SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC

Similar documents
BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Decision on Merced Irrigation District Transition Agreement

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

California s Emission Reduction Plan for Ports and International Goods Movement

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Merger of the generator interconnection processes of Valley Electric and the ISO;

Rider 11 Partial Requirements Service (PRS)

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

s m BC hydro REGENERATION December 22, 2011

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

Net Metering Policy Framework. July 2015

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

BC Hydro OATT - Balancing Area Transmission Service Workshop. January 20, 2014

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

SOLAR DISTRIBUTED GENERATION PROGRAM UPDATE

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

NOVA SCOTIA UTILITY AND REVIEW BOARD

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

AMERICAN ASSOCIATION OF PORT AUTHORITIES

SEP 2016 JUL 2016 JUN 2016 AUG 2016 HOEP*

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

April 20, Dear Mr. Wruck:

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

JEA Distributed Generation Policy Effective April 1, 2018

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, 2011

Comparison of Electricity Prices in Major North American Cities. Rates in effect April 1

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

in Major North American Cities

February 26, Ms. Laurel Ross Acting Commission Secretary British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3

2) Amend the availability of RS 1702 to include pathway lighting and seasonal lighting.

C&I Rate Design for EVs

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

These and other amendments are effected through the enclosed errata filing (Exhibit B-1-4) and explained in the attached errata sheet

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Renewable Energy System Tariffs and Pricing

The Commonwealth of Massachusetts

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

best to you all Gail Carbiener Page 1 of 5

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version]

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Rate Schedules. Effective 1/1/2019

PENINSULA CLEAN ENERGY JPA Board Correspondence

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

The Commonwealth of Massachusetts

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm

Patrick Wruck Commission Secretary

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

July 24, Project IR

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Large General Service Time-of-Use Storage Program

STAFF REPORT ACTION REQUIRED

Interconnection and Net Metering Service in Ohio

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, ,0272

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Zero Emission Bus Impact on Infrastructure

BCUC REGULATION OF ELECTRIC VEHICLE CHARGING SERVICE INQUIRY EXHIBIT A-35

INDEX RATE SCHEDULES

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

ORDINANCE NO. -'- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

PROPOSAL FOR A LIMOUSINE MINIMUM RATES PILOT PROJECT FEBRUARY 2011

Methodology of Cost Allocation

BEFORE THE NEW MEXICO PUBLIC REGULATION

Item No.: 5B-Supp Date of Meeting: July 17, Briefing on Air Quality Grant Funding

CPUC Net Metering Decision Is Good News For Clean Energy

SCE s 2017 Integrated Distributed Energy Resources Request for Offers ( IDER RFO ) Market Awareness Webinar. August 30, 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

FORTISBC INC. NET METERING PROGRAM TARIFF UPDATE EXHIBIT A 4

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

PUBLIC UTILITIES COMMISSION

Net Metering & Compensation Seminar

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Transcription:

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC 28 January, 2015

INTRODUCTION OUTLINE 1. Introduction 2. Background and Context Shore power Need for a Shore Power Rate: Port requests Initiatives in other jurisdictions, including BC Hydro s existing Shore Power Agreement Tariff Supplement (TS) No 76 3. Elements of Existing Shore Power Agreement TS No. 76 Shore power load characteristics Non-firm supply Pricing Interconnection costs 4. Proposed Shore Power Rate Expanded eligibility Retain non-firm characteristics Pricing and other elements 5. Stakeholder Engagement and Regulatory Schedule Timing and 2015 Rate Design Application (RDA) Proposed Schedule 2

BACKGROUND AND CONTEXT SHORE POWER Shore power refers to the electrical service provided to commercial ships when berthed in port and connected to a utility s electrical system, receiving electricity from the grid and allowing the ships to shut down their on-board electricity generation BC Hydro currently provides shore power service under TS No. 76: Applies to a specific customer (Port Metro Vancouver (PMV)) at a specific site (Canada Place) on a seasonal basis (April to October, inclusive) for a specific category of ships (cruise ships) Terms and conditions were approved by the British Columbia Utilities Commission (BCUC) effective December 19, 2008 (BCUC Order G- 197-08) 3

BACKGROUND AND CONTEXT SHORE POWER: PORT REQUESTS Port Authorities are either planning or have already installed shore power facilities in addition to those at Canada Place PMV: PMV is planning to implement shore power capabilities at its container facilities in Vancouver and Delta by December 31, 2015 PMV has applied for funding for the project under Transport Canada s Shore Power Technology Program for Ports (SPTP) and is in the final stage of negotiations Prince Rupert Port Authority (PRPA): PRPA has installed shore power capabilities at its container terminal and is currently awaiting a shore power rate The shore power facilities were tested in October 2014 Beyond those planned for the immediate term identified above, further expansions are planned at PMV and PRPA 4

BACKGROUND AND CONTEXT SHORE POWER AT PMV CANADA PLACE Princess, Holland Cruise and Disney cruise ships have been retrofitted to receive shore power at PMV Canada Place The following table shows the number of connections in 2014 at PMV Canada Place: 2014 Connection Summary Canada Place Total Percent Actual Connections 76 78% Missed Connections BC Hydro Interruption 5 5% Other 17 17% Total Missed Connections 22 22% Potential Connections 98 100% 5

BACKGROUND AND CONTEXT INITIATIVES IMPACTING SHORE POWER California California At-Berth Regulation (2007) requires container ships, reefer (refrigerated cargo) vessels and cruise ships to take shore power while at berth at California ports starting in 2014 or adopt alternative technology that achieves equivalent emission reductions Defines term California Ports as Ports of Los Angeles, Long Beach, San Francisco, Oakland and Hueneme More vessels being retrofitted for shore power (50% 2014-2016, 80% 2020+) Increasing numbers of vessels visiting B.C. are equipped for shore power Government of Canada August 2012: Canadian/U.S. federal governments enacted the North American Emission Control Area under the International Convention for Prevention of Pollution from Ships Providing funding for shore power facilities through Transport Canada s SPTP Supporting the reduction of vessel emissions through shore power and alternative technologies 6

BACKGROUND AND CONTEXT JURISDICTIONS PROVIDING SHORE POWER Port/Utility Port of Juneau/Alaska Electric Light and Power Company (2001) Shore Power Service Voltage Energy Charge (cents/kwh) Non-firm T Variable capped at 10 cents/kilowatt hours (kwh) Demand Charge None Other Service is interruptible depending on surplus hydro power availability Port of Seattle/Seattle City Light (2005/2006) Firm* D High load hours: 7.17 cents/kwh; low load hours: 4.78 cents/kwh (Large Standard General Service: City) PMV/BC Hydro (2009) Non-firm D 8.022 cents/kwh (based on RS 1880) x 1.0344 (distribution loss factor) = 8.298 cents/kwh Port of San Francisco/San Francisco Public Utility Commission (2010) $2.02 per kilowatt (kw) per month (peak); $0.22 per kw month (offpeak) None Non-firm D 16.163 cents/kwh None * Rates are based on otherwise applicable tariff Administration charge: $150 per month Port of Los Angeles/City of Los Angeles Department of Water and Power (2010) Non-firm D 7.47 cents/kwh (Alternative Maritime Power AMP rate ) $1.43 per kw per month Administration charge: $150 per month 7

BACKGROUND AND CONTEXT JURISDICTIONS PROVIDING SHORE POWER Port/Utility Port of Long Beach/Southern California Edison (SCE) (2011) Port of Oakland/Board of Port Commissioners (City of Oakland) (2013) Port of Halifax/Nova Scotia Power Incorporated (2013) Shore Power Service Voltage Energy Charge (cents/kwh) Firm D Schedule TOU-8 Time of Use General Service Large Summer peak 33 cents/kwh; summer midpeak 10.4 cents/kwh; summer off-peak 3.7 cents/kwh (Otherwise applicable tariff for existing load) Schedule Maritime Entities at the Port of Long Beach (ME) applies to new growth Demand Charge Existing load - $6.18 /kw (Schedule TOU-8) (Otherwise applicable tariff for existing load) New Load - Port material surrounding release of Schedule ME rate states demand charge relief of 90% from Schedule TOU-8 Other Rate discounts based on new port load estimated to be 15% on electricity bills (Schedule ME) As approved by California Public Utilities Commission in March 2014, SCE will install and pay for 66 kv electric facilities to serve new port load. Shore power load appears to be included in the SCE load forecast Non-firm D None None Flat rate $267/hour plus 7.5% city utility tax Non-firm T and D 8.96 10.08 cents/kwh None Port of San Diego/San Diego Gas and Electric (2014) Port of Hueneme /SCE (2014) Non-firm * Blended 18-21 cents/kwh (by season for cruise ship) * Make-up of blended rate to be confirmed To be confirmed 8

ELEMENTS OF EXISTING SHORE POWER AGREEMENT EXISTING SHORE POWER AGREEMENT (TS NO.76) Filed as a special contract applicable only to PMV at Canada Place PMV is the customer of BC Hydro for non-firm shore service, since PMV owns the infrastructure and dock at the point of delivery for port electricity at Canada Place PMV resells power to cruise ships which are considered metered tenants of PMV for the purpose of applying BC Hydro s Electric Tariff 9

ELEMENTS OF EXISTING SHORE POWER AGREEMENT EXISTING SHORE POWER AGREEMENT (TS NO.76) Shore service is non-firm. BC Hydro will only supply shore power if it has the energy and capacity to deliver electricity available Non-firm energy is priced at the same rate as the RS1880 energy rate, adjusted for losses. RS 1880 is a non-firm service available to Transmission service customers with self-generation RS 1880 energy rate is $80.22 per MWh (RS 1823 Tier 2 energy price) (F15) There is no demand charge for capacity for shore service at Canada Place: Shore service is non-firm and can be interrupted Load is not included in BC Hydro load forecast No upstream transmission was advanced or built to serve PMV BC Hydro will interrupt the non-firm shore service if the energy and capacity is needed for any reason 10

ELEMENTS OF EXISTING SHORE POWER AGREEMENT EXISTING SHORE POWER AGREEMENT (TS NO.76) PMV responsible for all distribution-related capital costs that arise out of incremental infrastructure associated with non-firm shore service civil infrastructure required to install cables from nearest BC Hydro facility to PMV connection points electrical cables from BC Hydro connection points to PMV connection points required substation improvements including protection and control equipment Agreement includes operating procedures specifying connection and disconnection procedures in the event of an interruption Agreement is for a 10 year term 11

SHORE POWER RATE PROPOSED SHORE POWER RATE BC Hydro will be seeking BCUC approval for a generic shore power rate Expand eligibility criteria Include both transmission service and distribution general service customer sites A new Shore Power Rate is intended to expand the definition of eligible vessels to include cruise ships, container ships, cargo ships, freighters, tankers, bulk carriers, passenger and vehicle ferries, and similar deepsea vessels A new Shore Power Rate is intended to expand the definition of port customers to mean port authorities, terminal operators, wharf operators and dock operators that provide service to eligible vessels Service available year around assuming BC Hydro has the energy and capacity 12

SHORE POWER RATE SHORE POWER LOAD CHARACTERISTICS Context for options analyzed Shore power loads have the following characteristics Loads are naturally interruptible because vessels have on-board generation Shipping loads are often sporadic, low volume and low load factor 13

BACKGROUND AND CONTEXT PROPOSED SHORE POWER RATE: OPTIONS BC Hydro reviewed the default firm service rates (Large General Service RS16xx and Transmission Service RS 1823); however, given that load can be interrupted, shipping customers do not need firm service Demand charges of $6.925 /kva for RS 1823 and $9.95 /kw for all additional kw above 150 kw for RS16xx are high relative to those few jurisdictions whose shore power rates contain a demand charge Cruise companies have requested shore power service rates comparable with TS No. 76 and other jurisdictions that do not include demand charges BC Hydro does not include loads associated with existing non-firm rates (RS 1880, TS No.76) in its load forecast Demand charges are problematic for both Port Authorities and shipping companies Because of low load factor, average blended energy and demand rates are high and discourage the use of shore power Port Authorities have commented that demand charges create uncertain unit energy charges due to uncertainty in load factor 14

SHORE POWER RATE PROPOSED SHORE POWER RATE The new Shore Power Rate would incorporate the rate design and pricing principles that were approved for TS No. 76 and RS 1880 Electricity service is provided only when BC Hydro has available energy and capacity to do so The shore power customer is responsible for the cost of extending the BC Hydro system to serve the new load. BC Hydro will build the extension at the customer cost. No BC Hydro contribution will be provided TS No. 76 is designed to recover the costs of providing shore power service. This cost-recovery principle continues to be appropriate to protect non-participating ratepayers from harm 15

REGULATORY SCHEDULE TIMING AND 2015 RDA Target filing of RDA is summer 2015 and BCUC decision may not be available until 12 months after. This timing would not meet the requirements of PMV or PRPA BC Hydro proposes to file shore power rate application in March 2015 January-February 2015 stakeholder engagement process BC Hydro available to meet with stakeholders individually or as a group in February 2015 as a follow-up to this workshop and the associated written comment process 16

REGULATORY SCHEDULE PROPOSED SCHEDULE Action Date Workshop January 28 th, 2015 Workshop written comment period/stakeholder meetings BC Hydro files application March 16, 2015 Deadline for Intervener Registration March 23, 2015 Commission and Interveners Information Request (IR) No. 1 February 20, 2015/February 2015 March 31, 2015 BC Hydro response to IR No. 1 April 26, 2015 Submission on suitability of Streamline Review Process (SRP) Assuming agreement on SRP, date of SRP May 3, 2015 May 21, 2015 17

THANK YOU SEND COMMENTS TO: bchydroregulatorygroup@bchydro.com Mail: BC Hydro, BC Hydro Regulatory Group Attention 2015 RDA, 16th Floor, 333 Dunsmuir St., Vancouver, B.C. V6B-5R3 FAX: 604-623-4407, ATTENTION 2015 RDA For further information, please contact: BC Hydro Regulatory Group: bchydroregulatorygroup@bchydro.com Tel: (604) 623-4046 Web: www.bchydro.com/about/planning_regulatory/2015-rate-design.html Find BC Hydro at: www.bchydro.com