Stem Assembly Supplement

Similar documents
Installation, Operating & Maintenance Instructions. Worcester 18 / 19 Series Multiway Valves

Worcester 519 / 529 Series

BS EN ISO 9001 FM Worcester Controls E51/52 Enviro-Safe High Integrity Flanged Ball Valves

BS EN ISO 9001 FM Worcester Controls 5 Series BS 5351 Approved Flanged Ball Valves

Installation Operation Maintenance

Worcester Controls F819/829. Full Bore Firesafe Flanged Ball Valves

Worcester 53/54 Series. Reduced Bore Flanged Ball Valves to DIN 3202

Installation Operation Maintenance

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

Sub Section Title Page No. 1 Introduction 3. 2 Significant Equipment Detail 3. 3 Installation Guidelines 4. 4 Routine Maintenance 4

Installation Operation Maintenance

Worcester 18/19 Series. Modular Multi-Way Ball Valves

Installation, Operating & Maintenance Instructions. Norbro J-Switch FM 00707

/2" 2" Series 94 and FZ94 Three-Piece Ball Valves, 1

Worcester 18/19 Series. Modular Multi-Way Ball Valves

OPERATION AND MAINTENANCE INSTRUCTIONS

E818/828 Series Fugitive Emissions 150# and 300# Flanged 2" - 8" Two-Piece Ball Valves Installation, Operation and Maintenance Instructions

Installation, Operation and Maintenance Instructions Series 608 Ball Valve

F8/FB8 Series Ball Valves IOM-F8/FB8

FLOWSERVE CORPORATION NOBLE ALLOY VALVE BALL VALVE REPAIR INSTRUCTION

Sub Section Title Page No.

IOM-CleanFLOW TM. CleanFLOW Series Ball Valves. SV F Flow Controls I N C O R P O R A T E D

USER INSTRUCTIONS. Serck Audco Slimseal Wafer-Type Butterfly Valves. Installation Operation Maintenance. Experience In Motion SREEIM /13

MEMORY SEAL BALL VALVES MAINTENANCE MANUAL 2 12, Class 150 & 300, Regular Port, Flanged Unibody

Anodised aluminium construction for anti-corrosion and superior wear performance on internal surfaces

WORCESTER CONTROLS F519/529/819/829. Full Bore Fire Safe Flanged Ball Valves

NAF-Triball ball valve

Series Single seated top guided control valve. Preventive maintenance. Overhauling procedure. Wörth am Main SERVICE NOTE. Control Valve Division

Maintenance BR 26d Ball Valve

DB4604 GMR-SD and GMR40-SD Disc Brake Caliper - Spring Applied, Air Released

Assembly Instructions and Handling Regulations for KLINGER. Piston Valves KVN DN VI,VIII and Regulating Piston KVRLN DN , PN 40 VI, VIII

NAF-Triball ball valve DN for max. 40bar. Fk (9)GB 03.03

Metal Characterized-seated Control Valve 1. /4" 4" CPT 44 and 1 /2" 4" CPT 51/52 Installation, Operation and Maintenance Instructions

BR 01b Control valve

servicing the swivel

GMR-S and GMR40-S Disc Brake Caliper - Spring Applied, Air Released

Series A Floating Ball Valve Installation, Operation & Maintenance XXXX - X X X X X X X. Base Part Numbers. Trim Option Suffix Code

3. Installation and Commissioning 4. Maintenance 5. Spares

NAF-Duball ball valves Maintenance and installation instructions List of spare parts

N31 & N32 Series Installation, Operating & Maintenance

KLINGER Piston Valves KVN DN PN 16 I/III with valve ring KX-GT Modul

Pfeiffer. Maintenance instructions 3-way control valve Series 1d. 2. Design, operation and dimensions. 3. Installation, start-up and maintenance

Mounting and Operating Instructions EB 8222 EN. Type 3310/AT and Type 3310/3278 Pneumatic Control Valves. Type 3310 Segmented Ball Valve

CV Control Valves Installation and Operation Manual

V-SEGMENT SERIES V-Port Segment Control Valves (VS/VV/VM) Installation & Maintenance Manual

Navigator ADS551 Low level dissolved oxygen Replacement / Upgrade procedures wet section spares

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

½" to 4" (DN15 to DN100) LEA31 and LEA33 ANSI Control Valves Installation and Maintenance Instructions

USER INSTRUCTIONS. NAF Trunnball DL Ball Valves. Installation Operation Maintenance. Experience In Motion FCD NFENIM A4 01/15

Globe Control Valve Series 1a

DL/DS Series Diaphragm Valve

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS D SERIES TABLE OF CONTENTS

BBV Automatic or Manually Actuated Boiler Blowdown Valves Installation and Maintenance Instructions DN15 - DN65

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

VELAN TRUNNION-MOUNTED

HPS Two-Stage Vacuum Valve Instruction Manual Addendum - Bypass Valve Service

INSTRUCTION MANUAL. for BUTTERFLY VALVES

Scope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves

TRITEC (TT2) Instruction Manual

Parking Brake Shoe: Adjustments

Types PN5000 and PN6000 Series Pneumatic Actuators Installation and Maintenance Instructions

Series 1b Control Valve

DeZURIK VPB V-PORT BALL VALVES

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

Series 26a Ball Valve

J Flow Controls Model Numbering

Design CP Control Valve with ENVIRO-SEAL Bellows Seal Bonnet

USER INSTRUCTIONS. Installation Operation Maintenance. NAF Setball SF Ball Sector Valves. Experience In Motion FCD NFENIM A4 09/16

Maintenance Information

The Solution For The Valve Problems Plug Valves

26 Series Stainless Steel 2-way Ball Valves

Power-Seal High Performance Butterfly Valve: Series P1 Installation & Maintenance Manual

HAYWARD FLOW CONTROL TBH SERIES TRUE UNION BALL VALVE INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

CP-1, CP-2, CP-2L & CPD-2 Series Overhaul

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR T40 Mk. 2 DISC BRAKE CALIPER M1492

Flow Control. Before installation or maintenance, these instructions must be fully read and understood.

CONTROL VALVES. Installation, Maintenance & Operating Instructions. Read these instructions carefully before installation or servicing.

3M Overhaul Service Kit

Maintenance Information

McCannalok HIGH PERFORMANCE BUTTERFLY VALVE OPERATION AND MAINTENANCE MANUAL. The High Performance Company

3M Overhaul Service Kit

Fisher ED and EAD easy e Valves CL125 through CL600

Valve Accessories. Inspired By Challenge

JC VALVE ASSEMBLY AND MAINTENANCE PROCEDURE. REF. DOC. MMM700E Rev. 7 May 2011 SERIES-EFR ANSI. Page 1 of 22

Baumann Series Flexsleev Control Valve Instructions

Fisher POSI SEAL A31A Cryogenic High Performance Butterfly Valve

Peter Meyer Ball valves Cryogenic

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

PV4 - Compact Shut Off Style Pig Valve IOM - Installation, Operation & Maintenance

Brake Upgrade Kit Fitting Instructions Bonneville America

POSI-SEAL Type A31A Cryogenic High Performance Butterfly Valve

Fisher ED and EAD easy e Valves CL125 through CL600

Installation and Maintenance Instructions for Grinnell GRP Pneumatic Rack and Pinion Actuators

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

DeZURIK BHP HIGH PERFORMANCE BUTTERFLY VALVE

JC BALL VALVES ASSEMBLY AND MAINTENANCE MANUAL

INSTALLATION, OPERATION, MAINTENANCE MANUAL

SISU DP-330 DRIVE GEAR. Maintenance Manual

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

Valve accessories. Inspired By Challenge

Transcription:

Installation, Operating & Maintenance Instructions Assembly Supplement Envirosafe Cryogenic & Low Temperature O-Ring as FM 00707

Cryogenic & Low Temperature Valves: This section contains only details of Cryogenic and Low Temperature valve stem assemblies. For all other valve maintenance, disassembly, rebuilding, health and safety instructions etc, please refer to the relevant I.O.M. for the particular series of valve. There are three types of extended stem assemblies: 1. Bolt-on platform/extension with one-piece stem 2. Platform/extension integral with valve body, with one-piece stem 3. Platform/extension integral with valve body, with two-piece stem Installation: It should be noted that Cryogenic valves are supplied in a degreased condition for oxygen compatibility and that these conditions must prevail when installing the valve. When positioning into line, care must be taken to ensure that when in the closed position, the relief hole in the ball is on the upstream side and that the valve's direction arrow is pointing down stream. The valve stem axis must be within 45 of the vertical Maintenance, Disassembly, Rebuilding: 1.0 Any maintenance undertaken on a cryogenic valve should take place at room temperature. 2.0 Cryogenic and low temperature valves with extended stem / gland assemblies normally operate with the gland at a higher temperature than the valve body. As a result, there will be a frost line approximately two thirds of the way up the extension. A gland covered in frost is indicative of stem leakage and rectification will be required. 3.0 Before rebuilding, ensure that the repair kit and /or components used are suitable for the valve requirement. All components not replaced by items in the repair kit should be thoroughly cleaned (using a suitable degreasing agent, and wire wool for hard deposits) and checked for signs of corrosion, erosion or damage and be replaced if necessary. Cleanliness is essential for long valve life. All Worcester spares kits for this application are supplied in a degreased condition for oxygen compatibility, and similar conditions must prevail for all components during rebuild. 4.0 Bolt-on platform/extension with one-piece stem. 4.1 Leakage at the interface joint between body and extension: If leakage occurs from the interface joint, first check the tightness of the retaining screws and re-tighten to the correct torque if necessary. If leakage persists, it will be necessary to dismantle the valve extension in order to establish if the seal face is damaged or that the seal requires replacing. 4.2 Disassembly of the extended stem assembly: Remove the wrench assembly, followed by the locking clip, gland nut, disc springs, stop plate and gland (as appropriate to the valve size & series). Using a centre punch, gently mark the lower extension flange and the adjacent mating body flange (to ensure reassembly in the correct orientation). Remove the four bolts retaining the extension housing and separate from the body. Remove and discard the flange seal and bearing from the lower flange. Slide the stem out through the lower flange and extract and discard the gland packings and thrust seal.

4.3 Rebuilding: Fit the new thrust seal onto the extension stem and insert into the housing. Push the new stem bearing into the lower housing. To the top of the stem, fit the gland components, stop plate and gland nut as appropriate to the valve size and series (if disc springs are incorporated they should be fitted with outer edges touching). Tighten the nut to the recommended stem assembly torque. Over tightening will only reduce the life of the stem assembly. Fit the locking clip over the gland nut (if appropriate to valve size and series). Locate the extension flange seal into its' recess in the body (with the larger diameter face against the body). Refit the extension housing to the valve body, ensuring the centre punch marks are aligned, replace the four securing bolts and tighten finger tight. Tighten diagonally to the torque figures specified below. STEM EXTENSION BOLT SIZE STEM EXTENSION BOLT TORQUE (NM) M6 11 M8 22 M10 35 Replace and fully secure the wrench assembly. Turn the valve assembly to the closed position. 5.0 Platform / extension integral with valve body, with one-piece stem. 5.1 Disassembly of the extended stem assembly: Remove the wrench assembly, followed by the locking clip, gland nut, disc springs, stop plate and gland. Push the stem down into the valve body cavity and remove the split rings. Draw the stem out through the top of the extension housing and remove and discard the gland components. 5.2 Rebuilding: Insert the stem through the extension housing into the valve cavity and fit the split thrust bearing and split ring onto the stem shoulder, then draw up into the housing. Fit new thrust washers, top and bottom followers, with chevron seals in between, followed by the disc springs (with outer edges touching) and the gland nut. Tighten the nut to the recommended stem assembly torque (see chart following O-Ring Biuld Section). Over tightening will only reduce the life of the stem assembly. Replace the locking clip. Replace and fully secure the wrench assembly. Turn the valve to the closed position. 6.0 Platform / extension integral with valve body, with two-piece stem. 6.1 Disassembly of the extended stem assembly: Remove the wrench assembly, followed by the locking clip, gland nut, disc springs, stop plate and gland (as appropriate to the valve size & series). Push the stem down into the valve body cavity and drive out the extension 'Drivelok' pin. The lower stem portion can now be unscrewed and removed from within the cavity and the top portion withdrawn through the top of the housing. Remove the remaining gland components and discard the gland packing and thrust seal. The two sections of the stem must be stored together and remain as a matched pair. 6.2 Rebuilding: Fit the thrust seal to the lower stem portion and position into the stem bore through the valve cavity. Insert the upper stem portion through the top of the housing and screw the two sections together until the pin holes align, then refit the 'Drivelok' pin. To the top of the stem, fit the gland components, stop plate and gland nut as appropriate to the valve size and series (if disc springs are incorporated they should be fitted with outer edges touching). Tighten the nut to the recommended stem assembly torque (see chart following O-Ring Build Section). Over tightening will only reduce the life of the stem assembly. Fit the locking clip over the gland nut (if appropriate to valve size and series). 7.0 / Ball Alignment. 7.1 When refitting the ball into the body cavity, the pressure relief hole must be on the upstream side of the valve Upstream relief hole relative to the flow direction arrow on the side of the valve. and alignment pin 7.2 Revision 6 and 7 versions of these assemblies have an alignment pin in the stem that locates in an indent in the slot in the ball.

TYPICAL 3-PIECE VALVE WITH EXTENDED STEM ASSEMBLY - R6 & R7 VERSIONS Gland/Wrench Nut Lock Washer Wrench Sleeve Wrench Gland Nut Locking Clip R6 Design Wrench/Gland Nut Disc Spring Follower (Top) Chevron Seal Follower (Bottom) Thrust Bearing Split Thrust Bearing Split Ring

TYPICAL FLANGED VALVE WITH BOLT-ON EXTENDED STEM ASSEMBLY 65MM REDUCED BORE, 50MM FULL BORE AND LARGER Wrench Sleeve Wrench/Gland Nut Spring Washer Wrench Gland Nut Locking Clip Wrench/Gland Nut Disc Spring Gland Gland Thrust Seal Stop Pin Extension Platform Screw Extension Platform Bearing Flange Seal UP TO AND INCLUDING 50MM REDUCED BORE, 40MM FULL BORE

TYPICAL EXTENDED STEM ASSEMBLY - R5 VERSION (2-PIECE STEM) 15-50MM REDUCED BORE, 15-40MM FULL BORE Lockwasher/Wrench Nut Wrench Sleeve Stop Plate Gland Nut Disc Spring Gland Gland Washer Extension Platform Extension Flange Extension Extension Housing Thrust Bearing Tang Extension Drivelok Pin

TYPICAL STEM ASSEMBLY (2-PIECE STEM) 65-150MM REDUCED BORE, 50-100MM FULL BORE Wrench Fixing Bolt Wrench Wrench Tube Gland Nut Indicator Stop Follower Seals Stop Pin Washer Extension Drivelok Pin Body Seat Ball Seat Insert Seal Insert Retaining Screw Location Ring Thrust Seal Insert

Envirosafe Valves: 'E' & 'EF' Series This section contains only details of Envirosafe valve stem assemblies. For all other valve maintenance, disassembly, rebuilding, health and safety instructions etc, please refer to the relevant I.O.M. for the particular series of valve. Maintenance, Disassembly, Rebuilding: 1.0 General: Before rebuilding, ensure that the repair kit and /or components used are suitable for the valve requirement. All components not replaced by items in the repair kit should be thoroughly cleaned (using a suitable degreasing agent, and wire wool for hard deposits) and checked for signs of corrosion, erosion or damage and be replaced if necessary. Cleanliness is essential for long valve life. 2.0 Leakage: 2.1 Due to the design of the Envirosafe Valve and with the installation of sensing devices (i.e. pressure indicators or leak detection equipment) to the purge ports, advanced warning of leakage can be obtained as soon as the primary seal begins to pass media. 2.2 Envirosafe valves are available with five purge port configurations: 'PP0': No purge ports (Inter-stage leakage monitoring not applicable). 'PP1': One purge port - BSPT. 'PP2': Two purge ports - BSPT. 'PP3': One purge port - NPT. 'PP4': Two purge ports - NPT. 2.3 Once a leak has been detected adjustment to the gland assembly can be carried out via the gland bolts retaining the gland plate. However it should be noted that the secondary seal would maintain valve integrity preventing any emission to atmosphere. 2.4 Primary Seal Leakage: If leakage is detected at the purge port tighten the gland bolts evenly to the specified torque. Over tightening will only reduce the life of the stem assembly. If leakage persists, it will be necessary to dismantle the valve and replace the damaged seals. 2.5 Secondary Seal Leakage: If leakage is detected to atmosphere past both the primary and secondary seals follow the same procedure as 2.4 above. 3.0 Assembly Dismantling: 3.1 15mm to 65mm Reduced Bore,15mm - 50mm Full Bore Valves: a) Remove the wrench (one-piece design) by removing the two retaining set screws, followed by the gland bolts, disc springs, gland plate and follower(s). b) Push the stem down into the body cavity and from the inner end, remove the split ring and split thrust bearing. Now withdraw the stem through the top of the body (care must be taken to avoid damaging the sealing surfaces of the packing chamber). This may require consider able force - the stem flats can be clamped in a vice utilising soft jaws to aid removal. c) All of the gland packings etc will be withdrawn with the stem as the stem thrust seal face is a larger diameter than the internal bores of the packings. All soft seals should be discarded.

3.2 80mm to 250mm Reduced Bore, 65mm - 200mm Full Bore Valves: a) Remove the wrench assembly (cast 'T'-head with tubular wrench) by removing the single hexagon headed bolt, followed by the stop plate, gland bolts, disc springs, gland plate and follower(s). b) Push the stem down into the body cavity and remove. The stem thrust seal is now removed from the stem and discarded. c) Remove the gland packings form the stem bore (with care to avoid damaging the sealing surfaces of the packing chamber). 4.0 Assembly Rebuilding: Before rebuilding, ensure that the repair kit and /or components used are suitable for the valve requirement. All components not replaced by items in the repair kit should be thoroughly cleaned (using a suitable degreasing agent and wire wool for hard deposits) and checked for signs of corrosion, erosion or damage and be replaced if necessary. Cleanliness is essential for long valve life. PTFE stem builds should be lubricated with a grease suitable for the application, whilst Graphite stem builds should be lubricated with 'Fomblin RT15' 4.1 15mm to 65mm Reduced Bore,15mm - 50mm Full Bore Valves: a) Insert the stem down through the stem bore and out into the body cavity, then fit the split thrust bearing with split ring beneath and draw the stem back upwards into the thrust recess. b) With the stem in the closed position place the ball into the body (flanged valves need to have one seat placed into position before the ball is located) then turn to the open position. c) Gland (PTFE or Graphite builds). Assemble the PTFE or Graphite stem gland packings in the order described below: PTFE build: Primary seals, lantern ring, three chevron packing rings (one chevron packing ring is carbon filled PTFE - black in colour - and must be fitted as the top ring), then either follower 'T' then follower 'G', or thicker one-piece follower 'T'. Graphite build: Two graphite gland seals, lantern ring, two further graphite gland seals then either two follower 'G's or thicker one-piece follower 'G'. d) Place the gland plate over the stem. e) Lubricate the gland bolts with a suitable anti-galling agent, place six off disc springs onto each bolt (refer to following sectioned views for fitting arrangement) and locate through the gland plate and screw into the body. Tighten evenly to the correct torque - see table below. f) Replace the wrench. 4.2 80mm to 250mm Reduced Bore, 65mm - 200mm Full Bore Valves: a) Place the new stem thrust seal onto the stem and pass up through the body cavity into the stem bore. b) The remainder of the build is as per 3.1-b above onwards. 4.3 E81 & EF81 Series: As these valves are of all welded construction, the scope for rebuilding is limited to replacing the gland area. Removal of the old packings must be done with great care to avoid damaging the sealing areas of the bore and stem. VALVE NOMINAL SIZE RECOMMENDED GLAND BOLT TORQUE (NM) Reduced Bore Full Bore PTFE 'T' Build Graphite 'G' Build 15mm & 20mm 15mm 4.5-5.0 10.2-12.4 25mm & 32mm 20mm & 25mm 7.3-7.9 13.6-15.8 40mm, 50mm & 65mm 32mm, 40mm & 50mm 9.6-10.7 23.7-26.0 80mm & 100mm 65mm & 80mm 19.8-22.6 30.5-33.3 150mm & 200mm 100mm & 150mm 27.1-29.9 38.4-41.2

STEM BUILDS ALL SIZES Follower 'T' Chevron Rings Primary Seals Gland Bolt Disc Spring Gland Plate Follower 'G' Lantern Ring Graphite Rings Split Thrustbearing 'T' Detail Split Ring 'G' Detail VALVE SIZES: 15-50MM REDUCED BORE, 15-40MM FULL BORE Gland Bolt Follower 'T' Chevron Rings Primary Seals Disc Spring Gland Plate Follower 'G' Lantern Ring Split Thrustbearing Graphite Rings 'T' Detail 'G' Detail VALVE SIZES: 65-200MM REDUCED BORE, 50-150MM FULL BORE

TYPICAL 'E' AND 'EF' STEM ASSEMBLY 15-50MM REDUCED BORE, 15-40MM FULL BORE Firesafe "EF" Build Follower 'G' Graphite Gland Lantern Ring Graphite Gland Disc Springs Gland Plate Follower 'G'* Wrench Wrench/Gland Nut Disc Springs Follower 'T' Chevron Ring Lantern Ring Wrench Screw Thrust Bearing Split Ring Primary Seal * Not fitted on all PTFE stem builds Either one thick or two thin followers

TYPICAL 'E' AND 'EF' STEM ASSEMBLY 65-200MM REDUCED BORE, 50-150MM FULL BORE Firesafe "EF" Build Follower 'G' Graphite Gland Lantern Ring Graphite Gland Spacer Gland Bolt Disc Springs Hex Head Bolt Wrench Head Wrench Tube Stop Gland Plate Gland Nut Disc Springs Chevron Ring Follower 'G'* Follower 'T' Lantern Ring Primary Seal * Not fitted on all PTFE stem builds Either one thick or two thin followers Thrust Bearing

O-Ring Builds: This section contains only details of O-Ring stem assemblies. For all other valve maintenance, disassembly, rebuilding, health and safety instructions etc, please refer to the relevant I.O.M. for the particular series of valve. 1.0 General: Before rebuilding, ensure that the repair kit and /or components used are suitable for the valve requirement. All components not replaced by items in the repair kit should be thoroughly cleaned (using a suitable degreasing agent, and wire wool for hard deposits) and checked for signs of corrosion, erosion or damage and be replaced if necessary. Cleanliness is essential for long valve life. 2.0 15mm to 50mm Reduced Bore, 15mm - 40mm Full Bore Valves: 2.1 Dismantling: Remove the wrench assembly, followed by the locking clip, gland nut, bearing retainer and bearing. Withdraw the stem from within the body cavity and remove and discard the thrust seal. Remove and discard the packing ring (if fitted) and the o-ring. 2.2 Rebuilding: Fit the new thrust seal onto the stem shoulder and insert into stem bore from the inside the body cavity. The O-ring can now be fitted over the stem and pushed down into the packing recess. As the O-ring can easily be damaged on the stem thread and cause leakage, great care should be taken when fitting. Any lubricant used on the O-ring should be compatible with both the O-ring material and the line media. Fit the packing ring (if the valve size requires), bearing, bearing retainer and gland nut, and tighten until the stem torque specified below is achieved. (This is the torque of the stem assembly only i.e without ball and seats being fitted). Refit the locking clip. 3.0 65mm to 250mm Reduced Bore, 50mm - 200mm Full Bore: 3.1 Dismantling: Remove the wrench assembly, followed by the locking clip (if fitted), gland nut and stop plate. Withdraw the stem from within the body cavity and remove and discard the thrust seal. Remove the 'top hat' bearing retainer, bearing, gland or thrust seal (dependent on valve size), O-ring and stem location ring. 3.2 Rebuilding: Fit the new thrust seal onto the stem shoulder and insert into stem bore from the inside the body cavity. Refit the stem location ring. The o-ring can now be fitted over the stem and pushed down into the packing recess. As the O-ring can easily be damaged on the stem thread and cause leakage, great care should be taken when fitting. Any lubricant used on the O-ring should be compatible with both the O-ring material and the line media. Fit the gland or thrust seal (dependent on valve size), bearing, 'top hat' bearing retainer, stop plate and gland nut, and tighten until the stem torque specified below is achieved. (This is the torque of the stem assembly only i.e without ball and seats being fitted). Reduced Bore VALVE NOMINAL SIZE Full Bore RECOMMENDED STEM ASSEMBLY TORQUE (NM) 15mm & 20mm 15mm 3-5 25mm & 32mm 20mm & 25mm 4-6 40mm, 50mm 32mm, 40mm 6-8 65mm 50mm 8-11 80mm & 100mm 65mm & 80mm 18-22 150mm & 200mm 100mm & 150mm 23-28 250mm 200mm 35-40

O-RING STEM BUILDS 65MM & LARGER REDUCED BORE, 50MM & LARGER FULL BORE 15-50MM REDUCED BORE, 15-40MM FULL BORE Gland Nut Gland Nut Locking Clip Gland Nut Bearing Retainer Bearing Ring (Thrust Seal) O-Ring Thrust Seal Stop Plate Bearing Retainer Bearing Gland * O-Ring Location Ring Thrust Seal * Not fitted to 65mm reduced bore, 50mm full bore valves

Worcester Controls TM Burrell Road, Haywards Heath, West Sussex RH16 1TL, England. Telephone: +44 (0)1444 314400 Telefax: +44(0)1444 314401 Website: www.worcestercontrols.co.uk TM indicates a trade mark of Worcester Controls Information given in this leaflet is made in good faith and based upon specific testing but does not, however constitute a guarantee. A Flowserve Company Published and Printed by Worcester Controls Copyright Worcester Controls PB STEM IOM Iss. 8/02