Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Similar documents
DIRECTORY, IDENTIFICATION, LABEL, MARKING, PLAQUE, AND SIGN REQUIREMENTS FOR SOLAR PV SYSTEMS

CHAPTER 10 ELECTRICAL. Notes:

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

CHAPTER 10 ELECTRICAL

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

Green Building Technology

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Solar PV Standard Electrical Plan

Photovoltaic Solar Plan Review

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

2016 Photovoltaic Solar System Plan Review List

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Load Side PV Connections

Solar PV Standard Electric Plan

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

PHOTOVOLTAIC SYSTEMS

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Solar Power Installation Application

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Applicant and Site Information Job Address: Permit #:

CPS 3Phs String Inverters NEC 2014 Compliance

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Residential Photovoltaic (PV) Packet

City of Manhattan Beach Community Development

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Questions from the AHJ To Fuse or Not to Fuse?

ENGINEERING SPECIFICATION

SOLAR PV INSTALLATIONS

A Look at the 2017 NEC Significant Changes

Definitions. Scope. Customer Generation Interconnection Requirements

Supply-Side PV Connections

32 IAEI NEWS March. April

Technical Summary of Battery Energy Storage Systems

TABLE OF CONTENTS. About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1

Non-Residential Solar Energy Photovoltaic (PV) Packet

Know the Code: PV and NEC

STREAMLINED SOLAR CHECKLIST Owner Name:

Renewable sources of electricity a brief overview

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

TABLE OF CONTENTS CHAPTER 1 ELECTRICAL THEORY About This Textbook...xi. Passing Your Exam...xiv. How to Use the National Electrical Code...

Table of Contents. CHAPTER 1 ElECTRiCAl THEoRY Mike Holt enterprises, inc neC.Code ( )

Temporarily Approved Solar Photovoltaic System Electrical Schematics

XXX RESIDENCE : XXX kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

City of Manhattan Beach Community Development

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Installation and Operations Manual

Application Note Three Phase String Inverters NEC 2014 Compliance

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

SINGLE PHASE WIRING SPECIFICATIONS

NEC REQUIREMENTS FOR GENERATORS

Solar Photovoltaic (PV) Design Considerations & Issues. By Paul M. Williams, President & CEO

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

THREE PHASE WIRING SPECIFICATIONS

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

CONNECTING INVERTER. by John Wiles

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

Know the Code: PV and NEC

THIS PANEL FED FROM INV1. PER NEC 408.4(B) Part No NEC (C) Entrances to rooms or other guarded locations that contain exposed live

Service Entrance Methods

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number:

Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see

Spring Test 7 due 05/03/2013

2014 NEC Changes Part 1 (Homestudy)

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

Codes and Standards: Focusing on the Sustainability Aspects of Electrical Installations What, Why and How?

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

RGS PV-000. Sheet List

hat inspectors need to know

See Part 3 for the Introduction for Article 314

Code Calculations. for an Off-Grid PV System

Solar Photovoltaic (PV) System Components

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings

To complete the process for a net metering interconnection, please follow the steps below:

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES

Micro3 Grid Tied Residential Package

Photovoltaic Installations

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

2014 NEC Changes (Homestudy)

Transcription:

Mike Holt s Illustrated Guide to Directory, Identification, Label, Marking, Plaque, and Sign Requirements for SOLAR PV SYSTEMS Extracted From Mike Holt s Illustrated Guide to Understanding NEC Requirements for Solar Photovoltaic Systems For more information about this book and other Solar PV products visit www.mikeholt.com/solar NEC, NFPA 70, NFPA 70E and National Electrical Code are registered trademarks of the National Fire Protection Association. Mike Holt Enterprises, Inc. 1.888.NEC.CODE www.mikeholt.com Info@MikeHolt.com COPYRIGHT 2011 Charles Michael Holt 11.29.11

ARTICLE 690 Solar Photovoltaic (PV) Systems Introduction to Article 690 Solar Photovoltaic (PV) Systems You ve seen, or maybe own, photocell-powered devices such as night lights, car coolers, and toys. These generally consist of a small solar panel and a small light or motor. Typically, these run on less than 10V dc and draw only a fraction of an ampere. These kinds of devices are very different from a system that can power a house or interconnect with a utility to offset a building s energy consumption. Consider the sheer size and weight of solar modules for providing electrical power to a building. You re looking at mechanical and site selection issues that may require specialized expertise. The value of these modules also means there are security issues to consider, which may require more than just installing locks. There are also civil and architectural issues to address. In summary, these installations are complicated and require expertise in several non-electrical areas, which the NEC doesn t address. Article 690 focuses on reducing the electrical hazards that may arise from installing and operating a solar photovoltaic system, to the point where it can be considered safe for property and people. This article consists of eight Parts, but the general requirements of Chapters 1 through 4 apply to these installations, except as specifically modified by Article 690. Part I. General 690.1 Scope. Article 690 applies to photovoltaic (PV) electrical energy systems, array circuit(s), inverter(s), and charge controller(s) for PV systems, which may be interactive with other electrical power sources (electric utility) or stand-alone with or without energy storage (batteries). Figures 690 1 and 690 2 Figure 690 2 690.4 Installation. (B) Identification and Grouping. PV system conductors, both dc and ac, can be installed in the same raceways, outlet and junction boxes, or similar fittings with each other, but must be kept entirely independent of non-pv system wiring conductors. Figure 690 22 Figure 690 1 Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 1

Ex: Identification of different systems isn t required where conductor identification is evident by spacing or arrangement. (F) Circuit Routing. PV source and output conductors must be routed along building structural members (beams, rafters, trusses, and columns) where the location of those structural members can be determined by observation. The location of PV source and output conductors imbedded in built-up, laminate, or membrane roofing materials in areas not covered by PV modules and associated equipment must be clearly marked. Figure 690 22 PV system conductors must be identified by separate color coding, marking tape, tagging, or other approved means and grouped as follows: (1) PV Source Circuits. Identified at points of termination, connection, and splices. (H) Multiple Inverters. Where multiple utility-interactive inverters are located remote from each other, a directory is required at each dc PV system disconnecting means, at each ac disconnecting means, and at the main service disconnecting means showing the location of all ac and dc PV system disconnecting means in the building/structure. Ex: A directory isn t required where all PV system disconnecting means are grouped at the service disconnecting means. 690.5 Ground-Fault Protection. PV systems must have ground-fault protection to reduce fire hazards. Figure 690 27 (2) PV Output and Inverter Circuits. Identified at points of termination, connection, and splices. (3) Multiple Systems. Conductors of each system must be identified at termination, connection, and splice points. Figure 690 23 Figure 690 27 (C) Labels and Markings. A warning label must be on the utilityinteractive inverter stating the following: Figure 690 28 Figure 690 23 WARNING ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 2

Figure 690 28 Figure 690 71 Caution: The label must resist the environment for 25 to 40 years of system use and be suitable for the environment and be installed so as not to void equipment listing [110.3(B)]. When plastic is used, it should not be placed in direct sunlight, unless specifically manufactured as sunlight resistant; a metallic engraved sign would be best. Part II. Circuit Requirements 690.10 Stand-Alone Systems. (C) Single 120V Supply. The battery based inverter output is permitted to supply a 120V single-phase, 3-wire, 120/240V distribution panel marked with the following words or equivalent: (4) A permanent plaque identifying the locations of the service and inverter ac disconnect(s) must be placed at service and inverter ac disconnect(s) locations. 690.15 PV Equipment Disconnect. PV equipment must have a disconnecting means that opens all ungrounded circuit conductors from all sources of power. Where equipment is energized from more than one source, such as an inverter supplied by dc current input from the array and ac current output to the utility source, a disconnecting means is required for each and both dc and ac disconnects must be grouped together and each permanently marked to identify their purpose. Figure 690 73 WARNING SINGLE 120-VOLT SUPPLY DO NOT CONNECT MULTIWIRE BRANCH CIRCUITS Part III. Disconnecting Means 690.14 PV System Disconnecting Means. (C) Requirements for Disconnecting Means. The PV system disconnect must open all ungrounded conductors. (2) Marking. Each PV system disconnect must be permanently marked to identify it as the PV system disconnect. Figure 690 71 (D) Inverter Disconnects. Where utility-interactive inverters are not readily accessible, dc and ac circuit disconnecting means is requires as follows: Figure 690 73 Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 3

690.16 Disconnecting Means for Fuses (B) PV Output Circuit. A disconnecting means must be provided for PV output circuits. Where the disconnecting means is more than 6 ft from the fuse, a directory indicating the location of the fuse disconnect must be at the fuse location. Figure 690 75 690.17 Disconnect Requirement. Disconnects must be a manually operable switch or circuit breaker meeting all of the following: (4)For dc disconnects where line and load terminals will be energized when the switch is in the open position, a warning sign must be placed on or adjacent to the disconnect such as: Figure 690 78 Figure 690 75 Figure 690 78 Nonload-break fuse pullouts or holders must be marked Do not open under load. Figure 690 76 WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION Part IV. Wiring Methods 690.31 Wiring Methods. (E) Circuits Inside Buildings/Structures. (3) Marking/Labeling. Wiring methods and enclosures containing PV dc conductors must be marked Photovoltaic Power Source by labels or other approved permanent marking means. Figure 690 87 Figure 690 76 (4) Marking /Labeling Methods. The marking required by 690.31(E) (3) must be visible after installation and appear on every section of the wiring system separated by enclosures, walls, partitions, ceilings, or floors. Spacing between labels/marking must not be more than 10 ft and labels must be suitable for the environment. Figure 690 88 690.35 Ungrounded Systems. PV power systems are permitted to be ungrounded if they comply with the following: Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 4

(1) Rated maximum power-point current (Imp x number of combined paralleled source circuits). (2) Rated maximum power-point voltage (Vmp x number of modules in each source circuit). (3) Maximum system voltage (Voc). Note: See 690.7(A) for maximum photovoltaic system voltage calculation. (4) Short-Circuit Current (Isc x 1.25). Note: See 690.8(A) for maximum circuit current calculation. Figure 690 87 Author s Comment: The values for maximum power-point current (Imp), maximum power-point voltage (Vmp), open circuit voltage (Voc), and short-circuit current (Isc) are indicated on the manufactures specifications sheet for the modules used for the system. (5) Maximum rated output current of the charge controller (if installed) Example: Determine the DC PV power source information needed for the PV power source label based on the following: array consists of twenty-three 200W modules, 11.05 Imp, 18.10 Vmp, 22.60 Voc (at 7 C), and 11.80 Isc. Figure 690 111 (1) Rated Maximum Power-Point Current (Imp) Imp = Module Rated Imp Number of Strings in Parallel Imp = 11.05A 1 Imp = 11.05A Figure 690 88 (F) Labeled. The PV power source must be labeled with the following warning at every junction box and termination point: WARNING ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. Part VI. Marking 690.53 Direct-Current PV Power Source. A permanent label must be applied by the installer at the PV dc disconnect indicating: (2) Rated Maximum Power-Point Voltage (Vmp) Vmp = Module Vmp Number of Modules per String Vmp = 18.10V 23 = 416V (3) Maximum System Voltage (Voc) PV Voc = Module Voc Table 690.7 Correction Factor # Modules per String PV Voc = 22.60 Voc 1.14 23 modules PV Voc = 593V (4) Short-Circuit Current (Isc) Isc = Module Isc 1.25 Number of Strings in Parallel Isc = (11.80A 1.25) 1 Isc = 14.75A Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 5

Example: What s the rated ac output current for a utility-interactive inverter rated 5 kw at 120/240V supplied by twenty-three dc modules each rated 200W? Inverter Rated ac Output Current = Inverter kw rating/ Nominal ac Voltage Inverter Rated ac Output Current = 5,000W/240V Inverter Rated ac output current = 20.83A at 240V Author s Comment: Panelboards containing ac inverter circuit breakers must be field-marked to indicate the presence of multiple ac power sources [705.12(D)(4)]. Figure 690 111 690.54 Interactive System. The point of connection of the PV system to ac power must be marked with the rated ac output current and nominal operating ac voltage. Figure 690 112 690.56 Identification of Power Sources. (A) Facilities with Stand-Alone Systems. Any building/structure with a stand-alone PV system (not connected to a utility power) must have a permanent plaque placed on the exterior of the building/ structure at a readily visible location that is acceptable to the authority having jurisdiction. The plaque must indicate the location of the stand-alone PV system disconnecting means and that the structure contains a stand-alone electrical power system. (B) Facilities with Utility Power and PV System. Buildings/structures containing both utility power and a PV system must have a permanent plaque placed at the service and PV system ac disconnecting means identifying the location of the other system if not located at the same location. Figure 690 113 Figure 690 112 Figure 690 113 Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 6

ARTICLE 705 Interconnected Electric Power Production Sources Introduction to ARTICLE 705 Interconnected Electric Power Production Sources Anytime there s more than one source of power production at the same building or structure, safety issues arise. In cases where a power production source such as a generator is used strictly for standby power, the NEC requires transfer switches and other safety considerations as covered in Articles 700, 701, or 702 depending on whether the standby power is legally required or optional. When interactive electrical power production sources such as wind powered generators, solar photovoltaic systems, or fuel cells are present, there usually isn t a transfer switch. In fact, it can be expected that there will be more than one source of electrical supply connected simultaneously. This can raise many questions regarding how to maintain a satisfactory level of safety when more than one power source is present. Article 705 answers these and other questions related to power sources that operate in parallel with a primary source. Typically, a primary source is the utility supply, but it can be an on-site source instead. Part I. General 705.1 Scope. Article 705 covers the installation of electric power production sources (photovoltaic, wind, micro-hydro generators, etc) operating in parallel with a primary source(s) of electricity. Figure 705-1 Note: Primary sources of electricity include a utility supply and on-site electric power sources like photovoltaic or wind powered systems. 705.10 Directory. A permanent plaque or directory denoting all electric power sources on or in the premises must be installed at each service equipment location and all interconnected electric power production sources. 705.12 Point of Connection. (D) Load Side. Where distribution equipment is capable of supplying multiple branch circuits or feeders or both, the interconnecting provisions for the utility-interactive inverter(s) must comply with (D)(1) through (D)(7). (4) Marking. Panelboards containing ac inverter circuit breakers must be field-marked to indicate the presence of multiple ac power sources such as: Figure 705-15 Figure 705 1 (7) Inverter Output Connection. Where distribution equipment is capable of supplying multiple branch circuits or feeders, the ac inverter circuit breaker must be located at the opposite end from the input feeder supply conductors. Figure 705-18 Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 7

Where distribution equipment is capable of supplying multiple branch circuits or feeders, a permanent warning label on panelboard is required to warn that the inverter output connection circuit breaker must not be relocated: Figure 705-19 Figure 705 15 Figure 705 19 WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE CIRCUIT BREAKER Figure 705 18 Mike Holt Enterprises, Inc. www.mikeholt.com 888.NEC.CODE (632.2633) 8

25% OFF Introducing Mike Holt's Illustrated Guide to Understanding NEC Requirements for SOLAR PHOTOVOLTAIC SYSTEMS This brand new book and DVD program is an insightful guide to the sweeping changes in the NEC as it relates to the installation of PV systems of any size. This program explores the safety aspects of installation and the maintenance of PV systems. If you are a PV installer, Electrician, Inspector or Engineer this book will be an eye opener to the complexity of solar photovoltaic systems and the importance in understanding those NEC Rules that govern their installation. For a limited time you can get your copy for 25% off list price use discount code PVPDF11 NAME TITLE COMPANY ADDRESS CITY STATE ZIP PHONE E-MAIL ADDRESS VISA MASTERCARD DISCOVER AMEX MONEY ORDER CHECK CREDIT CARD # EXP. DATE 3 OR 4 DIGIT SECURITY CODE ON FRONT OF AMEX OR BACK FOR ALL OTHERS 2011 SOLAR PHOTOVOLTAIC SYSTEMS ORDER FORM PRICE QTY TOTAL Book List Price $62 $49.60 $ DVD Program List Price $210 $168.00 $ (includes book & 2 DVDs) SUB-TOTAL $ SALES TAX FLORIDA RESIDENTS ONLY ADD 6% $ Shipping (5% of total price) - Minimum $7.50 $ TOTAL $ Mail form to: 3604 Parkway Blvd., Suite 3, Leesburg, Florida 34748 FOR VOLUME DISCOUNTS, PLEASE CALL OUR OFFICE Visit: www.mikeholt.com Call: 888.NEC.CODE (632.2633) Fax: 352.360.0983 MIKE HOLT Enterprises, Inc. TM...as for me and my house, we will serve the Lord [Joshua 24:15]