16K HYDRAULIC PLANETARY CAPSTAN DRIVE

Similar documents
20,000 LB INDUSTRIAL WINCH

POWERMASTER SERIES 20,000 LB INDUSTRIAL WINCH AND BUMPER

MODEL RPH-20,000 INDUSTRIAL PLANETARY WINCH OPERATING, SERVICE AND MAINTENANCE MANUAL

OPERATING, SERVICE AND MAINTENANCE MANUAL MODEL SCH 2900 MODEL SCH 3600 MODEL SCH 4900 PLANETARY WINCHES

OPERATING, SERVICE, AND MAINTENANCE MANUAL

MODEL HD-P8000 PLANETARY WINCH

MODEL RPH-25,000 INDUSTRIAL PLANETARY WINCH OPERATING, SERVICE AND MAINTENANCE MANUAL

MODEL H 700 DOW-LOK EQUIPPED INDUSTRIAL LOW-MOUNT WINCHES (WITH 20,000 LB RATING)

MODEL HD-P8000 PLANETARY WINCH

MODEL HD-234 AIR SHIFT INDUSTRIAL LOW-MOUNT WINCHES OPERATING, SERVICE AND MAINTENANCE MANUAL

MODEL RPH 12,000 PLANETARY WINCH

MODEL RPH 15,000 PLANETARY WINCH

MODEL HD-P10000 PLANETARY WINCH

MODEL HD-234 RAM-LOK EQUIPPED INDUSTRIAL LOW-MOUNT WINCHES OPERATING, SERVICE AND MAINTENANCE MANUAL

MODEL HD-P8000 PLANETARY WINCH

OPERATING, SERVICE, AND MAINTENANCE MANUAL

OPERATING SERVICE AND MAINTENANCE MANUAL

Ramsey Winch Company OWNER'S MANUAL MODEL H-800 SERIES DOW-LOK EQUIPPED INDUSTRIAL LOW-MOUNT WINCH

RAM-LOK INDUSTRIAL LOW-MOUNT

MODEL RPH 10,000 PLANETARY WINCH

MODEL RPH 8000T PLANETARY WINCH

Hercules 50K OM B

INSTALLATION AND OPERATING INSTRUCTIONS FOR RAMSEY WIRELESS REMOTE CONTROL FOR THE BADGER WINCH. Warnings

Ramsey Winch Company OWNER S MANUAL BADGER Electric Winch Model BADGER Congratulations

RUFNEK 80 DESIGN SERIES 001 SERVICE MANUAL INTRODUCTION AND THEORY OF OPERATION...2 ASSEMBLY NUMBER EXPLANATION...2 WINCH MODEL CODES...

Ramsey Winch Company OWNER S MANUAL Front and Rear Mount Detachable Electric Winch

Installation, Operating & Maintenance Manual 30P Planetary Winch

Ramsey Winch Company OWNER S MANUAL Electric Winch Model TR Volt

RUFNEK 100 SERVICE MANUAL

Size 12.4 Mesur-Fil Fluid Couplings P WC-98

SERVICE MANUAL GENERAL ASSEMBLY...14

Ramsey Winch Company OWNER S MANUAL BADGER Electric Winch Model BADGER 2500 W/Wireless Remote Control

INSTRUCTIONS FOR OVERHAUL OF RAMEY RE SERIES WINCH

Ramsey Winch Company OWNERS MANUAL FRONT MOUNT ELECTRIC WINCH Model Patriot 15000

MODEL DC-300 SERIES RAM-LOK EQUIPPED INDUSTRIAL LOW- MOUNT WINCHES

Size 7.0 Mesur-Fil Fluid Couplings P-1033 WC-96

RUFNEK 45 SERVICE MANUAL

INSTRUCTION AND PARTS MANUAL MODEL PH50 PLANEMATIC DRIVE THE LOGICAL CHOICE

Ramsey Winch Company Owner s Manual Front Mount Electric Winch PATRIOT 9500UT

Installation Instructions XRC 3.0 3,000lb Winch Part # 97203

Size 9.4 Mesur-Fil Fluid Couplings P WC-97

3.2 DRIVE TORQUE HUB. Roll, Leak and Brake Testing SECTION 3 - CHASSIS & TURNTABLE. 3-2 JLG Lift

I. General Safety Precautions

Electric Winch. Installation & Operation Manual. 12 & 24 volt. Vr. 1

Ramsey Winch Company OWNER S MANUAL BADGER Electric Winch Model BADGER Congratulations

OPERATING, SERVICE AND MAINTENANCE MANUAL

DISC BRAKE/DUAL MASTER CYLINDER CONVERSION. Tools, Equipment and Supplies Needed:

R24. Instruction manual

DAP-625S and DAP-875S

Form No , 9 5, 6. Parts List for: X1A1 AIR DRIVEN WITH REMOTE CONTROL HYDRAULIC PUMP. Max. Capacity: 10,000 PSI

Read this entire manual before operation begins.

accidents which arise due to nonobservance and the safety information herein.

ATV WINCH. Thank you for purchasing a

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Power Float Manifold. Installation and Operations Manual Module 11A

ORIGINAL INSTRUCTIONS G715A. Pneumatic-hydraulic Riveter E. Warner Ave Santa Ana, CA

Hydraulic Motors Repair Instructions

Straight-Bore Clutch LSCC-32, 44, 54

DP DIAPHRAGM PUMP Parts & Instruction Manual

ELECTRICAL WINCH 45EWHST12

Pick Up Broom OWNERS/OPERATORS MANUAL. Model Number. Serial Number. Date of Manufacture. To Serial # Phone:

OWNER/OPERATOR MANUAL. Airmotor effective dia. in. 2.5

MODEL G300 BRAKE BLEEDER

HAYWARD FLOW CONTROL TBH SERIES TRUE UNION BALL VALVE INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTALL INSTRUCTIONS OPERATORS MANUAL PE VOLT DC ATV WINCH PERMANENT MAGNET MOTOR

I. Safety Requirement WARNING. ATV/UTV Winch

WARNING. Electric Recovery Winch. General Safety Precautions

LUBRICATOR GUN INSTRUCTIONS-PARTS LIST. 10,000 psi (700 bar) Maximum Delivery Pressure. Detachable-type

POWER GEAR SLIDE-OUT MANUAL

EATON 751, 781 HYDROSATIC TRANSAXLE

Electric Actuator Installation, Operation & Maintenance Manual

BC Brake Caliper. (i) MEX (55) QRO (442) MTY (81) DIST. AUTORIZADO

Electric Winches. Installation & Operation Manual. Covering - 12 & 24 volt winches. Vr. 1

CRD610 Automatic Fitting Inserter

INSTALL INSTRUCTIONS OPERATORS MANUAL PE VOLT DC ATV WINCH PERMANENT MAGNET MOTOR

Owner s Manual: PSHV SERIES WINCHES

DeZURIK 24 and Larger BHP High Performance Butterfly Valves WITH (FB) FYRE-BLOCK SEAT

INSTALL INSTRUCTIONS OPERATORS MANUAL PE VOLT DC ATV WINCH PERMANENT MAGNET MOTOR

OPERATING, SERVICE AND MAINTENANCE MANUAL

Single-Position Detent Clutch DC Series. (i) MTY (81) MEX (55) QRO (442)

Elgin Hydraulic Clutch-Brake ECB-240, Product Number FORM NO. L F FORM NO. L F-0704

Planetary Winch. Operating and Maintenance Manual

DelTech Controls L.L.C.

CDS-JOHN BLUE COMPANY

Ramsey Winch Company Owner s Manual Patriot Profile Front Mount Electric Winch 12 V. Congratulations! Table of Contents

Ramsey Winch Company OWNER'S MANUAL ATV Electric Winch Model ATV3000

Model AM2 M40 Panel Installation, Operation, and Maintenance Manual

Spring-Engaged/Hydraulically-Released BD Caliper Brake. (i) MTY (81) QRO (442) MEX (55)

Operation and Maintenance Manual for BS and BH Hydraulic Torque Wrenches

Operators Manual. Model 3370 Air Cooled Recirculator rev.8/98

Form No Parts List for: MODEL B HYDRAULIC PUMP GENERAL SECTION PG PG553-2UK FT600 PG554. PG120A Series Y70G Series. Sheet No.

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Power Train. Chapter 5

INSTRUCTION INFORMATION FOR TYPE "DB" ELECTRIC DISC BRAKE (DB-0, DB-2, DB-4)

DENISON HYDRAULICS Premier Series. open circuit pump controls P16 B-mod, P09 A-mod. service information

Installation & Operator s Manual

MOTORIZED FOLDING CAMPER WINCH

Heavy Duty Hoist WARNING. General Safety Precautions. Thank you for purchasing a

GRINNELL MODEL CB800 CIRCUIT BALANCING VALVE INSTALLATION & SETTING HANDBOOK

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

Transcription:

16K HYDRAULIC PLANETARY CAPSTAN DRIVE CAUTION: READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF CAPSTAN DRIVE. SEE WARNINGS!

TABLE OF CONTENTS FORWORD...1 WARRANTY INFORMATION...1 SPECIFICATIONS...1 WARNINGS.........1 MOUNTING INSTRUCTION.......2 CAPSTAN SAFEGUARD INFORMATION.....2 MAINTENANCE......2 HYDRAULIC SYSTEM REQUIREMENTS......3 HYDRAULIC CIRCUIT...3 TROUBLE SHOOTING...4 OVERHAUL INSTRUCTIONS...5-9 CARRIER ASSEMBLY INSTRUCTION...10 DIMENSIONAL DRAWING...11 PARTS DRAWING AND PARTS LIST...12-13 LIMITED WARRANTY.....BACK COVER

PLEASE READ THIS MANUAL CAREFULLY RAMSEY HYDRAULIC PLANETARY CAPSTAN DRIVE 16K This manual contains useful ideas for obtaining the most efficient operation from your Ramsey Capstan Drive, and safety procedures one needs to know before operating a Ramsey Winch. Do not operate this winch until you have carefully read and understand the "WARNING" and "OPERATION" sections of this manual. WARRANTY INFORMATION Ramsey products are designed and built to exacting specifications. Great care and skill go into every product we make. If the need should arise, warranty procedure is outlined on the back of your self-addressed postage paid warranty card. Please read and fill out the enclosed warranty card and send it to Ramsey Winch Company. If you have any problems with your product, please follow instructions for prompt service on all warranty claims. Refer to back page for limited warranty. SPECIFICATIONS* WARNINGS: STAY OUT FROM UNDER AND AWAY FROM RAISED LOADS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH. DO NOT EXCEED MAXIMUM LINE PULL. RATINGS SHOWN IN TABLE. DO NOT USE CAPSTAN TO LIFT, SUPPORT, OR OTHERWISE TRANSPORT PEOPLE. 1

CAPSTAN DRIVE MOUNTING The drive housing has six (6) through drilled holes for 5/8 in. capscrews and four (4) holes drilled and tapped to ¾ - 10UNC that can be used for mounting. The drive can be either flange mounted using the four holes in the face of the housing, or surface mounted using the four tapped holes. A minimum of four (4) grade 5 or better fasteners should be used. CAPSTAN SAFEGUARDS AND OPERATION The capstan drive is equipped with a dual brake valve cartridge; therefore, the capstan may be operated in either direction. The rope can be wrapped around the capstan in either direction. To install the bayonet type capstan, push the capstan onto the extension shaft, against spring tension, then turn counter-clockwise (viewed from the outside) to the stop. Release the capstan and verify that the spring has pushed the capstan outward into the lock position. MAINTENANCE Adhering to the following maintenance schedule will keep your capstan in top condition and performing as it should with a minimum of repair. A. WEEKLY 1. Check the oil level and maintain it to the oil level plug.if oil is leaking out, determine location and repair. 2. Check the pressure relief plug in top of the gear housing. Be sure that it is not plugged. B. MONTHLY 1. Check the capstan mounting bolts. If any are missing, replace them and securely tighten any that are loose. Use grade 5 or better bolts. 2. Inspect the cable. If the cable has become frayed with broken strands, replace immediately. C. ANNUALLY. 1. Drain the oil from the capstan annually or more often if winch is used frequently. 2. Fill the capstan to the oil level plug with clean kerosene. Run the capstan a few seconds with no load in the reel in direction. Drain the kerosene from the capstan. 3. Refill the capstan to the oil level plug with all purpose SAE 80W-140 gear oil. 2

HYDRAULIC SYSTEM REQUIREMENTS Refer to the performance charts below to properly match your hydraulic system to the capstan performance. The charts consist of: (1) first layer line pull (LB) vs. working pressure (PSI), (2) first layer line speed (FPM) vs. flow (GPM), and (3) relief valve setting (PSI) vs. flow (GPM). A motor spool directional control valve is required. SYSTEM REQUIREMENTS: 2500 PSI RELIEF VALVE SETTING 20 GPM FLOW RATE* 10 MICRON NOMINAL FILTRATION *CAUTION: DO NOT EXCEED 20 G.P.M. IF EXCEEDED, MOTOR AND WINCH MAY BE DAMAGED TYPICAL LAYOUT PERFORMANCE CHARTS PERFORMANCE WITH 9.8 CU. IN. HYDRAULIC MOTOR 3

TROUBLE SHOOTING GUIDE CONDITIONS POSSIBLE CAUSE CORRECTION CAPSTAN WILL NOT PULL MAXIMUM LOAD 1. System relief valve may be set too low 2. Low Hydraulic Oil 1. Increase relief valve setting until recommended pressure is obtained. 2. Check/Fill oil in reservoir SLOW LINE SPEED 1. Relief valve may be clogged 2. Low Hydraulic Oil 3. Low Hydraulic System Flow rate. 4. Motor worn out 1. Remove/Clean relief valve. Re-Install valve and reset pressure 2. Check/Fill reservoir 3. Check flow rate. Refer to Page 3 Hydraulic system requirements. 4. Replace motor EXCESSIVE NOISE 1. Hydraulic system flow too high 1. Check flow rate. Refer to Page 3 Hydraulic system requirements. 4

INSTRUCTIONS FOR OVERHAUL 16K CAPSTAN Take note of mounting configurations for proper mounting of parts during re-assembly. Replace all gaskets, o- rings, and seals during re-assembly. Disconnect tube (item #40) from elbow fittings (items #20) on bottom of end bearing and counterbalance valve (item #19). Remove motor (item #11) from end bearing by slowly unscrewing capscrews (items #38). CAUTION: MOTOR IS UNDER SPRING PRESSURE. Remove springs (items #18) from pockets and inspect for damage. Replace gasket (item #17). Remove coupling and input shaft (item #4 and #5) from end bearing. Examine coupling for signs of wear, replace if necessary. If necessary, remove counterbalance valve from motor by removing capscrews (items #39). 38 11 17 40 20 19 39 5 20 4 18 5

Remove retaining rings (items #27 and 35) with screwdriver. Remove brake parts from end bearing. NOTE POSITION OF O-RINGS AND BACKUP RINGS BEFORE REMOVAL. Examine brake discs (items #6) and stators (items #8) for signs of wear, and replace if necessary. Examine o-rings (items #29 and 30) and backup rings (items #32 and 34) in brake piston (item #3), as well as oring (item #31) and backup ring (item #33) in backup brake piston (item #7) for signs of wear. Remove o-rings and backup rings from grooves in brake piston or backup brake piston and replace if necessary. 35 32 30 7 27 3 29 34 31 33 6 8 6

Remove the carrier assembly (item #2), input coupling (item #10), and retaining ring (item #26). Remove ring gear (item #12) and dowel pins (item #15). Using a screwdriver, remove the retaining rings (item#25) from the gear housing (item #1) Remove pin (item #14) from output shaft (item#9) Using a soft hammer, gently tap the output shaft (item#9) from housing (item #1). Bearings (item #23) can be removed from output shaft (item #9) by removing retaining rings (item #24) Oil seal (item #21) should be inspected and replaced if necessary. 15 24 26 14 12 2 10 9 25 25 23 23 24 24 36 37 21 22 22 1 22 7

Set winch with gear housing end down on work surface. Install well-oiled o-rings and backup rings into grooves on outside of brake piston and backup brake piston as shown in cross-section A-A below. Piston, backup piston, brake discs and stators must be clean and free of grease and oil. Insert brake discs (item #6) and stators (item #8) into gear end alternating, with stators first and last. Insert backup brake piston (item #7) into motor end and insert brake piston (item #3) into it. Apply even pressure on piston when installing. Install retaining rings (item #27 and 35) into grooves in motor end housing. NOTE: (Item #27) is thicker than (item #35) MOTOR SIDE 32 30 31 33 34 29 35 HOUSING SIDE 32 30 3 SECTION A-A 7 7 27 3 29 34 31 33 6 8 8

Insert springs (item #18) into pockets in back of brake piston. Insert motor coupling (item #4), engaging it with input shaft (item #5). Place gasket (item #17) on mounting surface of motor (item #11). Slide motor shaft into coupling. Attach motor to motor end bearing housing using (2) capscrews (item #38). Evenly tighten to 49 ftlbs. (66 Nm) torque. Install the counterbalance valve (item #19) to the motor using (4) capscrews (item #38). Tighten to 17 ft-lbs (23 Nm). Securely connect fittings (item #20) to motor end housing and counterbalance valve, and connect tube assembly (item #40) to fittings. Apply at least 550 PSI hydraulic system pressure to brake and verify that brake releases. 38 11 17 40 20 18 19 5 4 39 20 9

DISASSEMBLY OF CARRIER ASSEMBLY Carrier assemblies may be purchased as a complete assembly (see pg.16 ) or parts may be purchased individually (see pg 13). If purchasing individual parts, it will be necessary to disassemble the gear carrier as outlined below. 1. Carefully drive roll pin #103 into carrier pin #102 so that it is captured within carrier pin #102 but not touching the opposite side of the carrier #101. 2. Tap carrier pin #102 to remove it from the carrier #101. 3. Remove planet gear assembly#104 from the carrier #101. 4. Remove the roll pin #103 from the carrier pin #102. 5. Repeat this process for the two remaining gears in the carrier. 104 103 102 101 ITEM QTY PART NO DESCRIPTION 101 1 317024 CARRIER-INPUT MACHINED CAPSTAN 102 3 470134 PIN INPUT PLANET CARRIER 16K CAPSTAN 103 3 470060 ROLL PIN 3/16 DIA. X 7/16 LG 104 3 296706 GEAR INPUT PLANET ASSEMBLY 16K CAPSTAN 10

8.50 5.64 4.25 24.80 17.05 7.75 0.69 VENT/FILL PORT LEVEL PORT (BOTH SIDES) Ø0.75 Ø2.44 3.38 3.58 8.50 Ø4.75 7.16 3.58 3/4-10UNC-2B X 1.25 DEEP 4-PLACES 5.63 2.55 4x Ø0.65 5.50 DRAIN PORT 7.16 4.25 8.50 11

38 11 35 3 32 34 39 19 7 31 20 17 8 18 40 6 27 30 29 33 12 24 13 5 9 20 4 16 15 28 14 23 2 24 26 23 10 22 36 37 25 22 1 21 22 12

PARTS LIST ITEM QTY PART NO DESCRIPTION ITEM QTY PART NO DESCRIPTION 1 1 338376 HOUSING-GEAR, MACHINED, 23 2 402130 BEARING-BALL, 6215-SKF 2 1 247044 CARRIER ASSEMBLY-INPUT 24 3 490064 RING-RETAINING, DNH-130 3 1 330013 PISTON-BRAKE, MACHINED, 25 2 490063 RING-RETAINING, DNS-75 4 1 355146 SHAFT-INPUT 1 26 1 490055 RING-RETAINING, DNS-42 5 1 431034 COUPLING-MOTOR 27 1 490066 RING-INTERNAL RETAINING 6 5 330012 DISC-BRAKE 28 1 462079 O-RING-5.234 ID X.139 DIA 7 1 330014 PISTON-BACKUP BRAKE, MACHINED 29 1 462067 O-RING-2.225 ID X.210 THK 8 6 330011 STATOR-BRAKE, 30 1 462068 O-RING-3.10 ID X.210 THK 9 1 355143 SHAFT-OUTPUT, 31 1 462069 O-RING-2.975 ID X.210 THK 10 1 431025 COUPLING-INPUT CARRIER 32 1 462070 RING-BACKUP, 3.143 ID X.076 THK 11 1 458178 MOTOR-HYD 9.8 C.U.IN. 33 1 462071 RING-BACKUP, 3.018 ID X.076 THK 12 1 334827 RING GEAR 34 1 462072 RING-BACKUP, 2.268 ID X.076 THK 13 6 414897 CAPSCREW-3/8-16NC X 1LG,SOCKET HEAD 35 1 490049 RING-INTERNAL RETAINING 14 1 470106 PIN-CAPSTAN SHAFT 36 1 456008 RELIEF FIT-1/8-27PFT,BALL CHECK,Z/P 15 5 424035 PIN-DRUM DRIVE 37 1 468042 REDUCER-3/4-16 O-RING X 1/8NPTF 16 1 338375 HOUSING-BRAKE, MACHINED 38 2 414511 CAPSCREW-1/2-13 X 2.0 LG SOC HD 17 1 442223 GASKET-MOTOR FLANGE 39 4 414159 CS-5/16-18UNCX2.50,HXHD,GR5,ZP,N/P 18 11 494124 SPRING-BRAKE 40 1 509134 ASSEMBLY-TUBE, HYD BRAKE RELEASE 19 1 516013 VALVE-MTR CONTROL 20 2 432018 FITTING Parker#4-C5OX-S T-LOK, 7/16-20 90 degree 21 1 486086 SEAL-OIL 22 3 468041 PLUG-3/4-16 (-8 SAE) WITH O-RING, SOC HD 13

RAMSEY WINCH warrants each new RAMSEY Winch to be free from defects in material and workmanship for a period of one (1) year from date of purchase. The obligation under this warranty, statutory or otherwise, is limited to the replacement or repair at the Manufacturer's factory, or at a point designated by the Manufacturer, of such part that shall appear to the Manufacturer, upon inspection of such part, to have been defective in material or workmanship. This warranty does not obligate RAMSEY WINCH to bear the cost of labor or transportation charges in connection with the replacement or repair of defective parts, nor shall it apply to a product upon which repair or alterations have been made, unless authorized by Manufacturer, or for equipment misused, neglected or which has not been installed correctly. RAMSEY WINCH shall in no event be liable for special or consequential damages. RAMSEY WINCH makes no warranty in respect to accessories such as being subject to the warranties of their respective manufacturers. RAMSEY WINCH, whose policy is one of continuous improvement, reserves the right to improve its products through changes in design or materials as it may deem desirable without being obligated to incorporate such changes in products of prior manufacture. If field service at the request of the Buyer is rendered and the fault is found not to be with RAMSEY WINCH's product, the Buyer shall pay the time and expense to the field representative. Bills for service, labor or other expenses that have been incurred by the Buyer without approval or authorization by RAMSEY WINCH will not be accepted See warranty card for details. RAMSEY WINCH COMPANY PO BOX 581510 Tulsa OK 74158-1510 Telephone: (918) 438-2760 FAX: (918) 438-6688 Visit us at www.ramsey.com 914231-0409-A