Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 3. Sh. R. Srinivasan Vice President (Corp.) Athena Chhattisgarh Power Pvt Ltd #7-1-24/1/RT. G-1. B-Block 1 st Floor, "Roxana Towers", Greenlands, Begumpet, Hyderabad - 500 016 E-mail: rsrinivasan@ath-chhattisgarh.in Mob: 09910833929 5. Sh. N. Ramakrishnan, Sr. GM Business Development / Sh. C. Narasimha, Manager KSK Mahanadi Power Company Ltd. 8-2/293/82/A/431/A, Road 22, Jubilee Hills, Hyderabad - 500 033 Emall: narasimha@ksk.co.in Mob: 9959444903 7. Sh. P.K.Sharma GM-Projects Lanco Amarkantak Power Pvt Ltd. Plot -397, Udyog Vihar, Phase-3, Gurgaon 122 016 E-mail: pramod.sharma@lancogroup.com Mob: 9971001991 2. Sh. Vikas Saxena Executive Vice President Jindal Power Ltd. 2 nd Floor, DCM Building, Plot 94, Sector-32, Gurgaon - 122 001 E-mail:krn.kumar@jindalsteel.com Mob: 09958881573 4. Sh. N M Ambade General Manager (Project Finanace) SKS Power Generation (Chhattisgarh) Ltd. 501 B, Elegant Business park, Andheri Kurla Road, J. B. Nagar, Andheri (E). Mumbai - 400 059 Email: nmambade@spgcl.com Mob: 9987094679 6. Sh. Janmejaya Mahapatra Head-BD Korba West Power Co Ltd 6 th & 7 th Floor, Vatika City Point, M. G. Road, Gurgaon - 122 002 Email: janmejaya.mahapatra@avanthapower.com Mob: 9717005276 8. Sh. Ajaya Kumar Nathani Head Transmission (GMR Energy Ltd.) GMR Chhattisgarh Energy Pvt. Ltd. Building # 302, New Shakti Bhawan, New Udaan Bhawan Complex, IGI Airport, New Delhi 110 037 E-mail: ajaya.nathani @gmrgroup.in Mob: 8826830027 Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh- 493225 ravishanker.s@gmrgroup.in 9. Sh. R K Gupta CEO (Power Business) DB Power (Chhattisgarh) Ltd. 813, Udyog Vihar, Phase-V, Gurgaon - 122 016 Email: devendras.sinha@dbpower.in 10. Sh. Atanu Ghosh Chowdhury Vice President Bharat Aluminium Company Ltd. Balco Nagar, Korba - 495 450 Chhattisgarh E-mail: devendra.patel@vedanta.co.in
Mob:9999004555 Mob: 9893122359 11. Sh. Subrato Trivedi Managing Director VISA Power Limited Visa House, 8/10 Alipore Road, Kojkata - 700 027 Email: subrato.trivedi@visapower.net Mob: 9836447744 12. Sh. Ravi Arya Head Commercial (Thermal Projects) / Sh. Abhishek Gupta MB Power (M.P.) Ltd. 239, Okhla Industrial Estate, Phase-III, New Delhi - 110 020 Mob: 98182180 78 13. Sh. P. Bhaskar Technical Director Karnataka Power Corporation Ltd. 82, Shakti Bhavan, Race Course Road, Bengaluru - 560 001 (Karnataka) E-mail: tatotd@karnatakapower.com ; kpclre@gmail.com Mob: 080-22254545 /9560798049 15. The CEO (Power Business) Maruti Clean Coal & Power Ltd. Hira Arcade, Ground Floor, New Bus Stand, Pando, Raipur - 492 001 Email : trnenergy@acbindia.com; acbpower@acbindia.com Mob: 09953150412 17. Sh. H. M. Jain Vice President (Power) Aryan MP Power Generation Pvt. Ltd. 7 th Floor, Ambience Office Block, Ambience Mall, Ambience Island, NH-8, Gurgaon. Email : trnenergy@acbindia.com acbpower@acbindia.com Mob: 09953150412 19. Sh. G. Venkatachalam Director Dheeru Powergen Pvt. ltd. 110, Amrutha Ville, Rajbhavan Road, Hyderabad -500 082, Ph. +91-40-23395167, Mob: +91 9849032180/ 9346239288/ 9350582001 14. Sh. Suren Jain Managing Director Jaiprakash Power Ventures Ltd., Sector 128, Distt Gautam budh Nagar, ida (UP) 201304 / The Director In-charge Jaiprakash Power Ventures ltd. P.O. Jaypee Nagar Rewa - 486 450 E-mail: alok.gupta@jalindia.co.in Mob: 9717364276 16. Shri Harish Sharan Executive Director / Sh. S. S. Sharma Sr. Vice President PTC India ltd 2 nd Floor, NBCC Tower, 15 Bhikaji Cama Place New Delhi - 110 066 Phone : 011-41659136 Email : harishsaran@ptcindia.com 18. Sh. Ramesh kumar Managing director Essar Power Gujarat Ltd. 44 Km Stone, Jamnagar-Okha Highway P.O. Box -07, Devabhumi, Dwarka, Khambalia, Gujarat - 361 305 20. Shri H M Jain Vice President (Power) TRN Energy Ltd., 7th Floor, Corporate Tower, Ambience Mall, NH-8, Gurgaon 122 002
E-mail:gvchalam@gmail.com; dheerupowergen@gmail.com 21. Sh. Jitendra Mahapatra Head- Electrical, Jhabua Power ltd. Avantha Power & Infrastructure Ltd., 6 th & 7 th Floor, Vatika City, M. G. Road, Gurgaon - 122 002 22. Sh. P S Dutta Gupta Head - Corporate Affairs / Sh. R. K. Agarwal Executive Director Sarda Energy & Minerals Ltd. 1 st Floor, Vanijya Bhawan, Jail Road, Devendra Nagar Square, Raipur - 492 001 E-mail: pduttagupta@seml.co.in Mobile : +91 9752090024 Phone : +91 771 2214208/2214210 23. Sh. T. P. Vijayasarathy Executive Director (Corporate) Torrent Energy Ltd, Torrent House, Off Ashram Road, Ahmedabad - 380 009 25. Executive Director (Engg.) NTPC Ltd., Engg. Office Complex, Plot no. A-8A, Sector-24, Post Box. 13, ida 201 301 (U.P) 27. Sh. Deepak Tehlan, General Manager (Fin.) / Sh. D. P. Bhasin, Sr. General Manger Pipavav Energy Ltd. 12 th Floor, Videocon Towers Jhandewalan Extn. New Delhi - 110 055 Mob: +91 9811750209 Email: dtehlan@videoconmail.com 29. Sh. B K Jain Chief Engineer (Electrical) / Sh. A K Rastogi Chief Engineer (Electrical) Dept. of Atomic Energy, Govt. of India Heavy Water Board Vikram Sarabhai Bhawan 5 th Floor, Anushaktinagar Mumbai 400 094 Mob: +91 93 24783334 24. Sh. Satish Dukare General Manager Dhariwal Infrastructure Ltd. C-6, Tadali Growth Centre, M.I.D.C, Chandrapur,-442406 Email: Satish.dukare@rp-sg.in Mob: +91 9561112003 26. Managing Director MP Power Management Company Ltd., Shakti bhawan, Rampur, Jabalpur, Madhya Pradesh 482 008 Mob: +91 9425602570/ +91 9425150665 Email: md@mptransco.nic.in Makarand.chincholkar@mppmcl.com Pramod.chowdhary@mppmcl.com 28. Sh. A. K. Garg, Director, Chhattisgarh State Power Trading Co. Ltd. 2 nd Floor, "Vidyut Seva Bhavan", Dangania, Raipur 492 013 Email: cg.techcell@gmail.com Ph: 0771-2574300/ 0771-2574117 Mob: +91 9425584512 30. Sh.S.S.Mishra Addl. General Manager / Smt. Suchitra Maggon Addl. General Manager NTPC Limited NTPC Bhavan. Core-7, Scope Complex, 7. Institutional Area, Lodhi Road, New Delhi - 110 003 Email: ssmishra@ntpc.co.in smaggon@ntpc.co.in
bkjain@mum.hwb.gov.in Mob: +91 9650991556 31. Sh.Vinod Agrawal Director / Sh. R. V. Mathe, VP (Comml.) Vandana Vidhyut Ltd Vandana Bhawan, M.G. Road, Raipur, Chhattisgarh E-mail:vvl@vandanavidhyut.com/ corpaff@vandanavidhyut.com/ md@vandanavidhyut.com Mob: +91 8329992001 32. Chief Engineer (Transmission) / Sh. N. K. Jain, Associate Director, Nuclear Power Corporation of India Ltd. 9-S-30, V.S. Bhavan, Anushaktinagar, Mumbai - 400 094 Email: nkjain@npcil.co.in Ph: 022-25992248 Mob: +91 9969482792 33. Sh. Suresh Jain, MD, Bina Power Supply Company Ltd., Sector-128, District Gautam Buddh Nagar, NOIDA-201304 (U.P.) 34. Sh. Vinay Mittal MD Essar Power MP Ltd. Village-Bandhora, Post-Karsvalal, Tehsil- Mada, Waidhan Dist: Singrauli -486886 Madhya Pradesh Vinay.mital@essar.com
Minutes of 11 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 16.02.2016 at POWERGRID, Gurgaon 1. The 11 th Joint Co-ordination Committee meeting of IPPs in WR was held at POWERGRID Office, Gurgaon on 16 th Feb, 2016. The list of participants of the meeting is enclosed at Annexure-I. 2. CTU welcomed the participants and informed that Minutes of the 10 th meeting of the Joint Co-ordination Committee of IPPs granted LTA in WR held on 07.10.2015, were issued vide letter ref. no. C/CTU/W/OA/10JCC dated 19.10.2015. As no observations/comments were received on the minutes, accordingly the minutes of 10 th Joint Co-ordination Committee as circulated are confirmed. 3. CTU stressed that generation developers should ensure completion of their dedicated lines to match with the commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the IPPs need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon ble CERC in Petition no. 112/TT/2013. 4. It was clarified by CTU that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the associated transmission system. However it is noted that the information given by generation developers is being treated as if it is imparted officially by them. It is therefore requested that any substantial issue to be addressed by CTU may kindly be submitted by official correspondence, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content, therefore it was advised that such communication should strictly follow CERC Regulatory provisions specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. 5. All the LTA customers were advised to clear the Consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines for timely implementation of the same. In case of failure the IPPs shall only be responsible towards any delay in implementation of the bays. 6. All discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. 7. It is noted that some of the IPPs/ applicants have been successively not attending the JCC Meetings. All such IPPs/ applicants to kindly attend the future meetings so as to have a better co-ordination. 8. The LTA customers were requested to update the progress of their generation projects and the discussion are summarised below Page 1 of 16
of the Generation Projects Minutes of 11 th JCC Meeting of IPPs granted LTA in WR HIGH CAPACITY TRANSMISSION CORRIDOR IV ( Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) LTOA / LTA Applicant CHATTISGARH IPP 1 Maruti Clean Coal (1X300) LTOA Quantum (MW) Target Beneficiaries WR NR 171 126 45 Firm beneficiary Rajasthan: 200 MW CSPTCL : 14 MW 2 Dheeru Power Gen 450 367.5 82.5 NIL 3 Chhattisgarh State Power Trading Co. Ltd* MADHYA PRADESH IPP 4 5 6 Jaiprakash Power Ventures Ltd. (2X660) Aryan MP Power generation Pvt. Ltd (2X600) Bina Power Supply Company Ltd (2X250) (10 th JCC) U-1:, COD in Jul 15 (9th JCC : Uncertain) (11 th JCC) U-1:, COD in Jul 15 (9 th JCC : Uncertain) 432 260 172 NIL 1240.8 853.5 387.3 MP-465.3 MW (Operational) 1122.0 841.5 280.5 NIL (9 th JCC onwards U-1& 2 : in Sep 14 & Feb 15) (9 th JCC: Abandoned) (9 th JCC: Abandoned) 265.35 132.68 132.67 NIL Dedicated / Connectivity line & LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Dheeru gen - WR PS (Bilaspur) 400kV D/c line Jaiprakash - Satna 400kV D/c (High Capacity) line commissioned Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity) Bina TPS - Suitable Location (along Bina (PG) - Bina (MPPTCL) 400kV D/c line) - 400kV D/c (High Capacity) line: Termination of one ckt to Bina (PG) & other Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. representative was available to update the status. representative was available to update the status. Matter in CERC for relinquishment of LTA for balance quantum (775.5 MW). Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. representative was available to update the status. Matter in CERC for relinquishment of LTA for full quantum. Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. Page 2 of 16
LTOA / LTA Applicant LTOA Quantum (MW) Target Beneficiaries WR NR Firm beneficiary (10 th JCC) (11 th JCC) Dedicated / Connectivity line & ckt to Bina (MPPTCL)- Total 3681.15 2581.1 432.17 HIGH CAPACITY TRANSMISSION CORRIDOR V ( Associated with Chhattisgarh IPPs) LTOA / LTA Applicant LTOA Quantu m (MW) Target Beneficiaries WR NR ER RAIGARH (KOTRA) COMPLEX 1 2 3 4 5 RKM Powergen Ltd (4X360) Athena Chhattisgarh Power Ltd. (2X600) SKS Power Gen. (Ch) Ltd. (4X300) Korba West Power Co. Ltd. (1X600) Visa Power Ltd. (1X600+1X660) 819 419 200 200 NIL 683 342 341 UP: 300 MW (LOI) 683 319 364 Firm beneficiary (10 th JCC ) (LOI ) 100- RERC 240 140 100 CSPTCL: 5% 678 478 200 CSPTCL: 424 MW West Bengal: 200 MW with option to increase to 510 MW U-1/2: Oct/v 15 U-3/4: Mar/May 16 U-1: Dec 15 U-2: Mar 16 (9th JCC : U-1/2: Feb 16/ Dec 15 U- 3/4:Jan/Mar 18) U-1: Mar'14 (COD) U-1: Sep 17 U-2: Mar 19 (11 th JCC ) t attended (U1/U2: COD in v 15 / Feb 16- as informed through email) U-1: Sep 16 U-2: Mar 17 t attended (U1/2/3/4: Sept 16/Dec 16/Sept 18/ Dec 18 - as informed via letter) t attended U-1: Sep 18 U-2: Mar 20 Dedicated / Connectivity line & 400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line 8 km out of 11 km stringing completed. 400kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line expected by Mar 16 400kV SKS - Raigarh PS (Near Kotra) D/c line (Triple/Quad) - in Feb 15 400kV Korba (W)- Raigarh PS (near Kotra) D/c line expected by v 15- as informed in 10 th JCC 400kV Visa Power- Raigarh PS (Near Kotra) D/c (Triple) line - expected by Jun 17 representative was available to update the status, however the updated generation project status was informed vide email Representative informed that 92% works of the generation plant are completed. representative was available to update the status. submitted vide letter dt. 25.02.2016 representative was available to update the status. The representative informed that they have already spent about 50% on the project cost on Unit-I & common system. Page 3 of 16
LTOA / LTA Applicant LTOA Quantu m (MW) Target Beneficiaries WR NR ER Firm beneficiary (10 th JCC ) (11 th JCC ) Dedicated / Connectivity line & However works on main plant activities kept on hold on account of cancellation of coal block. 6 DB Power Ltd. (2X600) 705 530 175 RAIGARH (TAMNAR) COMPLEX 7 8 9 Jindal Power Ltd. (4X600) Jindal Power Ltd. (400 MW) TRN Energy Pvt. Ltd (2X300) 1400 700 700 Tamil Nadu: 208 MW Rajasthan-250 Tamil Nadu : 400 MW Kerala: 190 & 142.5 MW (9th JCC: U-1: Feb 14 U-2: Synchronized in Mar 15, COD yet to be achieved) U-1/2: Mar 14 (COD) U-3: Jan 15 (COD) U-4: synchronized in Mar 15, COD expected in Mar 16 400 400 NIL 393 243 150 UP : 390 MW U-1: Jan 16 U-2: Jun 16 U-1: Feb 14 U-2: Synchronized in Mar 15, COD yet to be achieved- as informed in 9 th JCC) t attended t attended U-1: Mar 16 U-2: Sept 16 DB Power Raigarh PS (near Kotra) 400kV D/c (Triple/Quad) line - commissioned JPL Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) 3 ckts commissioned, 4 th circuit expected by Oct 15 (as informed in 10 th JCC) TRN - Raigarh PS (near Tamnar) 400kV D/c line in Jul 15 Activities shall only resume once the coal allocation is made which is expected in May, 2016. Tamil Nadu - 208 MW LTA to SR operational. representative was available to update the status. Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. Page 4 of 16
LTOA / LTA Applicant LTOA Quantu m (MW) Target Beneficiaries WR NR ER Firm beneficiary (10 th JCC ) (11 th JCC ) Dedicated / Connectivity line & JANJGIR-CHAMPA COMPLEX 10 11 12 13 KSK Mahanadi Power Co. Ltd. (6X600) Bharat Aluminum Co. Ltd. (BALCO- 4X300) Lanco Amarkantak Power Pvt. Ltd. (2X660) Vandana Vidyut Ltd. (2X135 + 1X270) RAIGARH COMPLEX 2340 2340 200 100 100 Tamil Nadu: 500 MW UP: 1000 MW Gujarat : 1010MW Tamil Nadu : 200 MW Kerala : 95 MW Chhattisgarh: 55 MW 858 858 NIL 265 165 100 CSPTCL : 25 MW Telangana : 120 MW U-1/2: Aug'13/Aug'14 (COD); U-3/4: Sep 16/ Mar 17; U-5/6: Sep/Dec 17 U-1/2:, U-3/4: Oct' 15 U-1: Aug 16 U-2: Dec 16 U-1: Apr 14 (COD) ; U-2:Mar 16 U-3:Apr 19 U-1/2: Aug'13/Aug'14 (COD); U-3/4: Sep 16/ Mar 17; U-5/6: Sep/Dec 17 400kV KSK Champa Pooling Station 2xD/c (Quad) 1 st D/c line expected by Mar 16; 2 nd line by Sep 16 Balco Dharamjaygarh / Korba PS 400kV D/c (Triple/Quad) line expected by Oct 15 (as informed in 10 th JCC) LANCO Champa PS 400kV D/c (Quad) line - expected by Apr 16 Vandana Vidhyut Dharamjaygarh PS 400kV D/c line : Mar 17 Generation developer was advised to expedite the implementation of the dedicated transmission lines and bays Representative not attended JCC, however as per earlier status of progress, 100 MW to Tamil Nadu Operational. representative was available to update the status. representative was available to update the status. It is requested that TSA may be signed at the earliest. 14 GMR Chhattisgarh Energy Pvt. Ltd. (2X685) 816 386 430 NIL U-1: Jun 15 (COD); U-2: Feb 16 U-1: Jun 15 (COD); U-2: Feb 16 GMR - Raipur PS 400kV D/c (Quad) line - commissioned in Jan 14 15 Chhattisgarh State Power Trading Co. Ltd* Total 16288 5809 3487 2322 NIL 1090 7 5181 200 representative was available to update the status. Page 5 of 16
Other Generation Projects in Chhattisgarh & Madhya Pradesh 1 2 3 4 5 6 LTOA / LTA Applicant PTC(Lanco-II) (1X300) Mahan (Essar power Ltd.(2X600) Karnataka Power Corporation Ltd (2X800) MB Power (Madhya Pradesh) Limited (2X600) Pipavav Energy Private Ltd Essar Power Gujarat Ltd. LTOA Quantum (MW) Target Beneficiaries WR NR ER SR Firm beneficiary (10 th JCC) (11 th JCC) 300 0 300 0 0 NIL t attended 1200 1200 0 0 0 MP: 150 MW U-1: Apr 13 (COD) U-2: Dec 15 763 0 0 0 763 NIL Uncertain 392 200 192 0 0 UP-192 MW U-1: May 15 (COD) (Operational) U-2: Dec 15 U-1: Apr 13 (COD) U-2: Jun 16 (MOEF clearance awaited-as informed vide email) U-1: May 15 (COD) U-2: Mar 16 1200 550 290 360 0 NIL 250 0 0 0 250 NIL Uncertain ( certain date given despite repetitive requests) 3 years from MoEF Clearance Uncertain ( certain date given despite repetitive requests) 3 years from MoEF Clearance Dedicated / Connectivity line & Pathadi TPS - WR PS (near Sipat) 400kV D/c (Quad) line - commissioned Mahan TPS WR PS 400kV D/c line - expected by Jul 16 KPCL - Champa PS 400kV D/c (Quad) line MB TPS - Jabalpur PS 400kV D/c (Triple) line Pipavav TPS Pirana 400kV D/c (triple) line Salaya TPS - Bachau 400kV D/c (Triple) line - advanced stage of completion representative was available to update the status. Representative stated that the dedicated transmission line is getting delayed by 5-6 months representative attended JCC, status submitted through e-mail. MOEF clearance still awaited 392 MW operational; Representative requested for return of CBG as per Regulations. Consistently not attending the JCC meetings, accordingly it may be put-up to WR constituents meeting for Conn/LTA applications for discussion & decision Representative stated that they are serious about development of the project, however project works are held-up for want of MOEF clearance and shall be resumed upon such approval. The Page 6 of 16
7 8 LTOA / LTA Applicant Torrent Energy Ltd. LTOA Quantum (MW) Target Beneficiaries WR NR ER SR Firm beneficiary 800 400 400 0 0 NIL Dhariwal Infrastructure Ltd. 300 150 150 0 0 Tamil Nadu: 100 MW (10 th JCC) (9 th JCC: U-1/2/3: Dec 14 (COD)) (11 th JCC) ( submitted though e-mail) 9 NPCIL (Kakrapar) 1400 1400 0 0 0 NIL t attended t attended 10 NTPC (Vindhyachal -V) 495.78 495.78 0 0 0 NIL 11 NTPC (Lara-I) 1586.51 1586.51 0 0 0 NIL 12 Jhabua Power Ltd 210 210 0 0 0 13 MP Power Management Company Ltd. Kerala: 204.25 MW in Aug 15, COD by Oct 15 U1: Apr 17 U2: Oct 17 U-1: Dec 15 246 246 0 0 0 NIL U-1: Dec 15 Oct 15 (COD) U1: Apr 17 U2: Oct 17 U-1: Synchronization Feb 16 and COD expected by Mar 16 U-1: Synchronization Feb 16 and COD expected by Mar 16 Minutes of 11 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & TEL(DGEN) TPS- Navsari 400kV D/c (Triple/Quad) line commissioned - Jul 13 LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Kakrapar NPP - Navsari 400kV D/c Interconnection at 400kV Bus of Vindhyachal TPS- IV switchyard Lara - Raigarh PS (Kotra) 400 kv D/c line Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: signing of TSA is also requested. t generating power due to non-availability of Gas. It is requested that TSA may be signed by the developer. Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. LTA for 100 MW to Tamil Nadu is operational representative was available to update the status Generation, dedicated Tr. Line & identified Tr. System commissioned, further participation not required. MPPMCL to give letter for consent of payment of relinquishment charges for reduction of LTA on account of auxiliary. Total 9143.29 6438.29 1332 0 1013 Page 7 of 16
of the Associated HIGH CAPACITY TRANSMISSION CORRIDOR IV ( Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) under the Scope of POWERGRID: Transfer of power from generation projects near Bilaspur complex in Chhattisgarh & MP projects Tr. System 1 Indore- Vadodara 765kV S/c 2 Vadodara Pirana 400kV D/c (Quad) 3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara of other associated transmission lines. 1 765 KV S/C Bina - Gwalior line (3rd Ckt) 2 765KV S/C Gwalior-Jaipur line (2nd Ckt) 3 765 KV S/C Jaipur - Bhiwani line Page 8 of 16
under the Scope of POWERGRID HIGH CAPACITY TRANSMISSION CORRIDOR V ( Associated with Chhattisgarh IPPs) Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1. 1 Raigarh Pooling Station (Near Kotra) Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits 2 Raigarh Pooling Station (Near Kotra) Raigarh 400kV D/c 3 Raipur Pooling Station Raipur 400kV D/c 4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra) (1x240 MVAR B/R) at 765kV, 1x80 MVAR bus reactor (charged at 400kV) 5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R) Page 9 of 16
Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2 1 Champa Pooling Station Raipur Pooling Station 765kV D/c -150 KM - 2x240 MVAR line reactors at Raipur 2 Raigarh Pooling station(near Kotra) Raigarh pooling station(near Tamnar) 765kV D/c 3 Champa Pooling Station Dharamjaygarh/Korba 765kV S/c 4 Raigarh Pooling Station (near Kotra) Champa Pooling Station 765kV S/c 5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station (1x240 MVAR B/R) 1x80 MVAR bus reactor when charged at 400kV) 6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R) with 1x1500 MVA transformer with 1x1500 MVA transformer Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3 1 Raipur Pooling Station Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha 2 Wardha bus reactor 1x330 MVAR Page 10 of 16
strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4 1 Wardha Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad 2 Aurangabad(PG) Boisar 400kV D/c (Quad)-300 km - 2x63 MVAR line reactors at each end on both circuits 3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R) 4 Augmentation of transformation capacity at Boisar by 1x500MVA Jun 16 Dec 16 Severe RoW issues in Nashik Dist. due to grape garden System strengthening in rth/west part of WR for IPP Projects in Chhattisgarh Part-5 1 Padghe Padghe(PG) 400kV D/c (Quad)- 25 km Jun 16 Oct 16 2 Vadodara Asoj 400kV D/c(Quad)-15 km - 3 Aurangabad (PG) Padghe(PG) 765kV 1 D/c - 2x240 MVAR line reactors at each end on both circuits 4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R) Jun 16 Jun 16 Oct 16 Oct 16 The LILO of under construction 400 kv Tarapur-Padghe line (MSETCL) bypassing Kudus substation is not workable as the work of LILO of 400 kv Tarpur- Padghe line is stopped for the last 2 years due to severe RoW & n0navavilability of forest clearance. Page 11 of 16
(Unless Kudus Substation of MSETCL is constructed, Power cannot be evacuated from Padghe) System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6 1 Raipur Pooling Station Wardha 765kV 2nd D/c-380 km - 2x240 MVAR line 2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha Jun 16 Jun 16 System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7 1 Wardha Aurangabad (PG) 765kV 2nd D/c 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9 1 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR) 2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s Jun 16 Dec 15 1500 MW - Jun 16 1500 MW - Sept 16 in Dec, 2015 Page 12 of 16
3 LILO of Abdullapur Sonepat 400kV D/c(triple) at Kurukshetra 4 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively: to be upgraded to 6000MW 5 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra Dec 15 Mar 18 Dec 15 Mar 18 Minutes of 11 th JCC Meeting of IPPs granted LTA in WR in Dec, 2015 in Dec, 2015 Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10 [TBCB award placed to succesful bidder Sterlite in Mar 12 with commissioning schedule of 39 months(june 15)] 1 Aurangabad(PG) Dhule (IPTC) 765kV S/c line 2 Dhule (IPTC) Vadodara (PG) 765kV S/c line 3 Dhule (IPTC) Dhule (MSETCL) 400kV D/c Quad line 4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s Page 13 of 16
of other Transmission Lines Minutes of 11 th JCC Meeting of IPPs granted LTA in WR 1 400KV D/C Kurukshetra - Jind line (Q) Mar 18 Mar 18 2 765 KV D/C Jabalpur Pooling Station - Line commissioned in Bina line Dec'13. 3 Jabalpur PS-Bhopal 765kV S/c TBCB 4 Bhopal- Indore 765kV S/c TBCB 5 TEL(DGEN) TPS- Vadodara 400kV D/c May 18 TBCB (SPV transferred) 6 220kV Navsari- Besthan May 18 TBCB 7 765KV D/C Jabalpur Poolin Stn. - Orai line Apr 18 Apr 18 8 765kV Orai- Aligarh Apr 18 Apr 18 9 765KV D/C Narendra (New Kudgi) - Oct 15 Kolhapur line (initially charged at 400KV) 10 400KV D/C Kakrapar APP - Vapi line Dec 16 Oct 16 11 400KV D/C Kakrapar APP - Navsari line Oct 16 12 Vindhayachal PS- Jabalpur PS 765kV D/c Jun 18 Jun 18 TBCB 13 400KV D/C Lara STPS - Raigarh (Kotra) line Apr 16 Mar 16 Name of the Sub-Station 1 765/400 KV Champa Pooling Station 2 765/400KV Jabalpur Pooling station (2x1500MVA) 3 1x1500 MVA 765/400kV ICT at Vindhayachal PS Jul 17 Jul 17 Sub-station commissioned along with ICT-I in Dec.'13 & ICT-II in Mar'14. Page 14 of 16
Annexure-I List of Participants in the 11 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 16.02.2016 Name Designation Organization E-mail 1. Seema Gupta COO (CTU-Plg.) Power Grid Corporation of India Ltd sgupta@powergridindia.com 2. Ashok Pal GM (CTU-Plg.) Power Grid Corporation of India Ltd. ashok@powergridindia.com 3. Avinash Pavgi GM (Commercial) Power Grid Corporation of India Ltd. apavgi@powergridindia.com 4. R Nagpal GM (CMG) Power Grid Corporation of India Ltd. rnagpal@powergridindia.com 5. D N Rozekar DGM (CTU-Plg.) Power Grid Corporation of India Ltd. drozekar@powergridindia.com 6. B P Kundu DGM (BDD) Power Grid Corporation of India Ltd. bpkundu@powergridindia.com 7. Nishant Jyoti DGM (CTU-Plg.) Power Grid Corporation of India Ltd. nishantjyoti@yahoo.com 8. Rajesh Verma CDE (CTU-Plg.) Power Grid Corporation of India Ltd. rverma@powergridindia.com 9. Anil Kumar Meena DCDE (CTU-Plg.) Power Grid Corporation of India Ltd. anilsehra@powergridindia.com 10. Laxmi Kant Manager (CTU-Plg) Power Grid Corporation of India Ltd. laxmikant@powergridindia.com 11. K Jyoth Kumar Officer (CTU-Plg.) Power Grid Corporation of India Ltd. jyoth@powergridindia.com 12. Manish Pareta DE (CTU-Plg.) Power Grid Corporation of India Ltd manish.pareta@powergridindia.com 13. Rishu Garg AM-Transmission GMR Chhattisgarh Energy Pvt. Ltd. Rishu.garg@gmrgroup.in 14. C Narasimha Manager KSK Mahanadi Power Company Ltd. narasimha@ksk.co.in 15. Pramod Chowdhary Sr. GM (Comml.) MP Power Management Co. Ltd. pramod.chowdhary@mppmcl.com Page 15 of 16
Name Designation Organization E-mail 16. R. Srinivasan Vice President (Corp.) Athena Chhattisgarh Power Ltd. rsrinivasan@ath.chhattisgarh.in 17. Rangarao G Project Head Visa Power Ltd. g.rangarao@visapower.net 18. Gobi Krishnan R Project manager Visa Power Ltd. gobi.krishnan@visapower.net 19. V. Mittal Advisor MB Power( MP) Ltd vijendra.mittal@hpppl.in 20. Abhishek Gupta AGM MB Power( MP) Ltd abhishekgupta@hpppl.in 21. Deepak Rodricks GM Essar Power MP Ltd. / deepak.rodricks@essar.com Essar Power Gujarat Ltd. 22. Manoj Kumar AGM (Power) ACB (India) Ltd. acbpower@acbindia.com 23. Suveen Vyas DGM (PP&M) NTPC Ltd. suveenvyas@ntpc.co.in 24. Rohit Ladha Dy. Manager (comml) NTPC Ltd. rohitladha@gmail.com 25. Janmejaya Head-BDD Jhabua Power Ltd. janmejaya.mahapatra@avanthapower.com Mahapatra 26. Roopam bansal Deputy Manager-BDD Jhabua Power Ltd. roopam.bansal@avanthapower.com Page 16 of 16