SOLAR TECHNIQUE ATTACK SOLARTHERM HSA 200 PARALLEL MOUNTING BRACKETS ON THE ROOF

Similar documents
SOLAR TECHNIQUE ATTACK SOLARTHERM HSA 200 FLAT ROOF INSTALLATION, STROKE BY 45

W W W. A T T A C K. S K

MANUAL. Collector FK7300. Mounting parallel roof bracket attachment system

Manual CPK 7210 N. Flate plate collector. Mounting parallel bench srew mountingsystem x x x x / version

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

For our present, For their future. Version 11.03

Installation and Operation Manual for a Solar System with KPC1-BP Collectors

Installation Instructions. Vitosol 100. Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No.

VIESMANN. Installation instructions VITOSOL 200-T. for contractors. Vitosol 200-T Type SP2 Vacuum tube collector based on the heat pipe principle

TRIC A On-Roof Installation for EURO- Collectors*

Installation and Operation Manual for a Solar System with KPW Collectors

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR ROOF MOUNTING INSTALLATION UK/IE (2011/05) GB/IE

Installation instructions

Installation instructions

Safety and Installation Instructions For Fluitecnik PV Modules

Version For our present, For their future.

Assembly instructions

VIESMANN. Installation instructions VITOSOL 200. for heating engineers. Vitosol 200 Type SD2 Direct flow vacuum tube collector

3-Way Ball Valve Type 23H

VIESMANN. Installation instructions VITOSOL 300-T. for contractors. Vitosol 300-T Type SP3A Vacuum tube collector based on the heat pipe principle

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR FLAT ROOF INSTALLATION (30, 45 ) WALL INSTALLATION (45, 60, 90 )

ES1V2.0, ES1V2.65, ES2V/2.0 AL, EM2V/2.0, ES2V/2.65, ES2H/2.65

Nanometrics Solar Power System

Installation Manual. Logasol SKS 4.0 Mounting on sloped roofs. Flat Plate Collectors. For Contractors. Please read carefully prior to installation.

Butterfly Valve Type 57P

for Solar Systems with KTU R Collectors

GATE VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

Roof access hatch installation instructions

FKB-1 / FKC /200/300 l system. Thermosiphon for flat roofs and rooftops. Installation instructions (2010/06) GR

SOLAR SPOT Installation Guide

TIDALFLUX 2300 F Quick Start

Solar PV General Introduction Guide for Electricians

s_enn Exterior Stainless Steel Shading System by Draper

ULTRASONIC FLOW SENSOR QALCOSONIC FLOW 2

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

AUO Photovoltaic Module Installation Manual. Version 2.0

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v

CIRCO5SolarCirculationUnit

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

MAJESTIC SLATE CLASS A ECOSTAR GOLD STAR ROOF SYSTEM SPECIFICATIONS

Solar module user manual Conergy PM 225P-250P

4.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

3.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

HEAVY DUTY TROLLEY JACK. Operation Manual

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

Rolli D6/5A. Operating Instructions HORN GMBH & CO. KG. Product Description. Safety Indications. Mounting. Commissioning.

GARAGE DOOR OPENER OWNER S MANUAL S3/S4

Sediment strainer (Type Y)

Play it safe. Mounting instructions incell system. Premium incell XM, L Mounting system for roof-integrated photovoltaic systems

If there is additional labor or other costs above the 4 hrs labor you must call VMAC for approved coverage

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v

Solar Heating Pool Installation

Philadelphia Solar Installation and Operation Manual

Supplementary instructions. Air cooling - FIBERTRAC 31. Active air cooling system for radiation-based sensors. Document ID: 50339

SOLAR-LIFESTYLE INSTALLATION AND MAINTENANCE INSTRUCTIONS FLAT-PLATE COLLECTOR FLAT ROOF AND WALL-MOUNTED INSTALLATION (2011/05) UK

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Flue installation instructions. Air flue duct for use with ecomax and ecotec boilers. For the installer

SolarSheat Wall Installation Manual

Installation Instructions. Ultimate Screen. English Version 2.3

These installation and maintenance instructions must be read in full and completely understood before the installation!

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION MANUAL. IEC version. TSM_IEC_IM_2012_RevB

Contents H-V034-E-12. Serial No. (page) (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Operation Manual for Torque Sensors

FRAME AND BUMPERS 13-1 FRAME AND BUMPERS TABLE OF CONTENTS

VIESMANN. Installation instructions VITOFLAME 300. for contractors

SolarSheat Wall Installation Manual

Solar Thermal. Grant Solar Pump Station Installation & Servicing Instructions

PRODUCT MANUAL TILE CUTTING MACHINE. . Operation. Parts List and Diagram SPECIFICATIONS CAUTION:

Product Catalog Evacuated tube collectors CPC OEM CPC w OEM

Installation instruction

Ground Effects, P/N: (V6), (V8)

Transformer bushings, type GOA 250. Installation and maintenance guide

# 1, Bowes Place, Phillip, ACT 2606, Australia. Phone:

Photovoltaic Modules Installation Manual for Australia

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

Mounting SySteMS ApplicAtionS overview version 1.2 March 2013

Type 3320, Service Manual. Serviceanleitung Service Manuel

FLEXIBLE PHOTOVOLTAIC MODULES. Instruction Manual

Statik und Holzverbindung TWINLOC Statics and connector TWINLOC

Photovoltaic Module User Manual

Recommended Tools: Phillips Screwdriver, Flat Blade Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver,

Installation Manual. For. Trident Boat Lifts

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Installation Instructions Vanishing Lid Bracket

EGQ 212: Duct transducer, CO 2 and temperature

Breezair TBA 550 Installation Manual

Layher Ladders Instructions for Assembly and Use. Quality management certified according to DIN EN ISO 9001:2000 by TÜV-CERT.

INSTALLATION MANUAL OF EZINC OPEN LOOP THERMO SIPHON SOLAR WATER HEATING SYSTEMS

ROUSSILLON MODEL Motor inside shaft 250 Nm

ThermoLite 110W-330W Solar Panel Installation Instructions

accqpulse Velocity Profiler Sensor Installation Guide

WATERFLUX 3070 Quick Start

Cargolift 85 Pv Repair. Cargolift 90 Sa Standard. Cargolift 120 Saav Jumbo. Cargolift 120 F Drive-on IMPORTANT

INSTALLATION & OWNER S MANUAL

SOLAR CHARGE CONTROLLER

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC)

VADA - V75-S PRODUCT OVERVIEW CONSTRUCTION USAGE LIMITATIONS MOTOR WARRANTY

Transcription:

SOLAR TECHNIQUE ATTACK SOLARTHERM HSA 200 PARALLEL MOUNTING BRACKETS ON THE ROOF W W W. A T T A C K. S K

Content Safety warnings... 4 Shipping instructions... 5 Installation instructions... 6 Tools Overview... 7 Material Overview... 8 Recommended mounting points...10 Parallel mounting brackets on the roof... 11 Specifications... 17 Recommendations for service... 18 Warranty... 20 3

Safety warnings In the case of mounting on the roof - before the work it is essential to install compliant independent protection against falling or catching device according to DIN 18338 on roofing work on the roof and sealing work on roofs and in accordance with DIN 18451 for work on scaffolding safety net! Regulation on the protection of workers in construction BGBl 340/1994 7-10! It is absolutely necessary to keep other regulations in the country! If there are no safeguards against falling or catching device-independent entities due to the technical reasons, it is necessary to use a safety harness! Use only safety harnesses, which are identified and tested by authorized testing laboratory (safety or webbing, connecting cords / belts, shock absorbers, shortening ropes). If there are no protection devices against falling or catching independent on people, without the use of safety harnesses there is danger of falling from great heights and thus of severe or fatal injuries! Safety harness must be preferably nailed above the user. Fix safety harness only to eventually building components or points that have sufficient capacity! Only prescribed heat transfer medium! Do not use damaged ladders, for example cracked beams with a wooden ladder rungs, bent and broken metal ladders. Do not repair brittle beams, side walls and walls of wooden ladders! Place the strap-on ladders safely. Be careful when attaching the right angle (68-75 ). Strap ladders are secured against slipping, overturning, sliding and running, for example advanced bases, bases ladder adapted substrate hinges. Ladders rest only to the secure anchors. In the field of transport ensure ladders by closures. When using ladders, there is danger of falls caused by slipping, fall or flip over the ladder! Contact with loose electrical lines can be fatal. Near unattached electrical lines, with which contact is possible, work only if state was secured when they are not under voltage and this condition is ensured during the entire period of work, electrically conductive parts are protected by fencing or covering them, and there is no reduction of safety distance. Radius of voltage 1 m...1000 V voltage 2 m...voltage from 1000 to 11000 V 3 m...voltage from 11000 to 22000 V 4 m...voltage from 22000 to 38000 V > 5 m in the case of unknown voltage The manufacturer hereby undertakes to take back products marked with the ecological brand and materials they contain, to deliver for further processing. Only prescribed heat transfer medium can be used! In the case of drilling and handling collectors wear goggles! During installation, wear safety boots! When mounting and handling collectors, wear gloves providing protection against cuts! During installation, wear a helmet! 4

Shipping instructions Attention: Do not lift the collector for the connector or a threaded screw connections! 5

Installation instructions General warnings and warnings of carriage The mounting system is only suitable for roofs with tiled roofing. Installation can be performed only by specialized personnel. All work in this guide apply only to such specialized personnel. When installing in principle be used the supplied material. Before installation and operation of solar collectors with a view to inform the applicable local rules and regulations. When transporting the collector is advised to use the conveyor belt. The collector may not be lifted for a connection or threaded screw connections. Avoid shock and mechanical impact on the collector, especially for solar glass, rear wall and pipe connections. Statics roof with tiled roofing Installation may be done only on flat roofs or bearing constructures with sufficient capacity. Before mounting the collectors should definitely check the static load capacity of the roof or bearing constructure, in each case the call should be static, to examine local and regional features. In doing so, it is necessary to pay particular attention to the quality (wood) of bearing constructure - strength bolting consolidating assembly plant collectors. Inspection of the structures collectors at their place of installation according to DIN 1055, part 4 and 5 or under the law of the country is necessary especially in areas with high snow precipitation (note: 1 m3 of snow dust ~ 60 kg / 1 m3 of wet snow ~ 200 kg) or in areas with strong winds. It should be taken of all the specific location of installation of equipment (warm Alpine wind, the effects of flow turbulence wind, etc.) that could result in an increased burden on the device. When selecting the installation site must be ensured in order for not to exceed the maximum loads or forces acting due to wind or snow precipitation. In principle, the collector arrays have to be installed so that if any snow accumulation in the catchment grid (or accumulated due to the specific situation of the installation) can not reach the collector. Collectors may not be installed on the roof edge (it should be observed marginal zone E/10 on flat roofs according to EN 1991, at least 1 m). The upper edge of the collector shall not protrude above the roof. Attention: Installation of a solar collector field represents interference in the (existing) roof. Roofing such as tiles, shingles and slate, especially furnished and habitable attic or roofs with insufficient slope (with respect to their roofing) requires the implementation of construction protections (for example support construction) as a hedge against the ingress of water due to wind pressure and drifting snow. Protection against lightning / settlement potential building In accordance with current standards for protection against lightning ÖVE / ÖNORM EN 62305 part 1-4, the collector array may not connect the lightning conductor buildings. It is necessary to keep a safety distance min. 1 m from possible neighboring conductive object. For mounting on a metal support structure is generally necessary to consult with a qualified electrician. In order to realize the potential of settlement building by an authorized electrician must connect metal pipe solar circuit as well as all caps or holders of collectors with the main rail for bonding in accordance with standard ÖVE / ÖNORM E 8001-1 or standards applicable in the country. Connections Collectors must be interconnected, depending on their design screw connections (1 "IG / AG) or by connecting pipe so that the surfaces of joints sealed. It is necessary to ensure the proper imposition of gaskets. If you are not connecting elements as scheduled no flexible hoses, it must be ensured in order to have the connecting pipes take appropriate steps to compensate for thermal expansion due to temperature fluctuations, for example.: Expansion bends and flexible pipes (see link collectors / operational recommendations). For larger collector fields is necessary to insert the expansion bends or flexible joints (Attention: need to check the sizing of the pump). When tightening the connections necessary to follow from the other side (control) or other tick-key, to avoid damage to the absorber. Inclination angle / general information The collector is suitable for slope min. 15 max. 75. Connections collectors and ventilating / air vent openings should be protected from water penetration and dirt and dust ingress, etc. Warranty The warranty arises only use the original means of frost protection from the supplier and properly carried out installation, commissioning and maintenance. A precondition for entitlement to guarantee the installation of qualified personnel, without exception, adherence to instructions in the manual. 6

Tools Overview Measuring tape Drill Allen handpiece Hexagonal wrench Angle Grinder Hammer Ratchet with extension 7

Material Overview Roof Mount Roof mount bracket Screw 6*60 Screw hinges M8*25 Self-locking hex nut M8 Clamp Clutch bearing profiles Mounting flange Mounting bracket Wascher M8 T Bolt M8x25 Hexagon nut M8 8

Carrier rail Mounting template Gasket 9

Recommended mounting points Collectors 2 3 4 5 6 Total length 239 cm 361 cm 482 cm 603 cm 724 cm Mounting points 6 8 10 12 14 In areas with large snowfall or high wind areas, it is necessary to schedule additional fasteners! (DIN 1055 follow eventually. Of force in the country). 10

Parallel mounting brackets on the roof General Warning: Points 8-11, 16 and 17 are needed only for installation of more than two collectors! 1: The vertical dimension of the collector -> A = 125-155 cm 1 ) 2 ) 2: Focus attachment points (see recommendation from previous page), remove the slate / roofing Generally: for one collector is needed one Fasteners. 3: Connect the roof mount bracket with umbrella holder, flatten them and fasten with screws 6 * 60th 3 ) 4 ) 4: Place the slate / roofing, if necessary, adjust it. 11

5 ) 5: The roof mount insert screws with a flat head and tighten them first hand only. Order: screw with a flat head - roof mount - washer nut 6: Install the lower bearing rail (6a, 6b) 6a ) Order: Bearing rail screw with a flat head - roof mount - washer - nut 6b ) 7: Install the upper bearing rail (7a, 7b) 7a ) Order: Bearing rail screw with a flat head - roof mount - washer - nut 12

Attention: The upper and lower bearing rail must fit together perfectly straight and parallel! 7b ) 8 ) 8: Install additional mounting points under 1 4. 9: Push and pull terminal extension until the middle of the inner matrix of the bearing rails (top and bottom). 9 ) Order: Bearing rail - terminal extension - washer nut 10 ) 10: Put another bearing rail (top and bottom) and attach it to an extension terminal. Order: Bearing rail - terminal extension - washer nut 13

11a ) 11: Attach the bearing rails (top and bottom) with roof bars or terminal extension. Order: Bearing rail screw with a flat head - roof mount washer nut 11b ) 12a ) 12: Hang the first collector to the lower bearing rail and straighten it (12a + 12b!). Warning: The distance between the collector and the end of the bearing rails = 45 mm. A dimension = dimension B! 12 b ) 14

13: Place the clamp on the upper bearing rail and tighten them first hand only. 13 ) Order: Top bearing rail screw with a flat head - washer - clamp - washer nut 14a ) 14: Hang the second collector. (Dimension A = dimension B in FIG. 12b). Please use the mounting template (14b). 14b ) 15 ) 15: Turn the clip 90 degrees and firmly tighten with a long socket wrench. 15

16 ) 16: For each affecting bearing rails slide and place the mounting part extending into the upper bearing rail. 17: Install additional terminal / other collectors, according to point 12 16. 17 ) 18 ) 18: Replace the fixing unit to the left and right upper end of the collector box. Order: Bearing rail screw with a flat head - fitting parts - washer nut 19: Connect the collectors with and torque. 19 ) 16

Specifications Gross area m2 2,02 Weight kg 31 Net area Surface hole m2 m2 1,84 1,91 Capacity Maximum operating pressure l bar 1,4 10 1221 1730 117 70 83 1170 17

Recommendations for service Rinsing and performance For security reasons, the device must perform when collectors are not exposed to sunlight, where it is necessary to cover collectors. Especially in areas where there is danger of frost, facility has to be filled with a mixture of water containing up to 40% of frost protection. To protect the materials from excessive heat load device is to be filled and placed in service as soon as possible, but not after 4 weeks. If this is not possible before putting into operation is necessary to replace gaskets to prevent leaks. Attention: Pre-mixed composition frost protection is necessary before filling in device mixed with water! Recommended means of frost protection for flat plate collectors: TYFOCOR-L 40% of the means of frost protection (60% / water) - frost point of - 22 C / FREEZING POINT: - 26 C 50% of the means of frost protection (50% / water) - frost point of - 32 C / FREEZING POINT: - 44 C It is possible that filled collectors can no longer be completely removed. For this reason the threat of frost collectors may also be carried out in order to perform pressure and functional testing only a mixture of water and frost protection. Alternatively, you can also do a pressure test using compressed air and spray the leak search jobs. Mounting the sensor The temperature sensor should be mounted in the outlet collector box located next to the sensor housing. In order to ensure optimal contact, the gap between the housing and a sensor with adequate heatconductive paste. When installing the sensor may be used only material with sufficient resistance to high temperatures (250 C) (body sensor, contact paste, wire, sealants, insulation). Operating pressure Max operating pressure is 10 bar. Ventilation Equipment must be vented: - when it is placed in service (after filling), - 4 weeks after commissioning, - if necessary, for example in case of disturbances. Warning: Danger of scalding hot steam or heat transfer fluid! The ventilation valve handle only when the heat transfer fluid temperature < 60. In the discharge device may be hot collectors! Cover Collectors and let out device preferably in the morning. Control of heat transfer fluid Every two years, it is necessary to check the frost protection and heat transfer medium ph. - Frost protection, check with measuring means frost protection and if necessary replace or add the means. Required value of protection is approx. - 25 C to - 30 C or by weather conditions. - Check the ph with indicator sticks ph (nominal value is approx. PH 7.5): In case of fall below a threshold ph L 7 replace heat transfer medium. Maintenance collector Collector or collector array must be visually inspected every year - if they are not damaged, the seal, pollution, etc. Other recommendations for operation and maintenance can be found in the general instructions for commissioning and maintenance / rules from the supplier. 18

Link collector A possible link can be seen in the attached sketch. Based on the structural characteristics of the situation, however, may be different in practice. If the collector field consists of more than 6 collectors (vertically aligned) or 4 collectors (arranged horizontally) in the series, it is necessary to plan appropriate measures to compensate for thermal expansion due to temperature fluctuations (expansion bends or flexible pipe) or a field to be multiple times in parallel run. Output Reverse Flow rate In order to achieve good performance collector, should be the size of the field around the collector about 25 m² to choose a specific flow rate 30 l / m² h. Pipe cross-section Table sizing, specific flow rate 30 l / m2 h The size of the collector field pribl. 5 pribl. 7,5 pribl. 12,5 pribl. 25 Diameter pipe / copper 10-12 15 18 22 Diameter pipe / corrugated stainless steel pipes DN16 DN20 The pressure loss in one collector in the case of a mixture of antifreeze agent / water (40% / 60%) where the heat transfer fluid temperature 50 C. Pressure loss curve: p = 0,0000106x² + 0,0137580x Flow rate 0 50 100 150 200 250 300 350 400 450 500 Pressure loss 0 0,7 1,5 2,3 3,2 4,1 5,1 6,1 7,2 8,3 9,5 19

Warranty For cases using the device for the purpose for which it is not intended or alterations assembly components and the consequences resulting from such proceedings are not covered by warranty. All information and instructions in this guide apply to the current state of development. Please always use the appropriate assembly instructions supplied with collectors. Photographs of symbols are used as pictograms. They are based on the potential rate of error in a press, but also due to the need of constant technological changes, please understand, that we can not assume any liability for the accuracy of the content of the document. We refer you to the validity of the General Conditions in their amended version. This installation manual contains its own information, subject to copyright protection. All rights and changes in this assembly manual are reserved. 20

ATTACK, s.r.o. Dielenská Kružná 5020 038 61 Vrútky Slovak republic Tel: +421 43 4003 103 Fax: +421 43 3241 116 E-mail: export@attack.sk Web: www.attack.sk Výrobca ATTACK, s.r.o. si vyhradzuje právo technických zmien výrobkov bez predchádzajúceho upozornenia. ATTACK, s.r.o. producer reserves the right to change technical parameters and dimensions of boilers without previous warning. Der Hersteller ATTACK, s.r.o. behält sich das Recht der technischen Veräderungen an Produkten ohne eine vorige Warnung. Изготовитель ATTACK, s.r.o. оставляет за собой право изменения технических параметров и размеров котла без предыдующего предупреждения. Le producteur ATTACK, s.r.o. réserve le droit des modifications techniques sans l avertissement précédent. Productor ATTACK, s.r.o. reserva el derecho de cambios técnicos sin advertencia anterior. ATTACK, s.r.o. 06/2015