3ATS & 3NTS J-design 600 A 3ADTS & 3NDTS A Transfer Switches. Installation Manual. Installation A DANGER. Table of Contents WARNING

Similar documents
Installation Manual. E-design A Transfer Switches A

Florham Park, NJ USA Call (ASCO) for sales or service

Operator s Manual Series ATS Automatic Transfer Switches 600 through 1200 amps

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

Florham Park, NJ USA Call (ASCO) for sales or service

Operator s Manual Series ADTS Automatic Delayed Transition Transfer Switches, amps

Operator s Manual Series ADTS Automatic Delayed Transition Transfer Switches 150 through 4000 amp. Rating Label. Nameplate A

www. ElectricalPartManuals. com Operator s Manual

Operator s Manual Series ATS Automatic Transfer Switches 30 through 4000 amp. Rating Label. Nameplate C TABLE OF CONTENTS

section-page Table 1. Transfer switching device ratings. Conditional short circuit current

Operator s Manual Series ACTS Automatic Closed Transition Transfer Switches 150 through 4000 amps A. Rating Label.

600 D 220 E 230 J Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

Operator s Manual Series ATB Automatic Transfer & Bypass Isolation Switches 150, 260, and 400 amp sizes A. Rating Label.

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

Owner s Manual. Series 165 Automatic Transfer Switches rated 100 and 200 amps, single phase, 240 V ac for automatic 2 wire start generators

design prefix 50 Hanover Road, Florham Park, New Jersey USA (ASCO), for service call (ASCO)

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

Catalog Number Identification with Elements Explained

Operator s Series 300 Generator Paralleling System

Operator s Manual Series ATB Automatic Transfer & Bypass Isolation Switches G design 1000 through 3000 amp. Rating Label B

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

WARNING. Instructions for Combination Bypass Isolation and Transfer Switches Amps I.L A FILE APPLICATION SAFETY PRACTICES

Accessory 44 Strip Heater. Automatic Transfer Switches. Wiring. Mounting H

Manual Transfer Switch

Operator Manual. Transfer Switch. RSS100 and RSS Cummins Inc. All rights reserved. English

Transformer Installation, Operation, and Maintenance Manual

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

O & M Manual for the EATON Generator Ready Loadcenter

Owner's/Installation Manual

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

Quick Start Guide TS 910

Installation Instructions

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

A. Submit manufacturer's literature and technical data before starting work.

Installation Instructions Electric Heaters 5 20 kw

Installation KCS/KCP. Automatic Transfer Switches. Models: 30 to 4000 Amperes. TP /12e

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

Installation Instructions Electric Heaters 5 20 kw

Owner's Manual 600 and 800 Amp RTS Automatic Transfer Switch

Operation and Installation RDT-HFNA-0100B RDT-HFNC-0200A MPAC 300. Automatic Transfer Switches. Models: Electrical Controls: TP /07b

INSTALLATION INSTRUCTIONS

REFERENCE MANUAL FORM: MX-TRM-E REL REV MTE

OTEC Transfer switch open transition

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

Quick Start Guide TS 910 & TS 920

Technical Manual. DLM Module. This manual should remain with the unit.

Owner s Manual. For Automatic Transfer Switch. PowerPact Home Standby Generator MODEL NUMBER: SERIAL NUMBER: DATE PURCHASED:

ASCO 7000 Series Power Transfer Switch Technical Data and Ordering Information

This Automatic Transfer Switch with built-in Load Center includes an Express Install Kit.

POWER SYSTEMS, INC. Owner s Manual. Integrated Load Center. 200 Amp, 600 Volts. This manual should remain with the unit.

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

ASCO 7000 Series Power Transfer Switch Technical Data and Ordering Information

Company Switch Installation Instructions and User Manual

Owner s Manual. For Automatic Transfer Switch. 100 Amp. Model Number RTG16EZA3 MODEL NUMBER: SERIAL NUMBER: DATE PURCHASED:

ASCO Low Voltage Automatic Transfer Switch Systems

User s Manual. ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual

Parts Manual. Transfer Switch. OTPCB (Spec A) 150/225/260 Amps. English Original Instructions (Issue 4)

User s Manual. ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual

CR193 Vacuum Limitamp* Contactors

EXTREME R MOTOR OWNER'S MANUAL

INSTALLATION MANUAL MODEL #100947, AMP MODEL #100949, AMP RELIANCE CONTROLS ARL SERIES AUTOMATIC TRANSFER SWITCH

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

User s Manual. ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual

Transfer switch OTEC and OTECSE open transition

Optimal Series. Automatic Transfer Switch. Installation and User Manual for the OPT2225 Automatic Transfer Switch. Full Version

Transfer Switch. RA Series 100A (Spec B) 200A (Spec B) 400A (Spec A) English Original Instructions A056K730 (Issue 3)

High Frequency SineWave Guardian TM

Transfer switch OTEC open or delayed transition

Parts Manual. Transfer Switch. OTPCC (Spec A) 300/400/600 Amps. English Original Instructions (Issue 4)

USER'S GUIDE. WiseHP11 SINGLE PHASE HIGH PRECISION AVR SERVO-MOTOR AUTOMATIC VOLTAGE STABILIZER

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

PLASTIC FOLDING ARM KIT This kit is designed for the 1600 model barrier gate operators only. Recommended for low headroom applications.

Installation Sheet January, 2016 Supersedes February, 2013

CurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN

User s Manual. ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

FC/FCA 12, 24, 32 & 48 VOLT, 6 & 10 AMP BATTERY CHARGER OPERATION & MAINTENANCE GUIDE

Operation and Installation RXT. Automatic Transfer Switch. Model: Amp Automatic Transfer Switches

Operation and Installation RXT. Automatic Transfer Switch. Model: Amp Automatic Transfer Switches

O & M Manual for the EGSU Automatic Transfer Switch with RTC-100 Control and Integral Loadcenter-100 Amp

Installation Instructions For Motor Control Center (MCC) Units

Transfer switch GTEC open or delayed transition

CALTRAP INSTALLATION AND OPERATIONS MANUAL

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

Owner's Manual. LTS Load Shed Switch. This manual should remain with the unit.

Owner's Manual. GenReady Load Center and Transfer Switch. This manual should remain with the unit. Model Numbers. GenReady Basic Panelboard

Owner's Manual. LTS Load Shed Switch. This manual should remain with the unit.

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

E C. Carter Electric, Inc. Generator - Operation. Owner: Shelby City School District New High School 32 Dick s Drive Shelby, Ohio 44875

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

M T E C o r p o r a t i o n. MTE Series RL. Line/ load Reactors USER MANUAL PART NO. INSTR -011 REL MTE Corporation

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Parts Catalog. Generator Set TGHAA (Spec A C) Printed in U.S.A. Replaces (Spec A) 1 97

Cutler-Hammer IB E. O & M Manual for the Cutler-Hammer ATC-400 Controlled AGswitch

COOKSON OWNER'S MANUAL

4000 SYSTEM OPERATING MANUAL

NORTH CAROLINA SHERIFFS ASSOCIATION

Transcription:

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS 3ATS & 3NTS J-design 600 A 3ADTS & 3NDTS 150-600 A Transfer Switches DANGER is used in this manual to warn of a hazard situation which, if not avoided, will result in death or serious injury. is used in this manual to warn of a hazardous situation which, if not avoided, could result death or serious injury. DANGER CAUTION CAUTION is used in this manual to warn of a hazardous situation which, if not avoided, could result in minor or moderate injury. Refer to the outline and wiring drawings provided with the 3ATS, 3NTS, 3ADTS, or 3NDTS for all installation and connection details and accessories. Refer to User s Guide 381333-400 for the Goup G Controller status display messages, time delays, pickup and dropout settings, and adjustments. Rating Label Each transfer switch contains a rating label to define the loads and fault circuit withstand/closing ratings. Refer to the label on the transfer switch for specific values. Do not exceed the values on the rating label. Exceeding the rating can cause person injury or serious equipment damage. An experienced licensed electrician must install the transfer switch. Installation These transfer switches are factory wired and tested. Installation requires mounting, connecting service cables, and connecting engine start and auxiliary control circuits (if required.). Table of Contents INSTALLATION Mounting...1 Power Connections...2 Engine Starting Contacts...2 FUNCTIONAL TEST 1- Manual Operation...3 2- Voltage Checks...5 3- Electrical Operation...6 TESTING & SERVICE Transfer Test...7 Preventive Maintenance...7 Manual Load Transfer...7 TROUBLESHOOTING...8 Supporting Foundation The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the transfer switch for all mounting details including door opening space. If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and 1 inch minimum clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment. Mounting Refer to the outline and mounting diagram and mount the transfer switch according to details and instructions shown on the diagram. Mount it vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the transfer switch. NOTICE Protect the transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the transfer switch. 381333-404 A 381333-404 A ASCO Power Technologies Page 1

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS Line Connections Refer to the wiring diagram provided with the transfer switch. All wiring must be made in accordance with the National Electrical Code and local codes. DANGER De-energize the conductors before making any line or auxiliary circuit connections. Be sure that the Normal and Emergency line connections are in proper phase rotation. Place the engine generator starting control in the OFF position. Make sure engine generator is not in operation. Testing Power Conductors Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs, and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation. Connecting Power Cables After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the transfer switch. Make sure that the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the transfer switch. Be careful when stripping insulation from the cables, avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label. Harnesses The transfer switch is connected to the left side of the controller by a plug-in harness. Auxiliary Circuits Connect auxiliary circuit wires to appropriate terminals on the transfer switch as shown on the wiring diagram. Controller Ground A grounding wire must be connected to the controller s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges. Engine Starting Contacts The engine control contact connections are located on the transfer switch for 3ATS & 3NTS or upper right of the enclosure for 3ADTS & 3NDTS. Connect signal wires to appropriate terminals as specified on the wiring diagram, Table A, and shown in Figure 1. Table A. Engine Start Connections. When normal source fails contact closes contact opens left side of transfer switch For 3ADTS & 3NDTS the terminal block TB is located in the upper right side of the enclosure. terminal block TB on 3ATS & 3NTS Terminals on transfer switch TB1 and TB2 TB1 and TB3 Figure 1. Engine start and auxiliary circuit terminal block TB located on 3ATS & 3NTS transfer switch. window indicators O is open C is closed Emergency contacts Normal contacts Figure 2. Main contact position indicators on right side. Page 2 ASCO Power Technologies 381333-404 A

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS Functional Test The functional test consists of three checks: manual operation, voltage checks, and electrical operation. NOTICE Do these checks in the order presented to avoid damaging the transfer switch. 1 Manual Operation A maintenance handle is provided on the transfer switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically). frame Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers. 1. After deenergizing both power sources, open the enclosure door. Locate and remove the maintenance handle from the clip on the left side of the transfer switch. See Figures 3, 4, 5, & 6. See Figure 2 for the contact position indicators. 2. Install the handle into the hole in the molded. Move the handle up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris. 3. 3ADTS and 3NDTS have two contact shaft s. See Figures 5 and 6 and Table B. 4. Return the transfer switch to the Normal position. Note: If Normal and Emergency connections are reversed this operation is also reversed. UP closes the handle Normal source contacts (lower) DOWN closes the Emergnecy source contacts (upper) Figure 3. Maintenance handle operation on 3ATS & 3NTS. left side of transfer switch maintenance handle contact shaft clip Figure 4. Maintenance handle on 3ATS & 3NTS left side of transfer switch maintenance handle Emergency source contact shaft clip Normal source contact shaft Hubs shown with Emergency source contacts open and Normal source contacts closed. See Table B on page 4. Figure 5. Maintenance handle on 3ADTS & 3NDTS 381333-404 A ASCO Power Technologies Page 3

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS handle frame UPPER SHAFT Emergency contacts UP opens The contacts DOWN closes The contacts LOWER SHAFT Normal source contacts UP closes the contacts DOWN opens the contacts Figure 6. Maintenance handle operation on 3ADTS & 3NDTS Table B. 3ADTS & 3NDTS Maintenance Handle positions. ALL POWER MUST BE OFF Transfer Switch Position Interlocked Shafts Link between contact shafts prevents closing both N & E contacts Maintenance Handle Shaft Indicators up E = O upper contacts open Normal contact shafts up N = C lower contacts closed up Load Disconnected down E = O upper contacts open N = O lower contacts open Emergency down E = O upper contacts closed down N = C lower contacts open Note: The and contact shaft turn in opposite directions through a cam follower mechanism. Note: If Normal and Emergency connections are reversed, this operation is also reversed. Page 4 ASCO Power Technologies 381333-404 A

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS 1 Close the normal source circuit breaker. The normal source accepted and the load on normal lights should come on. 2 3 Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals. Close the emergency source circuit breaker. (Start generator, if necessary.) The emergency source accepted light should come on. Normal Source Accepted Load on Normal Load on Emergency Emergency Source Accepted Figure 7. Four indicator lights. 2 Voltage Checks First check the nameplate on the transfer switch; rated voltage must be the same as normal and emergency line voltages. DANGER Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death could result Perform steps 1 through 6 at the right. Observe the indicator lights. See Figure 7. Black circle means the light is on. 4 5 6 Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch emergency source terminals.* Use a phase rotation meter to check phase rotation of emergency source; it must be the same at the normal source. Shut down the engine-generator, if applicable. The emergency source accepted light should go off. Then put the starting control selector switch (on the generator set) in the automatic position. Close the enclosure door. White circle means the light is off. * If necessary, adjust the voltage regulator on the generator according to the manufacturer s recommendations. The transfer switch will respond only to the rated voltage specified on the transfer switch nameplate. Also see User s Guide 381333-400 for voltage settings in the controller. Continue to 3 Electrical Operation on the next page. 381333-404 A ASCO Power Technologies Page 5

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS 1 The normal source must be available and the generator must be ready to start. Check that the normal source accepted light is on. 2 For 3ATS & 3ADTS press the transfer button. The engine should start and run within 15 seconds. For 3NTS & 3NDTS the generator must be started manually at the generator. The emergency source accepted light should come on. Press this button Figure 8. Transfer button and indicator lights. 3 Electrical Operation This procedure will check the electrical operation of the transfer switch. Close the transfer switch enclosure door and tighten the screws before you test electrical operation. Observe these lights Perform steps 1 through 5 at the right. Observe the status lights. See Figure 8. Black circle means light is on. White circle means light is off. NOTE: For 3NTS manually start the emergency generator at the generator. Then press the transfer button for load transfer. If the inphase transfer feature is activated, transfer may not occur immediately. Transfer will occur when the phase relationship between sources is correct. Press the transfer button again for load retransfer to normal, then manually stop the generator at the generator. Also see User s Guide 381333-400 for inphase transfer and time delay settings in the controller. This completes the functional test of the transfer switch. Leave the engine-generator starting control in the automatic position. 3 4 5 For 3ATS & 3ADTS the transfer switch should transfer to the emergency position. The load on emergency light should come on and the load on normal light should go off. For 3NTS & 3NDTS press the transfer button for load transfer. For 3ADTS & 3NDTS both lights will be off during the delayed-transition transfer time delay. If the transfer to emergency delay is used, the transfer occurs after a time delay. For immediate transfer (bypass timer) press the transfer button again. For 3ATS & 3ADTS the transfer switch should transfer back to the normal position. The load on normal light should come on and the load on emergency light should go off. For 3NTS & 3NDTS press the transfer button for load retransfer. For 3ADTS & 3NDTS both lights will be off during the delayed-transition transfer time delay. If the retransfer to normal delay is used the retransfer should occur after a time delay. For immediate retransfer (bypass timer) press the transfer button again. For 3ATS & 3ADTS the unloaded running delay keeps the generator running for a cool-down period. Then the generator should stop and the emergency source accepted light should go off. For 3NTS & 3NDTS manually stop the generator at the generator (after a cool-down period). Page 6 ASCO Power Technologies 381333-404 A

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS Testing & Service Transfer Test Operate the transfer switch at least once a month by following the Electrical Operation procedure on page 6. Preventive Maintenance Reasonable care in preventive maintenance will insure high reliability and long life for the transfer switch. An annual preventive maintenance program is recommended. ASCO Services, Inc. (ASI) is ASCO Power Technologies national service organization. ASI can be contacted at 1-800-800-2726 for information on preventive maintenance agreements. DANGER Yearly Inspection Hazardous voltage capable of causing shock, burns, or death is used in this transfer switch. Deenergize both Normal & Emergency power sources before performing inspections Clean the enclosure. Deenergize all sources, then brush and vacuum away any excessive dust accumulation. Remove moisture with a clean cloth. Inspect the transfer switch contacts. Deenergize all sources, then remove the transfer switch barriers and check the contact condition. The non-replaceable main contacts are designed to last the life of the transfer switch. Reinstall the barriers carefully. Maintain transfer switch lubrication. Under normal operating conditions no further lubricating is required. Renew factory lubrication if the transfer switch is subjected to severe dust, abnormal operating conditions, or if the TS coil(s) is replaced. Order lubrication kit 75-100. Check all cable connections & retighten them. Torque to values shown on the transfer switch label. Replacement Parts When ordering replacement parts provide the Serial No., Bill of Material No. (BOM), and Catalog No. from the transfer switch nameplate. In the US call 800-800-2726 (ASCO) or contact customercare@asco.com. Manual Load Transfer This procedure will manually transfer the load if the controller is disconnected. Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers. 1. Deenergize both the normal and emergency source (open both circuit breakers). 2. Use the maintenance handle to manually operate the transfer switch to the opposite source. See pages 3 and 4, Manual Operation. 3. Close the enclosure door. If the transfer switch is in the emergency position, manually start the generator and then close the emergency source circuit breaker. 381333-404 A ASCO Power Technologies Page 7

ASCO 3ATS, 3ADTS, 3NTS, 3NDTS Troubleshooting Problem Check in Numerical Sequence 1 Operation 2 Generator 3 Voltage For 3ATS & 3ADTS the enginegenerator set does not start when the transfer test button is pressed or when the Normal source fails. The outage must be long enough to allow for the feature 1C time delay plus engine cranking and starting time. Starting control must be in automatic position. Batteries must be charged and connected. Check wiring to the engine starting contacts. - For 3ATS & 3ADTS the transfer switch does not transfer the load to the emergency source after the gen-set starts. Wait for the feature 2B time delay. For immediate transfer, press the transfer button (bypass timer). If inphase transfer is active, wait for inphase condition. For 3NTS & 3NDTS press the transfer button. Is the generator accepted light on? Generator output circuit breaker must be closed. Generator frequency must be correct. Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). * * There are factory settings. For 3ATS & 3ADTS the transfer switch does not transfer the load to normal source when normal returns or after transfer test. Wait for the feature 3A time delay. For immediate retransfer, press the transfer button (bypass timer). If inphase transfer is active, wait for inphase condition. For 3NTS & 3NDTS press the transfer button. - Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches). For 3ATS & 3ADTS the generator does not stop after load retransfer to the normal source. Wait for the feature 2E delay. Starting control must be in automatic position. - For 3ADTS & 3ADTS the load is deenergized (off). Load Disconnect Timer on display. Wait for the delayedtransition transfer timer. See User s Guide 381333-400. - Not in auto light is always on. For 3NTS & 3NDTS this light is always on, indicating it is a manual transfer switch. - - Alert light is on. Read the display for more information. Refer to User s Guide 381333-400. - - Printed in U.S.A. ASCO Power Technologies, L.P. 2013 Page 8 ASCO Power Technologies 381333-404 A