HS2 Ltd Responses to Transport Select Committee Questions

Similar documents
Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Modernising the Great Western railway

ATO for High Speed Lines. Trevor Foulkes M.A., C.Eng, FIRSE, FIET Head of Control-Command and Signal Engineering

Aging of the light vehicle fleet May 2011

The operating cost model considered the variable elements of operating costs only, as follows:

How will high speed rail transform the sheffield city region

Powering Sydney s Future

Best Practices in Intercity Rail An Infrastructure Manager s Perspective. Nigel Ash Managing Director, Network Rail Consulting TRB January 2014

RESPONSE TO CROSSCOUNTRY CONSULTATION ON PROPOSED TIMETABLE CHANGES FOR DECEMBER 2017.

Risk Management of Rail Vehicle Axle Bearings

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

HS2 and the Capacity Issue

Theme of the Workshop. How the Railways contribute to improving quality of life?

Integrating transport (buses)

Application of claw-back

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Submission to Greater Cambridge City Deal

TORONTO TRANSIT COMMISSION REPORT NO.

Post Opening Project Evaluation. M6 Toll

A Joint initiative by ProRail and Network Rail for ETCS Level 3 Hybrid Demonstration

Investigation into the Department for Transport s decision to cancel three rail electrification projects. Report. Department for Transport

Case study for Park Royal Transit benefits compared to rail

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

Traffic and Toll Revenue Estimates

MERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION SECTION 2: CHESHIRE SCHEMES AND ISSUES

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011.

TransPennine Express and Angel Trains orders 95 Inter-City rail carriages from UK manufacturer Hitachi

THE UK RAIL REPORT 2018

Response of the Road Haulage Association to Transport for London s Consultation. Changes to the Ultra Low Emission Zone and Low Emission Zone.

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Department for Transport. Transport Analysis Guidance (TAG) Unit Values of Time and Operating Costs

Proposed Dounreay - Mybster 275 kv / 132 kv

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

How our experience could serve your ambitions Lessons learnt

Addressing ambiguity in how electricity industry legislation applies to secondary networks

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

EXTENDING PRT CAPABILITIES

Friends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation

Highspeed Rail -an international outlook

Passenger Information The informed traveller

Green Line LRT: Beltline Recommendation Frequently Asked Questions

HS2 Bill Select Committee. Petition No. 691 SAM PRICE. 11 October 2016

Future Funding The sustainability of current transport revenue tools model and report November 2014

Operating bus or coach services abroad if there s no Brexit deal

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

Option 2 - Convert to Automatic Train Control (ATC) Signalling Technology

Estimation of electrical losses in Network Rail Electrification Systems

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Rail Safety and Standards Board

NEW HAVEN HARTFORD SPRINGFIELD RAIL PROGRAM

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail.

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Response of the Road Haulage Association to Leeds City Council. Air Quality Public Consultation Feb 2018

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims.

committee report General Permitted Development Order SPT response to consultation

London 2050 Infrastructure Plan

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT

THE UK RAIL MARKET 2015

TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING

4 COSTS AND OPERATIONS

High Speed Rail Regional Impact

2013 ELR Addendum Note Implications of Siemens / ABP Announcement East Riding of Yorkshire Council

Energy Technical Memorandum

Mechanical Trainstop Systems

UNINTENDED CONSEQUENCE OF THE ELECTRIC VEHICLE REVOLUTION

WLTP. The Impact on Tax and Car Design

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

EVSE Impact on Facility Energy Use and Costs

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level BUSINESS STUDIES 9707/03

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for "A transparent and reliable hull and propeller performance standard"

Prof. Dr. Andrea Giuricin. Benefits of the competition in the High speed rail and the limits to the competition

Response of the Road Haulage Association to Leeds City Council. Air Quality Public Consultation August August 2018

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER

HS2 A National Strategy for High Speed Rail. Tim Smart Head of Engineering & Operations HS2 Ltd

Traffic Calming: traffic and vehicle noise

South Gloucestershire Challenge Fund and Cycle Ambition Fund

Final Report. Solar feed in tariff for regional Queensland for

Overview of Railway Noise Control in Europe

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

A REVIEW OF HIGH-SPEED RAIL PLAN IN JAVA ISLAND: A COMPARISON WITH EXISTING MODES OF TRANSPORT

Senate Standing Committees on Economics 27 June 2014 PO Box 6100 Parliament House CANBERRA ACT 2600 By

Submission to Select Committee on Electric Vehicles - inquiry into the use and manufacture of electric vehicles in Australia

1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).

Mandate to CEN on the revision of EN 590 to increase the concentration of FAME and FAEE to 10% v/v

Examining the load peaks in high-speed railway transport

Controlling the Speed of Tilting Trains Through Curves

Save Ealing s Centre Only the Best will Do

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Appendix 3. DRAFT Policy on Vehicle Activated Signs

Interim Advice Note 137/10. The use of Stepped Speed Limits at Roadworks. Interim Advice Note 137/10 Stepped Speed Limits

Transcription:

HS2 Ltd Responses to Transport Select Committee Questions 1. Without HS2 or a strategic alternative, when will capacity on WCML be exhausted? Please give details of projected load factors by year, section of the route and time of day; and explain what assumptions they make about pricing, including possible measures to smooth demand. The attached maps show HS2 Ltd s forecasts of demand (daily trips) and load factors (proportion of passengers to seats) on the WCML for the Intercity West Coast Train Operator only (currently Virgin Trains) in 2008, 2021 and 2043. The demand forecasts underpinning these maps show that the total number of long distance rail trips over 100 miles will grow by 95% between 2008 and 2043, or around 2% per year on average. On this basis, even allowing for substantial committed capacity increases, the average all day load factor on the West Coast TOC into and out of London is expected to grow from 56% in 2008 to 75% in 2043. As this is an all day average it represents a very significant level of crowding; during the peaks and on busier routes the load factors would be much higher than 75% resulting large numbers of people standing on many trains. The reduction in the load factor shown between 2008 and 2021 on some sections of the WCML reflects the fact that the forecast growth in trip numbers over this period is less than the increase in capacity provided by the introduction of the Very High Frequency timetable at the end of 2008 and the committed lengthening of the Pendolino fleet. However, it is important to note that actual growth on Virgin Trains between 2008 and 2011 of around 10% per year 1

has been noticeably higher than the average growth of 2% per annum forecast. This means that the demand level forecast for 2021 has already been reached and the load factors shown for that year are therefore likely to prove an under-estimate. The forecasts provided assume that the Pendolino fleet retains the same number of first class carriages as today and that current policies on fares remain in place, including an annual increase of RPI+3% between 2012 and 2015 in line with decisions taken following the 2010 Spending Review. While we have not ourselves undertaken any analysis of possible pricing measures to smooth demand, a 2006/07 study by AECOM for DfT which focused on peak flows at busy London termini concluded that very little could be done in practice to shift people out of the peak. Peak fares on long distance services are already significantly higher than during the off-peak, and we believe it unlikely that different pricing structures that is, further increases in fare levels at peak times - would do much to smooth demand. And by 2043 crowding across the whole day is expected to be so high that such pricing measures would be largely irrelevant. There is no simple definition of when capacity on a route is exhausted. It can be defined as the point when additional seating capacity via longer or more frequent trains can no longer be reliably provided, or the point when existing trains become unacceptably crowded. Further complexity is introduced as demand and train frequencies vary considerably across different days of the week and times of day. This means there is no established definition of when a route is full. However, as explained in their evidence to the Committee, analysis has been conducted by Network Rail which indicates that a) by the mid-2020s some train services on the West Coast Main 2

Line will be sufficiently full that ordinarily further capacity enhancement intervention would be considered essential, but b) no further viable options for enhancing capacity will be available. The recently published West Coast Main Line RUS strongly supports a new high speed line as the best solution to long term capacity issues on this route. 2. Has the DfT s guidance been followed fully with respect to the sensitivity tests performed on passenger demand forecasts and income elasticities? As far as possible HS2 Ltd has followed the Department s guidance for forecasting, appraising and sensitivity testing transport schemes. However, given the nature and scale of HS2, HS2 Ltd considered that certain elements of the guidance relating to sensitivity testing and choice of forecast year or demand cap are not appropriate. In terms of testing the robustness of the rail demand forecasts, the guidance recommends that forecasts are subject to sensitivity tests regarding the elasticity of rail demand to changes in income and fares. The impact of these sensitivity tests is to change the rate of growth in rail demand which, in turn, will affect the business case for a project or policy. Since the range of uncertainty regarding the growth in rail demand is greater than uncertainty around the income and fare elasticities, HS2 Ltd chose to undertake more wide ranging sensitivity tests than recommended by the guidance. The tests undertaken by HS2 Ltd included varying the rate of rail demand growth, the year at which growth is capped and the impact of lower (indeed, non-existent) growth in air and car travel. The results of these tests produce a much wider range of demand outcomes than would be obtained from following the guidance. The tests undertaken by HS2 Ltd therefore exceed the guidance and remove the need to carry out the specific tests suggested. The 3

details of all of the sensitivity tests undertaken by HS2 Ltd are set out in Chapter 7 of the Economic Case for HS2 Consultation Document. 3. What is the base case or do-minimum scenario (in terms of more rolling stock or track capacity) on which the answers to Q1 above are predicated? Can you confirm that the same base case is used in calculating the BCRs of HS2 and the strategic alternatives such as Rail Package 2? The do minimum scenario includes all major rail schemes to which Government was committed as of summer 2009. Among the more important schemes this includes 106 additional Pendolino vehicles on the WCML, IEP trains running on the ECML and Crossrail. The Chiltern Evergreen 3 upgrade is not included, as it was not agreed at that point. By 2043 crowding on some services is expected to become so severe that it causes instability in the demand model. To increase confidence in model performance the capacity of all long distance services on the ECML was therefore further increased by 20% above that assumed by IEP, even though this does have the consequence of potentially understating the benefits of HS2. The base case used to assess the network-level strategic alternatives published as part of the suite of consultation documents included a similar allowance of additional capacity on the ECML. Separately, in updating the economic case for the original rail packages, additional modelling instability was encountered and a further adjustment was required. This was achieved by lengthening all Pendolino services to 11 cars in the base case and is acknowledged in the report on this update. 4

4. What assessment has been made in the business case of the implications for HS2 of Evergreen 3 the improved Chiltern line service? HS2 Ltd has not modelled the impact of Evergreen 3, and hence the exact impact on the HS2 business case is unknown. However, it is our view that the implications of including this scheme are likely to be small. Even with the upgrade, journey times on the Chiltern route will still be longer than the WCML and onward access options from Marylebone more limited than at Euston. More importantly, the Chiltern route is only a viable alternative for those passengers travelling between London and Birmingham whereas HS2 is serving a much wider market. We expect to be exploring this further as part of our advice to Secretary of State following the consultation. 7. We were told by TfL that they were worried about capacity at Euston to handle and disperse the passenger flows generated by the combination of HS2 and existing routes. They told us that Crossrail 2 would need to be in operation before the opening of HS2 to handle demand. We have also received representations about the disruptive impact of the Euston HS2 works on the existing train service into Euston. Can you comment on these issues? HS2 would increase the numbers of national rail passengers using both the mainline and Underground stations at Euston. As well as rebuilding the mainline station improvements to the Underground station would also be made, including a new direct link to Euston Square. These works would be expected to deal with crowding issues in the Underground station. 5

In terms of crowding on the underground trains, our analysis indicates that the extra number of Underground passengers at Euston due to HS2 would be small compared with the overall numbers already using the Underground. Whilst high quality public transport access and dispersal at all HS2 stations would undoubtedly be desirable to maximize the benefits of the new line, HS2 Ltd is not in a position to comment on the value for money of particular schemes. Even without HS2, the number of national rail passengers arriving or departing Euston will grow by 100% by 2043 resulting in around 8,700 additional passengers using the Underground station during the morning peak. The average loading of all London Underground services travelling through Euston Underground in the 3 hour AM peak period is currently 138% and is expected to increase to 185% in 2043 without HS2. Both the Northern and Victoria lines which stop at Euston are likely to be particularly heavily crowded. By 2043, HS2 Ltd estimates some 5,500 additional rail passengers would use Euston Underground Station in the morning peak as result of HS2 Phase 1 but this is equivalent to an increase in the total number of passengers travelling on London Underground services passing through Euston of just 2%. As a result of HS2 Phase 1 we estimate only a small additional increase in crowding on LUL services at Euston from 185% to 191% Accordingly, any requirement for additional underground capacity would be predominantly triggered by general growth, not the effect of HS2. We believe that the same conclusion holds, in principle, for the wider Y network which would further increase demand at Euston but may also limit demand growth at Kings Cross St Pancras as passengers transfer to high speed services from the ECML and MML. We have not, however, analysed these numbers in equivalent detail, as we have yet to finish our work on developing the route and business case for links to Manchester and Leeds. HS2 Ltd will be working with TfL on the impacts at Euston as the Manchester and Leeds work is finalised, and is ready to provide any necessary input to TfL s wider ongoing 6

strategy for modernising and improving Underground services should a decision be taken to proceed with HS2. Impact on existing train services into Euston Our Euston station proposal was developed from the outset to minimize disruption to users during its construction. Euston station would be one of the most complicated areas of HS2 to construct. It would be undertaken over a number of years in several stages. Staging was developed on the basis of constructing new platforms on the western side to provide initially temporary platforms for existing classic services during subsequent construction stages and then progressively rebuilding the existing station in a number of stages. Upon completion of each stage, new platforms would be bought into service immediately. At the current feasibility stage of the project, the proposals provide at least 14 platforms at all times. This followed an examination of the current standard off-peak and morning peak service. The latter demands the use of all 18 platforms at times and represents the worst case. We concluded that the off-peak service could be maintained with a minimum of 11 platforms with minor adjustments to operational practice to reduce some long turnaround times. We considered a 12th platform would be useful to maintain all-day operational flexibility for special events and the like. The most critical period currently in the Morning peak is 08:40 09:10, with all 18 platforms being in use for part or all of this period. In order to operate the current volume of trains with a minimum of 14 platforms, we concluded turnaround times for some services would need to be reduced in line with those achieved at other similar London terminals. This would require detailed changes to arrival and departure times. However, by so doing it would be possible to maintain the current quantum of services, their frequency and general service intervals. 7

The London and South East Route Utilisation Strategy, July 2011 (Chapter 4, Table 4.1), notes that Euston currently operates less trains per hour in the peak than other London main line termini which have a similar mix of long distance and commuter services. This reflects extended platform occupation for some services. For example, the Highland Sleeper arrives before the critical peak but the empty stock remains occupying a platform until 0926 at present. Therefore through the period of Euston development we concluded that the existing train service could be maintained. Passengers would experience some level of inconvenience through building works changing pedestrian, public transport and road access during the multiple stages of the works, similar to other major rebuilding projects of which the most recent and relevant was St Pancras. We noted also in our report that on occasions it would be necessary to close the station entirely for short periods in order to stage the work. This would typically be to disconnect the track from one set of platforms and reconnect to another set, with the accompanying alterations to the signalling and overhead electrical equipment. Such closure would probably last several days, and would need to be timed to coincide with periods of lower demand such as long Bank Holidays or during the summer. The extent and timing of such closures would be developed if the project proceeds and be planned in conjunction with the availability of alternative routes. 8. Do you foresee any capacity problems on WCML north of Lichfield if HS2 opens in 2026 but the second phase to Manchester (and Leeds) does not start to open until 2032? Can the northern part of the line accommodate traffic from both HS2 and the classic line, including freight? 8

We do not foresee any significant capacity problems on WCML north of Lichfield, subject to the completion of Network Rail schemes as set out in the Technical Appendix to our 2009 Report. We considered the effect of the Day One service on the capacity of each route section of the WCML north of Lichfield including both routes towards Manchester (via Crewe and via Macclesfield). Our baseline was the existing capability of the routes concerned including any relevant NR committed schemes. We concluded that sufficient capacity would exist to operate the proposed pattern of HS2 services without detriment to other Train Operating Companies and Freight Operating Companies. However we do acknowledge that detailed timetabling work for a potential 2026 timetable would be necessary and would expect to work with Network Rail should the project be developed. We based our conclusion on the service pattern modelled for Day One and the change it would represent, as shown below: London to Existing Trains per Hour from London Pendolino or Voyager Assumed Future Trains per Hour from London Pendolino or Voyager HS2 Total Crewe 0 1 0 1 +1 Chester 1 1 0 1 0 Liverpool 1 0 2 2 +1 Manchester 2 1 2 3 +1 via Stoke Manchester 1 0 1 1 0 via Crewe Glasgow 1 1 1 2 +1 Difference 9

TOTAL +4 The above table compares the potential future off-peak services with the existing off-peak standard hour. In peak hours we have modelled a number of additional services, broadly in line with the level of service frequency enhancement in peak hours that already exists on the WCML. Further detailed work would be necessary to produce validated timetables at a later stage of the programme. The effect on each route section would be: Lichfield to Colwich This section of the WCML was modernised and 4-tracked as part of the West Coast Route Modernisation project, completed in December 2008. Sufficient capacity exists on this section to accommodate the 4 additional HS2 services without detriment to other operators or freight services. Colwich to Cheadle Hulme via Stoke The London Manchester via Stoke line diverges from the WCML at Colwich Junction. At Stone the line from Stafford converges, bringing with it 3 trains per hour (2 Cross Country and one London Midland), and further north there are also local services linking Macclesfield with Manchester. We concluded that the addition of an additional path per hour was achievable although detailed adjustments to the timetabling of existing services might be necessary. Stafford Crewe Liverpool and Scotland We concluded the proposed additional services could be accommodated. From Stafford through to Crewe the existing railway is 4-track. Whilst Crewe station itself is complex due to the series of flat junctions, there is some grade separation of the freight lines which 10

bypass the station. Between Crewe and Winsford the railway is 4- tracked, reducing to 2-tracks going north apart from a 4-track section between Hartford and Acton Bridge, where freight trains can be overtaken by passenger services. North of Warrington we proposed an increase of London services from one to two per hour. Having considered the limited capacity available we proposed that the two services (one HS2 and one classic rail) would be flighted closely together. This would maximise the connectional possibilities between the two services and minimise the demand on capacity. 9. We have been told that no high speed railway currently operates at 18 trains per hour. To what extent is 18 tph dependent on the deployment of new signalling technology? What are the main risks to meeting that target? Does HS2 Ltd have a strategy for risk mitigation? If 18 tph is not achieved, what implications would this have for services frequencies, destinations served and the economic case? We calculate that an 18tph service can be offered reliably on HS2 on a clock face regular interval timetable. This is based on using the European Train Control System (ETCS), the most up-to-date available design for the reference train, our proposed configuration of infrastructure for stations and junctions, and our proposed service pattern. We do not consider it requires technology development to achieve this at 225mph and we believe that only limited, foreseeable, development would be necessary for the ultimate potential route maximum speed. Capacity of current HS railways The operational capacity of any railway depends on traffic type, speed and stopping pattern mixes, layout of junctions and stations and train technical performance as well as the innate capability of the signalling control system. For example, the Japanese 11

centralised train control system permits trains to run safely at 3 minute intervals (notionally 20tph). However due to constraints of terminal station capacity from initial construction in 1964 and a complex pattern of stopping, semi-stopping and non-stopping trains, including trains timetabled to overtake each other, the practical capacity is generally limited to 13tph. Existing high speed lines have been designed and are operated with a variety of national systems developed variously in the 1970s and 1980s, such as TVM in France and LZB in Germany. These are reported to give a capacity of up to 16tph but in practice, sharing use existing lines into terminal stations this figure is reduced to 12 or 13 tph. New high speed lines in Europe are now being designed and fitted with ETCS (European Train Control System) which is now mandated under Interoperability legislation. Examples are Malaga - Madrid Barcelona and Milan Rome Naples. The HS2 proposal The HS2 proposal was developed as a whole operational system to accommodate the specific intensive frequency required, having taken full account of experience elsewhere on factors limiting practical capacity. We have determined capacity on the HS2 route based on: o the current functionality of ETCS Level 2 train control system and the standard European train radio system, GSM-R o the acceleration and braking performance of the HS2 Reference Train which used the performance data from Alstom for its AGV third generation high speed train with 360kph (225mph) capability o all trains having the same design performance o the gradient profiles of the proposed route where there is an absence of sustained steep gradients, which affect train braking distances, due to the topography of the land traversed 12

o avoiding capacity pinchpoints by providing grade separation at junctions and in Euston station throat, acceleration and deceleration tracks and high speed turnouts to minimise capacity loss at junctions, optimum design of track sectioning for the detection of train position and sufficient through platforms at Old Oak Common o no intermediate stations hence no stopping or overtaking movements on the two track core section On the basis of the technical performance of both the ETCS/GSM- R train control system and the Reference Train: o the minimum headway between successive trains operating at the maximum initial speed of 360kph would be 116 seconds and 11.6km. The emergency stopping distance of the reference train from 360kph would be 5.7km. o the worst case minimum headway between two trains was established as when a southbound train joined the line at a junction to follow a train passing through at full permitted speed. Following subsequent acceleration of the second train it would be some 130 seconds, and 13km, behind the first. A realistic combination of though and stopping trains at Birmingham Interchange, and through and diverging / converging trains at the point on the Y network where the northwest and Northeast limbs join, would give a technical capacity of 29 tph with existing available technology. To convert this to a practical, timetable planning, capacity we took into account general accepted railway practice which allows for typical day to day service variations, and European guidance published by the International Railway Union (UIC). On this basis we calculated a maximum planned capacity of between 21 and 22tph. The proposal then took into consideration the potential variability of on-time performance of trains coming on to the HS2 route from existing railway lines. In the first stage the greater proportion of 13

trains would be joining off the West Coast Main Line at Lichfield. In the second stage a higher proportion of train services would operate wholly on the dedicated high speed network but a significant number would still start on existing railway. Having regard for the future desire for regular clock-face services, with some principal destinations served on a 20 minute cycle, we determined that we should plan HS2 service specifications on the basis of 18tph. Risks to delivering reliable 18 tph capacity The principal risks of adopting the European Standard ETCS with GSM-R as the radio carrier are of technical obsolescence. However we considered that the continuing development of the system in the years before it was brought into service on HS2 would more likely enhance its capability than diminish it. Similarly, the risk of the European Union abandoning ETCS for a less capable system was considered remote. In any event we considered the additional margin we had already created by confining to 18tph compensated for this theoretical risk. We consider other developments of train and signalling control technology would more likely enhance the ability to deliver high capacity reliably. For trains we expect to see improved guaranteed braking and deployment of automatic train operation (ATO) under driver supervision. The former already exists on some trains without recourse to novel unproven technology to the degree necessary to maintain the headways, and therefore capacity, described above at 400kph. ATO has been widely used on metros and a version is operated on Japan s high speed lines, but there is not a specific version for ECTS Level 2 currently. It is anticipated that others will have created and proven such a product before 2020. We see the main benefits of ATO as being around improved management of key junctions to minimise potential delay and reduce energy consumption. 14

Implications of not achieving 18tph Although we consider we have adopted a prudent approach in using up to 18tph to develop the illustrative service specification of HS2, we have considered the impact of a lower planned capacity. We would expect to maintain the range of destinations and key frequencies by joining trains south of the West Midlands (ie 2 x 200m trains joined together) where demand forecasts indicate no requirement to operate full 400m long trains. 10. Does the proposed land-take for HS2 provide sufficient width for widening to 4 tracks at some future date? Are structures being designed with future widening in mind? No. The reasons for this were discussed in HS2 Ltd s 2009 report High Speed Rail: London to the West Midlands and Beyond. The relevant extract is reproduced below: 6.1.60 We have considered the possibility of laying four tracks along the HS2 alignment, thereby increasing its long term capacity, to 30+ train paths per hour in each direction, rather than the maximum of 18 we assume for a two track railway. However, for the following reasons we have not pursued this option: The level of demand we have assumed with growth continuing to 2033 and then levelling off does not appear to support such a substantial increase in capacity. That is not to say that the demand may not materialise at some point after the next 25-30 years. However it does suggest that HS2 would need initially to bear a substantial degree of additional cost and environmental impact on the basis that the demand may materialise. We do not believe this to be a credible position. 15

Were a second trunk into London to be justified, there are compelling reasons to believe that its optimal alignment would not follow the same as that of HS2. Firstly, a more easterly leg would enable high speed rail to address a broader market, and bring with it the possibility of further improved journey times to destinations east of the Pennines. Secondly, we believe there is no plausible site for the approximately 20-platform station that would be required to serve a four track high speed railway operating at full capacity, and nor is there a surface alignment into London that could support a four-track HS2. Were HS2 to be four-tracked to a point somewhere outside London, the second pair of tracks would need to enter London entirely in tunnel and terminate at a different station (although it is worth restating here that our analysis of the possible sites in central London suggests there is no obvious location for a second high speed terminal). A further reason for preferring a second route alignment is the added resilience it would give to a national network. 6.1.61 In short, a decision to four-track HS2 would need to be made against the backdrop of considerable uncertainty about future demand, and when other potentially superior options exist should the demand materialise. For these reasons we have recommended as part of our proposals for HS2 that it remain only a two-track railway. If demand materialises, a second leg could be built from the East Midlands to London. 11. Pierre Messulam, SNCF Director, told us that although passenger forecasts may prove broadly correct in the long run, the timing of costs and income can be problematic and make a significant difference to project viability. What sensitivity analyses have been performed on HS2 cost and income profiles? 16

Costs and revenues can affect project viability in a number of ways. HS2 Ltd has undertaken a number of sensitivity tests around the effect on the business case if demand growth were to be higher or lower, or capped at a different level, some of which are described in response to question 2 above. The nature of cost and revenue risks also differs under different models for funding and operating high speed rail. In particular, revenue risk would be a key issue for a private sector concessionaire under a PPP arrangement such as has been used for recent TGV projects in France. Ernst and Young provided some early views to us on financing issues for our 2009 Report, High Speed Rail: London the West Midlands and Beyond and, for example an illustrative profile of government funding is shown in Figure 5.1b of the Report (p203), but the work was not detailed enough to identify specific risks around timing. However, no decision has been taken on the preferred financing model for HS2. More work would be undertaken in this area if the decision is taken to take the project to the next stage. 12. How do the costs of a single route via Heathrow compare with the costs of the HS2 route plus a spur to Heathrow? We have reported on the estimated base construction costs for a route via Heathrow with a station at Iver and the HS2 route plus a spur to Heathrow in our report to Government published in March 2010 and also in our Options for Connecting to the Heathrow Area Supplementary Report published later in September 2010. Our worst case assumption for a spur, assuming a Terminal 5 station 17

on-airport in a box below-ground was that the estimated base construction costs would be c 200m less than for a route through a Heathrow Hub 4km north of the airport. As noted below we calculated the journey time penalty to a through train of stopping on a route via Heathrow Hub as 7 minutes. The cost of the spur option would be incurred, under the government s presently stated intention, with the second phase of HS2 to the North East and North West, when direct airport services would be scheduled. We continue to work with BAA to investigate the possibility of creating a ground level station at Terminal 5. Should this be the case, the cost of the spur would reduce and therefore the cost differential between it and the more expensive through route would increase. 13. We have received a detailed submission saying that the Heathrow Hub / Iver Common site assessed by HS2 Ltd is not the same as the Heathrow Hub station proposed by Heathrow Hub Ltd, and that the conclusions drawn are therefore misleading. Can you please comment? Briefly, we believe the site we assessed is at the same location as Heathrow Hub Ltd s, although the assumed nature of the station and services are very different. During preparation of our report in 2009 we met the promoters of the Heathrow Hub on a number of occasions to discuss their proposals and they made a written submission to HS2 Ltd to outline their proposed scheme. We believe that the location we assessed, adjacent the Great Western Main Line and the M25 on flood plain land occupied 18

currently by the Iver Sewage Treatment Facility, is the same as that proposed for the Heathrow Hub. We also assumed that it would be linked to the airport by an extended people mover. However, there were a number of differences in approach: o Our remit was to provide an interchange for HS2 with Heathrow Airport and Crossrail. Accordingly, we assessed only the benefits that such an HS2 interchange would bring. In contrast, the Heathrow Hub proposal was developed as a wider interchange with conventional rail and coach services. o The Heathrow Hub proposal included the shared use of the high-speed rail corridor into London, such as by Javelin services to Kent. These were not compatible with the capacity that we considered would be needed for long distance high speed services on HS2, consuming around half the potential capacity of the HS2 route. o The Heathrow Hub proposals envisaged a new 30 million passenger airport terminal integrated with the hub. o In addition, our station design and approach routes differed slightly we did not consider that a surface level station was viable given the necessary tunnelled approach either side. However, setting aside these differences, we did not progress this station location because: o If it was served by a through route, as the Hub promoters proposed, passengers on HS2 travelling to and from London who comprised the great majority of travellers - would incur a significant journey time penalty. o For air passengers it was not as attractive as options closer to or on-airport. o For HS2 passengers going to and from London it was not as attractive as a Crossrail interchange at Old Oak Common and we could not envisage these passengers transferring to 19

Crossrail at this location, thereby increasing demand at Euston. 14. If a route were to be provided via Heathrow, what is your latest estimate of the time penalty that would be incurred by stopping trains at Heathrow? Has this figure been used in your economic analysis? The economic analysis assumes that the journey time penalty of going via Heathrow would be an extra 7 minutes including a station stop. 15. The business case analysis assumes fare levels similar to those on the existing WCML. If premium fares were charged on HS2 (as occurs on HS1), what would be the impacts on passenger numbers, the business case and the level of much public subsidy. How has the business case taken account of the prospect of fares competition from Chiltern Line and WCML? The demand model used by HS2 Ltd makes use of data on average fares between any two places across all routes and services. It is therefore unable to analyse any competitive effects of different prices across different routes or operators. Nevertheless, for the work published in March 2010 HS2 Ltd undertook a high level study on the impact of charging a premium fare for HS2 trains. This found that the impacts of premium fares are many and complex, however it is certainly not the case that a single percentage premium is applicable or desirable across all markets and routes. Instead there would need to be careful management of revenue strategies similar to those already seen on long distance services to maximise use of capacity. The initial conclusions from this work were: 20

o The scope for premium fares is complex, with the impact varying considerably across different markets and routes. o The availability of non-premium service alternatives would make a big difference to the scope to generate additional revenues through premium fares. The economic case does not take account of fares competition across different routes or operators and we have not sought to undertake this analysis. Amongst other things, the impact of competition will be dependent on the regulatory framework under which HS2 would operate More work would be needed in all these areas if the Government decides to proceed with the scheme following the public consultation. 17. What analysis have you made of the use of HS2 by income groups and how does this compare with current rail use? HS2 Ltd has not specifically undertaken this kind of analysis. However, as the economic case assumes that HS2 trains are priced at the same level as classic rail services then it would be expected that the income distribution of HS2 will be broadly similar to the existing income distribution of users of long distance services classic rail. HS2 Ltd 25 August 2011 21