Tape 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper

(-TP) GEN Level of the Valve Cartridge) should be removed and cleaned during this maintenance cycle.valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION How to install WRRNTY dditional warranty information can be found at: www.speakman.com 3 Unthread and remove the Integral Stops using a socket wrench equipped with a 9/ deep well socket. 5 Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Shower Valve Bonnet. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied rough-in template, install valve at proper depth. The distance from the centerline of the inlet/outlet ports of the valve assembly to the finished wall MUST be between ½ - 3½. See images below for reference. MINIMUM MOUNTING DEPTH MXIMUM MOUNTING DEPTH 9/ Deep Well THE BCK EDGE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR INSIDE THE VLVE CCESS HOLE. SHOWER OUTLET THE FRONT SURFCE OF THE ROUGH-IN TEMPLTE IS FLUSH WITH OR OUTSIDE THE VLVE CCESS HOLE. SHOWER OUTLET If your Shower Valve is equipped with an integral diverter, remove the Diverter Nut using a socket wrench and a 13/ deep well socket. Remove Diverter Cartridge to prevent damage during soldering. ROUGH-IN TEMPLTE ROUGH-IN TEMPLTE TUB OUTLET TUB OUTLET 13/ Deep Well FINISHED WLL SURFCE ½ MINIMUM MOUNTING DEPTH FINISHED WLL SURFCE 3½ MXIMUM MOUNTING DEPTH PRODUCT TRINING PG. 19

(-TP) GEN THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION How to install 6 CPV-TP ONLY 7 If your installation is for a shower only, apply thread seal tape to the lower outlet port and install the included cap. tighten. Ensure Valve is positioned plumb and level. Remove Rough-In Template from Valve. Make threaded connections or plumb and solder all joints and fittings. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 8 OR Make piping connections for all accessories. Take care to protect surrounding area when soldering. Secure piping to surrounding structure. 9 Reinstall the Integral Stops using a equipped with a 9/ Deep Well or Crescent. OR 9/ Deep Well 10 If your Shower Valve is equipped with an integral diverter, reinstall the Diverter Cartridge taking care to align mounting posts of cartridge with the corresponding holes in the diverter valve body. Install Diverter Nut and tighten with a and 13/ Deep Well. Take care to not over-tighten connections. 11 Your Shower Valve has the ability to be mounted back-to-back with another Valve in a shared space. This means the hot and cold inlets may be reversed. Please see the following steps to adapt your valve for back-to-back mounting or reversed inlet supplies. 1 BCK-TO BCK INSTLLTION STEP 1 To adapt your shower valve for back to back installation, use an adjustable wrench to unthread and remove the Bonnet ❶. Then remove Cartridge ssembly ❷, and Bonnet O-Ring ❸ from valve body. If you are performing a Standard Installation, please proceed to Step 1 OR If you are performing a Back to Back Installation, or have reversed inlet supplies, please proceed to Step 1 13/ Deep Well 13 PRODUCT TRINING PG. 0 BCK TO BCK INSTLLTION STEP 1 Ensure the Valve is in the OFF position. Turn ON water supplies and check all connections for leaks.

(-TP) GEN If you are performing a Back to Back Installation, or have reversed inlet supplies, please proceed to Step 1 THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION 13/ Deep Well How to install 13 BCK TO BCK INSTLLTION STEP 1 Ensure the Valve is in the OFF position. Turn ON water supplies and check all connections for leaks. Reinstall Rough-In Template over Valve to protect it during final wall preparation. Rotate Valve Cartridge ❷180 and reinstall into Valve Body taking care to properly align the mounting posts of the Cartridge with the corresponding holes within the Valve. The H marking on Valve Cartridge cover should now be on the right hand side. Reinstall Bonnet ❶, making sure the Large Bonnet O-Ring ❸ is in place within the Valve Body. ROTTE 180 15 TEMPERTURE LIMIT DJUSTMENT The maximum hot water temperature setting adjustment (Temperature Limit Stop (TLS)) of the valve has been factory set at 110 F. Important- Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. To lower the limit of the maximum hot water temperature the valve delivers, adjust the valve s temperature limit stop (TLS) plate. Slip the retaining O-ring and the TLS plate towards the end of the spindle. With the water supplies on, rotate the valve spindle clockwise to the maximum desired hot water temperature. TLS PLTE LUG Position the TLS plate so it contacts the lug and therefore restricts the clockwise rotation of the spindle. Slip the retaining O-ring back into the groove of the spindle to hold the TLS plate in place. Rotate the spindle counter-clockwise to the Off position. PRODUCT TRINING PG. 1 O-RING

OTES: Tub Outlet: Tub Outlet: ½ Female ½ Female Copper Copper Sweat Sweat ½ NPT ½ Male NPT Male SWET SWET SWET -6" [1. METERS] -6" [1. METERS] -6" [1. METERS] NPT MLE NPT MLE 1'-9" designed to This bevalve usedto isinbe designed conjunction be used in conjunction SWET [533mm] SWET valve is designed used into conjunction rated withata 1.5 shower-head gpmat(5.7 L/min) rated(5.7 at or 1.5 gpmor(5.7 L/min) or hr-head a shower-head rated 1.5 gpm L/min) INSTLLTION INSTLLTION " [10mm] INSTLLTION " [10mm] " [10mm] ate higher flow rate her flow rate ONLY) ONLY) -6" -6"METERS] [1. METERS] ONLY) TO TOP OF TO OF TO [1. TOP OF TUBTOP SPOUT GEN This valve This valve is designed is designed to beto used be used in conjunction in conjunction TUB LEDGE (Cap included (Cap included for Shower for Shower Only Connections) Only Connections) - MIN - MIN - MIN [6mm] [6mm] [6mm] 3- MX3- MX 3- MX (DJUSTMENT) (DJUSTMENT) -- MIN MIN (DJUSTMENT) THERMOSTTIC/PRESSURE BLNCED VLVE INSTLLTION (-TP) with awith shower-head a shower-head ratedrated at 1.5at gpm 1.5 gpm (5.7 L/min) (5.7 L/min) or or higher higher flow rate flow rate to supplyto Contractor necessary to inlet supply connecnecessary inlet connecntractor supply necessary inlet connections. ns. [6mm] [6mm] 3-3- MX MX (DJUSTMENT) (DJUSTMENT) HOLE HOLE FOR FOR INSTLLTION INSTLLTION " [10mm] " [10mm] ONLY)ONLY)TO TOP TOOF TOP OF Rough-in Contractor Contractor to supply to supply necessary necessary inlet inlet connecconnections.tions. CT TO SUBJECT CHNGE DIMENSIONS SUBJECT TO CHNGE IONS TO CHNGE G FOR D CONSULT MOUNTING DG, LOCTIONS, NSIDG, 117.1, CONSULT ND117.1, DG, NSI 117.1, ND LOCTIONS, MOUNTING LOCTIONS, CONSULT NSI ND DIMENSIONS DIMENSIONS SUBJECT SUBJECT TO CHNGE TO CHNGE S.EGULTIONS. STTE REGULTIONS. SHOWER OUTLET: SHOWER OUTLET: NPT MLE NPT MLE SWET SWET SHOWER OUTLET: NPT MLE SWET CPV-TP/CPV-TP-DV Service Instructions: SHOWER OUTLET: SHOWER OUTLET: NPT MLE NPT MLE 1/ SWET 1/ SWET FOR D FORMOUNTING D MOUNTING LOCTIONS, LOCTIONS, CONSULT CONSULT DG, DG, NSI 117.1, NSI 117.1, ND ND STTE REGULTIONS. STTE REGULTIONS. INLETS (): INLETS (): NPT MLE NPT MLE SWET SWET INLETS (): NPT MLE SWET SERVICE INSTRUCTIONS " 50mm " 50mm " 50mm 5" 18mm 150mm 151mm INLETS (): INLETS (): NPT MLE NPT MLE 1/ SWET 1/ SWET 95mm 95mm 95mm 15 " 5151mm 151mm 151mm 150mm 150mm 150mm T/P CRTRIDGE REMOVL SPEKMN SPEKMN Caution- ny repair or servicing of the valve may affect the maximum hot temperature setting of the valve. fter working on the valve, make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum. 95mm SPEKMN SPEKMN SPEKMN TUB OUTLET: NPT MLE SWET CPV-TP-DV CPV-TP-DV ROUGH-IN ROUGH-IN DIGRM DIGRM CPV-TP 151mm 150mm TUB OUTLET: TUB OUTLET: NPT MLE NPT MLE SWET SWET 95mm 3 89mm TUB OUTLET: TUB OUTLET: NPT MLE NPT MLE 1/ SWET 1/ SWET CT TO SUBJECT CHNGE DIMENSIONS SUBJECT TO CHNGE DIMENSIONS DIMENSIONS SUBJECT SUBJECT TO CHNGE TO CHNGE SIONS TO CHNGE 5" 18mm 5" 18mm 3 89mm 1. Shut off the hot & cold water supply integral stops at the valve. SPEKMN SPEKMN CPV-TP-DV COMPLINCE: COMPLINCE: SMESME 11.18.1/CS 11.18.1/CS B15.1 B15.1 HOLEHOLE FOR HOLE FOR FOR HOLE HOLE FOR FOR SHOWER SHOWER RM RM SHOWER RM SHOWER SHOWER RM RM 6'-6" [ METERS] 6'-6" [6'-6" METERS] [ METERS] Shower Shower Valve Valve SSE10 SSE10 RM RM SHOWERSHOWER 6'-6" [ METERS] 6'-6" [ METERS] 6'-6" [6'-6" METERS] [ METERS] MLE NPT MLE NPT 5-5- (10MM) DI. 5- (10MM) (10MM) DI. DI. NPT MLE NPT MLE NPT MLE HOLE S: S: 5- (10MM) 5- (10MM) DI. HOLE DI. FOR FOR SWET SWET SWET SWET SWET VLVE CCESS NPT MLE NPT MLE VLVE VLVE CCESS CCESS HOLE FOR SWET Inlets: SWET Hot/Cold Hot/Cold Inlets: ½ VLVE Female ½ Female Copper Copper Sweat Sweat CCESS VLVE CCESS NPT MLE NPT MLE NPT MLE NPT ½ NPT ½ Male NPT Male MLE NPT MLE NPT MLE NPT MLE NPT SWET MLE SWET SWET NPT MLE NPT MLE SWET SWET SWET SWET SWET SWET SWET 5-5- (10MM) (10MM) DI. DI. HOLE HOLE FOR FOR VLVEVLVE CCESS CCESS NPT MLE NPT MLE SWET SWET Shower Shower Outlet: Outlet: ½ Female ½ Female Copper Copper Sweat Sweat ½ NPT ½ Male NPT Male NPT MLE NPT MLE SWET SWET Tub Outlet: Tub Outlet: ½ Female ½ Female Copper Copper Sweat Sweat ½ NPT ½ Male NPT Male NPT NPTConnections) MLE (Cap included (Cap included for Shower for Shower OnlyMLE Connections) Only NPT MLE NPT MLE NPT MLE SWET SWET SWET 1'-9" [533mm] SWET SWET -6" [1. -6" METERS] [1. METERS] -6" [1. METERS] -6" [1. -6" METERS] [1. METERS] This valve This valve is designed is designed to beto used be used inconjunction in conjunction or awith shower-head a shower-head rated rated at 1.5at gpm 1.5 gpm (5.7 L/min) (5.7 L/min) or INSTLLTION INSTLLTION "with [10mm] " [10mm] HOLE FOR HOLE FOR ONLY) ONLY) flow flow TOhigher TOP higher OF TO TOPrate OF rate INSTLLTION INSTLLTION INSTLLTION " [10mm]" [10mm] HOLEHOLE FOR HOLE " [10mm] FOR FOR ONLY) ONLY)ONLY) TO TOP TOOF TOP TOOF TOP OF -6"METERS] [1. METERS] - MIN - MIN -6" [1. TO- FLOOR [6mm] [6mm] MIN - - MIN MIN 3- MX 3- MX [6mm] [6mm] [6mm] INSTLLTION INSTLLTION [10mm] " [10mm] 3-ONLY) MX" 3- MXTOMX (DJUSTMENT) (DJUSTMENT) ONLY)3- TO TOP OF TOP OF TUB LEDGE NPT MLE NPT MLE SWET SWET -- MIN MIN [6mm] [6mm] 3-3- MX MX (DJUSTMENT) (DJUSTMENT) HOLE HOLE FOR FOR (DJUSTMENT) (DJUSTMENT) (DJUSTMENT) Contractor Contractor to supply to supply necessary necessary inlet inlet connecconnections.tions. SPRING CHECK STOP PRTS REMOVL SHOWER OUTLET: SHOWER OUTLET: NPT MLE NPT MLE 1/ SWET 1/ SWET DIMENSIONS DIMENSIONS SUBJECT SUBJECT TO CHNGE TO CHNGE FOR D FORMOUNTING D MOUNTING LOCTIONS, LOCTIONS, CONSULT CONSULT DG, DG, NSI 117.1, NSI 117.1, ND ND STTE REGULTIONS. STTE REGULTIONS. SHOWER OUTLET: SHOWER OUTLET: SHOWER OUTLET: NPT MLE NPT MLE NPT MLE 1/ SWET 1/ SWET 1/ SWET 3 89mm TUB OUTLET: TUB OUTLET: NPT MLE NPT MLE 1/ SWET 1/ SWET 95mm 3 89mm 151mm 3 89mm 3 89mm 3 89mm 150mm " 50mm 151mm DIMENSIONS DIMENSIONS SUBJECT SUBJECT TO CHNGE TO CHNGE TUB OUTLET: TUB OUTLET: TUB OUTLET: NPT MLE NPT MLE NPT MLE 1/ SWET 1/ SWET 1/ SWET INLETS (): INLETS (): NPT MLE NPT MLE 1/ SWET 1/ SWET " 50mm 95mm 150mm 150mm 150mm SHOWER OUTLET: SHOWER OUTLET: NPT MLE NPT MLE SWET SWET 95mm 151mm 151mm 95mm 151mm 95mm 5" (): 5" INLETS INLETS (): INLETS (): 18mm NPT MLE18mm NPT MLE NPT MLE 1/ SWET 1/ SWET 1/ SWET 151mm 150mm TUB OUTLET: TUB OUTLET: NPT MLE NPT MLE SWET SWET SPEKMN SPEKMN PRODUCT 1. Shut off hot and cold water supply valves to the integral stops of the valve. Remove valve trim from valve.. CLOSE integral stops by turning the stop spindles clockwise. Unscrew the stop s retaining nut with wrench. Carefully remove the retaining nut w/spindle, spring, and poppet assembly. Clean and/or replace the necessary parts. Reassemble the parts, reversing the above procedure. Repeat procedure on the other stop. 3. OPEN the integral stops by turning the stop spindles counter clockwise. Turn on the hot and cold water supply valves. Check for leaks.. Reassemble the trim parts. INLETS (): INLETS (): NPT MLE NPT MLE SWET SWET 95mm 150mm 150mm Remove valve trim from valve.. With the valve in the OFF position, remove the Bonnet by unthreading with an adjustable wrench. The cartridge may come out with the bonnet. 3. If necessary, remove the cartridge from the valve body by pulling on the valve spindle of the cartridge. Make sure the lower cartridge seal is installed in the bottom of the cartridge and not in the valve body. Inspect Lower Cartridge Seal with Integral Screens to verify they are debris free. If debris is present, remove Lower Cartridge Seal and clean Screen material.. Replace the necessary parts with new parts. When replacing the T/P cartridge, make sure that the Lower Cartridge Seal is properly installed in the recesses on the bottom of the cartridge. This Lower Cartridge Seal is positioned over the hot & cold inlet holes inside the body. 5. Make sure the large bonnet O-ring seal is installed and seated properly in the valve body. Reassemble the valve bonnet by threading it into the valve body with an adjustable wrench. Important- djust the valve s maximum hot water temperature to the recommended setting of 110 F. See Step #15 of the installation instructions for the TLS adjustment instructions. 6. Turn ON the hot & cold water supply integral stops. Check valve for leaks. 7. Reassemble the valve trim parts. TRINING PG. 151mm 95mm

(-TP) GEN THERMOSTTIC/PRESSURE BLNCED VLVE REPIR PRTS Repair Parts Diagram CPV-TP / CPV-TP-DV REPIR PRTS SPEKMN ITEM # PRT # DESCRIPTION 1 RPG05-086 CHECK STOP REPIR KIT RPG05-1109 T/P CRTRIDGE 3 RPG9-001 BONNET O-RING RPG9-0011 LOWER CRTRIDGE SEL 5 RPG05-0897 VOLUME CONTROL/DIVERTER CERMIC REPIR CRTRIDGE PRODUCT TRINING PG. 3

KEYS FOR BEST VLVE PERFORMNCE Maintenance THERMOSTTIC / PRESSURE BLNCED VLVE MINTENNCE: This type of valve must be cleaned and maintained on a regular basis. Periodic maintenance should be performed at least every 1 months or after any changes have been made to the building s plumbing system. This maintenance should include removing and cleaning the spring check stop components. Make sure the stop poppet in each stop moves freely. The Valve Cartridge Quad Rings with Integral Screens (located at the base of the Valve Cartridge) should be removed and cleaned during this maintenance cycle. Valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly. Life span of a cartridge THE LIFESPN OF THE CRTRIDGE is largely dependent on the water quality of the installation site. Typical lifespan of the cartridge is 10 years. In wall components of the valve body have a typical lifespan of 0-30 years. PRODUCT TRINING PG.

TEMPERTURE LIMIT DJUSTMENT Temperature limit adjustment THE MXIMUM HOT WTER TEMPERTURE SETTING DJUSTMENT (Temperature Limit Stop (TLS)) of the valve has been factory set at 110 F. Important- Check each valve installation with a thermometer to make sure the maximum hot water temperature is set to the recommended setting of 110 F maximum as site conditions will vary. To lower the limit of the maximum hot water temperature the valve delivers, adjust the valve s temperature limit stop (TLS) plate. Slip the retaining O-ring and the TLS plate towards the end of the spindle. With the water supplies on, rotate the valve spindle clockwise to the maximum desired hot water temperature. Position the TLS plate so it contacts the lug and therefore restricts the clockwise rotation of the spindle. Slip the retaining O-ring back into the groove of the spindle to hold the TLS plate in place. Rotate the spindle counter-clockwise to the Off position. Temperature Limit Stop (TLS) PRODUCT TRINING PG. 5

REPIR PRTS Repair parts for current valves Replacement parts for older valves Image Part Description Image Part Description RPG05-086 (T/P) Check stop repair kit G05-018-MO Sentinel valve block assembly (S-175, S-1735 (Model 57), S-1735 (Model 60), S-1735 (Model 17), S-1735) RPG05-0718 (P) screws, bonnet, and bonnet o-ring G05-065-MO Sentinel valve block assembly with volume control (S-185, S-1835 (Model 18), S-1835) RPG05-088 (P) Replacement cartridge for models CPV-P-IS, CPV-P-DV G99-007-MO Colortemp cartridge RPG05-083 (P) Replacement cartridge for models CPV-3000, CPV-3000-IS, CPV-300 (S-8761, S-8771, S-8561, S-8571, S-8590, S-8890) RPG05-1109 T/P Cartridge RPG03-057 Sentinel spindle repair group (S-175, S-1735 (Model 57), S-1735 (Model 60), S-1735 (Model 17), S-1735, S-185, S-1835 (Model 18), S-1835) RPG9-0005 (P) Cartridge lower quad rings RPG05-058 Piston and cap repair sentinel (S-175, S-1735 (Model 57), S-1735 (Model 60), S-1735 (Model 17), S-1735, S-185, S-1835 (Model 18), S-1835) RPG9-0076 (P) Spindle o-rings RPG07-000 Sentinel piston cap and washer kit RPG9-016 (P) Large bonnet o-ring RPG15-0063 Sentinel yoke and plunger repair assembly RPG05-0876 (P) Integral stop repair kit (S-175, S-1735 (Model 57), S-1735 (Model 60), S-1735 (Model 17), S-1735, S-185, S-1835 (Model 18), S-1835) RPG5-0011 Sentinel washer kit RPG05-0897 (P) Replacement diverter cartridge PRODUCT TRINING PG. 6

VLVE IDENTIFICTION How to identify your valve easily IDENTIFYING MRKINGS Can be found on the bonnet of your valve (-P) PRESSURE BLNCED (-TP) GEN 1 THERMOSTTIC/ PRESSURE BLNCED (-TP) GEN THERMOSTTIC/ PRESSURE BLNCED Short bonnet Marked by TYPE-P IS marked by visible nuts on both sides Taller bonnet White TLS at end Marked by T/P IS marked by visible nuts on both sides Taller brass bonnet Marked by T/P IS marked by visible nuts on both sides PRODUCT TRINING PG. 7