Installation Manual v1.0: The Torque Pro Propane Injection System GM. Please read all instructions before installation.

Similar documents
Installation Manual v1.1: The ATS Arc-flow Intake Manifold Dodge-Cummins 5.9. Please read all instructions before installation.

Figure 1 - Kit Contents

Installation Manual v1.0: : Pulse Flow Exhaust Manifolds 2006 LBZ Duramax 6.6L EGR Equipped Vehicles

Installation Manual v1.1: Piece Pulse Flow Exhaust Manifold, Stock Replacement L Cummins

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Installation Manual v1.3: 2-Piece Exhaust Manifold Dodge 5.9L. Please read all instructions before installation.

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: P/N 202-A Aurora 3000/5000 Compound Turbo Kit Dodge Cummins 5.9

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 6.7L

Installation Manual v1.2: Ford Sub Zero Intercooler L Ford Trucks. Please read all instructions before installation.

Installation Manual v1.0: 10-Digit P/N: Aurora 3000 Turbo System L Powerstroke Ford

KIT CONTENTS. Multimeter or test light Wire crimpers or soldering equipment. Wire terminals & connectors 10A inline fuse

05/03/ INST. Ford 6.0L Aurora Turbo Installation v Ford 6.0L Powerstroke

Installation Manual v1.4: ATS Twin CP3 Kit 2001 GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Installation Manual v1.0: RPM Governor Spring Installation Dodge. Please read all instructions before installation.

Installation Instructions

CAUTIONS AND WARNINGS

Installation Manual v1.2: LLY / LBZ/LMM Twin CP3 Kit GM Duramax. Please read all instructions before installation.

BD Ford L Powerstroke CRANKCASE VENTILATION KIT

Duramax LMM EGR Delete With Intake Tube

2/10/ INST

Installation Manual v1.1: ATS Twin CP3 Kit GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Installation Manual v1.0: Force Cool Kit Dodge with NV4500/NV4500HD/NV5600 Manual Transmissions. Please read all instructions before installation.

CHALLENGER TWIN TURBO SYSTEM INSTALLATION INSTRUCTIONS

2/10/ INST

BD Ford L Powerstroke CRANKCASE VENTILATION KIT

Industrial Injections Compound Turbo Installation For 6.7L Scorpion

with installation boost GAUGE this manual is for use with systems

Ford 6.0L Regulated Return Kit

BEFORE BEGINNING INSTALLATION

Step 6: Remove and save the MAP sensor for later use. Step 7: Remove the passenger side intercooler pipe and the EGR intake manifold.

2014+ Ram 3.0 EcoDiesel EGR Delete

Keeping You Cool Under Pressure

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Propane Conversion Systems. Installation Instructions: 2S-LIFAN200TM 2S-LIFAN200FM 2S-LIFAN390TM 2S-LIFAN390FM

Dodge 5.9L Cummins 24v ISBe

ELECTRONIC POSITIVE AIR SHUTOFF

Ford 6.0L. Part #: Part #: BD GASKET PART# will be needed for this installation.

Intercooler Installation For Ford 7.3L Powerstroke trucks -- Installation Instructions L Ford Powerstroke

BD TrackMaster S D o d g e H P C R Installation Instructions

Banks PowerPack TLC System including

1992 Toyota Cressida

DURAMAX LMM EGR DELETE

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

Installation Manual v1.0: Code Blocker Electronics Kit GM LBZ Duramax. Please read all instructions before installation.

Includes: 1. Upgraded Tube Type EGR Cooler 2. Silicone Hoses

LML 3 Y-Bridge Kit or High Flow Intake Bundle Package

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: Dodge 68RFE Automatic Transmission. Please read all instructions before the installation of the ATS Co-Pilot

Cummins Coolant Bypass Kit:

Installation Instructions

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

MINI MANIA REMOTE OIL COOLER INSTALLATION INSTRUCTIONS P/N NME1055

Included: 2. Intake Block Off Plates 1. Exhaust Block Off Plate 1. Coolant Hose - Reroutes the EGR Cooler Coolant 12. Pieces of mounting hardware -

2004½-2007 Dodge 5.9L Cummins 24v ISBe (600 motors only)

Banks DynaFact. PYROMETER GAuGE

SKID MARK GARAGE. Axillary Fuel Supply

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

Dodge 24v ISB

1963 GEN IV SUREFIT VINTAGE AIR CONDITIONING INSTALLATION

6.4L EGR Delete With Intake Elbow

Scion FR-S ZN6. GTX2867R Gen2 (Internal Wastegate) Installation Instructions GPP P/N #

Ford 6.7 EGR Delete Kit

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER

Ford 6.0L Powerstoke Regulated Fuel Return

Shotgun Single Barrel HPFP install guide

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Page 6 of 6 OUTLAW DIESEL EGR COOLER DELETE KIT W/INTAKE ELBOW L FORD POWERSTROKE

C40008 & C40009 EXHAUST BRAKES

Duramax Lift Pump Kit 9-11 PSI Installation Instructions P/N# D

Part# PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Procharger Stage II Intercooled Supercharger System (11-14 GT)

Single Barrel Shotgun HPFP Install Guide

Owner smanual. Banks Techni-Cooler Intercooler System L I-6 Jeep Wrangler. with Installation Instructions

Instant Chat off the main page of Or simply call our tech team at

CUSTOM-DIESEL.COM ATTENTION VERY IMPORTANT - PLEASE READ

Installation Instructions For #64260 Striker FE Module GMC/Chevrolet Duramax LB7 Diesel Copyright

H F G I. A (1) Reducer. pg.2

Disconnect the APP sensor harness connector. See Fig. 4. Remove the accelerator pedal mounting nuts. Remove the APP assembly.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Part# , , ,

Installation manual BMW E TS1/TS2

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

DODGE RAM 24V 5.9L CUMMINS

INSTALLATION INSTRUCTIONS

Part# JL AIR IT UP 4 Tire On Board Air Delivery System. (Requires External Air Source)

7649A FUEL INJECTOR CLEANING SPECIALTY TOOLS USER MANUAL & REPLACEMENT PARTS LIST

Includes: 1. Silicone Hose 2. EGR Block Off Plates 1. Exhaust Block Off Plate 2. Hose Clamps 1. Spacer/Washer 8. Bolts 2. Nuts

Installation Instructions Part Number

TURBO KIT INSTRUCTIONS

These instructions were written for reference only and the use of a factory service manual is recommended.

Xtreme Air Command. Step 1 Prepare the components. Step 2 Select a mounting location. Parts list

Kit INSTALLATION GUIDE. 5 psi Low Pressure Sensor (Single Gauge)

Please call us at Mon-Fri 8am-5pm if you need any additional assistance.

INTAKE (INDUCTION) IN(TURBO)

All cores due 30 days after invoice date - no credit after 60 days.

Owner smanual. Banks Techni-Cooler Charge Air Cooler Assembly Dodge 6.7L Cummins (24-valve) ISB Pickup Trucks. with Installation Instructions

INSTALLATION INSTRUCTIONS

THANK YOU FOR CHOOSING BATHERBOX GETTING STARTED WHAT S IN THE BOX? N. Northview Ave Sioux Falls, SD 57107

Transcription:

PRO66-INST Installation Manual v1.0: The Torque Pro Propane Injection System GM Please read all instructions before installation. Thank you for purchasing the ATS Torque Pro Propane Injection System. This manual is to assist you with your installation and operation of the system. If you are installing this system for a customer, please pass this manual on to your customer for future reference. Note: In addition to a regular tool set, this install requires: 1/8 NPT (National Pipe Thread) tap Size R Jobber drill bit ¾ Unibit 1. Drain approximately 2 gallons of coolant from the radiator into a clean container and save the coolant to reuse later. 2. Remove the tube that runs from air cleaner housing to the turbo inlet, by loosening the hose clamps which are attached to the hose and the air cleaner filter from the inner fender well, using a nut driver. Then drill a ¾ dia. hole in the side of the air cleaner hose near the turbocharger using a ¾ uni-bit and install the venturi mounting grommet.

3. Mount regulator bracket to the top of the existing alternator bracket using the factory bolts. 4. Install all the fittings into the regulator; A. The lock off valve into the top of regulator (1/4 pipe). B. The two 90 degree water fittings in the right left sides of regulator (3/8 pipe). C. The 5/8 orifice fitting in the bottom side of regulator (1/2 pipe). Tighten all fittings and install the 5/16 hose fitting in the side of the lock off valve. 5. Cut the heater hoses near the firewall and then cut out about 1 straight section of each hose. Then install the Y fittings into each hose. Pointing the Y s toward the regulator on top of the water pump. 2

6. Attach the water lines to the regulator; first install the hose to the right side of the regulator and then the left side and secure with clamps provided in system. 7. Bolt the regulator to the mounting bracket on the water pump (2) ¼ X 5/8 long cap screws, (2) washers and (2) lock washers using a 7/16 wrench. Route the water lines over the top of the motor towards air conditioner condenser and the Y s that were installed. Install and clamp the lines to the Y s using clamps provided in it. (Wire tie hoses so they won t move around). 8. Remove the Intake manifold pipe on the passenger side of the motor. Using a socket, loosen the lower clamps on the intake hose on the pressure chamber and slide clamp down the steel tubing. When removing the air intake pressure chamber take special care not to damage the intake gasket and also make sure that 3

debris does not enter the intake of the motor while lifting air intake pressure chamber. Using a shop towel cover the manifold and intercooler pipe openings to keep foreign objects out. 9. Drill and tap 1/8 pipe into the intake manifold. Use an R drill; locate hole as shown in the drawing in the front side of manifold (LLY motor), or top of manifold (LB7 motor). Install and tighten the hob switch. The hob switch comes pre-set to 5 lbs. Adjustable between 3.1 psi to 7.4 psi. 11. Re-install intake manifold pipe, remove the shop towels covering the manifold and intercooler pipe. Slide the clamp back over the hose on the pressure chamber and tighten. 12. These instructions assume that the tank is already mounted. If the tank is not mounted, this is a good time to do so whether under the truck or in the bed. NOTE: If you are going to mount the tank in the bed, a bulkhead fitting should be used. This kit assumes that the tank is mounted at the frame. If you decide to mount the tank in the bed, you will need to purchase a bulkhead fitting and two more 3/8 fittings, which can be found at a parts store. 13. Assemble the L.P.G. (low pressure gas) feed hose, this is the hose that has white markings. Use the 15 hose supplied in the system. Route the L.P.G. hose on the outside of the frame rail and away from exhaust and up to the regulator to find the correct length. Secure hose to frame using tie wraps. 14. Install 5/16 L.P.G. hose to tank or bulkhead fitting. Use a ¾ wrench. Cut the L.P.G. hose to desired length and assemble hose fitting to hose by disassembling hose fitting, and screwing the large female end in a counter-clockwise rotation onto the hose. With female end install into the hose, holding the fitting in a vise or using a wrench, place a small amount of oil to the other female fitting and install this fitting into the large fitting screwing this fitting in a clockwise rotation until fittings are tight together. Route the L.P.G. hose assembly on outside of rail and away from exhaust. Use tie wraps to secure hose to prevent any chafing. Connect the L.P.G. hose assembly to either bulkhead fitting or tank at the liquid valve. 15. Connect 5/16 L.P.G. hose assembly to the fuel lock off valve, Use a ¾ wrench. 16. NOTE: IMPORTANT Slowly open the liquid valve at the tank and using a solution of soap and water in a spray bottle, check all connections for leaks! (It will bubble or have an odor.) If any leaks exist, repair and recheck for leaks. 4

17. Re-attach the air cleaner box in the engine compartment. Install the filter and clamp on the top cover and re-install the stock intake hose and venturi fitting. 18. Install the vapor injection hose. Attach the hose to the bottom of the regulator and to the intake hose venturi. 19. Connect one side of the lock off valve to the ground of the battery. Wire tie to ground cable. 20. Connect the other side of the lock off valve to the Hobb switch. 21. Mount the on/off switch in a convenient place in the cab. 22. Run a wire from the other side of the Hobb switch to inside the cab to the on/off switch. 23. Run a wire from the switch to a keyed power source. (Make sure it is fused). Have Any Questions? Thank you for purchasing the Torque Pro Propane Injection System. Please check our website at http://www.atsdiesel.com for technical support and other performance products such as the Five Star torque converter, ATS High Performance Valve Body and ATS High Performance Transmission along with our full line of power enhancers. Please call or e-mail our Technical Service Department, 8:00am to 5:30pm Mountain Standard Time, Monday through Friday. Contact Information Toll Free: 800-949-6002 Local: 303-431-7973 Fax: 303-431-01135 Website: www.atsdiesel.com Email: info@atsdiesel.com 5