INSTALLATION OF OPTIC 3 INJECTOR SYSTEM ONTO AN SHIMADZU GC-2010 GAS CHROMATOGRAPH.

Similar documents
Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

Hot Injection Adapter Kit - Installation Guide

Installing the 6850 Direct Valve Column Connector Kit

OPTIC-4. Multimode GC Inlet. Installation Guide OPTIC-4 Inlet CO 2 Cooling Option.

Installing a Purged Packed Inlet

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

260 Solvent Vapor Exit Accessory

Installing a PTV Inlet

Installing a Cool On-Column Inlet

Installing a PTV Inlet

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Agilent G1554A On-Column Capillary Inlet with EPC

Agilent G3510A/G3511A Multimode Inlet

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Installing the CO 2 Cryogenic Oven Cooling Kit

Installing a Purged Packed (PP) Inlet

Nickel Catalyst Tube Accessory 19205A

1310 Inlets. 1 of 36. Jun Illustrated Parts Breakdown Agilent 6890 Gas Chromatograph Service Manual

Deans Switch Microfluidics

ENGINE DISPLACEMENT 2000 NUMBER OF VALVES 16 ENGINE SET NUMBER

BLOC U A-12G BLOC U C-12G

Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

Agilent G2855A Deans Switching System

Agilent SD-1 Purification System ml/min

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Model 8610C Gas Chromatograph. GC Chassis Types ECD PID FID / DELCD FPD. Mounts up to Six Detectors and Five Injectors

Agilent 6850 Series II Network GC System G2630A Performance Specifications

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

Agilent 7697A Headspace Sampler

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Installing an Auxiliary Pressure Control Module

Agilent G2738A Upstream Capillary Interface

AZ Chrom s.r.o.

Installing the Flame Ionization Detector EPC Flow Control Manifold

Choose for Your Instrument. GC Supplies - Agilent Instrument Quick Pick Guide

PRODUCT SPECIFICATION. Product Specification Crystal 9000 Gas Chromatograph. Chromatec Crystal Laboratory Gas Chromatography System

Technical Procedure for Gas Chromatography-Mass Spectrometry (GC-MS)

1350 Valves. 1 of 14. Jun Illustrated Parts Breakdown Agilent 6890 Gas Chromatograph Service Manual

C40008 & C40009 EXHAUST BRAKES

Page 1. Alternate Carrier Gas Considerations and Faster GC Analysis

Installing an Auxiliary Pressure Control Module

Installation Guide Thermal Conductivity Detector Accessory 19232E

ENGINE DISPLACEMENT NUMBER OF VALVES 16 VEHICLE CATEGORIES

5. Engine Control Module (ECM) I/O Signal

Choose for Your Instrument

NPD to FID conversion on SRI 8610C or 310C GC July2012

Installation Instructions General Motors 8.1 Sequential Vapor Injection (S.V.I.) System 7500/6500 Series Trucks model year.

6890 Installing ¼ Glass Columns

The Quality of Light TM. MODEL: SSI-600-PDC Controller Operation Manual. Metaphase Technologies Inc. JAN-09

Troubleshooting Tips & Tricks for your GC Analyzer & CFT Application

Technical Procedure for Gas Chromatography (GC-FID)

Using the PSD for Backflushing on the Agilent 8890 GC System

ENGINE DISPLACEMENT NUMBER OF VALVES ENGINE SET NUMBER VEHICLE CATEGORIES. Direct LiquiMax-2.0 PETROL ECU MANUFACTURER / CODE Bosch MED 17.

MAKE OF AUTOMOBILE: ENGINE SET NUMBER 366/

The Analysis of Hydrocarbon Composition in LPG by Gas Chromatography using the DVLS Liquefied Gas Injector

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Choose for Your Instrument. GC Supplies - Bruker (Varian) Instrument Quick Pick Guide

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

Model DS1000/DT20 System

Setting up SilFlow for BackFlush in your GC

AZ Chrom s.r.o.

VDF G G VDF G G VDF G G METALLIC HOSE 12GF FITTING FOR SOLDERING 12 12G

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

Using a New Gas Phase Micro-Fluidic Deans Switch for the 2-D GC Analysis of Trace Methanol in Crude Oil by ASTM Method D7059 Application

Agilent 218 Purification Solution

TUNE-UP KIT INSTRUCTIONS

Proof of Long-Term, Leak-Free Performance for a Novel Self-tightening GC Column Nut

Units with pedestal and busbars on the short side (+H360, flat mounting)

MODEL YEAR: SYSTEM APPROVAL NUMBER ( R115 ) R ENGINE SET NUMBER 354/

Copyright 2004 Alltech Associates, Inc.UNP. brochure #487K. accessories

5. Engine Control Module (ECM) I/O Signal

Agilent 6890 Gas Chromatograph

Installation, Operation, and Maintenance Manual

Welker Gas Sampler Model MPS-2

MONGOOSE. Introduction. < blueroomelectronics > Assembly Instructions. Mongoose was designed as an introduction to Mechatronics.

Product Guide: Series III Pump Control Board Set (RoHS)

We recommend that when you need spare parts, you should use only original parts.

HOLLEY VR2 FUEL PUMPS P/N & Installation Instructions 199R10975

GC Injector Liners. Bruker Varian Agilent (HP) Perkin Elmer Finnigan. Phone: Page 4

SE RV I CE MANUAL. Page 1 of 13

Microsep Low-Bleed PTFE-Lined Septa. XLB Septa

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

MODEL YEAR: 2007 SYSTEM APPROVAL NUMBER ( R115 ) R ENGINE SET NUMBER 350/

Prins autogassystemen b.v. Veldhoven

Table of Contents Next FLO-SAFE Manifold System Pre-Installation Kit Matrx Toll-Free: Technical Support: Fax: Rev.

Agilent G2647A (Single) and G2648A (Dual) Flame Photometric Detector Update Kits

ASSEMBLY INSTRUCTIONS FOR 10L, 15L, & 20L JACKETED PROCESS REACTOR SYSTEMS

INSTALLATION INSTRUCTIONS FUEL RAIL

Agilent G2333B (Single) and G2334B (Dual) Flame Photometric Detectors

Product manual Oil Streak Sensor INTRODUCTION CONSTRUCTION. Master Sensor

Chapter 11. Engine & Associated Systems Contents INTRODUCTION. Tools Required

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Bracket/ Hardware STEP 1

Engine Emission Control 6.7L Diesel

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

Part# PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Agilent 7820A Gas Chromatograph

Achieving Higher Sensitivities Using GC-FID with the Agilent Multimode Inlet (MMI)

Pressure Transducer Field Installation Instructions for the LI-6252 CO 2 and LI-6262 CO 2 /H 2 O Analyzers

Transcription:

INSTALLATION OF OPTIC 3 INJECTOR SYSTEM ONTO AN SHIMADZU GC-2010 GAS CHROMATOGRAPH. Please read the manual first before installation. ATAS GL International B.V. De Run 4441 5503 LS Veldhoven Tel: +31 (0)40 254 95 31 Fax: +31 (0)40 254 97 79 Info@atasgl.com www.atasgl.com Page : 1 of 13

Unpacking the installation kit Check for the following parts in the installation kit Description Quantity Part Number Cable for OPTIC 3 Shimatzu 2010 1 H400034 Mounting plate 1 H200034 Spacer with internal thread, 3 M4x30x9 25 pin male sund connector 1 Page : 2 of 13

Pre-installation P1 Gases P1.1 Helium supply: 99.999% purity for the carrier gas on OPTIC 3. The carrier supply should be made available using 1/8 o.d. copper tubing. The maximum input pressure for the OPTIC 3 is 700 kpa (100 PSI). P1.2 A compressed air supply will be required for cooling the OPTIC 3 injector (or for driving the liquid CO 2 cooling valve when a liquid CO 2 cooling kit, Pt.No.H500009 has been purchased). The compressed air supply should be free of oil, water mist and particulate to ensure reliable operation of the cooling system. The supply should be made available using 1/8 o.d. tubing. The operating pressure is 500 kpa (72 PSI) and the maximum inletpressure is 700 kpa (100 PSI). P1.3 When an OPTIC 3 is to be used with a liquid CO 2 sub ambient kit, please refer to the CO 2 kit installation manual. P2 Electrical Supply One mains supply socket will be required. The OPTIC 3 has a universal electronic power supply and can be used with 110 V 60 Hz and 230 V 50Hz. P3 Mounting Considerations P3.1 OPTIC 3 Injector Positioning. The has two injector positions available. The OPTIC 3 injector will fit into both the injector positions. It is advisable with a DTD unit to install the injector in the front position. P3.2 Control Module Positioning. The OPTIC 3 control module is usually placed on the left hand side of a Shimadzu GC-2010. The dimensions of the control module are 43cm x 15cm x 43cm (h x w x d). P4 GC and Autosampler I/O Requirements P4.1 If the OPTIC 3 is being mounted on a stand-alone chromatograph the Cable for OPTIC 3 - is required. (H400013) P4.2 If the installation is with a CombiPal, the Cable for OPTIC 3 - (H400013) is required and an extra cable between CombiPal and OPTIC 3 is required. (H400001) P4.3 The combination of a Shimadzu autosampler and OPTIC 3 is not supported from ATAS GL at the moment. Page : 3 of 13

1 Safety Before removing any cover from the gas chromatograph Disconnect the mains supply Disconnect or de-pressurise any gas connections Allow all ovens and heated zones to cool to a safe temperature Read the relevant sections of the gas chromatograph manual 2 Removal of Autosampler and/or MSD 2.1 If fitted, remove the autosampler and the autosampler mounting plate from the top the GC oven, referring to the autosampler and/or GC manuals if required. 2.2 If fitted, the MSD may be removed if it obstructs the installation, refer to the GC and/or manuals for information. (Usually no necessary) 3. Removing the inlet, pneumatics, and manifold When no free position is available one of the injectors should be removed. If there is a free position available for the OPTIC 3, skip section 3. 3.1 Turn off the oven and the inlet and allow them to cool. WARNING Turn off the oven and the inlet and allow them to cool. Turn off all flows at the initial gas supply. Then turn off the main power switch and unplug the power cord. 3.2 Remove the top cover, left side panel and the pneumatics chassis cover. 3.3 Remove the column. 3.4 Loosen the two screws, which secure the inlet to the oven, and lift the inlet out of the oven. 3.5 Remove the heater and temperature sensor connector. 3.6 Remover the gasline blok attached at the regulator and remove the complete injector. 3.7 In order to prevent the G.C. reporting an electronic fault condition on the injector removed above, a replacement plug should be placed. 4 Placing the GC thermocouple Page : 4 of 13

In order to have an accurate constant column flow, it is necessary to know the GC column oven temperature. This is measured with a thermocouple supplied with the OPTIC 3. 4.1 Find a hole in the GC oven top and guide the thermocouple trough the wall inside the GC oven. Or place the thermocouple near the injector and guide it inside the GC oven. 4.2 Fix the thermocouple end some where in the GC oven so it s measuring the oven temperature in a good way. Take care that the end of the thermocouple is not in contact with metal. 4.3 Route the thermocouple cable to the back of the host chromatograph. 4.4 Connect the thermocouple plug to the thermocouple socket on the rear panel of the OPTIC 3 control module. Note that it is important to ensure that the correct connector is used. Warning: Do not use the connector for the Injector thermocouple. 5 Mounting the OPTIC 3 Injector 5.1 Place the insulation material supplied with the installation kit in the hole where the injector should be installed. 5.2 Mount the installation bracket and place the tree 30mm spacers. 5.3 Place the injector in the position prepared and fix it using the 3 M4x10 screws supplied with the injector kit. 6 Gas Control Connection to the Injector 6.1 The pipe work from the OPTIC 3 injector will be connected to the ports on the rear of the control module. 6.2 The injector top should be located and the pipe work uncoiled. Re-fit the injector top. 6.3 Form the pipe work neatly on the oven top and route the pipe work such that it may be connected to the ports on the rear of the control module. 6.4 The carrier out, split, pressure and septum purge ports on the rear of the control module have been fitted with appropriate reducing ferrules to enable direct connection to 1/16 o.d. pipe work. 6.5 Connect the split line from the OPTIC 3 injector (with an Split identifier) to the Control module Split port using the PTFE reducing ferrule supplied with the injector. Page : 5 of 13

Do not push the split line to much inside the ferrule so it is touching the metal of the coupling. Make sure there is an electrical insulation between the control module and the OPTIC 3 injector split line. 6.6 Connect the carrier line (with a Carrier identifier) to the Carrier Out port on the control module. 6.7 Connect the septum purge line (with Septum Purge identifier) to the Aux Gas In / Purge In port on the control module. As the standard, there is a fixed restrictor installed allowing a few ml/min septum purge flow. 7 Cooling Air 7.1 Connect the 1/8 o.d. Nylon pipe supplied with the injector to the To Injector port on the cooling solenoid on the control module rear panel. 7.2 Route the cooling air line to the injector. It is suggested that a similar route to the carrier, pressure, split and purge lines is chosen. 7.3. Fit the cooling tube to the cooling pipe. Take care not to brake the cooling pipe on the welding. 7.4 The cooling pipe should be positioned such that the outlet projects down into the cup of the OPTIC 3 injector and is approximately level with the injector central tube when the injector is viewed from above. Ensure that the end of the cooling tube does not come into contact with the central tube of the injector when the cooling pipe is secured in place. The cooling air should not blow direct on the thermocouple. 7.5 The cooling air line can be cut to length using a sharp knife to improve the neatness of the installation before the outlet end of the Nylon line is pushed over the inlet end of the cooling pipe. A secure connection will be ensured if the nylon pipe overlaps the cooling pipe by 10-12 mm. 9 Connections of Injector Power and Thermocouple Cables 9.1 Route the injector thermocouple cable under the back cover and of the host chromatograph. 9.2 Connect the thermocouple plug to the thermocouple socket on the rear panel of the OPTIC 3 control module. Note that it is important to ensure that the correct connector is used. Warning: Do not use the connector for the GC thermocouple. Page : 6 of 13

Figure 1. 9.3 Route the injector power cable (flat blue cable sleeved with a braided glass fibre sheath) to the injector and connect the connectors to the OPTIC 3 injector. See figure 1. 9.4 Take care that the heater cable clamps are not in contact with the top-boss clamp nut or the central tube. If this happens, there is a short cut and the injector will not perform well. 9.5 Secure connections between the power cable and the injector are necessary for reliable operation of the system. (Torque settings 5lb/inches [58grms/meter]) Connections that are insufficiently tight will cause increased contact resistance and may cause the connections to overheat. Note, however, that overtightening the power cable fixing nuts may cause damage to the threads on the mounting studs which may require replacement of the injector. 10 Connection of Helium and Cooling Air Supplies 10.1 Connect a supply of helium of a suitable quality at a pressure between 200 and 700 kpa to the Carrier IN port on the rear of the control module using the copper tube supplied. Note that the maximum pressure that can be set using the OPTIC 3 gas control will be approximately 5 psi less than the carrier gas supply pressure. As a result a low carrier supply pressure may limit the flexibility of the equipment. 10.2 Connect a supply of cooling air to the Air In port on the cooling solenoid on the rear of the control module at a pressure between 400 and 500 kpa. Lower pressure can be used if decreased cooling performance is acceptable. Page : 7 of 13

11 Logic Cable Connection 11.1 If the host chromatograph is either a stand alone unit or if fitted with an autosampler, connect the 15 way D connector of the logic cable (P/No. H400035) to the Chromatograph connector on the rear of the OPTIC 3 control module and connect the other end to the host chromatograph. Connect the wires according to the figure 2. White to 1 Brown to 2 Yellow to 3 Green to 4 12 Software installation (Evolution Workstation) 12.1 Refer to the OPTIC 3 user s guide appendix B. Figure 2. 13 Communication configuration 13.1 Refer to the OPTIC 3 user s guide appendix B. Page : 8 of 13

14 Configuration of the OPTIC 3 14.1 The OPTIC 3 IO menu should be set as follows: OPTIC-GC interface: OPTIC Master Ready Out: Disabled Closed Ready In: Closed on Ready Autosampler output: Closed on Ready Evolution software Figure 3. I/O Settings. 15 Configuration settings of the GC 15.1 The should give a closed signal on ready. This can be configured in the following way: Press FUNC button go to 6, GC Config and press enter. Go to 9, other configurations and press enter. Set the Polarity in Ready to Close. See figure 4. Page : 9 of 13

Figure 4. Cable when AOC 20i is used Use the start and ready calbe from Shimadzu supplied with the sampler. Solder this cable to the 25 pin male subd connector supplied with this kit. Pin number (OPTIC) Colour autosampler cable 1 White 2 Black 6 Yellow 5 Red Connect the 25 pin connector on the back of the OPTIC control box, using the autosampler port. 16 Testing 16.1 Fit an O ring to a liner and place the liner in the injector, ensuring that the notch at the end of the liner is towards the bottom of the injector. 16.2 Fit the white PTFE insulating washer to the top of the injector base before securing the injector top to the injector base. Note that excessive tightening of the top boss clamp nut is unnecessary to form a seal between the top and bottom halves of the injector. 16.3 Refit the covers to the host chromatograph, routing the OPTIC 3 cables and pipework under the injector mouldings and covers if appropriate. Tywraps are provided to allow the cables and pipework to be clipped together to ensure a tidy installation. Refit the injector moulding and cover or autosampler mounting plate. Page : 10 of 13

16.4 Fit a capillary column to the injector and check the pipework for leaks. An electronic Leakseeker or 50/50 isopropanol/water should be used for leak checking. Under no circumstances should soap solution or other proprietary leak detector fluid be applied to couplings in the piping system. 16.5 Run a test sample of known composition to test the system chromatographically and to check logic connections between the OPTIC 3, host chromatograph and auto sampler, where fitted. Page : 11 of 13

17 Testing the OPTIC 3 communication in a system. (Ready Input & Ready Output) In principal there are two system possibilities, depending on the hardware. 17.1 The OPTIC 3 is Master: The auto sampler waits for the OPTIC to be Ready and the OPTIC waits for the GC to be Ready. Auto sampler starts the OPTIC; OPTIC starts the GC; GC starts data-acquisition. Testing: Turn the GC oven to OFF; set the data-acquisition software to ready; start a CombiPal method; Start an OPTIC method. The CombiPal should wait; the OPTIC should wait (Initialising on the display of the OPTIC). Turn the GC oven back to on. When the GC gets Ready, the OPTIC gets Ready and the CombiPal will start. Check the start sequence as described above. 17.2 When the original Shimadzu sampler is used there is the same sequence as with a CombiPal. To check the communication with the original Shimadzu sampler see 16.1. The installation is now complete. If you have suggestions for this manual please mail to info@atasgl.com Page : 12 of 13

Shimadzu GC-2010 Bare Threads Interface cable for OPTIC 3 Cable P/No: H400035 1,5 meter 4 core shielded OPTIC 3 15 pin female Chromatograph Shimadzu 2010 OPTIC 3 remote Bare threads chromatograph 15 pin female Yellow 3 TTL Ready out 1 Logic Ready Input Green 4 gnd 9 0V White 1 Start Start in 7 Relay Run Output Brown 2 gnd 14 Relay Run Output Page : 13 of 13