Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

Similar documents
2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

No. 1/9/SP&PA-2013 / Dated:

Thereafter, the agenda items were taken up.

I. Operational Feedback from NLDC:

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

List of the participants is enclosed at Annexure I.

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Report. the feasibility of

RFP Corrigendum No. 01

No.1/9/06-SP&PA/ Dated: As per List enclosed-

Standing Committee on Power System Planning in Northern Region

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

Evacuation system from Chamera III HEP (231 MW).

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

Annexure. Technical Details Package 1

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Agenda Note for Standing Committee Meeting of Power System Planning in ER

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

HVDC Systems in India

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

Sl.No. ECONOMIC ACTIVITY Saharanpur Muzaffarnagar Shamli Bijnor Moradabad Sambhal

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

No. उ. क ष. व. स./प रच लन/106/01/2017/ द न क: स व म : प रच लन समन वय उपसममत क सदस य To: Members of OCC

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Indian Power System Framework

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013.

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y


भ रतसरक र Government of India व द य तम त र लय Ministry of Power उत तरक ष त र यव द य तसवमवत Northern Regional Power Committee

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Shortage

Shortage

STUDY OF MOBILITY PLAN IN LIGHT OF UPCOMING METRO RAILWAY IN MEERUT CITY REROUTINGOF CITYBUSROUTES ALLOCATIONOFDEPOTSOFUPSRTCANDMCTSL

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Shortage

Disclosure to Promote the Right To Information

Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

MINUTES OF THE 47 th SLCF MEETING HELD ON

Need Assessment Document (NAD) DDUGJY

'J!TW ~ / Government of India ~ ~ / Ministry of Power ~ ~ ~1~<t1~UI / Central Electricity Authority ~ ~ ~ 4~~'1\J1-11 ~q;-;y ~

DETAILS OF ONGOING LINES UNDER TRANSMISSION WEST S Tend. Length Est. cost

Agenda of 11 th System Studies Meeting in NER

DETAILS OF ONGOING LINES IN TRANSMISSION SOUTH

North Eastern Regional Power Committee

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

Draft National Electricity Plan

Delhi-NCR. Ambient Air Quality Data of AIR LABORATORY. For the Month of November, 2017

Bihar: Transmission System Study for 13 th Plan

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

Shortage

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

PRAGATI ENGINEERING COLLEGE

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

NATIONAL INSTITUTE OF WIND ENERGY

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Before the. Case No. 106 of 2009

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Transcription:

भ रत सरक र / Government of India व य त म लय / Ministry of Power क य व य त धकरण / Central Electricity Authority स व भवन, आर. क. प रम, नई द ल -110066 Sewa Bhawan, R.. Puram, Delhi-110066 ISO: 9001:2008 No. 1/9/2013-SP&PA/ Dated: 22 nd October, 2014 -As per List Enclosed- Subject: The 35 th Meeting of the Standing Committee on Power System Planning of Northern Region Sir, In continuation of earlier notice vide even no. dated 24 th September, it is to intimate that the 35 th Meeting of the Standing Committee on Power System Planning of Northern Region would be held at 1100 Hrs. on 3 rd November, 2014 instead of 27 th October, 2014 at Board Room, PTCUL, idyut Bhavan, Near ISBT Crossing, Majra, Dehradun Uttarakhand. The Agenda for the Meeting has also been uploaded in the CEA website www.cea.nic.in (path to access-home page-wing specific documents/power System wing/standing Committee/ Northern Region). You are requested to make it convenient to attend the meeting. Nodal Officer for the meeting in Uttarakhand S.. Sharma, Director (Project), PTCUL Tele Phone No. 0135-2645753, Mobile No. 09837893761 Mail ID shrawan_k_sharma@ptcul.org Yours Sincerely, Sd/- (Goutam Roy) Director SP&PA Ph. No. 011-26711015 Mobile No. 08376817933 Email goutam.roy@nic.in Copy for information to: 1) PPS to Chairperson, CEA 2) PPS to Member PS, CEA 3) Joint Secretary(Trans.), Ministry of Power, Shram Shakti Bhawan, Rafi Marg, Delhi

List of Addressee- 1 - Member Secretary NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, atwaria Sarai, Delhi - 110016 (Fax-01 1-26865206) 4. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, Delhi- (Fax-01 1-24361018) 7. Director (T&RE) NHPC Office Complex, Sector - 33, NHPC, Faridabad - 121 003 (Fax-0129-2256055) 10. Director (Projects) POWERGRID, Saudamini, Plot no. 2, Sector - 29, Gurgaon-122 001 Fax-0124-2571932' 13. Director (Technical) RRPNL, idyut Bhawan, Jaipur- 302 005. Fax 0141-2740794 16. Director(Technical) HPSEB Ltd. idyut Bhawan, SHIMLA-171004 (Fax-01 77-2813554) 19. COO(CTU), POWERGRID, Saudamini, Plot no. 2, Sector - 29, Gurgaon-122 001 (Fax-0124-2571809) 2. Director (W&P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow - 226 001 (Fax-0522-2287822) 5. Director (Projects) PTCUL, Urja Bhawan, Campus, anwali Road Dehradun- 248001. Uttarakhand (Fax-0135-2763431) 8. Director (Operations) Delhi Transco Ltd. Shakti Sadan, otla Marg, Delhi - 11 0 002 (Fax-01 1-23234640) 11. Director(Technical), Punjab State Transmission corporation Ltd. (PSTCL), Head Office The Mall, Patiala - 147 001 (Fax-0 1 75-230401 7 ) 14. Director (Technical) HPNL, Shakti Bhawan, Sector -6, Panchkula - 134 109 (Fax-01 72-2560640) 17. Director(Technical) THDC Ltd. Pragatipuram, Bypass Road, Rishikesh- 249201 Uttarakhand, (Fx-0135-2431519) 3. CEO, POSOCO B-9, Qutab Institutional Area atwaria Sarai Delhi - 110016. (Fax : 26852747) 6. Member (Power) BBMB, Sectot-19 B Madya Marg, Chandigarh-1 60019 (Fax-01 72-2549857) 9. Chief Engineer(Transmission) NPCIL,9- S-30, ikram Sarabhai Bhawan, Anushakti Nagar, Mumbai - 400 094 (Fax-022-25993570, 25563350) 12. Chief Engineer(Operation) Ministry of Power, UT Secretariat, Sector-9 D Chandigarh - 161 009 (Fax-01 72-2637880) 15.Managing Director, HP PowerTransmission Corporation Ltd., Barowalias, halini, SHIMLA-171002 (Fax-01 77-2623415 18. Development Commissioner (Power), Power Development Department, Grid Substation Complex, Janipur, Jammu. Fax No. 191-2534284

Draft Agenda note for 35 th Standing Committee Meeting on Power System Planning in Northern Region. 1. Confirmation of the minutes of 34 th Meeting of the Standing Committee on Power System Planning in Northern Region held on 23/12/2013 1.1 The minutes of the 34th meeting of Standing Committee on Power System Planning in Northern Region held on 8th August 2014 at Delhi at NRPC, atwaria Sarai, Delhi, were circulated vide CEA letter No. No. 1/9/SP&PA-2013 / Dated: 25.08.2014. POWERGRID had indicated that the reactive compensation associated with Inter-Regional system strengthening scheme for WR and NR part-b had some inadvertent errors. The same has been corrected and is given as below. Line Reactors 1. Jabalpur Pooling station - Orai 765 D/c Approx Line length Line Reactor- From bus Line Reactor- To bus 419km 330 MAR 330 MAR 2. Orai Aligarh 765k D/c line 300km 240 MAR 240 MAR 3. Orai Orai(UPPTCL) 400k D/c 38km - - (Quad 4. LILO of one circuit of Satna-Gwalior 80 km 765 2XS/c at Orai Existing Satna-Gwalior 765k S/c 350km 240 MAR 240 MAR* (Switchable) Satna-Orai 765k S/c 320km 240MAR 240 MAR (Switchable to be retained) Orai-Gwalior 765k S/c 130km - - 5. LILO of Agra-Meerut 765 k S/c line at Aligarh 35km Existing Agra-Meerut 765k S/c 270 km 240 MAR (Switchable) Agra-Aligarh 765k S/c 130km - - Aligarh-Meerut 765k S/c 200km 240 MAR (Switchable) 6. LILO of anpur Jhatikara 765 k S/c at Aligarh S/s 35km Existing anpur-jhatikara 765k S/c 465 km 330 MAR (Switchable) 330 MAR (Fixed)** anpur-aligarh 765k S/c 330km 330 MAR (Switchable) 330 MAR (Switchable) Aligarh-Jhatikara 765k S/c 190km 330 MAR (Presently fixed to be made Switchable) 1

Bus Reactors 7. 2x1000MA, 765/400 substation at Orai GIS S/s 8. 765 Switching Station at Aligarh (GIS) Approx Line length Line Reactor- From bus 2x330MAR bus reactor 2x330MAR bus reactor Line Reactor- To bus ** Existing non-switchable Line reactor at Gwalior end of Satna-Gwalior line which is to be LILOed at Orai shall be converted into switchable line reactor * Existing non-switchable Line reactor at Jhatikara end of anpur-jhatikara line which is to be LILOed at Orai shall be converted into switchable line reactor along with a spare unit. No observations on any other items of the Minutes of the Meeting have been indicated by any of the constituents. Accordingly, the minutes of the meeting has been confirmed with the above change may please be confirmed. 2. 220k lines for connectivity of new 400/220k ISTS substations under ISTS strengthening It is observed that many a times the 220 k outlets from the new 400/220k substations are not available matching with the commissioning of new 400/220k substations which remain unutilized for need of connectivity at 220k level. The issue was discussed in the 34 th meeting of the Standing Committee of NR, wherein Members were of the view that when ever any state put up any proposal for construction of S/S under ISTS, it must be accompanied by planned 220 k systems to be constructed by the STU. So that the underlying 220 k STU network is available matching with the commissioning of the ISTS substation for drawl of power. Members may please deliberate and concur. 3. LILO of oteshwar Pooling Station- Meerut 765 D/c line at proposed 765/400 Substation Rishikesh: Agenda by PTCUL The issue was discussed in the 34 th SCM of NR. The issue was deferred as POWERGRID had requested the need for further study. PTCUL had proposed to upgrade the existing 400/220k Substation at Rishikesh to 765k voltage level through LILO of one ckt. of oteshwar Pooling Station- Meerut 765k D/c line. It was indicated that upgrading the 2

existing 400 k Rishikesh Substation to 765/400k would improve reliability and improve the power supply to Uttarakhand & will also remove the power transfer constraint on 400k Roorkee -Muzaffarnagar line during low hydro generation condition. Load flow studies had been carried for the proposal and it is seen that there are unbalanced loading in the lines from Rishikesh with 765k Rishikesh - Meerut line section would be underutilized. The proposal would not be a cost effective one as it would include creation of 765k substation. Considering the power requirement of the area, as a alternative it is proposed to provide oteshwar Pooling Station- Rishikesh 400k D/c (Quad) line. It would provide additional outlet from Tehri/ otewshwar complex and independent feed for providing reliable and quality power supply to Rishikesh area. Members may please deliberate and concur. 4. LILO of 220k Dhauliganga- Pithoragarh(PG) for construction of 220k GIS S/s at Jauljibi, Pithoragarh & 2x100 MA, 220/132k GIS s/s at Almora in umaon region: The issue was discussed in the 34 th SCM of NR. The issue was deferred as POWERGRID had requested the need for further study. PTCUL had proposed to construct 220k GIS Substation at Jauljibi for meeting the future load demand & reliability of power supply in Pithoragarh and nearby region. The 220 GIS Substation at Jauljibi was proposed by LILO of 220k Dhauliganga- Pithoragarh(PG) line. PTCUL proposed that whenever the 220k Dhauliganga - Bareilly would be upgraded to 400k level, PTCUL would connect the substation at 220k S/S of Pithoragarh (PG). The proposal has been further studied and PTCUL has intimated that as per field report of EE(O&M), the present total connected load in Jauljivi and nearby area (approx. 30MA) is being catered from 132 S/s Pithoragarh (PTCUL) through long 33 feeders. 3

Annexure-A Due to remote area and long 33 line length from Pithoragarh to Jauljivi and non availability of 132 substation and line in Jauljivi and nearby area, 220/33 S/s Jauljivi is now proposed to be created by LILO of one circuit of 220 Dhauliganga-Pithoragarh (PGCIL) line at 220 S/s Jauljivi (PTCUL) under Phase I. Here, it is to mention that 220 k Pithoragarh S/s which is presently energized by LILO of one ckt. of Dhauliganga-Bareilly 400 k D/C line charged at 220 k, has only 2X100MA 220/132k ICTs for feeding load at Pithoragarh. Later when the Dhauliganga-Bareilly line would be upgraded to 400k level, supplying the load Jauljibi, Almore from Pithoragarh would overload the 220k ICTs at Pithoragarh. It is therefore proposed that under Phase II 400/220k, 2X315MA GIS Substation at Jauljibi in Pithoragarh area may be considered under ISTS. by LILO of one line of 400 k Dhauliganga-Bareilly (PGCIL) at Jauiljibi(ISTS). Dhauliganga HEP and Bareilly (PG) would feed Jauljibi 400/220k substation. Under Phase II, the existing link of Dhauliganga-Pithoragarh (PGCIL) line at 220 S/s Jauljibi (PTCUL) 4

under Phase I would be disconnected and the S/S would now be connected to Jauljibi 400/220k substation through 220 k D/C line. Jauljibi 400/220k substation would be the feeding point for supply of power to 220k Jauiljibi, Almora and other loads of the umaon region. The substation would improve the voltage, reliability and quality of power supply in umaon hills while catering to future load growth. PTCUL may draw requisite no. of 220k lines from the substation. Accordingly following proposal is put for consideration of the Committee. Phase I. i) Creation of 220/33 S/s Jauljivi by PTCUL by LILO of one circuit of 220 Dhauliganga-Pithoragarh (PGCIL) line at 220 S/s Jauljivi (PTCUL). Phase II. ii) iii) iv) Creation of 400/220k, 2X315MA GIS Substation at Jauljibi in Pithoragarh area under ISTS by LILO of one line of 400 k Dhauliganga-Bareilly (PGCIL) at Jauiljibi(ISTS). 220 k Jauljibi (PTCUL) under Phase I would be connected to Jauljibi (ISTS)400/220k substation through 220 k D/C line. (line and the S/S under PTCUL scope) The existing link of Dhauliganga-Pithoragarh (PGCIL) line at 220 Jauiljibi S/s would be disconnected 5

220 Jauljivi area network(phase-i) Dhauliganga HEPP 280MW 220 S/s 20MW 132 S/s Ranikhet 13 22. 2 6 m 18MW 10 m 220 S/s Pithoragarh(PG CIL) 13 2 22 0 132 S/s athgodam 14.06m 132 132 S/s Bhowali 34m 132 132 S/s Almora 76.6m 132 132 S/s Pithoragarh 25MW 30MW Barielly 6

220 Jauljivi area network(phase-ii) 220 400 S/s Jauljivi 400 220 280MW Dhauliganga HEPP 220 S/s Almora( ) 132 S/s Ranikhet 18MW 220 S/s 220 S/s Pithoragarh (PGCIL) 40 0 20MW 13 2 13 22. 2 6 m 10 m 13 2 132 S/s athgodam 14.06m 132 132 S/s Bhowali 34m 132 132 S/s Almora 76.6m 132 132 S/s Pithoragarh 25MW 30MW Barielly Members may please deliberate and concur. 4. Construction of 220 S/s Almora(GIS) and its associated 220 lines PTCUL has proposed to construct 220 GIS substation at Almora and its associated 220 D/C Almoran -Pithoragarh(PGCIL) line which has already been approved by CEA vide their office letter no. 12A/G/2006 SP& PA dated 09.01.2007. The 400 Substation at Jauljivi is being proposed in central sector, The proposed 220/132 Substation Almora will be energized through 220 D/C Almora Jauljivi (ISTS) line which will improve the voltage, reliability and quality of power supply in umaon hills & also strengthen the umaon Hills Transmission System while catering to future load growth Presently there is no 220/132 link between Garhwal & umaon zone of Uttarakhand Hills, which adversely affects reliability of power supply in the region. In second phase, construction of 220 D/C line is proposed from 400 S/s aranprayag () to 220 S/s Almora (GIS) through which the interconnection for power transfer between Garhwal & umaon zone will be undertaken. 7

220 Almora area network 220 400 280MW Dhauliganga HEPP 400 S/s Jauljivi 220 220 S/s Almora( ) 132 S/s Ranikhet 18MW 220 S/s 220 S/s Pithoragarh (PGCIL) 40 0 20MW 13 2 13 22. 2 6 m 10 m 13 2 132 S/s athgodam 14.06m 132 132 S/s Bhowali 34m 132 132 S/s Almora 76.6m 132 132 S/s Pithoragarh 25MW 30MW Barielly Members may please deliberate and concur. 5. Re-planning of UITP Network for Alaknanda Basin CERC vide its Order dated 31-01-2013 has declared the UTIP Scheme as Deemed interstate Transmission Scheme. CTU is Nodal Agency for vetting of the comprehensive transmission scheme in accordance of the Connectivity Regulation. 8

UITP Network in Alaknanda Basin (Approved by CEA) 300 MW Badrinath 220 Lin e 171MW 250MW Tamak 400MW 520MW Tapovan 444 MW Pipalkoti 400 Line 400/220 S/s 400 Pipalkoti 400 Line 220/33 S/s Josimath Lin e 400 Line 400 Lin e(e xist ing) 400/220 S/s Srinagar ashipur Muzaffarnagar PTCUL have informed that due to extra ordinary circumstances & local resistance at the site, construction of 400k S/s at Pipalkoti could not materialize. Accordingly, PTCUL has proposed to construct 220/33k Joshimath S/s as 400/220/33 k in place of 400 k Substation at Pipalkoti. For the time being, PTCUL would construct line from Tapovan ishnugad HEP(520 MW) directly to 400/220k Srinagar(PTCUL) S/s(Quad) bypassing the proposed 400 Pipalkoti Substation (Phase I). 9

Re-Planned UITP Network in Alaknanda Basin(Phase-I) 520MW Tapovan 400MW 400 Lin e 400 Lin e(e xist ing) 400/220 S/s Srinagar ashipur Muzaffarnagar When 400k Joshimath would be constructed, one circuit of Tapovan ishnugad HEP to 400/220 k Srinagar (PTCUL) S/s would be LILOed at Joshimath. Members may please deliberate and concur. 6. Evacuation of Ghatampur TPS (3x660 MW), Uttar Pradesh Ghatampur Thermal Power Station is an intra-state project being constructed as a Joint enture of Neyveli Lignite Corporation and Uttar Pradesh Rajya idyut Utpadan Nigam Ltd.(UPRUNL). The 3x660MW Ghatampur TPS is located at anpur in Uttar Pradesh. UPPTCL has proposed following transmission system for its evacuation: 21/765 Generator Transformers, 2x 1500MA, 765/400k & 3x200MA, 400/132k ICTs at Ghatampur TPS along with 6-8 Nos. of 132 k outlets Ghatampur TPS -Agra(UP) 765k S/c Line-240 km Line reactors of 189 MAR at either end Agra(UP) -Greater Noida(UP) 765k S/c Line- 200 km 10

Line reactor of 189 MAR at Agra end Ghatampur TPS - Hapur 765k S/c Line -400 km line reactors of 330 MAR at either end Ghatampur TPS- anpur(pg) (400 or 765k) 400k D/c line The evacuation Plan was discussed with CEA & CTU in a meeting recently held in CEA. The evacuation system was found to be generally in order. The Detailed load flow plot with the above system is at Annexure I. Members may please note 7. 220 k Underlying system from the Central Sector 400 k S/S proposed in UP In the 34 th meeting of the Standing Committee of the Northern Region, the issue of readiness 220 k underlying transmission lines from the proposed central Sector 400 k S/S in UP, which are likely to be commissioned in the 2015-17 timeframe was discussed. In that meeting, UPPTCL was not ready with the details of the 220k line for evacuation of power from the central Sector 400 k S/S in UP, which are likely to be commissioned in the 2015-17 timeframe. Accordingly, the Standing Committee advised UPPCL to firm up the details of the 220 k line to be commissioned for evacuation of power from the Central sector 400 k S/S which are likely to be commissioned in the 2015-17 timeframe. UPPTCL has now intimated the details which are as under: i) Bagpath PG 400/220 k S/S U/C Bagpath (PG) 400 Bagpath 220 k D/C -18 km Bagpath (PG) 400 Baraut 220 k D/C - 25 M ii) Saharanpur PG 400/220 k S/S U/C Saharanpur (PG) 400 Behat 220 k D/C -50 km LILO of Saharanpur (220 k) Nanauta 220 k S/C at Saharanpur (PG) iii) Sohawal PG (Faizabad)400/220 k S/S (Existing) Sohawal (PG) 400 Tanda 220 k D/C -80 km Sohawal (PG) 400 Barabanki 220 k D/C -70 km iv) Shahjahanpur PG 400/220 k S/S U/C Shahjahanpur (PG) 400 Hardoi 220 k D/C -60 km v) Gorakhpur PG 400/220 k S/S (Existing) Gorakhpur (PG) 400 Gola 220 k D/C -60 km vi) Bhaunti PG 400/220 k S/S (Existing) LILO of one Ckt. of Panki Bhauti 220 k D/C line at Rania 11

UPPCL has indicated that more 220 k feeders are being planned from the above 400k S/S after examining the load growth and ROW feasibility. Members may please note 8. Transmission works at 400,220k undertaken by UPPTCL UPPCL Plans to construct transmission system at 400,220k level with the connectivity. The works are proposed to be commissioned by 2017. These works are in addition to the ongoing transmission projects. The details of the works as proposed by UPPCL are as under. Additional 765,400 k Substations & Lines in XII Plan 2014-2017 S.N. Name of Substations & Lines ckt (km) Remarks 1 2 3 4 765k Substations & Lines 1 Agra UP-765/400k S/S 2x1500 MA 2 i.agra UP(765) -Lalitpur 765k,2xSC line - 378km 756 ii. Agra UP(765) - Meerut PG or Gnoida (765) 765k SC line -200km 200 Ghatampur TPS Evacuating 765k Lines (Ghatampur TPS 765/400/ 132 k 2x1500,3x200 MA) i. Ghatampur TPS -Agra UP (765) 765k SC line-238km 238 ii. Ghatampur-Hapur 765 v SC line-400km 400 400k Substations & Lines 1 Agra (South) 400/132 k S/S,3x200 MA Agra UP (765) -Agra (South) DC line - 71 k 142 2 Math 400/220 k S/S, 2x315 MA i. LILO of Agra - Moradnagar 400 k SC line at Math - 27 km 54 ii. Agra UP (765) - Math SC line -141 km 141 3 arelibagh 400/132 k S/S, 3x200 MA LILO of one ckt of Meja - Rewa Road 400 k DC line (Q) 40 at arelibagh - 20 km (Q) Under Construction Under Construction Under Construction Under Construction 12

4 Hardoi Road 400/220/132 k S/S, 2x500+2x160 MA LILO of Unnao - Sarojininagar 400 k SC line at Hardoi 50 Road - 25 km 5 Shamli 400/220/132 k 2x500+2x160 MA i ii i. Shamli - Aligarh (400) 400k DC line - 180 km 360 Other 400 k Lines LILO of one ckt of Agra - Agra (PG) 400 k DC line at Agra UP (765) -35km 70 LILO of Agra - Moradnagar 400 k SC line at Agra UP (765)- 79km 158 iii Ghatampur - anpur(pg) 400 k DC line -30km 60 Under Construction Under Construction Additional 220 k Substations &Lines in XII Plan ( 2014-2017) S.No. Name of Substations & Lines 1 2 3 4 I Etah-II or Sikandrarao 220/132 k 2x160 MA 1 Etah-II -Aligarh(400) DC 140 2 Etah-II-Etah (Existing) DC 80 II Raja a Talab 220/132/33 k,2x160+2x40 MA 1 Raja a Talab (220)-Aurai (400) DC 60 2 Raja a Talab(220)-Sahupuri(220) 80 III Azamgarh II 220/132/33 k,2x160+2x40 MA 1 LILO of Sarnath(400)-Azamgarh(II) 220 k SC 50 2 Azamgarh II - Aurai (400) 220 k SC 60 I Gola 220/132/33 k, 2x160+2x40 MA 1 Gorakhpur PGCIL-Gola (220) DC 120 Partapur(Meerut) 220/132/33 k,2x160+2x40 MA 13 Ckt. ms. Remarks

1 Partapur-220(Meerut)-Hapur(765) DC 100 I Shamli-II 220/132/33 k, 2x160+2x40 MA 1 Shamli-II(220)-Shamli(400) DC 60 2 Baikala(Muzaffarpur-II)-Shamli-II(220) DC 80 II Modipuram-II 220/132/33 k, 2x160+2x40 MA 1 Modipuram-II(220)-Shamli(400) -DC 100 III Hapur 220/132,220/33 k, 2x160+3x60 MA 1 Hapur(220)-Hapur(765)- DC 30 LILO of Simbholi-Shatabdinagar 220 k SC at Hapur 50 2 220 IX Bus Adda Ghaziabad 220/33 k, 2x60 MA 1 LILO of Moradnagar(220)-Partab ihar(220) 10 X at Bus Adda (Ghaziabad)-220 Moradabad-II 220/132/33 k, 2x160+2x40 MA 1 LILO of Moradabad(220)-Nehtaur(220) at 30 XI Moradabad-II (220) Baikala(Muzaffarnagar-II) 220/132/33 k,2x160+2x40 MA 1 Baikala -220 (Muzaffarnagar)-Shamli 80 (400) DC 2 LILO of Muzaffarnagar()-Nanauta(220) 40 XII at Baikala (220) Chandausi 220/132/33 k, 2x160+2x40 MA 1 Badaun-Sambhal LILO 220 k SC at Chandausi 40 XIII Noida-45-220/33, 220/132 k,1x160,2x60 MA 1 Noida(148)-Noida-45 - DC 40 XI 1 Inderprasth 220/33 k - (Deposit) 3x60 MA Ataur(400)Ghaziabad -Inderprasth(Ghaziabad)-220 k DC 2 Loni(220)-Inderprasth-220 k -DC 30 X Barabanki 220/132/33 k, 2x160+2x40 MA 30 14

1 Sohawal(400)-Barabanki(220) - DC 150 XI Chakgajaria (Lucknow)220/132/33,220/33 k - (Deposit) 2x100+2x40+1x60 MA 1 Sultanpur Road(400)-Chakgajaria (Lucknow) 20 XII 220 k- DC Awas ikas 220/33 k - (Deposit) 5x60 MA 1 Sultanpur Road(400)-Awas ikas (Lucknow) 4 220 k -DC XIII Faridpur 220/132/33 k 2x160+2x40 MA 1 LILO of Roza-Dohna(220)- SC line at Faridpur(220) 20 Jagrti ihar 220/132/33 k (Deposit) 2x160+2x40 XIX MA 1 Hapur (765)-Jagrti ihar - DC 60 2 Partapur(220)-Jagrti ihar - DC 40 XX Phoolbagh 220/33 k, 3x60 MA 1 Unnao-RPH(anpur) LILO SC line 20 XXI Lalitpur 220/132 k 1 Lalitpur TPS-Lalitpur(220) DC 30 XXII Hardoi Road 400/220/132 k 1 Hardoi Road(400)-Hardoi Road(220)- DC Others 220 k Lines 1 Shahjahanpur(400) PGCIL-Hardoi(220) SC Line 2 LILO of Gokul-Hathrus 220 k SC at Math(400) 3 Math(400)-Chatta DC 4 LILO of Firozabad-Shamsabad 220 k SC Agra PG 30 60 30 60 4 Under Construction Under Construction Under Construction Under Construction Members may please note. 15

9. Creation of new 400k substations in Gurgaon area and Palwal area as a part of ISTS- Agenda by HPN HPNL has requested for creation of new three 400 k substation one at adarpur & other at Sohna Road in Gurgaon area and one 400k substation at Prithla in Palwal area as a part of Inter State Transmission System (ISTS). The first two S/S has been proposed to cater the load demand of sector 58 to sector 67 and sector 68 to sector 80 sectors of Gurgoan respectively. The creation of Prithala S/S would meet the power demand of the area to be developed under Prithala Development Plan. Beside this it will also act as a main feeding source to Palwal, Rangla Rajpur and Meerpur urli. A meeting was held in CEA on 3 rd September 2014 to discuss the same. During the meeting it was decided that joint studies would be carried out by HPNL & CTU in POWERGRID office. HPNL has furnished the district wise load projections of Haryana for 13 th Plan (2021-22). Looking at the load growth in and around Gurgoan, it is proposed that a bigger ring connecting the existing 400 k S/S of Dhonanda Faruk Nagar (to be created by LILO of Dhonda- Daulatabad D/C line)- Daulatabad - Gurgoan(PG) Sona- Manasher Neemrana- Dhonanda may be created around Gurgoan area with 400 k Quad conductor. The load flow result for the same is at Annex-II The 400k Sona as well as adarpur S/S would be constructed as 400/220 k, 2x500 MA. Prithla Substation in Palwal area is proposed to be constructed as 2*500MA, 400/220k by Agra-Prithala 400k D/c Quad lines. The Prithla S/S would be connected to adarpur by 400 k Quad D/C line and adarpur to connected to Sona Road by 400 D/C line. The details of the proposed ring would be as under: 16

The proposed S/S at adarpur S/S would feed load to sector 58 to 67 of Gurgoan and 220 k Badshapur and pali. HPN has envisaged the following network to evacuate power from 400 k adarpur S/S a) LILO of 220k Badshapur Pali D/C line at Qudarpur on M/C tower b) One 220 k M/C line (four ckt.) with twin moose conductor to feed the 220 k S/S envisaged at sector 59,61, 63 & 65 of Gurgoan. c) One 220 k D/C line with twin moose conductorto feed the 220 k S/S envisaged ain sector 64, 65 &67 Similarly the proposed S/S at Sona Road S/S would feed load to sector 68 to 80 of Gurgoan and 220 k ankerkheri(sona) Rangala Rajpur. HPN has envisaged the following network to evacuate power from 400 k Sonar S/S a) One 220 k M/C line (four ckt.) with twin moose conductor to feed the 220 k S/S envisaged at sector 69,70,75,75A,76 Gurgoan. b) Provision for 220 D/C line with twin conductor for future. As such the Standing Committee may consider the following : 17

i) Agra Prithala, 400 k D/C Quad line ii) 400 k D/C Quad line from Prithala adarpur(400 k) S/S iii) 400 k D/C Quad line from adarpur Sona Road (400 k ) S/S iv) LILO of Gurgoan Manesar D/C line at Sona Road S/S v) Neemrana Dhonanda(HPNL) 400 k D/C Quad line vi) Creation of 400/220k, 2*500MA substations at adarpur in Gurgaon area vii) Creation of 400/220k, 2*500MA substations at Sona Road in Gurgaon area viii) Creation of 400/220k, 2*500MA substations at Prithala in Palwal area ix) To cater to the future load growth of the area, provision of 2*500MA transformation capacity augmentation at these substations may be kept. Members may discuss & concur. 10. LILO of Sikar-Neemrana 400k D/c line at Babai(RRPNL) : Sikar is an existing 400/220k substation of POWERGRID. Presently it is connected to the grid through Bhiwadi- Neemrana- Sikar 400k D/c & Agra Sikar 400k D/c (Quad) lines. Further, following lines have already been approved for connectivity of Sikar: Sikar-Jaipur (PG) 400k D/c Sikar-Ratangarh 400k D/c During the last Standing Committee meeting, RRPNL had submitted the studies for the proposal of LILO of one/two ckts of Sikar- Neemrana 400k line at Babai. Babai is an under construction 400/220k substation of RRPNL under associated transmission system for Suratgarh Super Critical TPS (2x660MW) and is to be connected to Suratgarh through 400k D/c line. The study submitted by RPNL was considered. Simulation has also been carried out by POWERGRID to study the effect of proposed LILO. Both Babai and Sikar are connected to Suratgarh TPS and Jaipur. It is observed that LILO of one circuit causes unbalanced loadings on Sikar- Neemrana lines. Further, LILO of both circuits of Sikar- Neemrana at Babai results in off-loading of Sikar-Babai section of this line. In view of this, proposed LILO of Sikar- Neemrana line at Babai does not appear to be appropriate. The issue was discussed in details in the 34 th SCM, wherein there was a proposal for construction of one line from Babai to Mohindergarh in addition to the LILO of one circuit at Babai. The proposal was also not agreed by the committee as the committee was of the opinion that the connection between Babai to Mohindergarh would not serve any fruitful 18

purpose and the proposal was dropped. However, POSOCO was of the view that LILO of Sikar- Neemrana line at Babai would add up to the stability of the power supply to the North Eastern part of Rajasthan. Accordingly the committee may consider the following i) LILO of one ckt. of Sikar- Neemrana line at Babai ii) Babai Bhiwani D/C line The Babai Bhiwani D/C line would give strong connection to Babai with the Hydro Generation. Members may deliberate and concur 11. Requirement of 2 nos. 220 k bays at PGCIL's 400/220k GSS Sikar-Agenda by RRPNL During the 34 th Standing Committee Meeting held on 8-8-2014, augmentation of transformation capacity at 400/220k Sikar(PG) substation by 1x500 MA along with 2 nos. of 220 k line bays has been agreed and a confirmation of RPN was required regarding requirement of 2 nos. 220 k line bays. In this regard RRPNL has intimated that additional 2 nos. of 220 k line bays are required alongwith 1x500 MA (3" transformer) at Sikar for termination of a 220 k D/c line to nearby 220 k GSS or nearby 220k line(s) after getting the technical feasibility examined as per the field conditions. Members may note. 19

ANNEXURE-I

144005 QADARPUR 405.7 404.5 144001 PRITHHLA 407.6-27.4 122.9 27.4-133.9-27.4 122.9 27.4-133.9 293.9 16.3-293.4-54.2 16.3-293.4-54.2 184922 AGRA 413.6-661.2-28.1 667.7 8.1-661.2-28.1 667.7 8.1 B1 0.0-3208.0 184441 GURGAON 404.2 184450 MANESAR 402.8-223.7 40.1 223.8-223.7 40.1 223.8 14.0 131.4-14.0-145.9 14.0 131.4-14.0-145.9-555.7-67.3 562.0 1 0.0 114.6 B1 115.0-50.3-50.3 0.0 144408 DHANONDA 184445 NEEMR-PG 400.2 206.8-79.7-206.2 48.7 206.8-79.7-206.2 48.7 B1 113.1 0.0 184459 MAHIN_H 398.0 144409 FARUH-NAGAR 402.7 144404 JHAJAR_N 400.0-972.8 362.6 973.3-357.8-972.8 973.3-357.8 367.4-104.8-365.9 60.5 367.4-104.8 60.5 86.6 49.0-86.6-59.7 86.6 49.0-86.6-59.7 1-693.1 1 550.0 56.2R -365.9 144402 DAULATABAD4 402.9-48.5 12.9 48.5-27.6-48.5 12.9-27.6 310.7-310.5 108.1-310.5 108.1-120.3 293.9 0.2 48.5 144006 SONAROAD 0.0 399.0 184469 BHIWN-PG 395.2 181.6 40.3-181.2-63.8 181.6 40.3-181.2-63.8 184400 JHAJJAR4 400.0-523.9 106.6 527.2-110.2-528.0 108.1 531.4-111.2 1 457.5-41.2R 2 457.5-41.2R 3-36.1R 400.0 310.7-120.3 362.6 294.5-65.5 294.5-65.5-293.6-293.6 13.2 13.2 142322 QADARPUR 223.2 172.2 641.6 142208 PRITHLA 222.2-728.1 19.8 734.6-137.3 142212 SOHNAROAD 222.8 77.6 364.7-75.4 142239 MANESAR 222.8-220.1 29.6-17.5 29.6 220.1-220.1 142260 DHANONDA 227.2-263.4 119.5 265.0-88.4-263.4 265.0-88.4-263.4 265.0-88.4 119.5 119.5 223.0 33.1-21.9 211.6-364.7 23.5-17.5 220.1-633.3 142025 FARUH-NAGAR -211.6 142244 GURGAON-72 224.5-188.5 42.4 189.2-28.2-190.6 33.0 190.6-18.8-296.5 75.9 298.3-53.4-302.5 52.4 302.5-29.8 1 142238 DAULTABAD 221.4-175.3 12.0 175.9 0.1-175.3 12.0 175.9 0.1-175.3 12.0 175.9 0.1-211.6 33.1 211.6-21.9-211.6 33.1 211.6-21.9 ANNEXURE-II