AutoBoom Installation Manual

Similar documents
Case IH 3320, 3330, and Booms AutoBoom Installation Manual. P/N Rev B 06/15

Case IH Puma and New Holland T70X0/T7.XXX - Steering Ready SmarTrax Installation Manual. P/N Rev B 09/15 E20796

Buhler Versatile 23XX/24XX, Versatile 9X80, and New Holland Versatile 9X8X SmarTrax MD Installation Manual. P/N Rev A 04/16 E23635

Massey Ferguson 76X0/ 86X0/8700 Series, AGCO DT-B Series, and Challenger MT6X5C/D/E Series - Steering Ready SmarTrax Installation Manual

Calibration & Operation Manual

AIM Command FLEX, Patriot MY 2017 Installation Manual. P/N Rev. B 02/17 E29154

INSTALLATION MANUAL. Agra-GPS Fendt-JD Bridge for Fendttractors

AIM Command FLEX, Patriot MY Installation Manual. P/N Rev. A 8/16 E28145

Spray Height Controller

Miller and New Holland IntelliSpray Installation Manual. P/N Rev. A 07/17 E29654

Nitro (4000 Series) Installation Manual NT04

Spray Height Controller

Case IH 3150, 3185, 3200, 3310, Tyler Patriot Installation Manual CS2

John Deere 4730, 4830 Installation Manual JD8

INSTALLATION MANUAL. Agra-GPS Fendt-JD Bridge for Fendttractors

AccuFlow Vortex Installation Manual: John Deere 2510 H. P/N Rev. B 03/17 E29018

MS Sprayers NT 1000/1250 Installation Manual MS1

SUMMERS Pull-Type with Proxy Switch Sense Installation Manual SM2

PPM EO-100 TM. Operation Manual

FLEXI-COIL 67 Series (1999+) Installation Manual FC1

Rogator 854, 1054 & 1254 Series Installation Manual RG4

Miller Condor & New Holland Rear Mount Truss Boom Installation Manual MC02

Hagie 264, 284XP, DTS8, 2100, 2101, DTS10 Installation Manual HG2

Premium Supply. Direct Push. Models PCK-3530-DP PCK DP PCK-530-DP. Operator s Manual and Installation Instructions

Rogator Passive Roll (2012+) 3 Height Sensors Installation Manual RG10

John Deere (4730 & 4830) with Proportional Main Lift Installation Manual JD08

Spray Height Controller

Spray Height Controller

Model A Turn Signal Kit Installation Guide

Spray Height Controller

Hagie (STS 90/ ) Installation Manual HG03

Rogator Passive Roll (2012+) 5 Height Sensors Installation Manual RG11

Sprayer Control. Manual for SprayLink Cable Installations. Tank. Jet Agitator. Agitator Valve. Diaphragm Pump. Pressure Transducer.

PARTS CATALOG FOR. Mud Hog Rear Wheel Drive FOR. MF 9540/9550/9560, CAT 540C/550C/560C, Gleaner A540/A560, Fendt 6450R/9480R COMBINES

CDS-JOHN BLUE COMPANY

Rogator 64 and 74 Series and Willmar Eagle 8650 (JIC) & 84, 94 & 1386 Series (Flat Faced O-Ring) Installation Manual RG2 & RG6

Top Air (1200/ /90 ft Boom) Installation Manual TA1

Goldacres Passive Roll G8 Installation Manual GA02

Spray Height Controller

PARTS AND INSTALLATION MANUAL

Spray Height Controller

AGCO América do Sul (Factory Install) Installation Manual SP01

SKID STEER COMBO PLOW

Installation Instructions Winch Quick Connect Kit Part # (8 ) Part # (24 )

INSTALLATION CONSTELLATION DRIVING LIGHTS 5009

Accu-Flow. Installation & Service Manual

Premium Supply. Tilt Deck. Models PCK-TD PCK-PTD CTD-310-K. Operator s Manual and Installation Instructions

Top Air (TA 1200/1600, 80/90 Boom) Installation Manual TA01

CDS-JOHN BLUE COMPANY

Installation Instructions Receiver Rack (Part # 7700) Universal Application

Spray Height Controller

Spray Height Controller

Rogator Active Roll (2012+) Installation Manual RG12

DISC BRAKE CALIPER TOOL SET

1250 LB. CAPACITY MECHANICAL WHEEL DOLLY

Extreme Duty Grapple (Rock, Skeleton, Scrap & Tine) Operation and Maintenance Manual

INSTALLATION CONSTELLATION DRIVING LIGHTS 5009

JOHN DEERE 9970 COTTON PICKERS

INSTALLATION INSTRUCTIONS

INVERTER HARNESS INSTALLATION FOR FREIGHTLINER CASCADIA

Fast Standard Control Installation Manual FT4

Case IH (4420, 3320) Installation Manual CS03

Premium Supply. Tilt Deck. Models PCK-TD PCK-PTD. Operator s Manual and Installation Instructions

OWNER S GUIDE 8A DURALIFT II 13,200 LB. CAPACITY. Link Mfg. Ltd th St. N.E. Sioux Center, IA USA

Rogator Passive Roll (2012+) 5 Height Sensors Installation Manual RG11

RECHARGEABLE 24 LED WORK LIGHT

25 GALLON PORTABLE OIL LIFT

8700 Series 8900 Series Rolling Air Jacks

INSTALLATION BLIND SPOT TURN SIGNAL MIRRORS 1457

Owner s Manual & Safety Instructions

John Deere R4030, R4038 and R4045 Installation Manual JD12

COLD AIR INTAKE SYSTEM, CIVIC Si,

MODEL 5120 Tire Repair Station

USB Charge Port Installation Instructions

MODEL EF Full Circle Tire Spreader

4200 & 6200 Owner s Manual & Parts Book

Parts Manual FRONT-FOLD BOOMS MODELS 80, 90 & 100 HYDRAULIC FOR TA1200 & TA1600 SPRAYERS. Serial Number B & Higher. Part No.

OWNER S MANUAL Z SERIES TRACKS. Rev. 355_05

JD2800 Module Installation Guide

SAC Liquid Manure Flow Meter

ASSEMBLY / OPERATION INSTRUCTIONS. Low Profile Motorcycle Dolly

6 OFF ROAD LIGHT BAR

LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT

450 & Slant Top Owner s Manual & Parts Book

Thank You. for purchasing an Edelbrock Nitrous Oxide Injection System. Please take the time to read and understand the following.

STC2 Car Kit. Installation Guide

GPS AutoSteer System Installation Manual

OnBoard Drum Major Podium

AUTO-BLiP. User Manual Lotus INTELLIGENT DOWNSHIFTS. Version 1.0

J. & M. Mfg. Co., Inc. 284 Railroad Street - P.O. Box 547 Fort Recovery, OH Ph: (419) Fax: (419)

INSTALLATION CLAMP-ON FORK MOUNTED DRIVING LIGHTS 5015

Adjustable Shop Stool with Backrest

Spray Height Controller

MODEL 7400 STRUT SPRING COMPRESSOR

Single Leg AM / CM 20, 24 and 30. Installation

OPERATOR S MANUAL. 20-bu 3-Point Hitch Material Collection System. LP65048 Supplier ST /07/2017 English. North American Edition Printed in USA

INSTALLATION FORK MOUNTED DRIVING LIGHTS 5008

Deflection Sensor Installation Guide for welded steer axles Air-Weigh Customer Support:

Hydraulic Furniture Movers

MODEL 7600 STRUT SPRING COMPRESSOR

Transcription:

AutoBoom Installation Manual CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

Disclaimer While every effort has been made to ensure the accuracy of this document, Raven Industries assumes no responsibility for omissions and errors. Nor is any liability assumed for damages resulting from the use of information contained herein. Raven Industries shall not be held responsible or liable for the effects of atmospheric conditions and sunspot activity on the performance of our products. Raven Industries cannot guarantee the accuracy, integrity, continuity, or availability of the GPS signal from the U.S. Department of Defense/NAVSTAR GPS satellites, the OmniSTAR correction service or the WAAS correction service. Raven Industries accepts no responsibility for the use of the signal for other than the stated purpose. Raven Industries shall not be responsible or liable for incidental or consequential damages or a loss of anticipated benefits or profits, work stoppage or loss or impairment of data arising out of the use, or inability to use, the SmarTrax or any of its components.

Table of Contents Chapter 1 Important Safety Information... 1 Important Safety Information... 1 Hydraulic Safety... 2 Electrical Safety... 2 Chapter 2 Introduction... 3 Introduction... 3 Recommendations... 4 Preparing for Installation... 4 Point of Reference... 4 Hydraulic Fittings... 4 Chapter 3 PowerGlide Plus... 5 PowerGlide Plus Kit Contents... 5 Install the PowerGlide Plus Hydraulic System... 9 Install Fittings on the AutoBoom Valve... 9 Mount the AutoBoom Valve... 9 Install the Pressure Hoses... 10 Install the Tank Hoses - CaseIH and Patriot 1997 & Newer Only... 11 Install Left and Right Cylinder Hoses... 13 Install the Down Hoses... 14 PowerGlide Plus Hydraulic Schematic... 15 Install the Gauge Wheels... 16 Mount the Gauge Wheels... 16 Install the PowerGlide Plus Wiring... 17 Install the AutoBoom Node... 17 Connect the Harness to the Boom Function Controls... 18 Connect the Harness Cable... 18 Connect the Controller (If Applicable)... 19 Connect the Computer (If Applicable)... 19 Connect the Power Leads... 19 PowerGlide Plus Wiring Schematics... 20 AutoBoom Controller... 20 Envizio Plus... 21 SCS 4000/5000... 22 Viper Pro & Envizio Pro... 23 Chapter 4 UltraGlide... 25 UltraGlide Kit Contents... 25 Install the UltraGlide Hydraulic System... 29 Install Fittings on the AutoBoom Valve... 29 Mount the AutoBoom Valve... 30 Manual No. 016-0230-005 i

Table of Contents Install the Pressure Hoses... 31 Install the Tank Hoses - CaseIH and Patriot 1997 & Newer Only... 32 Install Left and Right Cylinder Hoses... 33 Install the Down Hoses... 34 UltraGlide Hydraulic Schematic... 35 Install the UltraGlide Sensors... 36 Mount the UltraGlide Sensors... 36 Connect the Sensor Cables... 37 Install the Gauge Wheels - Optional...38 Mount the Gauge Wheels... 38 Install the UltraGlide Wiring... 39 Install the AutoBoom Node... 39 Connect the Harness to the Boom Function Controls... 40 Install the Center Rack Control... 41 Connect the Harness Cable... 42 Connect the Controller (If Applicable)... 42 Connect the Computer (If Applicable)... 42 Connect the Power Leads... 42 UltraGlide Wiring Schematics...43 AutoBoom Controller... 43 Envizio Plus... 44 SCS 4000/5000... 45 Viper Pro & Envizio Pro... 46 Chapter 5 Replacement Parts... 49 Valve Blocks... 49 PowerGlide Plus Valve Block Replacement Parts... 49 UltraGlide Valve Block Replacement Parts... 50 Wheel and Assembly Brackets...51 Machine-Specific Wheels and Brackets... 51 Cushioned Axle... 51 Sensors and Brackets... 52 Molded Sensor Replacement Parts... 52 Machine-Specific Sensor U-Bolts... 52 ii CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

CHAPTER 1 1Important Safety Chapt er Information Important Safety Information NOTICE Read this manual and the operation and safety instructions included with your implement and/or controller carefully before installing the AutoBoom system. Follow all safety information presented within this manual. If you require assistance with any portion of the installation or service of your Raven equipment, contact your local Raven dealer for support. Follow all safety labels affixed to the AutoBoom system components. Be sure to keep safety labels in good condition and replace any missing or damaged labels. To obtain replacements for missing or damaged safety labels, contact your local Raven dealer. When operating the machine after installing AutoBoom, observe the following safety measures: Be alert and aware of surroundings. Do not operate AutoBoom or any agricultural equipment while under the influence of alcohol or an illegal substance. Remain in the operator s position in the machine at all times when AutoBoom is engaged. Disable AutoBoom when exiting from the operator s seat and machine. Do not drive the machine with AutoBoom enabled on any public road. Determine and remain a safe working distance from other individuals. The operator is responsible for disabling AutoBoom when the safe working distance has been diminished. Ensure AutoBoom is disabled prior to starting any maintenance work on AutoBoom or the machine. Manual No. 016-0230-005 1

Chapter 1 WARNING When starting the machine for the first time after installing AutoBoom, be sure that all persons stand clear, in case a hose has not been properly tightened. The machine must remain stationary and switched off, with the booms unfolded and supported while installation or maintenance is conducted. CAUTION Hydraulic Safety Raven Industries recommends that appropriate protective equipment be worn at all times when working on the hydraulic system. Never attempt to open or work on a hydraulic system with the equipment running. Care should always be taken when opening a system that has been previously pressurized. When disconnecting the hydraulic hoses or purging is required, be aware that the hydraulic fluid may be extremely hot and under high pressure. Caution must be exercised. Any work performed on the hydraulic system must be done in accordance with the machine manufacturer s approved maintenance instructions. When installing AutoBoom hydraulics or performing diagnostics, maintenance, or routine service, ensure that precautions are taken to prevent any foreign material or contaminants from being introduced into the machine s hydraulic system. Objects or materials that are able to bypass the machine s hydraulic filtration system will adversely reduce performance and possibly damage the AutoBoom hydraulic valves. Electrical Safety Always verify that the power leads are connect to the correct polarity as marked. Reversing the power leads could cause severe damage to the equipment. Ensure that the power cable is the last cable to be connected. 2 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

CHAPTER 2 Chapt er 2Introduction Introduction Congratulations on your purchase of the Raven AutoBoom system! This system is designed to provide automated boom height adjustment for agricultural spraying equipment. This manual applies to the following machines. For future reference, write your serial number in the space below. MAKE: CaseIH, Patriot MODEL: CaseIH 3150/3185, Pre-2002 Patriot YEAR: SERIAL NUMBER: FIGURE 1. CaseIH 3185 Note: This manual contains the installation instructions for the PowerGlide Plus and UltraGlide systems. Be sure to identify which system you have and follow only the instructions for that system. Manual No. 016-0230-005 3

Chapter 2 Recommendations Raven Industries recommends the following best practices when installing the AutoBoom system: Use part numbers to identify the parts. Do not remove the plastic wrap from a part until it is necessary for installation. Do not remove plastic caps from a part until it is necessary for installation. Tools Needed The following tools are recommended for installation of the AutoBoom system: SAE standard-sized wrenches Cable ties Set of tools Preparing for Installation Before installing AutoBoom, park the machine where the ground is level, clean, and dry. Leave the machine turned off for the duration of the installation process. During the installation process, follow good safety practices. Be sure to carefully read the instructions in this manual as you complete the installation process. Point of Reference The instructions in this manual assume that you are standing behind the machine, looking toward the cab. Hydraulic Fittings This manual may reference the following types of hydraulic fittings: SAE O-ring fittings ORFS (O-Ring Face Seal) fittings JIC fittings SAE O-ring fitting ORFS fitting JIC fitting (M) 4 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

CHAPTER 3 3PowerGlide Plus Chapt er PowerGlide Plus Kit Contents This section contains a list of the components that are included in the PowerGlide Plus AutoBoom kit. Before beginning the AutoBoom installation, compare the items in the AutoBoom kit with the components list. If you have questions about the kit, contact your Raven dealer. TABLE 1. PowerGlide Plus Installation Kit (P/N 117-0231-005) Picture Item Description Part Number Qty. Not Pictured Manual - CaseIH 3150/3185, Pre-2002 Patriot AutoBoom Installation 016-0230-005 1 Valve - PowerGlide Plus AutoBoom 063-0131-117 1 Plate - Hydraulic Block Mounting 107-0171-619 1 Cable - Case Adapter 115-0171-558 4 Fitting - 3/4 SAE O-Ring (M) to 9/16 JIC (M).031 Orifice Straight Adapter 333-0012-230 2 U-Bolt - 2-1/16 W x 3 L x 3/8 Thread 107-0171-609 2 Manual No. 016-0230-005 5

Chapter 3 TABLE 1. PowerGlide Plus Installation Kit (P/N 117-0231-005) Picture Item Description Part Number Qty. Bolt - 5/16-24 x 1 Grade 8 Hex 311-0049-235 4 Nut - 3/8-16 Zinc Flanged Lock 312-1001-164 4 Washer - 5/16 Zinc Plated Lock 313-1000-019 4 TABLE 2. Hydraulic Kit (P/N 117-0134-005) Picture Item Description Part Number Qty. Fitting - 3/4 JIC M/M/F Swivel Run Tee 333-0012-039 1 Fitting - 7/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-044 2 Fitting - 9/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-045 2 Fitting - 3/4 SAE O-Ring (M) to 3/4 JIC (M) Straight Adapter 333-0012-093 3 Fitting - 1-1/16 JIC M/F 90 Swivel Elbow 333-0012-099 1 Fitting - 1-1/16 JIC M/M/F Swivel Run Tee 333-0012-109 1 Fitting - 3/8 NPT (M) to 9/16 JIC (M) Straight Adapter 333-0012-123 2 6 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus TABLE 2. Hydraulic Kit (P/N 117-0134-005) Picture Item Description Part Number Qty. Fitting - 9/16 JIC (F) to 7/16 JIC (M) Straight Adapter 333-0012-159 2 Fitting - 3/8 NPT Breather 333-0012-196 2 Fitting - 9/16 SAE O-Ring to 3/8 NPT (F) Straight Adapter 333-0012-197 2 Hydraulic Hose - 3/4 JIC 90 (F) to 3/4 JIC (F) - 72 214-1000-302 2 3 Hydraulic Hose - 9/16 JIC 90 (F) to 9/16 JIC (F) - 192 214-1000-303 2 Hydraulic Hose - 3/4 JIC 90 (F) to 1-1/16 JIC (F) - 180 214-1000-304 1 TABLE 3. PowerGlide Plus Wheel Kit (P/N 117-0133-005) Picture Item Description Part Number Qty. Axle Assembly - Right Offset Cushioned 063-0131-589 1 Axle Assembly - Left Offset Cushioned 063-0131-590 1 Bracket - Left Weldment 116-0159-625 1 Bracket - Right Weldment 116-0159-626 1 Manual No. 016-0230-005 7

Chapter 3 TABLE 3. PowerGlide Plus Wheel Kit (P/N 117-0133-005) Picture Item Description Part Number Qty. Wheel 322-0131-008 2 U-Bolt - 2-1/16 W x 3 L x 3/8 Thread 107-0171-609 6 Bolt - 1/2-13 x 1-1/2 SS Hex 311-0058-186 4 Nut - 1/2-13 Zinc Hex 312-1001-043 4 Nut - 3/8-16 Zinc Flanged Lock 312-1001-164 12 TABLE 4. PowerGlide Plus Wiring Kit (P/N 117-0137-023) Picture Item Description Part Number Qty. Not Pictured CAN AutoBoom Calibration & Operation Manual 016-0130-062 1 AutoBoom PowerGlide Plus CAN Node 063-0130-010 1 Cable - Harness 115-0230-045 1 Cable - Power/CAN 115-0230-007 1 8 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

Install the PowerGlide Plus Hydraulic System PowerGlide Plus Install Fittings on the AutoBoom Valve Before mounting the AutoBoom valve on the machine, install the proper fittings on the valve. This prepares the valve for installation and simplifies the hose connection process later in the procedure. WARNING The machine must remain stationary and switched off, with the booms unfolded and supported, during installation or maintenance. Refer to the following table to install the fittings in the appropriate ports on the AutoBoom Valve. Fitting Part Number Port Fitting - 7/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter Fitting 333-0012-044 LV, RV 3 Fitting - 9/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-045 LC, RC Fitting - 3/4 SAE O-Ring (M) to 9/16 JIC (M).031 Orifice Straight Adapter 333-0012-230 Fitting - 9/16 JIC (F) to 7/16 JIC (M) Straight Adapter 333-0012-159 RT CYL RTN, LF CYL RTN RT CYL RTN, LF CYL RTN Fitting - 3/4 SAE O-Ring (M) to 3/4 JIC (M) Straight Adapter 333-0012-093 P, T, Bypass Mount the AutoBoom Valve 1. Secure the PowerGlide Plus AutoBoom valve (P/N 063-0131-117) to the mounting plate (P/N 107-0171- 619) using four 5/16 hex bolts (P/N 311-0049-235) and four 5/16 lock washers (P/N 313-1000-019). FIGURE 1. AutoBoom Valve Mounted on the Valve Mounting Plate Manual No. 016-0230-005 9

Chapter 3 2. Secure the mounting plate to the cross rail behind the sprayer s tank using two 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) and four 3/8 zinc flanged lock nuts (P/N 312-1001-164). FIGURE 2. AutoBoom Valve Mounted on the Sprayer Install the Pressure Hoses WARNING Hydraulics are under pressure. Care should always be taken with a system that has been pressurized. When disconnecting or purging hydraulic hoses, be aware that the hydraulic fluid within the machine s system may be extremely hot and under high pressure. CAUTION When installing AutoBoom hydraulics or performing diagnostics, maintenance, or routine service, ensure precautions are taken to prevent any foreign material or contaminants from being introduced into the machine s hydraulic system. Objects or materials that are able to bypass the machine s hydraulic filtration system will reduce performance and possibly damage the AutoBoom hydraulic valves. Machine AutoBoom Valve Part Number Hose End Location Hose End Location 214-1000-302 3/4 JIC (F) Steel Pressure Line 3/4 JIC (F) 90 P 214-1000-304 1-1/16 JIC (F) Return Bank 3/4 JIC (F) 90 T 10 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus FIGURE 3. Pressure Hose Installed Bypass (Original Pressure Line) New Pressure Hose 1. Locate the pressure line on the machine s hydraulic valve (Port P). 2. Trace the pressure line back to the point it joins the steel hydraulic line. 3. Disconnect the pressure line from the steel line. 4. Connect the end of the pressure line to the Bypass Port on the AutoBoom valve. 5. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-302) to the machine s steel line. 6. Connect the 90 end of the installed hose to Port P on the AutoBoom valve. 3 Install the Tank Hoses - CaseIH and Patriot 1997 & Newer Only FIGURE 4. Tank Hose Installed - CaseIH and Patriot 1997 & Newer Only 7. Disconnect the return hose from the machine s hydraulic tank. 8. Install the 1-1/16 JIC M/M/F swivel run tee (P/N 333-0012-109) on the machine s hydraulic tank. 9. Connect the return hose to the opposite end of the installed tee fitting. 10. Install the 1-1/16 JIC M/F 90 swivel elbow fitting (P/N 333-0012-099) on the 90 end of the installed tee fitting. 11. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-304) to the installed 90 elbow fitting. 12. Connect the 90 end of the hydraulic hose to Port T on the AutoBoom valve. Manual No. 016-0230-005 11

Chapter 3 Install the Tank Hoses - Tyler Patriot 1996 & Older Only FIGURE 5. Tank Hose Installed - Tyler Patriot 1996 & Older Only 1. Locate the tank line on the machine s hydraulic valve (Port T). 2. Trace the tank line back to the point it joins the steel hydraulic line. 3. Disconnect the tank line from the steel line. 4. Install the 3/4 JIC M/M/F swivel run tee (P/N 333-0012-039) on the machine s steel hydraulic line. 5. Connect the tank line to the opposite end of the installed tee fitting. 6. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-302) to the 90 end of the installed tee fitting. 7. Connect the 90 end of the hydraulic hose to Port T on the AutoBoom valve. 12 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus Install Left and Right Cylinder Hoses Machine AutoBoom Valve Part Number Hose End Location Hose End Location 214-1000-303 9/16 JIC (F) Left Tilt Cylinder 3/4 JIC (F) 90 LC 214-1000-303 9/16 JIC (F) Right Tilt Cylinder 3/4 JIC (F) 90 RC 1. Disconnect the cylinder hoses from the rod-end of the machine s tilt cylinders. 2. Route the right cylinder hose back to the AutoBoom valve and connect it to Port RV. 3. Route the left cylinder hose back to the AutoBoom valve and connect it to Port LV on the AutoBoom valve. FIGURE 6. Raise Hoses Installed on the Tilt Cylinder 3 4. Remove the fittings from the rod-end of the tilt cylinders. 5. Install the 3/8 NPT (M) to 9/16 JIC (M) straight adapter fittings (P/N 333-0012-123) into the rod-end tilt cylinder ports. 6. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-303) in the installed fitting in the rodend of the machine s right tilt cylinder. 7. Connect the 90 end of the hydraulic hose to Port RC on the AutoBoom valve. 8. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-303) in the installed fitting in the rodend of the machine s left tilt cylinder. 9. Connect the 90 end of the hydraulic hose to Port LC on the AutoBoom valve. Manual No. 016-0230-005 13

Chapter 3 Install the Down Hoses FIGURE 7. Installed Down Hoses Installed Down Hoses 1. Disconnect the hose from the base-end of the machine s left tilt cylinder. 2. Route the hose to the AutoBoom valve and connect it to the installed fitting in the RT CYL RTN Port. 3. Disconnect the hose from the base-end of the machine s right tilt cylinder. 4. Route the hose to the AutoBoom valve and connect it to the installed fitting in the LF CYL RTN Port. FIGURE 8. Installed Breathers Installed Breather Fittings 5. Remove the cylinder down fittings from the base-end of the tilt cylinders. 6. Install two 9/16 SAE O-ring (M) to 3/8 NPT (F) straight adapter fittings (P/N 333-0012-197) in the base-end of the tilt cylinders. 7. Install the 3/8 NPT breather fittings (P/N 333-0012-196) into the installed adapters. 14 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus PowerGlide Plus Hydraulic Schematic 3 Manual No. 016-0230-005 15

Chapter 3 Install the Gauge Wheels Mount the Gauge Wheels Note: Wheel mounting locations may be influenced by the boom configuration. Verify that the wheels will not interfere with or be damaged by folding or unfolding the booms. Determine an appropriate location for mounting a wheel on the boom. The wheel should be mounted outside of the boom fold, but inside the boom breakaway. WARNING The machine must remain stationary and switched off, with the booms unfolded and supported, while installation or maintenance is conducted. FIGURE 9. Gauge Wheel Installed (Back View) 1. Remove the nuts from the right wheel axle (P/N 063-0131-589). 2. Place the wheel (P/N 322-0131-008) on the right wheel axle. 3. Reinstall the lug nuts on the wheel axle to secure the wheel. 4. Attach the right wheel mounting bracket (P/N 116-0159-626) to the front of the right boom by installing three 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) through the back of the mounting bracket and securing them with six 3/8 zinc flanged lock nuts (P/N 312-1001-164). 5. Insert the right wheel axle into the right wheel mounting bracket, positioning it so that the bottom of the wheel touches the ground (or nearly so). 6. Secure the gauge wheel assembly in the wheel mounting bracket by installing two 1/2-13 x 1-1/2 SS hex bolts (P/N 311-0058-186) and two 1/2 zinc hex nuts (P/N 312-1001-043). 7. Repeat the steps above to install the left wheel. 16 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus Install the PowerGlide Plus Wiring Wiring Connections CAUTION Always connect the power cable as the last step in the wiring process and verify that the power leads are connected with the correct polarity. Reversing power leads can cause severe damage to the equipment. Note: For wiring connections made outside the cab, apply dielectric silicone grease (P/N 222-0000-006) generously on both the male and female ends of the connectors. Application of the grease will prevent corrosion to the pins and wires. Install the AutoBoom Node FIGURE 10. PowerGlide Plus AutoBoom Node Installed 3 1. Mount the AutoBoom node (P/N 063-0130-010) to the cross beam of the machine s center rack within a close proximity (3 feet/1 meter) to the AutoBoom valve. Note: Position the node so that the cable connectors face down. 2. Insert the large, rectangular node connector on the harness cable (P/N 115-0230-045) into the left port of the AutoBoom node. 3. Tighten the bolt on the node connector to secure. Manual No. 016-0230-005 17

Chapter 3 Connect the Harness to the Boom Function Controls Complete the following steps to connect the harness to the machine s boom function coils. 1. On the harness cable (P/N 115-0230-045), locate the Left Solenoid connector and connect it to Port 4A on the AutoBoom valve. 2. Connect the Right Solenoid connector to Port 4B on the AutoBoom valve. 3. Connect the Left Prop connector to Port 5A on the AutoBoom valve. FIGURE 11. Machine s Left and Right Tilt Boom Function Coils 4. Locate the machine boom function coils near the machine s boom stack valve. 5. Disconnect the connector from the machine s Left Tilt Up coil. 6. Install a boom sense adapter cable (P/N 115-0171-558) between the coil and the machine s coil connector. 7. Connect boom sense adapter cables between the Left Tilt Down, Right Tilt Up, and Right Tilt Down coils and the coil connectors. 8. On the harness cable, locate the Left Solenoid Sense connectors. Isolate the connector labeled Up and connect it to the Left Tilt Up coil via the installed boom sense adapter cable. 9. Connect the Down Left Solenoid Sense connector to the Left Tilt Down coil via the installed boom sense adapter cable. 10. Connect the Right Solenoid Sense connectors to the machine s Right Tilt Up and Right Tilt Down coils via the installed boom sense adapter cables. Connect the Harness Cable 1. Route the harness cable (P/N 115-0230-045) toward the machine s cab. 2. Connect the harness cable to the controller cable (P/N 115-0230-007). 3. Tighten the connector screw cap to secure the connection. Note: Be sure to allow enough slack in the harness cable to allow for boom racking. 18 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus Connect the Controller (If Applicable) 1. Route the controller cable (P/N 115-0230-007) into the right side of the machine s cab. 2. Locate the two controller connectors. Connect these connectors to the AutoBoom controller (P/N 063-0130- 011). Note: The AutoBoom controller should be mounted in the machine s cab so that the machine operator has easy access to it. Connect the Computer (If Applicable) Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 20 for installation and wiring instructions for your specific field computer. Connect the Power Leads 1. Locate the power cable that has the red and white power leads at one end. 2. Disconnect the machine s connectors from the battery terminals. 3. Install the red power lead on the positive battery terminal and reinstall the machine s battery connector. 4. Install the white power lead on the negative battery terminal and reinstall the machine s battery connector. 3 Manual No. 016-0230-005 19

Chapter 3 PowerGlide Plus Wiring Schematics AutoBoom Controller 20 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus Envizio Plus 3 Manual No. 016-0230-005 21

Chapter 3 SCS 4000/5000 22 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

PowerGlide Plus Viper Pro & Envizio Pro 3 Manual No. 016-0230-005 23

Chapter 3 24 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

CHAPTER 4 Chapt er 4UltraGlide UltraGlide Kit Contents This section contains a list of the components that are included in the UltraGlide AutoBoom kit. Before beginning the AutoBoom installation, compare the items in the AutoBoom kit with the components on this list. If you have questions about the kit, contact your Raven dealer. TABLE 1. UltraGlide Installation Kit (P/N 117-0232-005) Picture Item Description Part Number Qty. Not Pictured Manual - CaseIH 3150/3185, Pre-2002 Patriot AutoBoom Installation 016-0230-005 1 Valve - UltraGlide AutoBoom 063-0131-116 1 Plate - Hydraulic Block Mounting 107-0171-619 1 Sensor - Right Ultrasonic 063-0130-012 1 Sensor - Left Ultrasonic 063-0130-014 1 Sensor - Center Ultrasonic 063-0130-018 1 Manual No. 016-0230-005 25

Chapter 4 TABLE 1. UltraGlide Installation Kit (P/N 117-0232-005) Picture Item Description Part Number Qty. Cable - Case Boom Sense Adapter 115-0171-558 5 Cable - Center Rack Control Weatherpack Boom Sense Adapter 115-0230-037 2 Fitting - 3/4 SAE O-Ring (M) to 9/16 JIC (M).031 Orifice Straight Adapter 333-0012-230 2 U-Bolt - 2-1/16 W x 3 L x 3/8 Thread 107-0171-609 8 Bolt - 5/16-24 x 1 Grade 8 Hex 311-0049-235 4 Nut - 3/8-16 Zinc Flanged Lock 312-1001-164 20 (4 extra) Washer - 5/16 Zinc Plated Lock 313-1000-019 4 TABLE 2. Hydraulic Kit (P/N 117-0137-005) Picture Item Description Part Number Qty. Fitting - 3/4 JIC M/M/F Swivel Run Tee 333-0012-039 1 Fitting - 7/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-044 2 Fitting - 9/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-045 2 26 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide TABLE 2. Hydraulic Kit (P/N 117-0137-005) Picture Item Description Part Number Qty. Fitting - 3/4 SAE O-Ring (M) to 3/4 JIC (M) Straight Adapter 333-0012-093 3 Fitting - 1-1/16 JIC M/F 90 Swivel Elbow 333-0012-099 1 Fitting - 1-1/16 JIC M/M/F Swivel Run Tee 333-0012-109 1 Fitting - 3/8 NPT (M) to 9/16 JIC (M) Straight Adapter 333-0012-123 2 Fitting - 9/16 JIC (F) to 7/16 JIC (M) Straight Adapter 333-0012-159 2 Fitting - 3/8 NPT Breather 333-0012-196 2 4 Fitting - 9/16 SAE O-Ring to 3/8 NPT (F) Straight Adapter 333-0012-197 2 Hydraulic Hose - 3/4 JIC 90 (F) to 3/4 JIC (F) - 72 214-1000-302 2 Hydraulic Hose - 9/16 JIC 90 (F) to 9/16 JIC (F) - 192 214-1000-303 2 Hydraulic Hose - 3/4 JIC 90 (F) to 1-1/16 JIC (F) - 180 214-1000-304 1 Manual No. 016-0230-005 27

Chapter 4 TABLE 3. Optional Wheel Kit (P/N 117-0133-005) Picture Item Description Part Number Qty. Axle Assembly - Right Offset Cushioned 063-0131-589 1 Axle Assembly - Left Offset Cushioned 063-0131-590 1 Bracket - Left Weldment 116-0159-625 1 Bracket - Right Weldment 116-0159-626 1 Wheel 322-0131-008 2 U-Bolt - 2-1/16 W x 3 L x 3/8 Thread 107-0171-609 6 Bolt - 1/2-13 x 1-1/2 SS Hex 311-0058-186 4 Nut - 1/2-13 Zinc Hex 312-1001-043 4 Nut - 3/8-16 Zinc Flanged Lock 312-1001-164 12 28 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide TABLE 4. UltraGlide Wiring Kit (P/N 117-0232-024) Picture Item Description Part Number Qty. Not Pictured CAN AutoBoom Calibration & Operation Manual 016-0130-062 1 AutoBoom Node 063-0130-013 1 Cable - Sensor 115-0171-527 2 Cable - Harness 115-0230-045 1 Cable - Power/CAN 115-0230-007 1 Install the UltraGlide Hydraulic System 4 Install Fittings on the AutoBoom Valve Before mounting the AutoBoom valve on the machine, install the proper fittings on the valve. This prepares the valve for installation and simplifies the hose connection process later in the procedure. WARNING The machine must remain stationary and switched off, with the booms unfolded and supported, during installation or maintenance. Manual No. 016-0230-005 29

Chapter 4 Refer to the following table to install the fittings in the appropriate ports on the AutoBoom Valve. Fitting Part Number Port Fitting - 7/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter Fitting 333-0012-044 LV, RV Fitting - 9/16 JIC (M) to 9/16 SAE O-Ring (M) Straight Adapter 333-0012-045 LC, RC Fitting - 3/4 SAE O-Ring (M) to 9/16 JIC (M).031 Orifice Straight Adapter 333-0012-230 Fitting - 9/16 JIC (F) to 7/16 JIC (M) Straight Adapter 333-0012-159 RT CYL RTN, LF CYL RTN RT CYL RTN, LF CYL RTN Fitting - 3/4 SAE O-Ring (M) to 3/4 JIC (M) Straight Adapter 333-0012-093 P, T, Bypass Mount the AutoBoom Valve 1. Secure the PowerGlide Plus AutoBoom valve (P/N 063-0131-116) to the mounting plate (P/N 107-0171- 619) using four 5/16 hex bolts (P/N 311-0049-235) and four 5/16 lock washers (P/N 313-1000-019). FIGURE 1. AutoBoom Valve Mounted on the Valve Mounting Plate 2. Secure the mounting plate to the cross rail behind the sprayer s tank using two 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) and four 3/8 zinc flanged lock nuts (P/N 312-1001-164). FIGURE 2. AutoBoom Valve Mounted on the Sprayer 30 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide Install the Pressure Hoses WARNING Hydraulics are under pressure. Care should always be taken with a system that has been pressurized. When disconnecting or purging hydraulic hoses, be aware that the hydraulic fluid within the machine s system may be extremely hot and under high pressure. CAUTION When installing AutoBoom hydraulics or performing diagnostics, maintenance, or routine service, ensure precautions are taken to prevent any foreign material or contaminants from being introduced into the machine s hydraulic system. Objects or materials that are able to bypass the machine s hydraulic filtration system will reduce performance and possible damage the AutoBoom hydraulic valves. Machine AutoBoom Valve Part Number Hose End Location Hose End Location 214-1000-302 3/4 JIC (F) Steel Pressure Line 3/4 JIC (F) 90 P 214-1000-304 1-1/16 JIC (F) Return Bank 3/4 JIC (F) 90 T 4 FIGURE 3. Pressure Hose Installed Bypass (Original Pressure Line) New Pressure Hose 1. Locate the pressure line on the machine s hydraulic valve (Port P). 2. Trace the pressure line back to the point it joins the steel hydraulic line. 3. Disconnect the pressure line from the steel line. Manual No. 016-0230-005 31

Chapter 4 4. Connect the end of the pressure line to the Bypass Port on the AutoBoom valve. 5. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-302) to the machine s steel line. 6. Connect the 90 end of the installed hose to Port P on the AutoBoom valve. Install the Tank Hoses - CaseIH and Patriot 1997 & Newer Only FIGURE 4. Tank Hose Installed - CaseIH and Patriot 1997 & Newer Only 1. Disconnect the return hose from the machine s hydraulic tank. 2. Install the 1-1/16 JIC M/M/F swivel run tee (P/N 333-0012-109) on the machine s hydraulic tank. 3. Connect the return hose to the opposite end of the installed tee fitting. 4. Install the 1-1/16 JIC M/F 90 swivel elbow fitting (P/N 333-0012-099) on the 90 end of the installed tee fitting. 5. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-304) to the installed 90 elbow fitting. 6. Connect the 90 end of the hydraulic hose to Port T on the AutoBoom valve. Install the Tank Hoses - Tyler Patriot 1996 & Older Only FIGURE 5. Tank Hose Installed - Tyler Patriot Only 1. Locate the tank line on the machine s hydraulic valve (Port T). 32 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

2. Trace the tank line back to the point it joins the steel hydraulic line. 3. Disconnect the tank line from the steel line. 4. Install the 3/4 JIC M/M/F swivel run tee (P/N 333-0012-039) on the machine s steel hydraulic line. 5. Connect the tank line to the opposite end of the installed tee fitting. UltraGlide 6. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-302) to the 90 end of the installed tee fitting. 7. Connect the 90 end of the hydraulic hose to Port T on the AutoBoom valve. Install Left and Right Cylinder Hoses Machine AutoBoom Valve Part Number Hose End Location Hose End Location 214-1000-303 9/16 JIC (F) Left Tilt Cylinder 3/4 JIC (F) 90 LC 214-1000-303 9/16 JIC (F) Right Tilt Cylinder 3/4 JIC (F) 90 RC 1. Disconnect the cylinder hoses from the rod-end of the machine s tilt cylinders. 2. Route the right cylinder hose back to the AutoBoom valve and connect it to Port RV. 3. Route the left cylinder hose back to the AutoBoom valve and connect it to Port LV on the AutoBoom valve. FIGURE 6. Raise Hoses Installed on the Tilt Cylinder 4 4. Remove the fittings from the rod-end of the tilt cylinders. 5. Install the 3/8 NPT (M) to 9/16 JIC (M) straight adapter fittings (P/N 333-0012-123) into the rod-end tilt cylinder ports. 6. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-303) in the installed fitting in the rodend of the machine s right tilt cylinder. 7. Connect the 90 end of the hydraulic hose to Port RC on the AutoBoom valve. 8. Connect the straight end of the supplied hydraulic hose (P/N 214-1000-303) in the installed fitting in the rodend of the machine s left tilt cylinder. 9. Connect the 90 end of the hydraulic hose to Port LC on the AutoBoom valve. Manual No. 016-0230-005 33

Chapter 4 Install the Down Hoses FIGURE 7. Installed Down Hoses Installed Down Hoses 1. Disconnect the hose from the base-end of the machine s left tilt cylinder. 2. Route the hose to the AutoBoom valve and connect it to the installed fitting in the RT CYL RTN Port. 3. Disconnect the hose from the base-end of the machine s right tilt cylinder. 4. Route the hose to the AutoBoom valve and connect it to the installed fitting in the LF CYL RTN Port. FIGURE 8. Installed Breathers Installed Breather Fittings 5. Remove the cylinder down fittings from the base-end of the tilt cylinders. 6. Install two 9/16 SAE O-ring (M) to 3/8 NPT (F) straight adapter fittings (P/N 333-0012-197) in the base-end of the tilt cylinders. 7. Install the 3/8 NPT breather fittings (P/N 333-0012-196) into the installed adapters. 34 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide UltraGlide Hydraulic Schematic 4 Manual No. 016-0230-005 35

Chapter 4 Install the UltraGlide Sensors Mount the UltraGlide Sensors Sensor mounting locations may be influenced by the boom configuration. Determine the appropriate location for mounting sensors on the boom, ensuring the sensors will not interfere with or be damaged by folding or unfolding the booms. The sensor should be mounted outside of the boom fold, but inside of the boom breakaway. Note: When mounting two sensors per boom, the inside sensor must be turned sideways to prevent the sensors from interfering when folding the booms. FIGURE 9. Boom Sensor Mounting Locations Outside Sensor Mounting Location Optional Inside Sensor Mounting Location (Booms Folded) 1. Place two 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) on the outer-end of the center rail of the left boom. 2. Mount the left sensor (P/N 063-0130-014) on the installed U-bolts. 3. Secure the sensor to the boom by installing four 3/8 zinc flanged lock nuts (P/N 312-1001-164) to the ends of the U-bolts. 4. Tighten the nuts to ensure the sensor is mounted securely. 5. Repeat the steps above to mount the remaining boom sensor(s). 36 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide FIGURE 10. Center Sensor Mounting Location 6. Mount the center sensor (P/N 063-0130-018) to the machine s center rack using two 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) and four 3/8 zinc flanged lock nuts (P/N 312-1001-164). Connect the Sensor Cables 1. Connect the left sensor cable (P/N 115-0171-527) to the connector on the left sensor. 2. Route the left sensor cable to the AutoBoom valve. 3. Loop and tie-off any excess cable, while allowing enough cable for boom folding and extension. 4. Repeat the steps above to connect the remaining boom sensor cables. Note: The sensor cables will be connected to the AutoBoom system in the wiring phase of installation. 4 Manual No. 016-0230-005 37

Chapter 4 Install the Gauge Wheels - Optional Mount the Gauge Wheels Note: Wheel mounting locations may be influenced by the boom configuration. Verify that the wheels will not interfere with or be damaged by folding or unfolding the booms. Determine an appropriate location for mounting a wheel on the boom. The wheel should be mounted outside of the boom fold, but inside the boom breakaway. WARNING The machine must remain stationary and switched off, with the booms unfolded and supported, while installation or maintenance is conducted. FIGURE 11. Gauge Wheel Installed (Back View) 1. Remove the nuts from the right wheel axle (P/N 063-0131-589). 2. Place the wheel (P/N 322-0131-008) on the right wheel axle. 3. Reinstall the lug nuts on the wheel axle to secure the wheel. 4. Attach the right wheel mounting bracket (P/N 116-0159-626) to the front of the right boom by installing three 2-1/16 W x 3 L x 3/8 thread U-bolts (P/N 107-0171-609) through the back of the mounting bracket and securing them with six 3/8 zinc flanged lock nuts (P/N 312-1001-164). 5. Insert the right wheel axle into the right wheel mounting bracket, positioning it so that the bottom of the wheel touches the ground (or nearly so). 6. Secure the gauge wheel assembly in the wheel mounting bracket by installing two 1/2-13 x 1-1/2 SS hex bolts (P/N 311-0058-186) and two 1/2 zinc hex nuts (P/N 312-1001-043). 7. Repeat the steps above to install the left wheel. 38 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide Install the UltraGlide Wiring Wiring Connections CAUTION Always connect the power cable as the last step in the wiring process and verify that the power leads are connected with the correct polarity. Reversing power leads can cause severe damage to the equipment. Note: For wiring connections made outside the cab, apply dielectric silicone grease (P/N 222-0000-006) generously on both the male and female ends of the connectors. Application of the grease will prevent corrosion to the pins and wires. Install the AutoBoom Node FIGURE 12. UltraGlide AutoBoom Node Installed 4 1. Mount the AutoBoom node (P/N 063-0130-013) to the cross beam of the machine s center rack within a close proximity (3 feet/1 meter) to the AutoBoom valve. Note: Position the node so that the cable connectors face down. 2. Insert the large, rectangular node connector on the harness cable (P/N 115-0230-045) into the left port of the AutoBoom node. 3. Tighten the bolt on the node connector to secure. Manual No. 016-0230-005 39

Chapter 4 Connect the Harness to the Boom Function Controls Complete the following steps to connect the harness to the machine s boom function coils. 1. On the harness cable (P/N 115-0230-045), locate the Left Solenoid connector and connect it to Port 4A on the AutoBoom valve. 2. Connect the Right Solenoid connector to Port 4B on the AutoBoom valve. 3. Connect the Left Prop connector to Port 5A on the AutoBoom valve. 4. Connect the Right Prop connector to Port 13A on the AutoBoom valve. FIGURE 13. Machine s Left and Right Tilt Boom Function Coils 5. Locate the machine boom function coils near the machine s boom stack valve. 6. Disconnect the connector from the machine s Left Tilt Up coil. 7. Install a boom sense adapter cable (P/N 115-0171-558) between the coil and the machine s coil connector. 8. Connect boom sense adapter cables between the Left Tilt Down, Right Tilt Up, and Right Tilt Down coils and the coil connectors. 9. On the harness cable, locate the Left Solenoid Sense connectors. Isolate the connector labeled Up and connect it to the Left Tilt Up coil via the installed boom sense adapter cable. 10. Connect the Down Left Solenoid Sense connector to the Left Tilt Down coil via the installed boom sense adapter cable. 11. Connect the Right Solenoid Sense connectors to the machine s Right Tilt Up and Right Tilt Down coils via the installed boom sense adapter cables. 40 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide Install the Center Rack Control FIGURE 14. Machine s Center Boom Function Coils 1. Locate the Center Up coil on the machine s stack valve. 2. Unplug the coil connector from the Center Up coil. 3. Install a center rack control boom sense adapter cable (P/N 115-0230-037) to the machine s Up coil. 4. Connect the coil connector to the installed boom sense adapter cable. 5. Plug the single connectors on the installed boom sense adapter cable to the Center Up harness connectors on the AutoBoom valve harness (P/N 115-0230-045). 6. Locate the Center Down coil on the machine s stack valve. 7. Unplug the coil connector from the Center Down coil. 8. Install a center rack control boom sense adapter cable (P/N 115-0230-037) to the machine s Down coil. 9. Connect the coil connector to the installed boom sense adapter cable. 10. Plug the single connectors on the installed boom sense adapter cable in the Center Down harness connectors on the AutoBoom valve harness (P/N 115-0230-045). FIGURE 15. Machine s Unloader Coil 4 11. Locate the Unloader coil on the machine s stack valve. Note: The appearance of the connectors may vary from machine to machine. 12. Unplug the Unloader coil and connect it to the female end of the AutoBoom weatherpack boom sense adapter cable (P/N 115-0171-558). 13. Connect the double-ended male end of the weatherpack boom sense adapter cable to the Unloader coil. 14. Connect the single-ended male end of the weatherpack boom sense adapter cable to the female open center connector on the AutoBoom valve harness. Manual No. 016-0230-005 41

Chapter 4 Connect the Harness Cable 1. Route the harness cable (P/N 115-0230-045) toward the machine s cab. 2. Connect the harness cable to the controller cable (P/N 115-0230-007). 3. Tighten the connector screw cap to secure the connection. Note: Be sure to allow enough slack in the harness cable to allow for boom racking. Connect the Controller (If Applicable) 1. Route the controller cable (P/N 115-0230-007) into the right side of the machine s cab. 2. Locate the two controller connectors. Connect these connectors to the AutoBoom controller (P/N 063-0130- 011). Note: The AutoBoom controller should be mounted in the machine s cab so that the machine operator has easy access to it. Connect the Computer (If Applicable) Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 43 for installation and wiring instructions for your specific field computer. Connect the Power Leads 1. Locate the power cable that has the red and white power leads at one end. 2. Disconnect the machine s connectors from the battery terminals. 3. Install the red power lead on the positive battery terminal and reinstall the machine s battery connector. 4. Install the white power lead on the negative battery terminal and reinstall the machine s battery connector. 42 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide UltraGlide Wiring Schematics AutoBoom Controller 4 Manual No. 016-0230-005 43

Chapter 4 Envizio Plus 44 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide SCS 4000/5000 4 Manual No. 016-0230-005 45

Chapter 4 Viper Pro & Envizio Pro 46 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

UltraGlide 4 Manual No. 016-0230-005 47

Chapter 4 48 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

CHAPTER 5 5Replacement Parts Chapt er This section contains replacement part diagrams and listings for PowerGlide Plus,and UltraGlide systems. Please refer to these diagrams when calling to request replacement parts. Valve Blocks PowerGlide Plus Valve Block Replacement Parts Manual No. 016-0230-005 49

Chapter 5 UltraGlide Valve Block Replacement Parts 50 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

Replacement Parts Wheel and Assembly Brackets Machine-Specific Wheels and Brackets Cushioned Axle 5 Manual No. 016-0230-005 51

Chapter 5 Sensors and Brackets Molded Sensor Replacement Parts Machine-Specific Sensor U-Bolts 52 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

Index H Hydraulic Fittings 4 Safety 2 I Important Safety Information 1 Electrical Safety 2 Hydraulic Safety 2 Introduction 3 K Kit Contents PowerGlide Plus 5 P Point of Reference 4 PowerGlide Plus 5 Install Gauge Wheels 16 Hydraulic System 9 Down Hoses 14 Fittings 9 Left and Right Cylinder Hoses 13 Mount the AutoBoom Valve 9 PowerGlide Plus Hydraulic Schematic 15 Pressure and Tank Hoses (CaseIH Only) 10 Pressure and Tank Hoses (Tyler Patriot Only) 12 Wiring 17 AutoBoom Node 17 Connecting the Controller (if applicable) 19 Connecting the Harness Cable 18 Connecting the Harness to Boom Function Controls 18 Connecting the Power Leads 19 PowerGlide Wiring Schematics 20 Wiring Connections 17 Wiring Connections Computer (if applicable) 19 Kit Contents 5 Preparing for Installation 4 U UltraGlide Install Gauge Wheels (Optional) 38 Hydraulic System 29 Down Hoses 34 Fittings 29 Left and Right Cylinder Hoses 33 Mount the AutoBoom Valve 30 Pressure Hoses 31 Tank Hoses - CaseIH and Patriot 1997 and Newer 32 Tank Hoses - Patriot 1996 & Older 32 UltraGlide Hydraulic Schematic 35 Sensors 36 Connecting Sensors 37 Mounting Sensors 36 Wiring 39 AutoBoom Node 39 Connecting Power Leads 42 Connecting the Computer 42 Connecting the Controller 42 Connecting the Harness Cable 42 Connecting the Harness to Boom Function Controls 40 Installing Center Rack Control 41 UltraGlide Wiring Schematics 43 AutoBoom Controller 43 Envizio Plus 44 SCS 4000/5000 45 Viper Pro & Envizio Pro 46 Wiring Connections 39 R Recommendations 4 Replacement Parts Machine-Specific Wheels and Brackets 51 Sensors and Brackets 52 Machine-Specific Sensor U-Bolts 52 Molded Sensor Replacement Parts 52 Valve Blocks 49 PowerGlide Plus 49 UltraGlide 50 Wheel Cushioned Axle 51 Wheel and Assembly Brackets 51 T Tools Needed 4 Manual No. 016-0230-005 53

Index 54 CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center

RAVEN INDUSTRIES Limited Warranty What Does this Warranty Cover? This warranty covers all defects in workmanship or materials in your Raven Applied Technology Product under normal use, maintenance, and service. How Long is the Coverage Period? Raven Applied Technology Products are covered by this warranty for 12 months after the date of purchase. This warranty coverage applies only to the original owner and is nontransferable. How Can I Get Service? Bring the defective part and proof of purchase to your Raven Dealer. If your Dealer agrees with the warranty claim, the Dealer will send the part and proof of purchase to their distributor or to Raven Industries for final approval. What Will Raven Industries Do? Upon confirmation of the warranty claim, Raven Industries will, at our discretion, repair or replace the defective part and pay for return freight. What is not Covered by this Warranty? Raven Industries will not assume any expense or liability for repairs made outside our facilities without written consent. Raven Industries is not responsible for damage to any associated equipment or products and will not be liable for loss of profit or other special damages. The obligation of this warranty is in lieu of all other warranties, expressed or implied, and no person or organization is authorized to assume any liability for Raven Industries. Damages caused by normal wear and tear, misuse, abuse, neglect, accident, or improper installation and maintenance are not covered by this warranty.

CaseIH 3150/3185, Pre-2002 Tyler Patriot Open Center AutoBoom Installation Manual (P/N 016-0230-005 Rev C 6/09) Raven Industries Toll Free (U.S. and Canada): (800)-243-5435 Applied Technology Division or Outside the U.S. :1 605-575-0722 P.O. Box 5107 Fax: 605-331-0426 Sioux Falls, SD 57117-5107 www.ravenprecision.com atdinfo@ravenind.com Notice: This document and the information provided are the property of Raven Industries, Inc. and may only be used as authorized by Raven Industries, Inc. All rights reserved under copyright laws.