China Dadong-Qinhuangdao Railway Construction Project (1)(2)

Similar documents
Philippines Metro Manila Rail Commuter Maintenance Depot Construction Project

Locomotive Building Project

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

Japanese ODA Loan. Ex-ante Evaluation

Pakistan Second 220KV Guddu-Sibbi-Quetta Transmission Project

(1) Current State and Issues of the Electricity Sector in Indonesia

Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road)

Ex-Ante Evaluation (for Japanese ODA Loan)

China Toy Industry Report, 2008

I m Tetsuji Yamanishi, Corporate Officer at TDK. Thank you for taking the time to attend TDK s performance briefing for the fiscal year ended March

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

Main Contents I. Development of Electric Vehicles and Other Kinds of Alternative Energy II. Features of China s Petroleum Market III. Outlook on China

Indian engineering TRANSFORMING TRANSMISSION

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Project Site Afghanistan Nepal Pakistan India

Research and Development Forecast of High Voltage DC Power Supply in China, (Sample)

Automotive Industry. Slovakia. EHSK Analysts team Peter Kellich and Andrej Krokoš. April 2017

The Electrification Futures Study: Transportation Electrification

Report date: March 2001 Field survey: September Project Profile and Japan s ODA Loan

Rehabilitation of Diesel Railcars Project, Diesel Railcar Rehabilitation Project

217 IEEJ217 Almost all electric vehicles sold in China are currently domestic-made vehicles from local car manufacturers. The breakdown of electric ve

Meeting Materials for FY2011

The outlook of refined oil product supply and demand in China and the influence to market of northeast Asia

Annual Report on National Accounts for 2015 (Benchmark Year Revision of 2011) Summary (Flow Accounts)

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Report, construction machinery can be produced, and some of these products are exported.

China Electric Vehicle Industry Report, May 2013

China Beijing Subway Construction Project (1) (2) Beijing Subway Second Phase Construction Project (1) (2) (3) (4)

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

History of Subway in Kyoto

Modernising the Great Western railway

Can China Save the Market?

India Anpara Power Transmission System Project (1) (2)

Three Toll Roads Construction Project Report Date: October, 2002 Field Survey: August, Project Profile and Japan s ODA loan

Item

2013 China Auto Parts

Document from the Ministry of Transport of the People s Republic of China

Mercedes-Benz: Best Sales Result for the Month of June in Company History Up 13 Percent

Urban Transport systems in major cities in China. Sun Kechao Senior Engineer China Academy of Transportation Sciences, Beijing, China

TABLE OF CONTENTS OECD/IEA, 2017

Consolidated Financial Results for 1Q FY2016 July 29, 2016 Fuji Electric Co., Ltd.

China Heavy Truck Industry Report, 2009

Brief Description, Overall Objective and Project Objectives with Indicators

Slovakia Ex-Post Evaluation of Japanese ODA Loan Project Motorway Construction Project (SLO-P1)

Oilseeds and Products

Equipment Industry Report,

Research Coverage Report by Shared Research Inc.

Enhancing Regional Cooperation in Energy Infrastructure Development

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

2015 Carbon footprint JTP. Date of issue: 14 th March 2016

Indonesia Steel Industry : Development & Opportunities

Laboratory worker at Goedgevonden Coal Mine

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

CHINA BIWEEKLY. February 6th RMB Internationalization Business Promotion Office Global Business Division

U.S. Rail Crude Oil Traffic

Akinwole Omoboriowo II Chief Executive Officer(CEO) Genesis Electricity Limited(GEL) Africa

Item

U.S. Rail Crude Oil Traffic

Economic & Steel Market Development in Japan

AIR POLLUTION: Policy, actions and short term countermeasures to reduce air pollution of Ulaanbaatar city

Planning of the HSR Network

CMC Operating Results and Future Plan. April 24, 2018

Signs of recovery in the Russian construction market

Mazda Motor Corporation June 17, 2011

1. Project Profile and Japan s ODA Loan 1.1 Background

REPORT ON THE PRICING POLICY FOR GASOLINE AND DIESEL 2nd QUARTER 2017 BACKGROUND

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Third Quarter Results (ended December 31, 2013)

HCM will expand the production capacity and sales support, such as dealer empowerment, etc. in Chinese market.

Submission to Greater Cambridge City Deal

1.2 Objectives To rehabilitate C-BMPP and K-BMPP, which were constructed with funding from a Japanese ODA loan.

BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS)

TRAVEL DEMAND FORECASTS

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

2003 fourth quarter and full-year results

China Methanol Industry Report,

SAA Financial Results 2008/09. Building on Restructuring

Management Plan for FY2013

The Philippines. Manila

welcome to the BC Hydro community open house

Average Fuel Economy of Korea

Research and Investment Forecast of China Automotive Aluminum Wheel Industry, (Sample)

Global and China Automotive Wiring. Harness Industry Report,

The U.S. Car Wash Equipment Market: Size, Trends and Forecasts ( ) September 2016

P anorama 12 Brazil automotive Guide 2008

Energy Security of APEC Economies in a Changing Downstream Oil Environment

Statistical Annex. European Economic Forecast Autumn 2018

Analysis of Production and Sales Trend of Indian Automobile Industry

John Holland, President, International Copper Association. Copper Demand in Asia Growth Trends and Drivers for New Applications

Summary of Key Issues

Statistical Annex. European Economic Forecast Spring 2018

TAKING THE HIGH (FUEL ECONOMY) ROAD WHAT DO THE NEW CHINESE FUEL ECONOMY STANDARDS MEAN FOR FOREIGN AUTOMAKERS?

FY st Quarter Business Results. The Yamaha booth at the Japan International Boat Show 2013

FY2015 Medium-Term Management Plan Food and Beverage Distribution Business

Strong performance by the Bolloré Group s operating activities in 2018 Mr Cyrille Bolloré unanimously appointed Chairman and Chief Executive Officer

Voith Group On a good footing for future growth

Ronnie van Eeden. Senior Mining Engineer. Overview

Results Briefing FY2014 1H

Coal. 36 Reserves and prices 38 Production and consumption. 67 th edition

The US Car Wash Equipment Market ( Edition) October 2017

Overview of policies related to low carbon transportation in China

Transcription:

China Dadong-Qinhuangdao Railway Construction Project (1)(2) 1. Project Profile and Japan's ODA Loan Report Date: October, 2002 Field Survey: August, 2001 Site Map: Between Dadong and Qinhuangdao Site Photo: Coal Loaded Freight Train Passing Dashichuang Station 1.1 Background In China, the national economy has been developed under the Seventh Five-Year Plan (1986 1990) and the Eighth Five-Year Plan (1991 1995), and thereby there has been an increased demand for energy. In particular, demand for coal has increased in coastal areas where the economy has rapidly developed. During the 1970s and 1980s, since the insufficient transportation capacity was not able to carry hundreds of thousands tons of coal in Shanxi Province, new coal pits were not developed. 1 At appraisal, the construction of a railway for a coal-carrying route and the development of coal pits were being embarked upon. At that time, coal was carried via Beijing to Qinhuangdao Port by the Fengshada Line (Fengtai Shacheng Dadong). The transport capacity of the Fengshada Line was 79 million tons per year Daqin Line Dadong Eastern Zone (Dashichuang Qinhuangdao) (Covered by the ODA Loan) Shenyang Western Zone (Dadong Dashichuang Sha Chen Dshichuang Beijing Duanjiashanling Qinhuangdao Feng Tai Tianjin Jingqin Line while the actual volume in 1987 had already reached 79 million tons (coal occupies 65 million tons). Since a further increase in the transport capacity was impossible, the construction of the Daqin Line was launched. The Daqin Line, aimed at coal transportation, connects Dadong and Qinhuangdao Port and has a 1 Coal is produced mainly in the north of Shanxi Province including Dadong. It needs to be transported to the east and south of the country where coal is in high demand. Major production areas of coal are north of Shanxi (Dadong, Yanbei and Jinzhou), west of Inner Mongolia (west of Dadong, Bohai Bay District and Baotou) and Shaanxi Province. In 1990, coal production was estimated approximately at 142.6 million tons. 1

length of 652 Km. The construction was divided into two phases. The first phase, which aimed for a total of 410 Km of construction (Dadong Dashichuang zone with a length of 386 Km and Qinhuangdao Qinhuangdao Port zone with a length of 24 Km) was initiated in December 1985 under Chinese governmental fund, and was supposed to be completed in December 1988. The second phase of construction, which covered Dashichuang Qinhuangdao with a length of 242 Km, was commenced in 1988 under Japan's ODA Loan and was expected to be completed in 1991. 1.2 Objectives To newly construct an electrified single-track line in the zone of Dashicuang Qinhuangdao (242 Km) covered by the second phase construction, in order to respond to the increasing demand for coal transportation to Qinhuangdao. 1.3 Project Scope The construction of an electrified single-track line between Dadong and Qinhuangdao (242 Km). The main contents of the project were to newly construct a roadbed, rail track, bridges, culvert, tunnels, power equipment, communications, signals, buildings, rails, and transformer station. The ODA loan was to cover the total amount of the foreign currency portion of the project costs. 1.4 Borrower / Executing Agency Ministry of Foreign Trade and Economic Co-operation of the People's Republic of China Ministry of Railways of the People's Republic of China 1.5 Outline of Loan Agreement I II Total Loan Amount 12,131 million yen 6,279 million yen 18,410 million yen Loan Disbursed Amount 11,073 million yen 4,826 million yen 15,900 million yen Date of Exchange of Notes July, 1988 May, 1989 Date of Loan Agreement August, 1988 May, 1989 Terms and Conditions Interest Rate Repayment Period (Grace Period) Procurement 2.5% 30 years (10 years) General untied 2.5% 30 years (10 years) General untied Final Disbursement Date August, 1993 May, 1994 2. Results and Evaluation 2.1 Relevance The objectives of this project were to ' newly construct an electrified single-track line in the zone of Dashicuang Qinhuangdao in order to respond to the increasing demand for coal transportation to Qinhuangdao.' This project, nominated as a national project by the Chinese government, was implemented through the plan of 'Jinmei Waiyun (To carry coal of Shanxi out).' During the 1980s and 1990s, the economy grew rapidly and the demand for coal increased accordingly. The destination of coal supply was the south of China. In the coastal area in the south, berths for coal as well as thermal power stations were being constructed. The volume of coal exports was 13.13 million tons in 1987. Although it was not huge quantitatively, 2 the growth rate of export was as high as 36 % compared with that of the previous year. In considering such circumstances, it is assessed that the relevance of this project at appraisal was high. 2 The total volume of coal transferred via Duanjiashanling and Tianjin in 1986 was 51.42 million tons. Despite a one-year difference in the data for comparison, the share for export was less than 20 %. 2

Figure 1: Transition of Coal Consumption in China 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 石炭消費量の推移 ( 万トン ) (10 Thousand Tons) Total Volume of Consumption Volume for Power Generation 1985 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 Source: China Yearbook of Statistics. Later, coal consumption was declining after reaching a peak in 1996. Coal consumption for power generation was also declining (see Figure 8). As a background for this decline, the following factors can be pointed out: (1) the speed of thermal power station construction slowed down due to declining of electric demand growth ; (2) the Chinese government has been encouraging the utilization of alternative energy sources such as oil and gas ; 3 and (3) the economic situation also affected growth of coal demand. The figure below shows the change in energy consumption in China. The ratio of coal consumption to the total energy consumption gradually decreases after reaching a peak in 1990. By contrast, the ratio of oil energy consumption is increasing. But the ratio of coal is still high: 67 % in 1999. It means that coal is still a crucially important energy source. The Chinese government set up an objective to make further adjustment of the structure of electricity sources under the Tenth Five-Year Plan (2001-2005). Under this objective, it established a direction for appropriate development of power stations in which it plans to put a weight on development of large-scale coal power stations with the high-energy efficiency using the clean combustion technology. This project was and is still relevant. Figure 2: Change in Energy Consumption 100% 80% 60% 40% 20% 0% Coal Oil Natural Gas Hydroelectric Power 1978 1980 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 Source: China Yearbook of Statistics. Note: Based on conversion by SCE (Standard Coal Equivalent). At the time of the appraisal, it was planned to construct an electrified single-track line and later from 1996, to strengthen the transport capacity by expanding it to a double-track line. However, in order to 3 For instance, coal consumption is prohibited in Beijing, Tianjin and Shijiachuang. 3 1998 1999

respond to increase in the transport volume resulting from the rapid increase in demand on coals, the Chinese counterparts decided to construct an electrified double track line with its own funds in 1990 when the project was still at the implementing stage, and carried out the construction works ahead of the original schedule. As a reason for this adjustment, the following factors are quoted: the annual transport volume of the western zone of the Daqin Line (Dadong Dashichuang) in 1995 was adjusted upward from 55 million tons to 75 80 million tons; the fourth phase berth construction 4 in Qinhuangdao Port and the new line construction between Qinhuangdao and Shenyang were expected to increase transport demand; the transport capacity of the Jingqin Line (Beijing Qinhuangdao) had reached its saturating point, and did not absorb additional increase of the transport demands, thus increasing the necessity to enhance the transport capacity of the eastern zone of the Daqin Line (Dashichuang Qinhuangdao);. As a result of this adjustment, the transport capacity of the eastern zone of the Daqin Line was enhanced 80 % from 35 million tons per year at appraisal to 65 million tons per year. Total transport volume in 1995 of the Jingqin Line connecting Beijing to Qinhuangdao, the Beijing Tianjin Qinhuangdao Line and this line connecting Dashichuang to Qinhuangdao reached 146 million tons. 2.2 Efficiency 2.2.1 Project Scope As stated in the 'Relevance' of the plan, the project scope was adjusted from a single-track line to a double-track line. Accordingly, the project scope such as the total track length was altered. However, the expansion to the double-track line was done with the local funds and there was no change in the scope of the ODA Loan portion. 2.2.2 Implementation Schedule At appraisal, the span of construction was scheduled at four years from January 1988 to December 1991. The project was actually completed one year behind schedule in December 1992. The adjustment from single-track to double-track done by the Chinese counterparts with its own funds can be pointed out as a reason for this delay. Despite significant scope adjustment such as to double track construction, there was just a one-year delay, signifying the high implementing capacity of the counterparts. It can be assessed therefore that the project was efficiently implemented. 2.2.3 Project Cost In constructing a double-track line, parts for which unit construction was favorable (tunnels and bases of long and intermediate bridges) were initially designed for an electrified double-track line with the ODA funds but other construction works were carried out with the local budgets. The local currency portion had a cost overrun of more than 90 % compared with the initial plan. In particular, a notable overrun was seen in roadbed, rail track, bridges and buildings including stations. Reasons for the overrun include adjustment from single-track to double-track ahead of the initial schedule, additional construction of track installation, price increases in equipment and materials, and higher land lease prices. 5 The reason also includes repair charges incurred due to damages of local access roads by heavy construction machines and vehicles during the construction period. Considering the adjustment from single-track to double-track ahead of the original schedule as well as price increases during implementation, despite the more than 90 % cost overrun, it cannot necessarily be said that the project was inefficient. 4 The handling capacity of the coal berth in Qinhuangdao Port will be 75 million tons if the second berth constructed by the ODA loan and the first, third berths by Chinese own fund (collectively 60 million tons) are added to that of old berth (15 million tons). It was, therefore, understood that there were no problems in the capacity dealing with 64 million tons (estimate for 1995) of coal shipped from Qinhuangdao. In addition, the fourth berth construction project (Its loan agreement was signed in 1993. Its handling capacity was 30 million tons) was commenced in 1991. Hence, the total coal handling capacity of Qinhuangdao Port reached 103.65 million tons per year after the completion of the fourth phase of construction. 5 Growth rate of the consumer price index between 1987 and 1994 was about 12 % as an annual average. 4

The foreign currency portion of the ODA loan decreased to 86 % of that initially planned. Particularly, the foreign currency portion of components related to track installation decreased. It was understood that a more accurate estimate was made at the stage of detail design. 2.3 Effectiveness The objective of this project was 'to newly construct an electrified single-track line in the zone of Dashicuang Qinhuangdao in order to respond to the increasing demand for coal transportation to Qinhuangdao'. This section assesses how much this project contributed to the increase in demand for coal transport. 1) The Volume of Coal Transport Figure 3 shows the trends after 1992 in the transport volume of coal produced in the Northwest District (north of Shanxi Province and west of Inner Mongolia [Shenfu and Dongsheng]) and that of the Daqin Line (western zone of Dadong Dashichuang and eastern zone of Dashichuang Qinhuangdao). According to data from the executing agency, more than 50 % of the coal produced in the Northwest District was carried by railway. It is expected that the transport volume by railway will increase according to the increase in the volume of coal production. The volume share of the Daqin Line in railway transportation has been growing since its opening in 1992: occupying 68 % between Dadong and Dashichuang in 2000 and 54 % between Dashichuang and Qinhuangdao. It is expected that their share will increase to 73 % and 68 %, respectively, in 2005. But this prospect is based on a plan that the Daqin Line will take over the volume which has been carried by the other two lines and such other two lines will then specialize in passenger transport. Figure 3: The Volume of Coal Transport by Daqin Line 18,000 Volume of Coal Transported by Railway Railway (Dadong-Dashichunag) Railway (Dashichuang-Qinhuangdao) (Unit: 10,000tons) 16,000 14,000 12,000 10,000 8,000 6,000 Actual 4,000 2,000 Prospect 0 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source: Material from executing agency. Note: Data until 2000 is actual. That after 2001 is estimated on the basis of production prospects in 2005 and 2010. Figure 4 compares the designed and actual volume of coal which is carried by the zone of this project (Dashichuang Qinhuangdao, eastern zone of the Daqin Line) and other railway lines (the Beijing Tianjin Qinhuangdao Line and the Jingqin Line) in 1990, 1995 and 2000. The actual volume transported by the Jingqin Line decreased from 66 million tons in 1995 to 26 million tons in 2000. Similarly, that of the Beijing Tianjin Qinhuangdao Line decreased from 21 million tons in 1995 to 14.9 5

million tons in 2000. Meanwhile that of the Daqin Line increased from 20 million tons to 60.52 million tons, reaching about 60 % of the share. This reveals that a shift in coal transportation from other lines to the Daqin Line has been already made. Hence, contributions to the demand for coal transport by the zone targeted by this project are becoming significant. Figure 4: Comparison of Capacity and Actual Performance of Coal Transport Volume to Qinhuangdao This Project(Dashichuang-Qinhuangdao) Beijing-Tianjin-Qinhuangdao Line Beijing-Qinhuangdao (Jingqin Line) (10 Thousand Tons) 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 (Capacity) (Actual) (Capacity) (Actual) (Capacity) (Actual) 1990 1990 1995 1995 2000 2000 Source: Documents supplied by the executing agency Figure 5: Prospect and Actual Demand for Coal Transportation to Qinhuangdao 1990 1995 2000 Prospective (a) 7,950 10,600 13.300 Actual (b) 8,700 10,700 10,147 (b)/(a)( ) 109.4 100.9 76.3 Unit: ten thousand tons Note: Prospective data is from appraisal documents, actual data is from the executing agency. Figure 5 compares the prospect for coal transport demand and the actual demand by the above three lines. The actual transport demand in 1995 slightly exceeded the prospected demand. However, the actual demand in 2000 remained mostly at the same level in 1995, occupying only 76 % of prospected demand. The Ministry of Railways estimated that the transport volume of the Daqin Line in 2005 would be 100 million tons between Dadong and Dashichuang, and 93 million tons between Dashichuang and Qinhuangdao. This ODA loan will play a significant role in the transportation of coal to Qinhuangdao. It is also planned to increase the number of train services 6 and traction freight cars as the coal transport capacity between Dashichuang and Qinhuangdao is 65 million tons. 2) Financial Internal Rate of Return At appraisal, the financial internal rate of return (FIRR) of this project was estimated at 7.0 % by using 6 The number of services at the field survey was 70 on a daily average and the number of traction cars per one service was 66 (one car can carry 60 tons of coal). 6

incomes from coal transport and passengers as benefits. However, after recalculation based on a few available documents, it was not possible to calculate the FIRR as rail car replacement and maintenance expenses were high. This project, based on the result of the FIRR, cannot be assessed as having low financial efficiency considering followings : (1) the strategic significance of coal as an energy source is still high; (2) this project is expected to play an important role in the transportation of coal to Qinhuangdao in the future; and (3) there will be the indirect benefit that other lines having been involved in coal transport will have room for passenger transport. Preconditions Project life: 30 years Benefits: coal transport income by this project implementation Costs: initial investments + rail car procurement and replacement expense + maintenance expense 2.4 Impact At the time of appraisal, coal occupies more than three quarters of the primary energy consumption in China. Figure 2 illustrates its declining trends, but nonetheless, coal's significance has not changed yet. 7 Coal is concentrated in northern China, mainly in Shanxi Province, and coal-consuming areas such as the northeast, east, midland and south demanded coal supply from north China. According to documents at appraisal, it was estimated that among 106 million tons of coal carried by railway in 1995, 64 million tons would be shipped from Qinhuangdao Port to supply the coal demand in coastal areas and for exporting. The coal demand in Chinese coastal areas was expected to reach 50.8 million tons in 1995. Hence, it was expected that increasing coal supply from north China to coastal areas would boost production activities and promote economic development in coastal areas. 1) Impacts on the Economy in Coastal Districts and Export Growth Figure 6 explains the trends in the volume of coal shipped in and dispatched from Qinhuangdao Port. The volume for domestic supply has been 50 60 million tons after the year of the project completion in 1992. Exports are gradually increasing from 11.87 million tons in 1991 to more than 30 million tons in 2000. With the increase in exports, the volume of coal shipped in the Qinhuangdao coal berth in 2000 exceeded 80 million tons. 7 The share of coal to energy consumption in 1999 was 67 %. 7

Figure 6: Trends in the Volume of Coal Shipped in Qinhuangdao Coal Berth (Actual) Volume of Coal Shipped at Qinhuangdao Berth Volume of Coal Transported to Other Area in China Volume of Coal Exported (10 Thousand Tons) 9,000 8,000 8,378 7,000 6,000 5,000 4,000 3,000 5,263 3,115 2,000 1,000 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Source: Documents supplied by Port Authority of Qinhuangdao City. In overview, among the 100 million tons of coal that was transported by three lines to Qinhuangdao in 2000, 80 % was shipped in the coal berth at Qinhuangdao Port, while 50 % of this was transported to other areas in China and 30 % was exported. 8 According to data in 2000 (Table 7), major domestic destinations of coal shipped in Qinhuangdao Port were 8 provinces and cities: Liaoning Province, Shandong Province, Jiangsu Province, Shanghai City, Zhejiang Province, Fujian Province, Guangdong Province and Hainan Province. Their share exceeded 90 % in the same year. Table 7: The Actual Volume According to Destinations (2000) Unit: ten thousand tons Destinations Liaoning Shandong Jiangsu Shanghai Zhejiang Fujian Guangdong Hainan Miscellaneous Total All Berths 367 257 408 958 1,250 343 1,182 71 427 5,263 for Coal Share (%) 7.0 4.9 7.8 18.2 23.8 6.5 22.5 1.3 8.1 100.0 Source: Documents supplied by Port Authority of Qinhuangdao City. Figure 8 reviews the total volume of electricity generated, the volume generated by thermal power, and the volume of coal consumption for thermal power generation of 8 provinces and cities in 2000. The share of thermal power generation in these provinces and cities to the total volume of electricity was as high as 90 %. 8 The major share for export destinations in 2000 was taken by South Korea, Taiwan and Japan. 8

Figure 8: Trend of the Total Volume of Generated Electricity, the Volume of Electricity Generated by Thermal Power, and the Volume of Coal Consumption for Thermal Power Generation in 8 Provinces and Cities 6,000 Total Electricity Generated Electricity Generated by Thermal Power Volume of Coal Consumed for Power Generation 5,000 4,000 3,000 2,000 1,000 0 1993 1994 1995 1996 1997 1998 1999 Source: China Yearbook of Electricity Note: 1) Total of data from 8 provinces and cities (Liaoning Province, Shandong Province, Jiangsu Province, Shanghai City, Zhejiang Province, Fujian Province, Guangdong Province and Hainan Province) 2) Data from 1995 is not available. In addition, the total volume of generated electricity rapidly increased: its volume in 1999 had increased 1.61 times from that of 1993 while the volume of electricity generated by thermal power plants also increased 1.56 times. As regards economic development in the areas for the four years from 1996 to 1999, six provinces and cities, excepting Hainan Province and Liaoning Province, achieved more than 10 % economic growth on an annual average. It is understood that this power supply increased in response to the demand for power which accompanied economic growth. Similarly, the volume of coal consumed for thermal power generation also increased 54 million tons, from 130.94 million tons in 1993 to 185.17 million tons in 1999. The zone of the Daqin Line targeted by this project transported 47 million tons of coal in 1999. Though it is difficult to find a direct linkage between demand and supply, it can be estimated that this project contributed to the increase in coal supply to provinces and cities as well as economic development in these provinces. 2) Environmental Aspect As for environmental aspects, the Ministry of Railways took appropriate measures such as green planting against influences on vegetation and the ecosystem, the use of sound barriers and longer rail for noise reduction in places near schools. In addition, as a countermeasure to wastewater, wastewater disposal facilities, which fulfill the national standard, are installed. Coal transport causes funnel fumes, but this is minimized by sprinkling water. 2.5 Sustainability 1) Operation and Maintenance The operation and maintenance (O&M) of the Daqin Line, including the zone covered by this project, are undertaken by the Dadong Railway Sub-bureau, Beijing Railway Bureau, Ministry of Railways. 9 The total number of staff in the Dadong Railway Sub-bureau is 11,516 (at the time of survey. See the following 9 The railway operation between the Qinhuangdao berth and the Qinhuangdao Port berth was originally managed by the Tianjin Railway Sub-bureau, Beijing Railway Bureau, but it was later controlled by the Dadong Railway Sub-bureau, Beijing Railway Bureau in 1998, due to managerial convenience. 9

organization chart). The maintenance of rail track is carried out by the Construction Section, by dividing the whole length of 650 Km of the Daqin Line into three zones of 200 Km. There are the Hudong Maintenance Section, the Chawu Maintenance Section, and the Zunhua North Maintenance Section, which have 700 800 staffs, respectively. Rail is checked according to a plan on the basis of tenure of use, and is replaced if necessary. Staff in the Maintenance Section check rail and railroad ties every day. In addition, the Beijing Railway Sub-bureau has special vehicles for inspection. It conducts periodic inspection on rail condition twice a year in spring and fall. The maintenance of communication and signal facilities is made by the Eastern Electric Equipment Maintenance Section and the Chawu Electric Equipment Maintenance Section, which have 322 and 509 staffs, respectively. The maintenance related to electric equipment is undertaken by Power Supply Sections at Hudong and Chawu, which have 314 and 1,106 staffs, respectively. Organizational Chart of Daqin Line Dadong Railway Sub-bureau Zunhua North Maintenance Section Zunhua North Station Section Chawu Power Supply Section Chawu Electric Equip. Maintenance Chawu Maintenance Section Hudong Building Section Hudong Power Supply Section Hudong Car Section Hudong Electric Equip. Maintenance Hudong Maintenance Section Hudong Machine Section Hudong Station Section Sections Station Section Machine Section Maintenance Section Electric Equipment Maintenance Section Car Section Power Supply Section Building Section Content of Responsibilities Railway station maintenance Locomotive procurement, repair and maintenance Rail track, roadbed, bridge and tunnel maintenance Communication and signal facility maintenance Car procurement and maintenance Power supply for electrified trains and stations Building maintenance 2) Technical Capacity According to the Ministry of Railways, the technical capabilities of staff who maintain the Daqin Line are relatively high. Engineers, graduating from railway schools, have experience of more than ten years on average. In addition, technical training is also carried out for general staff. It can be assessed that the standard of technical capabilities and operation & maintenance system are fine. 10

Comparison of Original and Actual Scope Item Plan Actual Project Scope Electrified single-track line Electrified double-track line 1) Roadbed 2) Rail Track 3) Bridges 4) Culvert 5) Tunnels 6) Electrification Transformer 7) Power Equipments Distributing Station Power Cable A. High Voltage Cable B. Low Voltage Cable C. Control Cable 8) Communications Main Cable Digital Switching Equipment Crossbar Switching Equipment Optical CableTransmission 9) Signal Signal Cable CTC 23,947,800 m 3 301.039 km 127 bridges, 24,614 m 18,919.14 m 9 tunnels, 12,222 m 266 km (242+24 km) 75,000KVA 1 3 sites 37 km 210.5 km 8.5 km 250 km 450 km 1,200 sets 2,000 sets 5sites 185.7 km 20 sites 29,584,000 m 3 544.17 km 117 bridges, 24,171 m 839 sites, 23,313 m 9 tunnels, 12,256 m 254.2 km 75,000KVA 6 3 sites 84.5 km 179.6 km 27.2 k 242 km 421 km 1,032 sets 2,000 sets 3 sites 615 km 14 sites 10)Buildings Stations) (Including 110,000 m 2 159,500 m 2 11) Repair Yard For E/L,D/I 1 site 1 sire For F/c 1 site 1 site 12) Consulting Services None None Implementation Schedule January, 1988 December, 1991 January, 1988 December, 1992 Project Cost Foreign Currency Local Currency Total ODA Loan Portion Exchange Rate 18,410 million yen 41,283 million yen ( 1,200 million yuan) 59,693 million yen 18,410 million yen 1yuan 34.4yen as of 1988 15,900 million yen 78,189 million yen ( 2,303 million yuan) 94,089 million yen 15,900 million yen 1yuan 33.95yen as of 1988 11