PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

UNIVERSITY OF TOLEDO

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

HOISTING APPARATUS Inspection Guidelines

29 CFR Ch. XVII ( Edition)

MOBILE CRANES ONSHORE PROGRAM

Ryko Solutions, Inc. Crane and Jib Safety Program

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

CRANE, HOIST AND SLING SAFETY PROGRAM

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Overhead and Gantry Crane Program and Standard Operating Procedure

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Chapter 22 Mobile Cranes

Safe Operating Practices & Maintenance Manual

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Crane & Hoist Safety Guidelines

ESSENTIAL SAFETY RESOURCES

Crane Safety Resource Guide P AGE 1

Crane, Hoist, and Sling Safety Program October 24, 2017

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

STEEL ADJUSTABLE-HEIGHT GANTRY CRANE INSTRUCTION MANUAL

FHS-Series Steel Fixed Height Gantry Cranes Instruction Manual

HEALTH AND SAFETY MANUAL

Hand Chain Hoists. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

Table of Contents Rev. 10/31/2018 FHA MANUAL. FHA-series Fixed Height Aluminum Gantry Crane Instruction Manual

Occupational Safety and Health Admin., Labor

JIB-FM Series Floor Mounted Jib Cranes Instruction Manual

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Cranes. OSHA Office of Training & Education 1

Crane and Hoist Safety Program

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A

Provided by: Operating, Maintenance & Parts Manual

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

Responsible Unit: Facilities Management

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

Moving materials: Crane and hoist safety

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Powered Industrial Trucks

Owner s Manual Gantry Cranes

MOBILE CRANES AND HOIST

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Mobile Harbor Crane Safe Operating Procedures

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Distributed by Tri-State Equipment Company Inc. Web: PH: FAX:

1/2-TON MANUAL CHAIN HOIST

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY

While handling materials, employees must abide by the following requirements:

Crane & Derrick Operation Procedures for Construction

Ladder Safety Program

The Little Mule Lineman s Strap Hoist is the preferred hoist of utility industry professionals.

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

OPERATOR S MANUAL LEVER HOIST 0.75 TON 1.5 TON 3 TON. These Lever Hoists meet or exceed the following standards: CE ANSI B30.21

Product Line Glossary Terms

OPERATOR S MANUAL CHAIN HOIST 0.25 TON 0.5 TON 1 TON 2 TON. These Hand Chain Hoists meet or exceed the following standards: CE ANSI B30.

HOIST ARMY TYPE HOIST IMPORTANT

Fixed Ladder: A ladder that cannot be readily moved or carried because it is an integral part of a building or structure

LX1 Inspection Manual for Model LX1B. Table of contents 1. INSPECTION CLASSIFICATION DAILY INSPECTION FREQUENT INSPECTION...

Pagla Sewage Treatment Plant

PORTABLE LADDER SAFETY PROGRAM

Capacity (tonnes) 0.25t. No. of Falls 1. Load Chain (mm) Load Chain Grade 80

Lifting Beams & Custom Engineered Lifting Devices

CX HAND CHAIN HOIST OWNER S MANUAL ¼ Ton and ½ Ton Capacity Effective: May 9, 2017

ALUMINUM ADJUSTABLE-HEIGHT GANTRY CRANE INSTRUCTION MANUAL

LX MINI PULLER OWNER S MANUAL 1/4 and 1/2 Ton Capacities Effective: May 19, 2017

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

SECTION 14: AERIAL LIFT PROGRAM

Operation of Fork Lift Trucks

Owner s Manual. END TRUCKS Top Running & Underhung SERIES 3

Rev. 10/27/2015 CDL-2000, MANUAL

OPERATION SERVICE PARTS TUGIT2. Manually Operated Short Handle Lever Hoist A3140-XXX

CRANES & MOBILE LIFTING EQUIPMENT COMPANY POLICY AND PROCEDURE

ELECTRICAL GROUNDING SAFETY PROGRAM

Owner s Manual & Safety Instructions

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

ABSTRACT. Federal Program Change, Notice of Intent and Equivalency Required. See Section VI. National, Regional, and Area Offices.

Excavation worker killed by flying rigging when hook fails

Powered Industrial Trucks Workgroup The workgroup met on to discuss the applicability of the proposed rule for general industry on Powered

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Section 15: Cranes, Hoists and Rigging

TONS. Before each shift: Before operating: Before initial operation of hoist:

CRANE OPERATION INSTRUCTION AND GUIDELINES

INSPECTION AND MAINTENANCE CHECKLIST

Transcription:

Reed College 3203 Southeast Woodstock Blvd. Portland Oregon 97202-8199 Crane Safety Policy Effective Date: Revision Dates: February 9, 2011, June 25, 2012, July 2016 Review Dates: I. PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... 2 A. DEPARTMENTS... 2 B. REED COLLEGE EMPLOYEES... 2 C. ENVIRONMENTAL HEALTH AND SAFETY OFFICE... 3 D. FACILITIES... 3 V. PROCEDURES... 3 A. GENERAL REQUIREMENTS... 3 B. REQUIRED INSPECTIONS... 4 C. MAINTENANCE REQUIREMENTS... 4 VI. TRAINING... 4 A. HANDLING THE LOAD... 5 B. MOVING THE LOAD... 5 VII. REACTOR CRANE TRAINING... 7 VIII APPENDIX... 7 A. CRANE SAFETY ANNUAL CHECKLIST... 7 B. CRANE SAFETY WEEKLY CHECKLIST... 8 C. DEFINITIONS 9 D. CRANE INVENTORY AND HOIST LOAD SETTINGS 10 CraneSafetyJuly16.dot 1 of 11

I. PURPOSE Cranes are an integral part of our work environment. They increase productivity and promote workload efficiency. Reed College has developed this crane safety program in order to identify potential hazards when working with cranes. Reed promotes training to keep crane operators safe. While these safeguards should protect workers in most situations, there is no substitute for personal knowledge and vigilance when working with cranes. This document is meant to provide guidance for Reed College employees as well as employees contracted by Reed College. II. SCOPE This program is intended for all those who use or work around cranes and hoists on the Reed campus. Crane and chain hoist equipment includes the crane in the Reactor bay, hoists in the Grounds workshop, the Performing Arts Building, and the fifth floor Chemistry mechanical room. III. REFERENCES 1. Occupational Safety and Health Administration (OSHA) standards 29 CFR 1910.179 for overhead and gentry cranes. 2004 2. Occupational Safety and Health Administration (OSHA) standards 29 CFR 1910.180 for crawler locomotive and truck cranes. 2004 3. Oregon Occupational Safety and Health Administration (Oregon OSHA) standards division 3 subdivision N 1926.554 IV. RESPONSIBILITIES A. DEPARTMENTS 1. Each department must notify EHS and Facilities when purchasing a crane for purposes of updating the annual crane inspection list. 2. Each department must notify EHS when hiring a contractor that uses a crane on campus. 3. Each department must ensure that the crane contractor has a crane safety policy in place that meets or exceeds the standards of this document. 4. Each department must ensure campus cranes work is safe and in accordance with OSHA crane safety guidelines. 5. Each department must review these safety procedures with new employees as part of new employee training. CraneSafetyAug16.doc 2 of 11

B. REED COLLEGE EMPLOYEES 1. All employees must follow crane manufacturer s recommendations and safety guidelines. 2. All employees must perform equipment inspections on a regular monthly basis. 3. Employees must never operate damaged or faulty equipment in any form as determined by monthly inspections. 4. All employees are responsible for reporting unsafe crane use. C. ENVIRONMENTAL HEALTH AND SAFETY OFFICE D. FACILITIES 1. Provide guidance regarding safe crane usage as requested. 2. Oversee and revise crane safety policies as needed. 1. Facilities must schedule preventative maintenance on an annual basis by a competent person, or by a government or private agency recognized by the U.S Department of Labor. 2. Facilities will perform routine repairs on equipment. V. PROCEDURES This section addresses the safe and proper use of bridge cranes, including ceiling mounted overhead chain lifts and others having the same fundamental characteristics. These procedures follow the guidelines in OSHA 29 CFR 1910.179 for safe crane usage. A. General Requirements CraneSafetyAug16.doc 3 of 11

Installation and operation of equipment must meet manufacturer recommendations and OSHA 29 CFR 1910.179 requirements for safe crane usage. 1. New and altered cranes must be tested to ensure proper hoisting and lowering, trolley travel, bridge travel, and proper function of limit switches including locking and safety devices. A rated load (the maximum load for which a crane or individual hoist is designed and built by the manufacturer and shown on the equipment nameplate(s) test is also required. 2. Modifications to the crane will be allowed only if the manufacturer has approved the modification and the approval is documented in written form. A qualified engineer checks the new rated load which is then posted on the crane and supporting structure. The supporting structure to which the hoist is attached shall have a safe working load equal to that of the hoist. 3. The rated load of a crane must be plainly marked on each side of the crane. If the crane has more than one hoisting unit, each hoist must have its rated load marked on its floor or its load block. The marking must be clearly legible from the ground or floor. These ratings are: reactor crane - 4 tons, fifth floor chemistry - 2 tons Performing Arts - 1 ton, and Grounds workshop - ½ ton. 4. A minimum clearance of three inches overhead and two inches laterally must be maintained between the crane and obstructions. It is important to keep passageways or walkways clear so the movements of the crane do not jeopardize personnel safety. 5. All hooks must be equipped with a safety latch to prevent loads from becoming detached from the hook. CraneSafetyAug16.doc 4 of 11

6. Replacement chain must be the same size, grade, and construction as the original chain furnished by the crane manufacturer, unless otherwise recommended by the crane manufacturer. 7. Loads shall be attached to hooks by means of slings or other approved devices. 8. All operations near overhead lines must be consistent with 29 CFR 1910.333 (c)(3): Overhead line safety requirements. B. REQUIRED INSPECTION 1. All cranes must be inspected regularly, before initial use, frequently (monthly) and periodically (yearly). Requirements may be found on the crane safety checklist. 2. Before initial use, inspect a new crane to insure that the crane meets all OSHA safety standards. C. MAINTENANCE REQUIREMENTS VI. TRAINING 1. A preventative maintenance program follows the crane manufacturer recommendations on daily and periodic maintenance. 2. When performing crane maintenance, follow these procedures: a) All controllers must be in the off position. b) The main emergency switch must be in the open position and locked out. c) Post Out of order, or Warning, signs on the crane and on the floor around the crane. All safety guards and devices must be back in place or reactivated before placing the crane back into full operation. Only those who have fulfilled the requirements of crane training may operate cranes on campus. Training for designated crane operators consists of the following: program review, observation of crane in use by a trained individual and exhibition of safe use of the crane while a trained operator supervises. CraneSafetyAug16.doc 5 of 11

A. HANDLING THE LOAD 1. Insure that all hoist ropes and chains are free from kinks and tangles. 2. Do not wrap hoist chains and ropes around the load. 3. Attach the load to the load block with the appropriate slings or other approved devices. 4. A crane loaded beyond the manufacturers recommended rating of a safe load capacity will create a collapse hazard. Reed s crane capacities are: reactor crane, 4 tons (8000 pounds); 5 th floor chemistry chain lift, 2 tons (4000 pounds); Performing Arts chain lift, 1 tons (2000 pounds); and grounds workshop chain lift, ½ ton (1000 pounds), or the smaller amount of rating of any attachment on crane. 5. Insure that all hoist ropes and chains are free from kinks and tangles. 6. Do not wrap hoist chains and ropes around the load. B. MOVING THE LOAD 1. Before starting a hoist, meet the following conditions: (1. hoist rope or chain must not be kinked; (2. safely bring the hook over the load in such a manner to avoid swinging of the hook. 2. Before lifting more than a few inches, check the load, it must be well secured and properly balanced in the approved sling or lifting device. 3. During hoisting take care to: (1, avoid sudden acceleration or deceleration of the moving load; and (2, avoid contact with obstructions. 4. Do not use crane use for side pulls at anytime. 5. While individuals are working to attach or detach a load from the hook. There shall be no hoisting or lowering. 6. Do not carry loads over people. 7. Do not leave the controls when there is a load suspended in the air. 8. Test the brakes whenever the load is approaching the maximum load rating. Raise the load a few inches and apply the brakes. 9. A warning signal must sound whenever a load or the hook is approaching people. CraneSafetyAug16.doc 6 of 11

VII. REACTOR CRANE TRAINING Persons who have fulfilled the requirements of the crane operator training are the only authorized crane operators in the Reed Reactor facility. Training for designated crane operators must consist of a review of the Reactor Crane Training Program, as well as observing use of the crane by a trained individual and then exhibiting safe use of the crane while a trained operator supervises. The reactor office located in Chemistry 102 keeps a record of trained individuals on file. CraneSafetyAug16.doc 7 of 11

VIII. APPENDIX Appendix A: Crane Safety Annual Checklist Inspect the following items annually for Reed College cranes and hoists. A certified crane professional should do the inspection. A crane idle for more than 6 months needs this inspection before using. This checklist follows guidelines in accordance with OSHA 1910.179(j)(1) for crane inspection requirements. DID YOU Inspect crane for deformed, cracked, or corroded members. Yes No Inspect crane joints for loose bolts or rivets. Yes No Inspect crane for cracked or worn out sheaves and drums. Yes No Inspect crane for worn, cracked or distorted parts such as pins, bearings, shafts, gears, rollers, locking and clamping devices. Yes No Inspect crane for excessive wear on brake system parts, linings, pawls, and ratchets. Yes No Test load, wind, and other indicators over their full range, for any significant inaccuracies. Yes No Inspect crane for excessive wear of chain drive sprockets. Yes No Inspect electrical apparatus, for signs of pitting or any deterioration of controller contactors, limit switches, and pushbutton stations. Yes No Inspect all functional operating mechanisms for maladjustment interfering with proper operation. Yes No Inspect all hooks for deformation, cracks, or safety latch missing, or deformed. Yes No Inspect all hoist chains, including end connections, for excessive wear, twist, distorted links interfering with proper function, or stretch beyond manufacturer's recommendations. Yes No Inspect all functional operating mechanisms for excessive wear of components. Yes No Signature: Date: CraneSafetyAug16.doc 8 of 11

Appendix B: Crane Safety Weekly Checklist The following items are to be inspected weekly for Reed college cranes and hoists in regular use. An employee or student that has fulfilled the crane operator training may perform weekly safety inspections. Cranes and hoists not in regular use are not required to have weekly inspections; such cranes are subject to an annual inspection prior to being used after an idle period of 6 months or longer. Cranes and hoists not in use for more than 1 month, but less than 6 months must have a weekly inspection done prior to use. This checklist has been developed in accordance with OSHA 1910.179(j)(1) for crane inspections requirements. DID YOU Inspect all functional operating mechanisms for maladjustment interfering with proper operation. Yes No Comments: Inspect all hooks for cracks, or safety latch missing, or deformed. Yes No Comments: Inspect all hoist chains, including end connections, for excessive wear, twist, distorted links interfering with proper function, or stretch beyond manufacturer's recommendations. Yes No Comments: Inspect all functional operating mechanisms for excessive wear of components. Yes No Comments: Signature: Date: CraneSafetyAug16.doc 9 of 11

Appendix C: Definitions A "crane" is a machine for lifting and lowering a load and moving it horizontally, with the hoisting mechanism an integral part of the machine. Cranes whether fixed or mobile are driven manually or by power. [OSHA 29 CFR 1910.179(a)(1) A "hoist" is an apparatus which may be a part of a crane, exerting a force for lifting or lowering. [(1910.179(a)(42)] Rated Load - The maximum load for which a crane or individual hoist is designed and built by the manufacturer and is shown on the equipment nameplate.[1910.179(a)(50)] CraneSafetyAug16.doc 10 of 11

Appendix D: Crane Inventory and hoist load settings. This appendix has been developed to help users identify the types of cranes located on the campus of Reed College, as well as the safe load capacities as recommended by the crane manufacturer. The Reactor crane is a bridge crane. This crane has a load capacity rating of: 4 tons The Grounds workshop crane is an overhead chain lift. This chain lift has a load capacity rating of: ½ ton CraneSafetyAug16.doc 11 of 11