LASTFIRE FIRE TEST SPECIFICATION WATER MISCIBLE FUELS REVISION A MAY 2015

Similar documents
Fixed or Semi-Fixed Foam Fire Protection Systems for Storage Tanks

Module 4: Fire Fighting Foam Principles and Biodiesel Fuel

Ethanol Tank Fire Fighting

To establish a standardized procedure for Class B foam application by engine companies.

The Challenge: Ethanol / Ethanol blended fuels. What does this mean to the Fire Service? Presented to the Reebok foam seminar by:

Normal vs Abnormal Combustion in SI engine. SI Combustion. Turbulent Combustion

STYLE 5148 MERCURYMASTER OSCILLATING NOZZLE INSTALLATION, OPERATING, AND MAINTENANCE INSTRUCTIONS

DIKE AND SPILL PROTECTION

STYLE 5148 MERCURYMASTER OSCILLATING NOZZLE INSTALLATION, OPERATING, AND MAINTENANCE INSTRUCTIONS

Physical Scaling of Water Mist Protection of 260-m 3 Machinery Enclosure

Chapter 4 ANALYTICAL WORK: COMBUSTION MODELING

MCS TYPE B FOAM MAKER & FOAM CHAMBER NDD010. Approvals: UL, ULC

Hybrid & Electric Cars Guidance for organisers of Speed events

Foam Maker Discharge Devices Model KLF

TECHNICAL DATA OBSOLETE

BRANDFORSK 2016:7. ETANKFIRE - Fire extingusishing tests of ethanol tank fires in reduced scale. Henry Persson, Magnus Bobert, Francine Amon

COMPUTATIONAL FLOW MODEL OF WESTFALL'S 2900 MIXER TO BE USED BY CNRL FOR BITUMEN VISCOSITY CONTROL Report R0. By Kimbal A.

E/ECE/324/Rev.2/Add.106/Rev.6/Amend.5 E/ECE/TRANS/505/Rev.2/Add.106/Rev.6/Amend.5

Head to Head Demo Comparison Sheet

Static Discharge Ignition of Combustible Atmospheres

LONGREACH HIGH PERFORMANCE TRAILER MOUNTED MONITORS

TECHNICAL DATA. Table Standard Materials

Assembly instructions

PASSING ABILITY OF SCC IMPROVED METHOD BASED ON THE P-RING

( Versions Available)

Owners Manual. Table of Contents 3.1. INTRODUCTION AIRSPEEDS FOR EMERGENCY OPERATION OPERATIONAL CHECKLISTS 3

HEATEC TEC-NOTE. Portable fuel tanks. Volumes and Levels. Publication No Revised FIGURE 2. VOLUMES* (GALLONS)

TECHNICAL DATA. Table Standard Materials

Combustion Equipment. Combustion equipment for. Solid fuels Liquid fuels Gaseous fuels

ANNEX 7 RESOLUTION MEPC.199(62) Adopted on 15 July GUIDELINES FOR RECEPTION FACILITIES UNDER MARPOL ANNEX VI

gskin Instruction Manual gskin Radiation Sensors for greenteg AG Technoparkstrasse 1 greenteg.com

Chapter 8 Production of Power from Heat

Improving predictive maintenance with oil condition monitoring.

STORED PRESSURE 50, 125/150 LB. STORED PRESSURE ABC, REGULAR, PURPLE K DRY CHEMICAL

Storage and Dispensing Locations

INSTRUCTIONS FOR USING METAL ilites

Installation & Design Maintenance for ILBP System

Applications of Pneumatics and Hydraulics

STYLE 3462 FORESTRY BUMPER MONITOR INSTALLATION, OPERATING and MAINTENANCE INSTRUCTIONS

Doc:TED 11(794)W 1 September 2012 Draft Standard Automotive Vehicles - Windscreen Wiping System for 3 Wheeler Vehicles - Specification

CPCS renewal test factsheet

MHI Integrally Geared Type Compressor for Large Capacity Application and Process Gas Application

Forecourt safety Competent persons

Head to Head Demo Comparison Sheet

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

Optimization of Packed Tower Inlet Design by CFD Analysis. Dana Laird Koch-Glitsch, Inc.

CENTAXIAL TUBULAR CENTRIFUGAL FANS. BIA Airfoil Blade Design Direct Drive & Belt Driven Model CBD / CDD (Class I, II & III) Model CBD Belt Driven

An Explosive Situation. Definitions

NORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL OPERATIONS

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

IMPROVED HIGH PERFORMANCE TRAYS

GASOLINE VAPOR BEHAVIOR DURING LEAK DETECTION ACTIVITIES ON A MOTOR VEHICLE

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Report for CSP Joint Venture Click to edit Master text styles Second level Third level. Fifth level

Owner s Manual GLASSLINED PUMP TANK

Thermal Unit Operation (ChEg3113)

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION

Innovative Firefighting Products

Danish Fire Laboratories ApS

ATTACHMENT #1. TO: Patricia delabruere DATE: May 5, 2015 JNU Airport Manager

Test Procedure for Measuring Fuel Economy and Emissions of Trucks Equipped with Aftermarket Devices

Features Four Sizes Superior Foam Quality Operates at 30 PSI (2.1 bar) minimum Tool Free Maintenance Corrosion Resistant Polyester Finish

FIA & MSA Approved Systems FITTING INSTRUCTIONS PLEASE READ CAREFULLY BEFORE ATTEMPTING TO INSTALL YOUR SYSTEM. Inst/Z2000/All/V1/Oct05 1

BRISTLE BLASTING SURFACE PREPARATION METHOD FOR MAINTENANCE. Neil Wilds

OF IGNITION OVER A HEATED METAL SURFACE

Metrovick F2/4 Beryl. Turbo-Union RB199

Reliable Temperature Compensation is Critical to CNG Vehicle Safety

Chemical and Physical Characteristics of Ethanol and Hydrocarbon Fuels

Module 3: Influence of Engine Design and Operating Parameters on Emissions Lecture 14:Effect of SI Engine Design and Operating Variables on Emissions

Storage and Dispensing Locations

Module 2:Genesis and Mechanism of Formation of Engine Emissions Lecture 3: Introduction to Pollutant Formation POLLUTANT FORMATION

The Discussion of this exercise covers the following points:

Accessory Fitting Instructions

TESTING OF FUELS : FLASH AND FIRE POINT

Procedure for assessing the performance of Autonomous Emergency Braking (AEB) systems in front-to-rear collisions

Control of PCCI Combustion using Physical and Chemical Characteristics of Mixed Fuel

HELICOPTER DECKS AND FACILITIES (HELIDK AND HELIDK(SRF)) APRIL 2008

Biodiesel Production and Analysis

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Explosion Relief Valves

Electrical Systems and Fault Finding

Dispersed Water in Jet Turbine Fuels: Negating the Effect on Particle Counting

CPCS renewal test factsheet

Not to be reproduced without permission Last date for receipt of BIS or used as STANDARD of comments 15 September 2011

Essentials of Fire Fighting

Not all Low Voltage Switchgear is created equal

INFLUENCE OF FUEL TYPE AND INTAKE AIR PROPERTIES ON COMBUSTION CHARACTERISTICS OF HCCI ENGINE

PERFORMANCE AND EMISSION ANALYSIS OF DIESEL ENGINE BY INJECTING DIETHYL ETHER WITH AND WITHOUT EGR USING DPF

Module7:Advanced Combustion Systems and Alternative Powerplants Lecture 32:Stratified Charge Engines

Stationary Battery Safety An Overview of the Process of Verifying the Safety of Battery Systems

How supercapacitors can extend alkaline battery life in portable electronics

Hydro Plant Risk Assessment Guide

Investigation into UK socket-outlets incorporating USB charging points

Salt Brine De-Icing & Dust Control Systems

T95 Load Cell Assembly for Silo, Tank & Vessel Weighing and Axle Weighing

STYLE 3463 FireFox. With Position Feedback Potentiometer

Comparison of Styropor and Neopor Expanded Polystyrene Foam Insulations HAI Project No. 1JJB

Comparison of Swirl, Turbulence Generating Devices in Compression ignition Engine

ISO 3679 INTERNATIONAL STANDARD. Determination of flash point Rapid equilibrium closed cup method

PEIRCE SMITH CONVERTER HOOD IMPROVEMENTS AT BHP COPPER

ROTAX Engine Type 914 F

Transcription:

LASTFIRE FIRE TEST SPECIFICATION WATER MISCIBLE FUELS REVISION A MAY 2015 REPORT No. PREPARED BY CHECKED BY APPROVED BY LFTEST WM B. Chisholm P. Watkins N. Ramsden DATE: May 2015 DATE: May 2015 DATE: May 2015

CONTENTS 1.0 INTRODUCTION 2.0 TEST PROTOCOL 2.1 Objectives 2.2 Test Requirements APPENDIX A - Test Set-Up APPENDIX B - Test Nozzles APPENDIX C - Test Criteria APPENDIX D - Example Results Sheet Our Ref: LFTEST WM MAY 2015

1.0 Introduction The original LASTFIRE Study identified the need for a small-scale fire test to evaluate the performance of fire fighting foam for storage tank application. Other tests were considered to be aimed at different types of incident such as rapid rescue situations. A test procedure was finalised in 2003 the LASTFIRE Foam test for Storage Tank Fires. It is designed to simulate the special considerations for tank incidents such as forceful foam impact, hot tank walls and distorted tank shells. Since the development of the protocol the test has been used to evaluate the performance of foam concentrate samples taken from numerous facilities, as well as freshly manufactured concentrates for end user batch acceptance purposes. Foam manufacturers also employ the LASTFIRE test to develop their foams for storage tank applications. The test is primarily used to evaluate foam performance on non-water miscible fuels. The current test standard uses heptane a readily available and consistent fuel specification; other tests have been performed on fuels such as gasoline. In recent times partly due to the evolution of ethanol, biogasoline etc. storage and handling operations and due to the need to understand foam performance on tanks storing fuels such as MTBE the LASTFIRE Steering Panel has identified a need to expand the LASTFIRE Specification so that foam performance on water miscible (WM) fuels can be tested. Thus a WM (or polar solvent ) LASTFIRE Foam Test for Storage Tank Fires needs to be developed. This Protocol outlines the requirements for such a test. It is based on the most recent test work by the LASTFIRE Group to establish the test methodology. This protocol has been revised to address perceived variations in fuel, sea water and third-party test administration. Changes outlined in this document mean that it is the most current as of May 2015. The main changes from the earlier version are as follows:- a) Clarification of fuel (ethanol) specification (Section 2.2.2); b) Clarification of simulated sea (salt) water recommended composition (Section 2.2.4); c) Clarification of system nozzle positioning for system nozzle part of test (Section 2.2.3). Our Ref: LFTEST WM 1 MAY 2015

2.0 Protocol 2.1 Objectives The primary objective of the WM LASTFIRE Foam Test is to: - 1. Evaluate the fire performance of a foam when applied to a Water Miscible (WM) fuel or polar solvent under test conditions, so that the potential fire performance for large scale storage tank applications may be determined. 2. Critically evaluate a foam by standardising on various test parameters and conditions, and by evaluating certain aspects such as: a. Ambient temperature, wind; b. Fuel type / grade; c. Fuel quantity; d. Tank freeboard height; e. Fire characteristics, preburn period etc.; f. Application Rate; g. Foam application duration; h. Foam nozzle positioning / application technique; i. Vapour seal and burnback capability; j. Fire performance criteria (control, extinguishment, post fire security). Once the critical test parameters mentioned above have been defined, a protocol can be established that is suitable for WM fuels. Section 2.2 describes the test fire requirements and methodology. Our Ref: LFTEST WM 2 MAY 2015

2.2 Test Requirements & Methodology Test requirements shall generally be in accordance with those of the non-wm LASTFIRE test; however, there are differences for the WM test. The requirements and general methodology for the WM test are as follows: 1. The LASTFIRE test pan (2.44 m diameter / 50 sq. ft) shall be used and the foam shall be made using the nozzles and equipment used in the (hydrocarbon) LASTFIRE Foam Test for Storage Tank Fires. See Appendix A for test set-up. 2. The test fuel shall be ethanol. (No water layer shall be provided as in the non-wm LASTFIRE test since this would mix with the ethanol). 3. 300 litres of ethanol shall be added to the LASTFIRE test pan*. *(Following burning and foam application it will be necessary to remove any residual fuel from the tank because water from the foam solution will be absorbed. This is unlike a test using heptane or gasoline after which the foam can simply be skimmed off the top of the fuel). 4. The nozzles used to make foam shall be the aspirating monitor nozzle and system nozzle** as specified in the non-wm LASTFIRE test. **The monitor nozzle is capable of producing aspirated foam designed to simulate an-aspirating large throughput monitor. The system nozzle runs at a low application rate and is capable of producing aspirated foam with slightly higher expansion characteristics than the equivalent monitor nozzle. Application using the monitor nozzle will be indirect from a backboard, whilst application via the system nozzle will be relatively gentle over the tank shell. 5. Each nozzle shall be evaluated in turn (i.e. monitor test and system test). The aspirated nozzle stream shall be directed from a backboard onto the fuel surface. The system nozzle stream shall be directed over the side of the pan. See Appendix A for test/backboard set-up. 6. The application rates for the nozzles shall be as given in Table 1. NOZZLE SOLUTION FLOW (lpm) NETT SOLUTION FLOW (lpm) APPLICATION RATE (lpm/m 2 ) Aspirated* 17.0 17.0 3.63 System 11.7 11.7 2.50 Table 1 Application Rates 7. The Fuel shall be ignited and be allowed to burn for 3 minutes. 8. Foam application shall be started 3 minutes after full involvement. Foam solution shall be applied for 7 minutes. 9. Time to 90% fire control shall be recorded by an experienced observer. At this point the radiative output from the fire will drop dramatically. Flames will still be visible although a large proportion of the fuel surface will be covered in foam. It is recognized that, to some extent, this is a subjective parameter. 10. Time to full extinguishment shall be recorded by an experienced observer +. Our Ref: LFTEST WM 3 MAY 2015

+ The time for total extinguishment shall be the point at which no visible flames are apparent, including any signs of ghosting across the foam surface. The foam blanket shall seal against the tank walls and particularly the baffle plate area where the foam s sealing ability is tested to the full. Any failure to control and extinguish the fire during and following the period of foam application shall be noted. 11. A vapour seal test ++ shall be conducted at 12 minutes. ++ 2 minutes following end of foam application (12 min into test) Torch Test - A lighted torch shall be passed over the whole of the foam blanket (without contact). The extent of re-involvement (if any) shall be recorded at this stage and assessed against the performance criteria given in Appendix C. The test shall ensure that the edges of the blanket and particularly the baffle areas are given attention. The torch shall be passed around the complete circumference of the pan inner edge within 75mm (3 ) of the foam blanket and across the centre of the tray. The torch test shall take at least 1 minute to conduct. 12. A Burnback resistance test shall be conducted. In the case of the WM test, the burnback pot shall be introduced at 14 minutes. The burnback pot shall contain 2 litres of test fuel. At 15 minutes the fuel shall be ignited. The time at which 25% area re-involvement/burning is observed shall be recorded. The pot shall be placed in the area of the oldest foam. 13. Test Results shall be recorded using the proforma given in Appendix D. 2.2.1 Ambient Conditions In many respects, there is an advantage to be gained from conducting the test in real weather conditions since the objective of the test is to reproduce the expected incident conditions. Ideally, the fire test shall be conducted outdoors in conditions of no precipitation. Where the test is unavoidably undertaken in conditions of precipitation (i.e. rain, sleet, snow etc.) an experienced person shall decide whether or not the weather conditions are likely to affect the test. Rain and/or high wind speeds or low ambient temperatures will tend to cause the test pan to cool slightly more quickly and therefore allow the foam to seal against the pan walls more effectively. Conversely, in hot environments with still wind conditions, a foam will take longer to seal since the pan walls will retain heat for longer periods. Clearly, if a test series is to be undertaken, then the conditions from test to test should not differ significantly. Any interpretation of test results shall therefore consider these factors. The fire test shall be undertaken in the following ambient temperatures and wind conditions wherever possible. Measurements of these shall be taken and recorded. Ambient Temperature: Wind speed: 5 o C<Ta <20 o C less than 3 m/s, gusts less than 5 m/s 2.2.2 Test Fuel The test fuel shall be ethanol of not less than 95% ethanol and no more than 5%isopropanol mixture. Fuel temperature shall be within the following limits:- Fuel Temperature - 10 o C <T < 30 o C Our Ref: LFTEST WM 4 MAY 2015

Tank wall temperatures shall be maintained at a level below the maximum temperature above, in between tests. Note:- If required by an end user, alternative fuels may be used. However, it must be recognised that test assessment criteria may need modification for interpretation. 2.2.3 Nozzle Positioning Non-system nozzle shall be arranged according to the configuration shown in Appendix A. A suitable nozzle platform shall be constructed to allow such positioning. The System nozzle shall be held in place by means of a suitable support that will allow the nozzle to be positioned over the test pan rim and the produced foam to flow down the inner wall of the pan. The system nozzle shall be positioned (ideally) so that the rear edge of the discharge nozzle is against the test pan, so that foam flows partially down the tank inner wall, and the remainder drops directly into the tank. The intention is to simulate a Type II discharge outlet that is designed to lessen submergence of the foam, but for the purposes of a meaningful test, not avoid it completely. It is recognised that sometimes, test pan/tank distortion makes this positioning difficult but it should be possible to allow a proportion of the foam solution discharge to flow down the tank inner wall. 2.2.4 Salt Water Premix Where the test is to be conducted using salt water premix, sufficient premix shall be made in a single batch for at least 3 nozzle tests (i.e. semi-aspirating, aspirating and system nozzle tests). The quantity of salt water premix shall be made with the following simulated sea water (i.e. salt water) composition:- Component % by Weight Sodium Chloride (NaC1) 2.5 Magnesium Chloride (MgC12 x 6H2O) 1.1 Calcium Chloride (CaC12 x 2H2O) 0.16 Sodium Sulphate (Na2SO4) 0.40 Potable water 95.84 If other simulated sea water compositions are to be used then these shall be subject to approval by the LASTFIRE Co-ordinator. 2.2.5 Foam Properties The accurate reproduction of the foam properties achieved on site from real foammaking equipment is a crucial part of the test, and to achieve this, special nozzles have been developed. Foam quality tests (Expansion and 25% Drainage Time) shall be undertaken to quantify foam properties. Our Ref: LFTEST WM 5 MAY 2015

It is recommended that the end user determines the foam properties for the foam solution produced from foam-making equipment on-site, so that these properties can be compared with those achieved during the test. The collection of foam samples from foam-making equipment shall be undertaken in line with the methods described in NFPA 11, Appendix C. Where a sample from the two non-system nozzle is required, the person undertaking the test shall direct the foam from an appropriate distance from the collection board (typically 2-3 metres) such that a representative sample is obtained. Where a sample from the system nozzle is required, the person undertaking the test shall discharge the foam sample by running foam down the collection board in a gentle manner in order to simulate such application. Our Ref: LFTEST WM 6 MAY 2015

APPENDIX A TEST SET-UP Our Ref: LFTEST WM 7 MAY 2015

Specification of Test Apparatus 300mm 2.44m 2.44m Test Pan 610mm Baffle Plates 100mm 50mm Drain fitting Material : Carbon steel or 304 SS lined carbon steel Shell thickness : 6.35-9.52mm Baffle plates (x2) : 300mm width, 600mm height (approx) clamped and / or bolted to pan sides Pan should be supported approx 300mm above ground by means of suitable legs. Our Ref: LFTEST WM 8 MAY 2015

Test Pan / Nozzle Arrangement Nozzle 750mm Tubular steel nozzle stand with lateral supports for nozzle / branch pipe 2.44m Test Pan 2200mm (Variable) 610mm Baffle Plates 1250mm 100mm 50mm Drain fitting Wooden Nozzle platform Our Ref: LFTEST WM 9 MAY 2015 Rev A

Backboard 1.00m Backboard a non-integral type used in the EN1568 test for gentle application may be used LASTFIRE Pan 2.44m Diameter Backboard Detail Our Ref: LFTEST WM 10 MAY 2015 Rev A

Support for System Nozzle (adjustable height) Nozzle 750mm Nozzle supports (end-on) Nominal diameter 300mm Nominal Height 250mm Nominal Thickness 2.5mm (With base) Nozzle Support Structure Burn-back Pot Additional Premix 120 litres Premix Tank 120 litres Pump-assisted PCV P Hose to Nozzle Water Clean-up Hose 75 lpm PUMP Regulator* Compressed-air assisted Air Compressor Premix Tank (min 120 litres) To Nozzle * e.g. Nullmatic Pressure Regulator 3-200psig range. Approx 110 psig for Aspirating (4USG) Nozzle / 85 psig for system nozzle Typical Piping Arrangements Our Ref: LFTEST WM 11 MAY 2015

APPENDIX B TEST NOZZLES Our Ref: LFTEST WM 12 MAY 2015

B.1.0 The following pages detail the nozzles, which should be used for this fire test. No other nozzles should be used. B.1.1 The aspirating nozzle was developed in line with the requirements of fire test UL 162 to provide foam quality (expansion and drainage time) similar to that produced from the application equipment actually used at incidents. (essentially monitors in this case). B.1.2 The simulation of topside foam pourers is achieved through the use of a foam system nozzle, specified in drawing B-3. This nozzle produces fully aspirated foam, and is able to be hooked over the rim of the test pan, providing suitable supports are available. (Appendix A) Drawing B-2 Drawing B-3 Aspirating foam nozzle and detail Foam system nozzle (aspirating) B.1.3 The foam characteristics of these nozzles are summarised below based on best current data available. Nozzle Emulation Foam Quality Foam Properties B-2 Titan / Colossus / Mega Good quality Expansion 5-10; 25% Drainage 3 mins B-3 Fixed system (Foam Pourer) Variable quality Range of expansion ratios and drainage times Typical aspirating monitors B.1.4 Aspirating nozzles were developed to represent large throughput monitor nozzles designed to aspirate foam in the order of 6:1. Our Ref: LFTEST WM 13 MAY 2015

Drawing B-2 Aspirating Nozzle and Detail Our Ref: LFTEST WM 14 MAY 2015

Our Ref: LFTEST WM 15 MAY 2015 Rev A

Drawing B-3 System Nozzle Our Ref: LFTEST WM 16 MAY 2015

1 2 3 52 5 4 10 9 45 23 40 ø25 ø23 Ø12,5 ø28 ø35 ø28 ø23 ø20 ø3 ø4 ø24,5 R3/4" ø35 2 34 13,5 3 32 55 6 70 90 54 33 35 Hard solder connection 85 40 58 50 25 105 55 60 30 25 590 Setscrew connection (x3) 11 48 Our Ref: LFTEST WM 17 MAY 2015 Rev A

Our Ref: LFTEST WM 18 MAY 2015 Rev A

APPENDIX C TEST CRITERIA Our Ref: LFTEST WM 19 MAY 2015 Rev A

Criteria Score - (all times from ignition) mins Fire Control 0 5 5 >5 8 2 8 10 0 Remarks > 10 FAIL OVERALL FAIL Maximum score 5 5% of total Extinguishment 0 7 65 >7 10 45 >10 12 25 >12 20 15 20 30 5 >30 FAIL OVERALL FAIL Maximum score 65 65% of total Vapour Suppression 10 No reignition Burnback Resistance 7.5 Minor edge ignition only 5 Full circumference ignition or single ghosting over surface 0 Full flash and prolonged ghosting over surface Maximum score 10 10% of total 20 15 15 10 10 7.5 0 5 FAIL Time not less than (mins) < 5 mins Maximum score 20 20% of total TOTAL 100 Ratings: Good Fire Performance - 80 100 Acceptable Fire Performance - 50 79.5 % inclusive Reduced Fire Performance - 25 49.5 % inclusive Poor Fire Performance - 0 24.5 % inclusive Our Ref: LFTEST WM 20 MAY 2015 Rev A

Vapour Suppression Criteria Vapour suppression performance shall be assessed in the LASTFIRE test by passing a lighted torch around the full circumference and centre of the foam blanket. The test is given a maximum possible 7.5% of the total test marks. The extent of re-ignition shall be evaluated and scores given based on the following observations:- 10 marks (10% of total) shall be given if:- No re-ignition occurs 7.5 marks (7.5% of total) shall be given if:- Only minor edge ignition is observed around part of the tank circumference (<65%), which then subsides and extinguishes. Flames must be less than or approximately equal the test pan height. 5 marks (5% of total) shall be given if:- And Re-ignition around > 65% of the circumference is observed, or minor ghosting across the foam blanket occurs. Ghosting or re-ignition is short lived, extinguishes rapidly, and results in only minor deterioration of the foam blanket (e.g. top layer removal only). 0 marks shall be awarded for vapour sealing capability if:- A full surface flashover of the foam blanket is observed. If a full flash occurs, flames must subside rapidly. Or Greater than 65% circumference re-ignites And Flames are significantly greater than the test pan height. Flaming is prolonged Or Flaming or ghosting occurs, and is prolonged with continued deterioration of the foam blanket. (e.g. multiple layer removal or exfoliation ) And Flames are less than or approximately equal to the test pan height. Our Ref: LFTEST WM 21 MAY 2015 Rev A

APPENDIX D EXAMPLE RESULTS SHEET Our Ref: LFTEST WM 22 MAY 2015 Rev A

Our Ref: LFTEST WM 23 MAY 2015 Rev A