Installation and Operating Instructions For MANUAL MANIFOLD SDLA& SDLAHP SERIES

Similar documents
Installation and Operating Instructions For AUTOMATIC CHANGEOVER MANIFOLDS LC and LCHP SERIES

Installation and Operating Instructions For AUTOMATIC CHANGEOVER MANIFOLD BI, BIHL, & BIHP SERIES

Installation and Operating Instructions For AUTOMATIC CHANGEOVER MANIFOLD HGM2, HGM2HL, & HGM2HP SERIES

Lifeline Medical Systems

Lifeline Medical Systems

Installation & Operating Instructions for Genesys2 LL & PL Series Manifolds

Installation & Operating Instructions for Genesys2 LL & PL Series Manifolds

CRD610 Automatic Fitting Inserter

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

VANGUARD A EZ INSTALL OPERATOR S MANUAL

Installation & Operating Instructions for Genesys 2 PX-CC Series Manifolds

CRD600 Automatic Fitting Inserter

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual

300 Series INSTRUCTION MANUAL. Compressed Air Filters Models 302 (grade) through 317 (grade)

528/ and 2000 Series Maniflex System

1 2-Inch Station Outlet Valves

HP x HP. Lifeline Medical Systems High Pressure Fully-Automatic Manifold Basic/TAE NFPA/ISO. Installation, Operation and Maintenance Instructions

Customer Support

APCO ASR-400/450 SEWAGE AIR RELEASE VALVES

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

PT-516 Pumping Trap Installation and Maintenance

Operating and Installation Instructions

GA Industries, LLC 9025 Marshall Road Cranberry Township, PA USA Telephone (724) Fax (724)

II DISTRIBUTION & SUBSTATION TYPE C

HR-20P Pneumatically Controlled Pressure Regulator

Model No. SP Low Volume Low Pressure (LVLP) Gravity Feed Spray Gun

HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS DIAGRAMS

Operation and Maintenance Manual for. Joyce/Dayton Linear Actuator Pound Capacity AC Actuator (with limit switch and potentiometer)

Manifolds HGM2 SERIES AUTOMATIC MANIFOLD

APCO CSV-1600 SURGE CHECK VALVE

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY

Rapid Shrink 100. Owner s Manual

Operating & Maintenance Manual. Automatic Medical Gas Manifold Digital Dome Loaded Regulator NFPA v1.5

OPERATING INSTRUCTIONS AND PARTS LIST BRIDGE DRIVE GEAR CASE

Operation & Service Manual

Automatic Medical Gas Manifold Dome Loaded Regulator NFPA v1.1

B57 Series Regulator Residential Regulator

AEROMOTIVE Part # /2 4.6L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

INSTALLATION AND MAINTENANCE MANUAL FORM #PM-126 REV A 12/09

Model 6518FR. NOTE TO INSTALLER: Please leave this information with the Maintenance Department. LIMITED WARRANTY

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

Operation and Maintenance Manual for. Joyce/Dayton Linear Actuator Pound Capacity DC Actuator, LA152L, and LA152C

GA-160 Gas Amplifier

Power Float Manifold. Installation and Operations Manual Module 11A

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

B58 Series Regulator Residential Regulator

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

READ THIS MANUAL CAREFULLY BEFORE USING THE PUMP

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

NECO Pumping Systems

Operation and Maintenance Manual. ACME SCREW Electric Cylinders by Joyce Dayton. Standard, Motor mount, and ComDRIVE style

CRD400 Fitting Inserter OPERATIONS MANUAL

B57 Series Regulator Residential Regulator

AEROMOTIVE Part # L 4V Fuel Rails INSTALLATION INSTRUCTIONS

PPM EO-100 TM. Operation Manual

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

INSTRUCTION MANUAL INSTALLATION, OPERATION, AND MAINTENANCE ACTUATOR MANIFOLD

Operation and Maintenance Manual. Joyce/Dayton Electric Cylinders with Ball Screw. Standard, Motor mount, and ComDRIVE style

ALITA LINEAR AIR PUMP OPERATION & MAINTENANCE MANUAL. AL- Model Number Date Code / Serial Number Date of Purchase

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

SHAW-BOX INSTRUCTIONS AND PARTS LIST SHAW-BOX RIGID MOUNT I-BEAM AND PATENTED TRACK TROLLEYS (PUSH & HAND GEARED - 1/2 THRU 15 TON RATED LOADS)

AEROMOTIVE Part # Street Rod Fuel Pump System INSTALLATION INSTRUCTIONS

18660, 18661, & Stealth Fuel Cell INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

Hazardous Location Direct-Drive Exhaust Fans. Operating Instructions & Parts Manual

8" - 12" Hydraulic Steel Squeeze Off Tool

FIXED DEPTH INSERTION METER INSTRUCTIONS

MEX (55) QRO (442) Web Controls

Presoak & Tire/Engine Cleaner Systems (Air Pump) DU TC_A & DU PS_A

OPERATING INSTRUCTIONS AND PARTS LIST

Model GP Triplex Ceramic Plunger Pump Operating Instructions/ Manual

DUAL PURPOSE DIAGNOSTIC LEAK DETECTOR

Operating and Installation Instructions

EMISSION CONTROL WARRANTY STATEMENT

13101 / / and Installation Instructions

Operating Manual High Viscosity Dispense Valve Item #

RolsplicerTM. Maintenance Manual And Illustrated Parts List

ORIGINAL INSTRUCTIONS G715A. Pneumatic-hydraulic Riveter E. Warner Ave Santa Ana, CA

AEROMOTIVE Part # Subaru STI Fuel Rails INSTALLATION INSTRUCTIONS

MR 5-30 Aviation Fuel Meter Owner s Manual

Operation and Maintenance Manual for Joyce Dayton. Integrated Actuator- Acme Screw. Maximum capacity: 2000-pounds

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Ford 5.4L GT500 Shelby Mustang Fuel Rail Kit INSTALLATION INSTRUCTIONS

SLR / SLR-S/N. Instruction Manual. Walrus America Inc

INSTALLATION AND MAINTENANCE MANUAL FORM #PM-122 REV A 12/09

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

USER S MANUAL FOR F & Q. Submersible Sewage Pumps

Loctite 300ml Cartridge Pusher Part Number EQUIPMENT Operation Manual

Installation, Operation and Maintenance Manual for Pressure/Vacuum Relief Valves (Spring Loaded)

60 Series End-Mount Brake Instructions Standard Housing

COMPRESSED AIR LOADER MODEL: AL-1

Firstmate Installation Manual and User's Guide May, 2003

Air Compressor. Owner s Manual. Sonny's Enterprises, Inc Hiatus Road Tamarac, Florida v1

"WHERE TUBING AND FITTINGS COME TOGETHER"

AEROMOTIVE Part # Subaru Fuel Rails for Top Feed Injectors WRX & STI INSTALLATION INSTRUCTIONS

SUNC3000 / Item #40885

AEROMOTIVE Part # Ford 5.4L Shelby GT500 Mustang INSTALLATION INSTRUCTIONS

Transcription:

Installation and Operating Instructions For MANUAL MANIFOLD SDLA& SDLAHP SERIES INTRODUCTION Western manifold systems are cleaned, tested and prepared for the indicated gas service and are built following Compressed Gas Association guidelines. The manifold is specially designed to regulate and monitor vaporized gas from cryogenic liquid cylinders. When the gas from the service bank of cryogenic cylinders is depleted a manual valve can be opened to permit the gas to flow from the reserve cryogenic cylinders. The manifold consists of an adjustable cryogenic line regulator, 72 cryogenic flexible pigtails with check valves, rigid wall mounted headers, a port for optional pressure switch and complete mounting hardware. CAUTION Failure to follow the following instructions can result in personal injury or property damage: Never permit oil, grease, or any other combustible material to come in contact with cylinders, manifold, and connections. Oil and grease may react and ignite while in contact with some gasesparticularly oxygen and nitrous oxide. Cylinder, header, and master valves should always be opened very s-l-o-w-l-y. Heat of recompression may ignite combustible materials. Pigtails should never be kinked, twisted, or bent into a radius smaller than 3 inches. Mistreatment may cause the pigtail to burst. Do not apply heat. Some materials may react and ignite while in contact with some gases particularly oxygen and nitrous oxide. Cylinders should always be secured with racks, chains, or straps. Unrestrained cylinders may fall over and damage, or break off the cylinder valve, which may propel the cylinder with great force. Oxygen manifolds and cylinders should be grounded. Static discharges and lightning may ignite materials in an oxygen enriched atmosphere, creating a fire or explosion. Welding should not be performed near nitrous oxide piping. Excessive heat may cause the gas to dissociate, creating an explosive force. Carefully read and follow installation and operating instructions! Manifolds are designed for gas withdrawal from cryogenic liquids. Contact with a cryogenic gas or liquid with skin or eyes may cause a freezing injury. WARRANTY All Western manifolds are warranted against defects in materials and workmanship for the period of one year from date of purchase. See back cover for details of limited warranty. 1 B20395 REL-11676 (0201)

TABLE OF CONTENTS GENERAL INSTRUCTIONS... 3 MANIFOLD INSTALLATION... 4 PLUMBING... 5 INSTALLATION OF OPTIONAL EQUIPMENT... 6 PRESSURE SWITCH INSTALLATION... 6 INSTALLING PIGTAILS AND ATTACHING CRYOGENIC CYLINDERS... 6 REMOTE ALARM HOOKUP... 7 START UP AND SYSTEM CHECKING PROCEDURES... 8 MANIFOLD OPERATION... 9 CRYOGENIC CYLINDER REPLACEMENT & HANDLING... 10 GENERAL OPERATION... 10 TROUBLE SHOOTING... 11 MANIFOLD MAINTENANCE & REPAIR PARTS... 12 REPLACEMENT PIGTAILS... 12 REGULATOR AND REGULATOR REPAIR KITS... 12 VALVES AND VALVE REPAIR KITS... 12 WARRANTY... 13 2 B20395 REL-11676 (0201)

GENERAL INSTRUCTIONS Manifolds should be installed in accordance with guidelines stated by the National Fire Protection Association, Compressed Gas Association, OSHA, Canadian Standards Associations, and all applicable local codes. The carbon dioxide and nitrous oxide manifolds should not be placed in a location where the temperature will exceed 120 F (49 C) or fall below 20 F (-7 C). The manifolds for all other gases should not be placed in a location where the temperature will exceed 120 (49 C) or fall below -0 F (-18 C). A manifold placed in an open location should be protected against adverse weather conditions, including direct rain, snow, and heavy moisture. During winter, protect the manifold from ice and snow. In summer, shade the manifold and cylinders from continuous exposure to direct rays and heat of the sun. Leave all protective covers in place until their removal is required for installation. This precaution will keep moisture and debris from the piping interior, avoiding operational problems. CAUTION: Remove all protective caps prior to assembly. The protective cap may ignite due to heat of recompression in oxygen systems. Overall Manifold Length 23 19 7 / 8 FIGURE 1 3 B20395 REL-11676 (0201)

Manifold Outlet Line Regulator FIGURE 2 MANIFOLD INSTALLATION 1. Determine and mark the vertical center line for installation of the manifold (Figure 3). This centerline will indicate where the vertical portion of the manifold will be located. 2. Measure from the floor to a point 60 in height* on this vertical line. Using a level, mark a vertical line at this point extending approximately 7 to the right of the centerline. (*Suggested manifold height. Wall mounting heights may vary from one installation to another depending on available space, cylinder height, etc.) 60 Floor Line 7 7 Center Line FIGURE 3 3. Mark another vertical line 7 to the left of the center line. 4. Remove the U-bolt assemblies from the mounting brackets. Position the brackets so that the top of the brackets are aligned with the horizontal line and centered on the right and left vertical lines. 5. Mark the mounting holes and install fasteners suitable for the type of wall construction. (Figure 4) Header Assembly Fastener U-Bolt Mounting Bracket 6. Mount manifold by placing the header on the brackets. Fit the U-bolt over the header pipe and tighten the mounting nuts. (Figure 5). FIGURE 4 4 B20395 REL-11676 (0201)

Manifold Outlet Relief Valve Piping Relief Valve Piping Relief Valve Piping Header Bracket FIGURE 5 PLUMBING 1. A 1/2 NPT male union is supplied with the control and is located at the outlet of the manifold. Connect this union to the pipeline system. The union provided permits removal of the manifold for service. (Figure 5) 2. If the manifold is installed in an enclosed area, vent piping should be attached to the manifold relief valves. The vent connections are 1/2 NPT female. 5 B20395 REL-11676 (0201)

INSTALLATION OF OPTIONAL EQUIPMENT PRESSURE SWITCH 1. Install an orifice bushing into the 1/2 NPT cross (Figure 6). 2. Install the pressure switch onto the orifice bushing (Figure 6) Orifice Bushing (Part No. WMS-1-97) Pressure Switch INSTALLING PIGTAILS AND ATTACHING CRYOGENIC CYLINDERS 1. Establish the inlet and the manifold ends of the pigtails. The flow direction stamped on the check valve will indicate the inlet and outlet ends of the pigtails. 2. Connect the manifold end of the pigtails to the manifold header cross. 3. Check the header valve to be certain it is open. 4. Back out the line regulator adjusting screw. This will protect the system from being over pressurized when opening cylinders. FIGURE 6 5. Attach full cryogenic cylinders to the pigtail connections as explained in Cryogenic Cylinder Replacement & Handling on page 10. 6. S-L-O-W-L-Y turn all cylinders on fully (turn counter-clockwise to open). Check all cylinder and pigtail connections for leaks using Western leak detect LT-100 or an oxygen safe solution. (Any bubbles around connections indicate leakage.) 6 B20395 REL-11676 (0201)

REMOTE ALARM HOOKUP Western SDLA manifolds may be connected to an alarm system provided a pressure switch is installed into the manifold. The pressure switch provides isolated (dry) remote alarm contacts. Wiring diagrams for remote audio/ visual alarms are included with the alarms. Listed below are three different remote alarm configurations. WESTERN S ALARM 1. Western s alarms (BIA-1, BIA-2, and BIA-3) require a 14 VAC power supply (P/N WMS-9-25C). 2. Connect one 24 VAC wire from the right side of the circuit board in the power supply box to the first 24 VAC terminal on the remote alarm printed circuit board (PCB) 3. Connect the other 24 VAC wire from the right side of the power supply box to the second 24 BAC terminal on the remote alarm PBC. 4. Connect a jumper wire from the 24 VAC terminal used in step 3 to the common (C) terminal on the power supply. 5. Connect a signal wire from the normally open (N/O) terminal on the power supply to the GAS-1 terminal on the remote alarm PCB. 6. Connect the second terminal on the left side of the power supply to the common terminal on the pressure switch. 7. Connect the fourth terminal on the left side of the power supply to the normally open (N/O) terminal on the pressure switch. N/C C N/C C N/O 24 VAC 1 2 GAS Signal Wires Pressure Switch Terminals N/O Power Supply PCB Note: Alarm Function is initiated on open circuit 24 VAC wires Remote Alarm PCB In some instances the power supply for the remote alarm is normally a part of the electrical contract on proposed constructions and exist in any furnished hospital. The following procedure should be followed: 1. Two alarm signal wires requiring dry contacts should run to the manifold location. 2. Connect one signal wire to the common (C) terminal on the pressure switch. (Figure 8) 3. Connect the other signal wire to the normally open (N/O) terminal on the pressure switch. FIGURE 7 Western s Remote Alarm Alarm Signal Wire Alarm Signal Wire N/C C N/O Note: Alarm Function is initiated on open circuit Pressure Switch FIGURE 8 Signal Wire Installation 7 B20395 REL-11676 (0201)

If the remote alarm requires a power supply for operation, then connect the alarm as follows: (Also see WESTERN S ALARM section) Power Supply Wires 1. The power supply will be determined by the remote alarm operation voltage. If the remote alarm is designed for 115 VAC service then the existing 115 VAC power source can be utilized directly. (Figure 9) If the remote alarm is designed for other than the existing AC power source then it is necessary to install a transformer in the system to provide the proper operating voltage. (Figure 9) (-) (+) N/C C N/O Pressure Switch Alarm System Normal Signal Wire Alarm Reserve in Use Signal Wire 2. Connect the positive lead (+) from the power supply to the common (C) terminal on the pressure switch. 3. Connect the ground wire from the alarm to the negative (-) lead from the power supply. Alarm Negative (-) Lead (ground wire) Note: Alarm Function is initiated on open circuit FIGURE 9 115 VAC Power Power Supply 4. Connect the reserve in use signal wire from the alarm to the normally closed (N/C) terminal on the pressure switch. 5. If a system normal signal is also employed, connect that signal wire to the normally open (N/O) terminal on the pressure switch. (-) (+) Transformer N/C C N/O Pressure Switch Alarm System Normal Signal Wire Alarm Reserve in Use Signal Wire Alarm Negative (-) Lead (ground wire) Note: Alarm Function is initiated on open circuit START UP AND CHECKING PROCEDURES FIGURE 10 User Supplied Power The SDLA series manifolds are designed to operate in two ways; to provide an increased supply of gas as well as higher flow rates than can be achieved using a single cryogenic cylinder, or to provide a manual changeover to a reserve cylinder. 1. S-L-O-W-L-Y open the cryogenic cylinder valve (turn counter-clockwise to open) (Figure 11) 2. Adjust the delivery pressure of the regulator to the designed pressure. The selection of the regulator set pressure may vary due to application requirements. If a pressure setting less than 20 psig is required then a line regulator must be installed at the manifold outlet. 3. Simulate a depleted bank by closing the header valves and creating a flow of gas through the manifold. The pressure reading on the gauge will drop. 4. S-L-OW-L-Y open the header valve (turn counter-clockwise to open) on the bank(s) that are to feed the system. 5. The manifold is now ready to supply your system. 8 B20395 REL-11676 (0201)

MANIFOLD OPERATION The manifold control includes the following components and features: regulator, flexible pigtails with check valves, header valves, and two header crosses. Gas flows through the manifold to the header valve and then through the regulator. Final delivery pressure is controlled by the manifold regulator. As the cryogenic cylinders deplete, the cryogenic cylinder pressure gauge along with any alarm system (if installed), will indicate that the bank of cylinders should be changed. After replacing empty cryogenic cylinders, the manifold is immediately ready for service. To insure proper operation, observe the following guidelines: 1. Carefully follow all instructions. 2. Establish proper flow direction of check valves. 3 Be sure the primary bank header valve is fully opened. 4. Replace empty cryogenic cylinders as soon as practical after the manifold has depleted. Relief Valve Delivery Pressure Gauge Line Regulator Header Valve Cross Cross FIGURE 11 9 B20395 REL-11676 (0201)

CRYOGENIC CYLINDER REPLACEMENT & HANDLING 1. Shut off all cylinder valves and the master valve on depleted cylinder bank. 2. S-L-O-W-L-Y loosen and remove the pigtail connection from the depleted cylinders. 3. Remove depleted cylinders. 4. With the valve outlet pointed away from you or anyone else, slowly open each full replacement cylinder valve slightly to blow out any dirt or contaminants which may have become lodged into the cylinder valve. 5. Place and secure full cylinders into position using chains, belts, straps, or cylinder stands. 6. Connect pigtails to cylinder valves and tighten securely. 7. S-L-O-W-L-Y turn each cylinder valve until each cylinder valve is fully open. NOTE: All cylinders on a given bank shall have their pressure building regulators set at the same pressure. Connect vent lines together on Dewars that are located on the same bank. Keep master valve on reserve bank closed until needed. 8. Check all cylinder/pigtail connections for leaks using Western Leak Detector, LT-100 or an equivalent oxygen safe solution. Repair or replace any connections that show signs of bubbles which indicates leakage. 9. The manifold reserve bank is now replenished and is ready for use. GENERAL MAINTENANCE 1. Manifold a) Daily - record line pressure. b) Daily - observe manifold for frosting or surface condensation. Should excessive condensation or frosting occur it may be necessary to increase manifold capacity. c) Monthly 1) Check regulators and valves for external leakage. 2) Check valves for closure ability. d) Annually - check relief valve pressure. - replace regulator seats. 10 B20395 REL-11676 (0201)

Trouble-Shooting (Only qualified repair personnel should make make repairs) SYMPTOM S YSTEM DEPLETES PREMATURELY Both banks of cylinders Both master valves are open. Close the reserve bank deplete at the same time. master valve. SYSTEM DOES NOT FLOW Manifold does not flow and Line regulator set at 0 psig. Reset the line regulator to delivery gauges drop down to desired delivery pressure. zero. LOSS OF CYLINDER CONTENTS Audible or inaudible gas Leakage at manifold piping Tighten, reseal or replace. leakage (unknown origin). connections. Leakage in downstream piping system. Leakage at header valve. Gauge leaks. Regulator leaks. Repair as necessary. Replace valve. Reseal or replace. Repair or replace. Venting at relief valve. Regulator setting too high. Set delivery pressure to specifications. Over pressure due to creeping or faulty regulation by regulator. Regulator freeze-up. (Nitrous oxide or carbon dioxide) Replace regulator seat and nozzle components. Reduce the flow demand or increase the number of supply cylinders. Gas leakage around Loose bonnet. Tighten bonnet. Regulator body or bonnet. Diaphragm leak on regulator. Replace diaphragm. Gas feeds from one cylinder Pressure building regulators Adjust pressure building at a time instead of the not at the same pressure. regulators and connect the cylinders emptying at the same time. Dewar vent valves together. 11 B20395 REL-11676 (0201)

MANIFOLD MAINTENANCE & REPAIR PARTS NOTE: Western manifold systems are designed and tested for optimal performance and adherence to safety specifications. We recommend the use of Western replacement components to maintain the standards of performance and the safety of the product. REPLACEMENT PIGTAILS 72 Cryogenic Flexible Pigtails with Check Valve WMH-2-5...CGA 320 for Carbon Dioxide (CO 2 ) service WMH-2-6...CGA 326 for Nitrous Oxide (N 2 O) service WMH-2-7...CGA 540 for Oxygen (O 2 ) service WMH-2-8...CGA 580 for Nitrogen, Argon, and Helium (N 2, Ar, He) service REGULATORS AND REGULATOR REPAIR KITS WMR-6-4...Cryogenic Line Regulator (LA and LAMP series) WMR-6-6...Cryogenic Line Regulator (LAMP series) RK-1070...Repair kit for WMR-6-4 and WMR-6-6 VALVES AND VALVE REPAIR KITS WMV-2-69...Cryogenic Header Valve WMV-4C-450...Inlet Relief Valve WMV-8-450...Line Relief Valve WMV-4-7...Inlet Relief Pipe Away WMV-8-7...Line Relief Pipe Away 12 B20395 REL-11676 (0201)

LIMITED WARRANTY WARRANTY: The Seller expressly warrants that the products manufactured by it will be free from defects in material, workmanship and title at the date of shipment. This Warranty is exclusive and is IN LIEU OF ALL IMPLIED OR STATUTORY WARRANTIES (INCLUDING WITHOUT LIMITATION, WARRANTIES AS TO MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, OR ARISING FROM COURSE OF DEALING OF USAGE OR TRADE) or any other express or implied warranties or representations. All claims under this warranty must be made in writing and delivered to the Seller prior to the expiration of 1 year from the date of shipment from the factory, or be barred. Upon receipt of a timely claim, the Seller shall inspect the item or items claimed to be defective, and Seller shall at its option, modify, repair, or replace free of charge, any item or items which the Seller determines to have been defective at the time of shipment from the factory, excluding normal wear and tear. Inspection may be performed at the Seller s plant and in such event, freight for returning items to the plant shall be paid by Buyer. Seller shall have no responsibility if such item has been improperly stored, installed, operated, maintained, modified and/or repaired by an organization other than the Seller. Adjustments for products not manufactured by Seller shall be made to the extent of any warranty of the manufacturer or supplied thereof. The foregoing shall be the Seller s sole and exclusive liability and Buyer s sole and exclusive remedy for any breach of warranty or for any other claim based on any defect, or non-performance of, the products whether based on breach of contract or in tort, including negligence or strict liability. 875 Bassett Road Westlake, Ohio 44145-1142 440.871.2160 800.783.7890 FAX: 440.835.8233 www.westernenterprise.com 13 B20395 REL-11676 (0201)