FLUXI 2000/TZ Instruction manual Mode d emploi Betriebsanleitung Istruzioni d uso Manual de instrucciones Installatie voorschrift

Similar documents
MZ Instruction manual Mode d emploi Betriebsanleitung Istruzioni d uso Manual de instrucciones Installatie voorschrift

Quantometer MZ. Description

Fluxi 2000/TZ Turbine Gas Meter

Fluxi 2000/TZ Turbine Gas Meter

Volumeter. RMG Meßtechnik GmbH. Publication No E

RMG Meßtechnik GmbH. Publication No E

Volumeter TRZ 03-K PRODUCT INFORMATION. Reliable Measurements of Gas

Rotary Displacement Meter DKZ 02

Rotary Displacement Meter RMG 132-A

Delta Commercial & Industrial Rotary Meter

Mounting and Operating Instructions EB 8111/8112 EN. Series V2001 Valves Type 3321 Globe Valve

INLINE Flow sensor for hazardous area II 1 G/D - II 2 D - II 3 GD - I M1

Delta Commercial & Industrial Rotary Meter

Operation Manual Woltman. Operation Manual WOLTMAN Water Meters

Nominal sizes: DN 10, 15, 20, 25, 32, 40, 50, 65, 80, 100, 125, 150 Pressure rating: PN 16. Product No. Nominal size Body connection

Turbine Meters. df5/99 TRZ

Operating Instructions for Float Flow Meter / Monitor. Model: SWK

Application The DA03 serves as indicator of differential. Follow mounting instructions in accordance to application.

Globe Valve Type Fig. 1 Type 3241 Globe Valve. Mounting and Operating Instructions EB EN

Type S030. Operating Instructions. Symbols used. INLINE fitting. Bedienungsanleitung Manuel d'utilisation

Solenoid Valves Type 3963

Intrinsically safe presure transmitters for hazardous environments Type MBS 4201, MBS 4251, MBS 4701 and MBS Technical brochure

Operating Instruction for Flowmonitor. Model: DF-WM

SITRANS P measuring instruments for pressure

Mounting and Operating Instructions EB 8048 EN. Type and Type Pneumatic Control Valves Type 3249 Aseptic Angle Valve

Datasheet PDCSY-MW-CHM. Technical Overview. Features. Product warranty and total quality commitment. General Information.

EXAMINATION CERTIFICATE

Operating Instructions

RUN ACCUM. TOTAL STOP BAT LOW HIGH

Spin-on filter according to Bosch Rexroth standard: Type 50 SL 30 to 80D. Features. Contents. RE Edition:

STEEMCO-MAS Flowmeter for Steam

Compact Heat Meters. Features. -A Pulsed output. -B M-Bus output. Accessories. UK Sales Tel: International Tel:

Installation and Operating Instructions DDM-DS11 DDM-DS11-MS1 DDM-DS11-MS2

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

DMK 331P. Industrial Pressure Transmitter. Pressure Ports With Flush Welded Stainless Steel Diaphragm. accuracy according to IEC 60770: 0.

Pneumatic or Electropneumatic Positioner for Rotary Actuators Type Fig. 1 Type 3761 Positioner. Mounting and Operating Instructions EB 8386 EN

Internet

Type Operating Instructions. Bedienungsanleitung Manuel utilisateur

Turbine meter. Operating manual. A-EN Rev.E 11/2013. Page 1 of 16

Spin-on filter according to Bosch Rexroth standard. Type 7 SL ; 7 SLS Features. Contents. RE Edition: Replaces: 01.

Note: Boldrin reserves the right, to modify the gas meters without changing the request concerning accuracy and security. page 2

Insertion magnetic inductive flowmeter

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

High Pressure Filter Pi 420

[DRAFT VERSION] For use for company in Europe who will place the product on the market. Please amend which necessary. Document No:

Safety Shuttoff Valve Type SL - IZN/M/H.1

ULTRASONIC FLOW SENSOR QALCOSONIC FLOW 2

Orifice flowmeter F O N4

NAMUR FLANGE: With integrated exhaust air recirculation Ordering information

Level Measurement based on Archimedes Principle. Device Description

DMK 331P DMK 331P. Industrial Pressure Transmitter. Pressure Ports With Flush Welded Stainless Steel Diaphragm. Pressure Transmitter.

Safety. Operating instructions Solenoid valve VGP DANGER. Contents WARNING CAUTION. Changes to edition Elster GmbH Edition 10.

STEEMCO Flowmeter for Steam

DMP 331P. Industrial Pressure Transmitter. Pressure Ports And Process Connections With Flush Welded Stainless Steel Diaphragm

T R A N S L A T I O N Declaration of Conformity as per Directive 2014/68/EU

Components for central heating

High Pressure Filter Pi 4230

Orifice plate flowmeters Series PR By-pass flowmeter for liquids, gases and steam

Declaration of Conformity as per Directive 97/23/EC

Water level controller and limiter

Micro Motion F-Series Coriolis Flow and Density Meters

ORIMAS Mass Flowmeter

DMP 333. Industrial Pressure Transmitter For High Pressure. Stainless Steel Sensor

DMP 331. Industrial Pressure Transmitter for Low Pressure. Stainless Steel Sensor

3/2 Way Pilot Valve 3/2 Way Solenoid Valve 1 /4" and 1 /2" 5/2 Way Solenoid Valve 1 /4" 6/2 Way Solenoid Valve 1 /4" 5/3 Way Solenoid Valve 1 /4"

Oriflow. Compact Orifice with HART communication. Operating instructions. A-EN RevC Latest Mod von 16

Datasheet PDCSY-MW-U. Technical Overview. Features. Product warranty and total quality commitment.

Instructions Manual. Target Disk Flow meter DP-65 / DP-500. Series DP-65 DP-500. instrumentation for fluids

Type 3761 Pneumatic or Electropneumatic Positioner for Rotary Actuators. Fig. 1 Type 3761 Positioner. Mounting and Operating Instructions EB 8386 EN

Mounting and Operating Instructions EB 8256 EN. Type 3286 Steam Conditioning Valve

Mounting and Operating Instructions EB 8111/8112 EN. Valve Series V2001 Globe Valve Type 3321

Electromagnetic Flow Monitor magphant

Solar Expansion Vessels

Manual Turbine Flow Meters HM Series

Turbine Meters TRZ 03 TRZ 03-L TRZ 03-K

Cable thermocouple Model TC40

DMK 331P. Industrial Pressure Transmitter. Pressure Ports With Flush Welded Stainless Steel Diaphragm

Mounting and Operating Instructions EB 8052 EN. Type 3251 Valve

EB EN. Type 3372 Electropneumatic Actuator. Translation of original instructions

STAINLESS STEEL PRESSURE REDUCING VALVE PRV ELITE

In line high pressure filters. HF 725 series

Electropneumatic Converters i/p Converters Type 6111 Mounting and Operating Instructions EB 6111 EN

INSERTION flow sensor for continuous flow measurement

136 MIDFLOW. Technical Manual

Control and Terminal Box Type A21-**-*****

Condensate Drain Valve AK 45. Original Installation Instructions English

Make sure that no hazardous fumes can build up in the piping and in the meter during commissioning, decommissioning and dismantling.

TR-QS Wafer-Style Turbine Flow Meters Installation, Operating & Maintenance Manual

ProFlow TO BE REALLY SURE. Vane Meters. Experience in flow measurement. Introduction

Satellite photo of cloud vortices caused by a mountain (Courtesy of our friends at NASA) tekvorx Operation Showing Simplified Construction

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

Safety. Operating instructions Solenoid valve for gas VG 6 VG 15/10 DANGER. Contents WARNING CAUTION. Changes to edition 07.15

Mounting and Operating Instructions EB 8252 EN. Type 3281 Steam Conditioning Valve

TECHNICAL MANUAL MT064

Series Level-Trol Electronic Liquid Level Transmitters

INTRODUCTION AND STANDARD SPECIFICATIONS

INDUCTIVE CONDUCTIVITY SENSOR. Instruction Manual. Bürkert 2001 Subject to technical change without notice

Pump Manual. Model Numbers: SP240VDFS57LPM SP240VDFS80LPM. Product Names: Digital Refueling Station - 57 L/min Digital Refueling Station - 80 L/min

Flow limiter SP/SMB13 for line installation in circulating-oil lubrication systems.

Duplex Filter Pi Features. Nominal pressure 40 bar (580 psi), nominal size up to 300

Transcription:

FLUXI 2000/TZ 652-099-2025 Instruction manual Mode d emploi Betriebsanleitung Istruzioni d uso Manual de instrucciones Installatie voorschrift

ANNEX 6: CE Certificate of Conformity declares that the product: - Turbine Meter FLUXI 2000/TZ is in conformity with the following directives: CE Certificate of Conformity Actaris Gaszählerbau GmbH 76161 Karlsruhe 1. 97/23/EG Modules B+D Category IV (pressure equipment directive), with type approval certificate n : DVGW: CE-0085BM 0417 The module D is supervised by TÜV Süddeutschland Bau und Betrieb GmbH (CE0036); Dudenstrasse 28, 68167 Mannheim. Certificate n.: DGR-0036-QS-135-1 2. 89/336/EEC-89 (electromagnetic compatibility) with modifications under consideration of the norms EN50081-1 1992 and EN50082-2 1995 Karlsruhe, 19.02.2002 (day of first CE-marking) St. Feller Head of Production 2

1 Characteristics...........................................................4 2 Packing of the FLUXI 2000/TZ..........................................4 2.1 Packing............................................................4 2.2 Storage............................................................4 2.3 Handling............................................................4 3 Installation...............................................................4 3.1 General recommendations............................................4 3.2 Recommended Installation............................................5 3.3 Start up............................................................5 3.3.1 Installation with an upstream valve..............................5 3.3.2 Installation with upstream and do wnstream valves...............5 3.3.3 Installation with a by-pass.....................................5 ENGLISH 4 Transmitters.............................................................5 5 Maintenance............................................................6 5.1 Lubrication..........................................................6 5.2 External silicagel cartridge............................................6 5.3 Inspection and repair.................................................6 6 Annex..................................................................38 3

Keep this manual easily accessible for all users. Please respect all national rules for installation, operation and service of gas meters. 1 Characteristics: Turbines gas meters are flow meters. The flow of gas turns a turbine wheel and the rotating speed of the turbine is proportional to the linear speed of the gas. The movement is mechanically transmitted to the totaliser through the magnetic coupling. Detailed characteristics are given in Annex 1 2 Packing of the FLUXI 2000/TZ 2.1 Packing The meter, depending on the size is delivered in an individual carton box or on a wood pallet. The packaging contains the plugs for the installed transmitters and the lubricant when an oil pump is installed. 2.2 Storage If the meter is not going to be used immediately, it should be stored under cover in a clean, dry environment. The caps fitted at the inlet and the outlet pipe must stay in place until installation. 2.3 Handling Meters should be handled with care. They must be lifted only with belts around the main body or on the eyelets. 3 Installation 3.1 General recommendations: See Annex 2 The standard Fluxi 2000/TZ is designed for use with clean and non-aggressive gases. For use with aggressive gases please contact ACTARIS for special versions. If the meter is equipped with an oil pump, turn oil tank according to the installation position. (1) Before installation, check visually that the meter has not been damaged during transport. (2) Do NOT weld pipework with a meter installed. (3) The meter should be installed without stress in the pipework. The flanges must be correctly lined up. The tightening torque of the bolts must not exceed (Nm): M16 M20 M24 M27 M30 M33 M36 120 200 300 400 550 700 1200 Please tighten bolts in opposite pairs. (4) To ensure accuracy, The meter has to be installed with an inlet straight pipe of 2 DN minimum, no downstream restriction. See details Annex 3. (5) Transmitters connection: Gas Meters are often installed in areas where there is a risk that Gas will be present. Therefore, electrical connections to meters need to be made with consideration of the use of Ex marked equipment or otherwise approved circuits. For plug assignment and pulse values refer to the main name plate. 4

(6) Dirt particles may damage the turbine wheel therefore the use of starting sieve and filter are recommended. (7) Pressure pulses must be avoided during starting and operating to preserve the turbine wheel. To prevent damage during starting, increase the pressure slowly at less than 0,3 bar per second. 3.2 Recommended installation Turbine meters are flow meters therefore their metrology can be affected by disturbances existing in the flow of gas. The Fluxi 2000/TZ has been designed to have a low sensitivity to flow disturbance. It can be installed with a minimal straight upstream pipe length. No minimal straight pipe is requested for the downstream pipe. See all details in Annex 3. An even better accuracy can be achieved by respecting the following rules: Use preferably elbow pieces with large radius ( 5 DN) to be installed at the inlet of the meter. For diameter variations, use preferably concentric convergent and divergent pieces, sudden changes must be avoided. Obstacles such as thermowells must not protrude in the pipe within 2 DN upstream of the meter. Gaskets should be correctly centred between the flanges and not protrude into the pipe. The built-in thermowells can be installed or removed without requiring a calibration of the meter. 3.3 Start up 3.3.1. Installation with an upstream valve Open the valve very slowly until the meter starts to operate. Increase slowly the pressure in the downstream pipe (max. 0,3 bar/second). When the downstream pressure is stabilised, open the valve completely. 3.3.2 Installation with upstream and downstream valves Close the downstream valve. Open slowly the upstream valve (max. 0,3 bar/second). When the pressure is stabilised in the meter, open gently the downstream valve to maintain the pressure in the meter and to avoid overflow. 3.3.3 Installation with a by-pass Close all valves. Slowly open the by-pass and wait until the downstream pressure is stabilised. Then proceed as 3.3.2. Close the bypass. 4 Transmitters The Fluxi 2000/TZ is equipped as standard with 2 Low Frequency (LF), Reed switches and an anti-tampering switch. As option, it can be also fitted with inductive low, medium or high frequencies (HF) transmitters. Low and medium frequency transmitters are intrinsically safe to EEx ia IIB T5. High frequency transmitters are intrinsically safe to EEx ia IIC T6. Pulse values and maximum frequencies are given in Annex 1 Electrical characteristics and wiring of the socket are given in Annex 4. The wiring of the transmitters is written on the name plate of the meter. ENGLISH 5

5 Maintenance When properly installed and put into service, the Fluxi 2000/TZ need no particular attention and will provide you with many years of satisfactory service. 5.1 Lubrication Meters equipped with an oil pump have to be periodically lubricated. Oil is delivered with the meter. Specific oil has to be used, for example Aeroshell fluid 12 MIL6085A Isoflex PDP38 (Klüber) Anderol 401D (Mobil Oil) Univis P38 (Shell) Quantity of oil to be filled: a) On commissioning to fill the volume between the pump and the bearings DN Oil vol. (cm 3 ) Push 50/80 2 0 100 3 15 150/200 4 20 250 5 25 b) In Service DN Oil vol. (cm 3 ) Push 50/80 0,5 2-3 100 0,8 4 150/200 1,0 5 250 1,2 6 c) Recommended lubrication periodicity Application Lubrication periodicity Dry gas, no dust Gas comprising light condensates and little dust 6 months Monthly Gas with high percentage of condensates and dust Weekly 5.2 External silicagel cartridge The meter can be equipped with an external silicagel cartridge for installation in severe environment conditions. The cartridge has to be replaced when its colour has changed. To replace the cartridge, unscrew the old cartridge, remove the protective plug of the new cartridge and screw it into the totaliser. 5.3 Inspection and repair It is possible to check the good functioning of the Fluxi 2000/TZ by applying a spin test. This test will give information about eventual friction in the turbine ball bearings. The test has to be conducted as follow: Accelerate the turbine wheel around 30 to 50% of Qmax then to measure the time until the turbine wheel stops. Measure the spin time (ST) until the turbine wheel stops. See Annex 5 for typical values of spin time. The following recommendations have to be observed for repair: In case of use with agressive or dangerous gas, it may be necessary to send a safety statement with the meter, detailing the type of Gas that has been measured. Some gas may still be present inside the meter and the pipe, therefore sufficient ventilation is required. 6

Repairs and maintenance must be done by trained or qualified personal. Afterwards a tightness test with 1.1 x PS (Pmax) must be performed. When changing pressure-bearing parts, ensure that spare parts which comply with the PED are used. If used with wet gas, internal and external effect of corrosion has to be checked regularly and in case of severe corrosion, the meter must be replaced. Use solvent and alcohol free cleaning product to clean the meter. ENGLISH 7