Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA

Similar documents
Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Clean Energy Council submission to the Energy Networks Australia. Technical Guidelines for Basic Micro and Low Voltage Embedded Generation Connections

Guideline for Parallel Grid Exit Point Connection 28/10/2010

DG system integration in distribution networks. The transition from passive to active grids

Issue 23 draft for Nuvve

-Mobility Solutions. Electric Taxis

A vision of Smart Grid deployment at ENERGA-OPERATOR SA

Utility Operator Model

City of Palo Alto (ID # 6416) City Council Staff Report

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

Comments on the Solar Alliance Proposal for Changes to New Jersey Interconnection Rules

E-Mobility in Planning and Operation of future Distribution Grids. Michael Schneider I Head of Siemens PTI

actsheet Car-Sharing

Addressing ambiguity in how electricity industry legislation applies to secondary networks

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).

Power distribution: contributing to the European energy transition

Comhairle Cathrach Chorcaí Cork City Council

Yukon s Independent Power Production Policy

BEFORE THE PENNSYLVANIA HOUSE TRANSPORTATION COMMITTEE

The Smart Grid: Re-powering America George W. Arnold National Coordinator for Smart Grid Interoperability NIST Gaithersburg, MD April 28, 2010

#14. Evaluation of Regulation 1071/2009 and 1072/ General survey COMPLETE 1 / 6. PAGE 1: Background

Joe Butler owns both full electric and hybrid electric vehicles since His fully electric EV became their primary vehicle in 2016.

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

Non-network solutions

Development of Smart Grids in Europe

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Presentation of the European Electricity Grid Initiative

Introducing AusNet Services Regulated Energy Services and the Distribution Business

northeast group, llc Southeast Asia Smart Grid: Market Forecast ( ) Volume II October group.com

CUSC Modification Proposal Form CMP270

Measuring the Smartness of the Electricity Grid

Electric Vehicle Adoption in the South African Context

John Holland, President, International Copper Association. Copper Demand in Asia Growth Trends and Drivers for New Applications

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

Decision on Merced Irrigation District Transition Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Smart Grids and Integration of Renewable Energies

QUESTION / CLARIFICATION QC-ENE-001

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Filed with the Iowa Utilities Board on September 17, 2018, RMU STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

King Island Renewable Energy Integration Project. Isolated Power System Connect 2015 Simon Gamble Manager Hybrid Off-Grid Solutions

Analysis of Operating Results and Financial Status

Integrating hosting capacity into Part 6 of the Code on low voltage networks

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

GLOBAL ENERGY STORAGE MARKET UPDATE: AUSTRALIAN ENERGY STORAGE ASSOCIATION

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

India Smart Grid Week, 2017

Transportation Electrification Public Input Workshop. August 3, 2016

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

Connecting your home or small business generation

Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

All-Energy 2016, Glasgow. Contributing funding partners:

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

UNLOCKING VALUE: MICROGRIDS AND STAND ALONE SYSTEMS

Electric Vehicle Charge Ready Program

Market Models for Rolling-out Electric Vehicle Public Charging Infrastructure. Gunnar Lorenz Head of Unit, Networks EURELECTRIC

Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

The Power Potential Project A guide to participating

Opening Address By. Programme Director: Mr Chris Yellend, Dr. Fereidoon Sioshansi, Menlo Energy Economics, USA

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

French National electro-mobility association Joseph Beretta Business opportunity and challenges

Photovoltaic Distributed Generation

ABB Services for Low Voltage equipment Your choice, your future

New Automotive Innovation and Growth Team (NAIGT)

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

The Electric Power System

ABB Drive Services Your choice, your future

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Innovation in electricity retailing for EVs in New Zealand

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

Reliability-related matters from the GREEN Grid project

Utility and project update 2-3 Project description 4

SIZE, SAFETY & KNOWLEDGE NINO NIZIC MANAGING DIRECTOR SOLARWATT AUSTRALIA

The impact of Electric Vehicles Deployment on Production Cost in a Caribbean Island Country

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

Iowa Statewide Solar Readiness Initiative

Biofuel issues in the new legislation on the promotion of renewable energy. Energy and Transport Directorate-General, European Commission

What should regulators and advocates consider when deciding who will build public EV charging infrastructure?

Regulating the Philippine Electric Power Industry

PV inverters in a High PV Penetration scenario Challenges and opportunities for smart technologies

ELECTRICAL DISTRICT # 2

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach

Reducing CO 2 emissions from vehicles by encouraging lower carbon car choices and fuel efficient driving techniques (eco-driving)

TILLAMOOK PEOPLE S UTILITY DISTRICT

When Grids Get Smart - ABB s Vision for the Power System of the Future

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

northeast group, llc Southeast Asia Smart Grid: Market Forecast ( ) Volume III March 2016

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Saving Money with Street Lights

Renewables in Transport (RETRANS)

GAS WORKS THE ROLE OF THE DISTRIBUTION SYSTEM OPERATOR IN THE ELECTRICITY MARKET

Transcription:

Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA George Horvath george.horvath@aecom.com Month Day, Year

Part A Introduction From Power Grid #1, to Power Grid #2 George Horvath - AECOM Month Day, Year

Page 3

Page 4

I used to get my electricity from something like this. Page 5

Mobile Phone Market Page 6

Page 7

I still get my electricity from something like this. Page 8

Why is this so? Page 9

Healthy markets are about room for diversity and choice Plenty of room in the market. Diversity brings innovation and wealth. Wealth is freedom to chose what is best for each participant. Page 10

Electricity Markets around the world are not real markets. There is very limited freedom of choice for market participants The Rules are made by small select groups mostly with technical rather than marketing backgrounds. Technical barriers to market entry are too high for many new players to enter Page 11

Power Grid #1 The Stone Age of Power Page 12

Generation We need much more We need to Control Greenhouse Gasses Page 13

Not Enough Transmission We need to Extend We need new Capabilities Page 14

Municipal Grid Growing Too Fast Growing Too Old Need to Extend and Replace while Improving Services Presentation Title June 16, 2014 Page 15

Business Customers Need More Reliability Page 16

Residents Need to control cost of energy Need Real Choice Regarding Supplier Page 17

New Forms of Generation Need New Grid Services Large Scale Wind Generation is Here Large Scale Solar PV Generation (Coming) Page 18

Distribution System Will become a Smart Grid system Hosting Hybrid & Embedded Generation GENERATION GENERATION Presentation Title June 16, 2014 Page 19

Will all Distribution Then be a Transmission System? GENERATION GENERATION Presentation Title June 16, 2014 Page 20

The Big Opportunity is EV Power Storage GRID SERVICES GRID SERVICES GRID SERVICES Page 21

Power Grid #2 - when we can say:- Page 22 We run our cars on 100% green energy. What is more: - We get it for free! Presentation Title 6/16/2014

A healthy Energy market room for diversity and choice Plenty of room in the Energy Market. Diversity in the Energy Market brings innovation and wealth and reduction in cost for consumers. Wealth is customer participation through freedom of choice. Page 23

Energy Market Governance Must Adapt to Enable a Diverse and Vibrant Energy Market Page 24

Part B Summary of PIPPA s Questions together with Summary of AECOM s Advice

PIPPA Topic 1 Given that Section 4.2, Annex A of Energy Regulatory Commission ( ERC ) Resolution 16, series of 2011 is inconsistent with diagram 4 of the same ERC Resolution; PIPPA would like advice on the following:- Page 26

PIPPA Topic 1 Question 1(a) from PIPPA: Is the definition of Connection Assets in Section 2.0, Annex A of Reso. 16 consistent with the definition of connection assets in other jurisdictions? AECOM Answer - Advice to PIPPA: The definition of Connection Assets is consistent with the definition of connection assets in some other jurisdictions In practice, there is a broad diversity in connection assets, which depends on the intended operational and business purposes they will serve. Page 27

PIPPA Topic 1 Question 1(b) from PIPPA: What specific types of assets or equipment are considered Connection Assets in other jurisdictions? AECOM Answer - Advice to PIPPA: Connection assets are links in the electricity network that are constructed to connect one grid customer at a location in the network. There is a broad diversity in types of assets which serve as connection assets, ranging from entire switchyards and transmission lines, to as simple as the conductors that link a generator to a transmission switchyard. The form depends on the purpose they will fulfil. Page 28

PIPPA Topic 1 Question 1(c) from PIPPA: Is the definition of Connection Assets for Generation Customers of Transmission Provider in Section 4.2, Annex A of Reso. 16 consistent with the definition of connection assets in other jurisdictions? AECOM Answer - Advice to PIPPA: There is a wide diversity in the forms and the extent of connection assets of power plants in other jurisdictions. There is also wide diversity in the forms and extent of connection assets of distribution customers, which may in turn, connect generation with the grid. Page 29

Connection Assets POWER PLANT CONNECTION ASSET Page 30

Example - The 500 kv Connection Assets of Nam Theun 2 Corporation - Laos Presentation Title 6/16/2014 Page 31

Also: ~ 320 km of 500 kv Transmission Line Connecting NT2 to EGAT RE2 Substation. Page 32

Captive Power Plant Built or Taken Over, By a Generation Company - Examples At; Industry Parks - Steel Mills Oil & Gas Facilities Pulp & Paper Mills Sugar Refineries Mines Port Facilities Municipal Substations - - - - Transmission Grid EXPORTING TO THE GRID G1 CAPTIVE POWER PLANT ESTABLISHED OR TAKEN OVER BY IPP G2 INDUSTRY-OWNED SWITCHYARD SUPPLYING LOCAL DEMAND Page 33

PIPPA Topic 2 With regard to a switchyard being an integral part of a power plant; PIPPA would like advice on the following:- Page 34

PIPPA Topic 2 Question 2(a) from PIPPA: Do you agree with the proposition that a switchyard is an integral part of a power plant? Why, or why not? AECOM Answer - Advice to PIPPA: Yes, a switchyard is part of a power plant, if it has been built primarily for the purpose of conducting the business of power generation. A switchyard is not part of a power plant if it has been built primarily for the purposes of the shared grid, even if power plant connects to it. Page 35

PIPPA Topic 2 Question 2(b) from PIPPA: Are you aware of any power plant without its own switchyard? If yes, please explain the circumstances in which that plant is being operated. AECOM Answer - Advice to PIPPA: Yes, when assets of a state-owned combined generation and transmission corporation was split into two state-owned entities > a Generation Corporation, and Transmission company Before generation is sold off. New power plant is developed near its fuel source. It will have a switchyard for its own operational & business purposes reliability, maintenance, expansion, etc. Page 36

PIPPA Topic 3 With regard to the statement: The acquisition of a power plant s switchyard does not affect Grid Security. PIPPA would like advice on the following:- Page 37

PIPPA Topic 3 Question 3(a) from PIPPA: NGCP has asserted that it needs to acquire the switchyard of certain power plants (particularly those that also directly connect the plant to a distribution utility) for grid security. What are your comments on this?. AECOM Answer - Advice to PIPPA: There are no means by which the acquisition of a grid-user customer s assets could be justified under a regulated, grid investment process. If there is a need for any asset, then the Grid Investment Process ensures that grid company can fund its own asset. I know of no mandate by which it could disrupt its customers businesses by breaking them up. Page 38

I know of no cases wherein Power Plant switchyards have been compulsorily acquired from Power Plant Owners by the Grid Company. I have been Expert Witness in the break up of a Power Generation Business wherein the High Court decided that:- Any assets created as part of Power Plant are parts of the Power Plant and must remain with the Power Plant in the division of assets to be sold separately. Page 39

PIPPA Topic 3 Question 3(b) from PIPPA: Assuming that the acquisition of a power plant s switchyard may enhance grid security, are there other more effective ways to achieve such purpose? If yes, what are they? Why are they more effective? AECOM Answer - Advice to PIPPA: It is my opinion that transferring ownership of power plant switchyards would DECREASE RELIABILITY and INCREASE THE COST of the grid for users and the public. There are many ways of improving grid reliability other than increasing the number of assets, and these alternatives would involve lesser cost and have produced verifiably positive results. Page 40

PIPPA Topic 3 Ways of Improving Grid Reliability Better designs - better materials more standardisation Reliability Centred Maintenance (FEMCA) clear and exacting systems performance requirements better condition monitoring and testing better in-service training of engineers stricter compliance and reporting proactive investigations of non-compliances well developed codes and standards of performance and also: N-1 and N-2 Page 41

PIPPA Topic 3 Ways of Improving Grid Reliability AECOM Answer - Advice to PIPPA: For the Transmission Industry; the formal consideration of reliability centres on N-1 and N-2, which is not efficient. Other reliability techniques are not formally implemented within utilities. Grid reliability would benefit from any and all of the initiatives listed on the previous slide. Current initiatives being undertaken by utilities include: Changing the utility s culture from being CAPEX-led to being Services-led with Asset Management as the focus. Improving the quality of organisational function e.g., training and adopting PAS55, is the current target for leading utilities. Page 42

PIPPA Topic 3 Question 3(c) from PIPPA: What is the impact, if any, upon grid security if a power plant s switchyard connects the plant to the grid and at the same time directly connects the plant to a distribution utility? AECOM Answer - Advice to PIPPA: There is no effect, provided that the arrangement is correctly engineered and adequate planning and operational processes are followed. There is a recognised commercial problem - the reduction in Grid Company Revenues resulting from such connections. The commercial concerns of the grid company can be addressed, but not by restricting connections. Page 43

PIPPA Topic 4 Allowing a power plant to directly connect to a distribution utility enhances a power plant s operational efficiency. PIPPA would like advice on the following:- Page 44

PIPPA Topic 4 Question 4(a) from PIPPA: Do you agree with this proposition that the power plant efficiency is improved by this? Why or why not? AECOM Answer - Advice to PIPPA: I agree firmly with this proposition. Serving local load reduces transmission losses and therefore increases power plant efficiency. In fact, many/ most System Operators formally practice Locational Marginal Pricing (LMP) to weight the bid-prices in favour of power plants that are closest to the load prior to determining the order of dispatch. The method of determining LMPs is to consider the system losses. Page 45

PIPPA Topic 4 Question 4(b) from PIPPA: What are the technical advantages and disadvantages of connecting a distribution utility directly to the switchyard of a power plant? If there are disadvantages, what are the mitigating measures that can be implemented? AECOM Answer - Advice to PIPPA: The main advantage is an improvement the efficiency of the utilisation of the transmission grid assets. Improvement in the reliability of supply for the local distribution customers. Also, lower cost power to local communities. There are no disadvantages. Page 46

PIPPA Topic 5 Hybrid embedded generation (where a power plant is connected to a grid and at the same time directly connected to a distribution utility or other end user) is allowed in other jurisdictions. PIPPA would like advice on the following:- Page 47

PIPPA Topic 5 Question 5(a) from PIPPA: Do you agree with this proposition? Why or why not? AECOM Answer - Advice to PIPPA: I firmly agree that Hybrid and Embedded generation is allowed in other jurisdictions. In fact, it is very actively encouraged by governments, through their departments of energy and other governmental and quasi-governmental organisations. Hybrid and Embedded generation is actively facilitated by Electricity Regulators through preparation of suitable codes and standards for planning, connections and operations. Page 48

PIPPA Topic 5 Question 5(b) from PIPPA: What are the issues (technical or otherwise) that were considered in determining whether or not hybrid embedded generation should be allowed? AECOM Answer - Advice to PIPPA: Precedent they existed in isolation before the grid, and continue operation after grid connection. Requirement for green energy, and energy efficiency. Advances in technology have created many new forms. Effective international standards have been prepared allowing ease of connection and operation. Page 49

Hybrid & Embedded Generation is Encouraged in - All States of the European Union - The United Sates Australia - New Zealand - The Pacific Islands - Parts of Asia e.g. Singapore, Laos. It is the Future Transmission Network CG Transmission Load Bus Sub-trans Distribution Bus LOAD DG Sub-trans Network DMR DA DG Sub-trans Load Bus MV Distribution Bus DG LOAD Distribution Network DMR DA LV Distribution Bus DG MV Load Bus DG LOAD Low Voltage Network DMR DA LV Load Bus DG LOAD DMR Page 50

PIPPA Topic 5 Question 5(b) from PIPPA: What are the issues (technical or otherwise) that were considered in determining why they are not allowed? AECOM Answer - Advice to PIPPA (Continued): Opposition from Grid Companies about loss of revenue and increasing operational complexity of the grid. Lack of grid planning processes that incorporate consideration of the effects and the needs of HG/EG. Poor technical administration of connection processes Misplaced concerns about the security impacts on the grid Page 51

PIPPA Topic 5 Question 5(c) from PIPPA: In other jurisdictions where hybrid embedded generation was allowed, what were the consideration for allowing this? AECOM Answer - Advice to PIPPA (Continued): Effective technical arrangements and Least Cost! Negotiations between PP Owner and the Connecting Party. Less costly for the community than grid supply. Improves community support for the PP Development. Sometimes, there is a government agency requirement to offer supply to local communities. Page 52

PIPPA Topic 5 Question 5(d) from PIPPA: In other jurisdictions where hybrid embedded generation was allowed, how were these implemented (e.g., how was the plant connected the grid and to a distribution utility or other end user)? AECOM Answer - Advice to PIPPA (Continued): Preparation of Appropriate Codes of Practice for technical and commercial administration of the connections Current Best practice in my opinion is according to IEEE Standard 1547 2003 Standard for Interconnecting Distributed Resources with Electric Power Systems. Page 53

Regulatory Roadmap for Development of Grid Services Review Page 54

Thank You Any questions? email address (george.horvath@aecom.com)