Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Similar documents
Questions from the AHJ To Fuse or Not to Fuse?

Supply-Side PV Connections

CONNECTING INVERTER. by John Wiles

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

32 IAEI NEWS March. April

Load Side PV Connections

705.12(D) The requirements pertaining to the connection. Unraveling the Mysterious. Load Side PV Connections. by John Wiles

hat inspectors need to know

A CLOSER LOOK AT BATTERIES by John Wiles. Perspectives on PV

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Code Calculations. for an Off-Grid PV System

Temporarily Approved Solar Photovoltaic System Electrical Schematics

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

ENGINEERING SPECIFICATION

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Solar PV Standard Electrical Plan

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Photovoltaic Solar Plan Review

CHAPTER 10 ELECTRICAL. Notes:

Solar PV Standard Electric Plan

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

2016 Photovoltaic Solar System Plan Review List

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Solar Power Installation Application

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

SINGLE PHASE WIRING SPECIFICATIONS

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

THREE PHASE WIRING SPECIFICATIONS

Definitions. Scope. Customer Generation Interconnection Requirements

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

To Ground or Not to Ground: That is Not the Question (in the USA)

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Selective Coordination Enforcement:

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

SOLAR PV INSTALLATIONS

PHOTOVOLTAIC SYSTEMS

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

Non-Residential Solar Energy Photovoltaic (PV) Packet

Residential Photovoltaic (PV) Packet

Green Building Technology

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Umatilla Electric Cooperative Net Metering Rules

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Managing Electric Vehicle Supply Equipment (EVSE) Installations

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

STREAMLINED SOLAR CHECKLIST Owner Name:

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

the National PhotoVoltaic protection note 5 I rated Introduction points of interest When to Fuse, When Not to Fuse

TRANSMISSION SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

BLOCKING DIODES AND FUSES IN LOW-VOLTAGE PV SYSTEMS

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals?

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Micro3 Grid Tied Residential Package

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

SECTION PANELBOARDS

CHAPTER V RESIDENTIAL WIRING

Net Metering Service. Customer Information Package

Quik-Spec Coordination Panelboard Specifications

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

Off Grid Residential Package 1.0KW

City of Manhattan Beach Community Development

CHAPTER 10 ELECTRICAL

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

672W Off Grid Residential Package

Technical Summary of Battery Energy Storage Systems

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

Know the Code: PV and NEC

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

GET GROUNDED. Renewable Energy System Grounding Basics

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES

Customer Installation Standards for Electric Service 2013 Edition. Frequently Asked Questions February 1, 2013

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

NET METER REQUEST FORM

TILLAMOOK PEOPLE S UTILITY DISTRICT

NEC REQUIREMENTS FOR GENERATORS

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Transcription:

Perspectives on PV A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles Back to the Grid, Designing PV Systems for Code Compliance 20 IAEI NEWS January.February 2006 www.iaei.org

Front row of modules on a 15 kw PV system on a commercial building In the September/October 2005 issue of IAEI News, the Perspectives on PV article discussed making the utility connection for utility-interactive PV systems. In some of the larger residential PV systems and in many commercial PV systems, the grid connection must be made on the supply side of the service disconnect to comply with the requirements of NEC 690.64. In designing PV systems for code compliance, knowledge of all of the various Code requirements is a must. This article will cover some of these requirements as they apply to a supply-side tap of the service-entrance conductors. PV systems employing supply-side connections should be inspected with these requirements in mind. Service-Entrance Conductor Taps for Utility-Interactive Inverter Systems Section 690.64 of the NEC establishes how and where a utility-interactive PV system may be connected to the utility system. The point of connection may be either on the load side of the service disconnect or the utility (supply) side of the service disconnect. In many cases, the complex requirements for load-side connections established by 690.64(B)(2) make such a connection impractical and dictate that the utility-interactive inverter be connected on the Figure 1. Supply-side interconnection diagram www.iaei.org January.February 2006 IAEI NEWS 21

supply side of the service disconnect. Figure 1 shows the basic one-line diagram of a supplyside tap. Here are some, but not all, of the major Code sections that address the requirements for such a connection. Can a Service-Entrance Conductor be Tapped? Section 690.64(A) allows a supply (utility) side connection as permitted in 230.82(6). Section 230.82(6) lists solar photovoltaic equipment as permitted to be connected to the supply side of the service disconnect. It is evident that the connection of a utilityinteractive inverter to the supply side of a service disconnect is essentially connecting a second service-entrance disconnect to the existing service and many, if not all, of the rules for serviceentrance equipment must be followed. Section 240.21(D) allows the service conductors to be tapped and refers to 230.91. Section 230.91 requires that the service overcurrent device be co-located with the service disconnect. A circuit breaker or a fused disconnect would meet these requirements. A Frequent Utility Requirement May Also Be Met When the new PV service disconnect consists of a utility-accessible, visible-break, lockable (open) fused disconnect (safety switch), it may also meet utility requirements for an external PV ac disconnect. While this utility-required switch is not a Code requirement, it is installed on the premises, and the NEC requirements for such an installation must be followed. Photo 1 shows a typical disconnect required by a utility for a 10 kw three-phase PV system. Note that it has been grounded improperly by using lugs and sheet metal screws rather than with the required ground-bar kit listed by the manufacturer. Section 230.71 specifies that the service disconnecting means for each set of service-entrance conductors shall be a combination of no more than six switches and sets of circuit breakers mounted in a single enclosure or in a group of enclosures. The addition of the photovoltaic equipment disconnect would be one of the six. Locations and Markings Section 230.70(A) establishes the location requirements for the service disconnect. Whether the service disconnect is allowed to be inside the building or outside the Photo 1. Utility-required AC PV system disconnect. Note improper grounding connections. building is usually governed by the local jurisdiction. Section 705.10 requires that a directory be placed in a central location showing the location of all power sources for a building. Locating the PV service disconnect and the direct-current PV disconnect (690.14) adjacent to or near the existing service disconnect may facilitate the installation, inspection, and operation of the system. See photo 2 for a typical label that is applied to the ac PV Disconnect. Size and Rating Section 230.79(D) requires that the disconnect have a minimum rating of 60 amps. This would apply to a service-entrance rated circuit breaker or fused disconnect used to connect the output of the PV system to the utility grid. Section 230.42 requires that the service-entrance conductors be sized at 125 percent of the continuous loads (all currents in a PV system are considered worstcase continuous currents). The actual rating should be based on 125 percent of the rated output current for the utility-interactive PV inverter as required by 690.8. The disconnect must have a 60-amp minimum rating. This 60-amp minimum requirement would apply even if the inverter rated continuous output current dictated only a 22 IAEI NEWS January.February 2006 www.iaei.org

Photo 2. Label on ac PV disconnect 15-amp circuit. Conductor ampacity adjustment factors for temperature and conduit fill may have to be applied. For a small PV system, say a 2500-watt 240-volt inverter requiring a 15-amp circuit and overcurrent protection, these requirements would require a minimum 60-amp rated disconnect, but 15-amp fuses could be used; fuse adapters would be required. While 15-amp conductors could be used between the inverter and the 15-amp fuses in the disconnect, 230.42(B) requires that the conductors between the service tap and the disconnect be rated not less than the rating of the disconnect; in this case 60 amps. How we would deal with the minimum 60-amp disconnect requirement and a 15-amp inverter overcurrent requirement using circuit breakers is not straightforward. A circuit breaker rated at 60 amps could serve as a disconnect and it could be connected to a 15-amp circuit breaker to meet the inverter overcurrent device requirements. In this case, the requirements of 690.64(B)(2) should be applied to the ampacities of any conductors involved, because the 15-amp circuit breaker now becomes a load-side connection on the new 60-amp service disconnect. Interrupt Capability Section 110.9 requires that the interrupt capability of the equipment be equal to the available fault current. The interrupt rating of the new disconnect/overcurrent device should at least equal the interrupt rating of the existing service equipment. The utility service should be investigated to ensure that the available fault currents have not been increased above the rating of the existing equipment. Fused disconnects with RK-5 fuses are commonly available with interrupt ratings up to 200,000 amps (photo 1). Section 230.43 allows a number of different service-entrance wiring systems. However, considering that the tap conductors are unprotected from faults (except by the primary fuse on the utility distribution transformer), it is suggested that the conductors be as short as possible with the new PV service/disconnect mounted adjacent to the tap point. Conductors installed in rigid metal conduit would provide the highest level of fault protection. All equipment must be properly grounded per Article 250 requirements. For ex- Photo 3. Exothermic weld splice in grounding electrode conductor www.iaei.org January.February 2006 IAEI NEWS 23

ample, photo 3, shows an exothermic weld irreversible splice in a grounding electrode conductor. Additional service-entrance disconnect requirements in Article 230 and requirements in other articles of the NEC will apply to this connection. Where to Connect? The actual location of the tap will depend on the configuration and location of the existing service-entrance equipment. The following connection locations have been used on various systems throughout the country. On the smaller residential and commercial systems, there is sometimes room in the main load center to tap the service conductors just before they are connected to the existing service disconnect. In other installations, the meter socket has lugs that are listed for two conductors per lug. Combined meter/service disconnects/load centers frequently have significant amounts of interior space where the tap can be made between the meter socket and the service disconnect. Of course, adding a new pull box between the meter socket and the service disconnect is always an option. In the larger commercial installations, the main service-entrance equipment will frequently have bus bars that have provisions for tap conductors. In all cases, safe working practices dictate that the utility service be de-energized before any tap connections are made. Summary Utility-interactive PV systems can be designed to be safely connected to the supply side of an existing service disconnect. These connections are being made throughout the country on both residential and commercial PV systems. Back to the Grid, The End of an Era? There is one long-term downside of installing a PV system on the roof of a building. At some point the roof may have to be repaired. The conventional wisdom in New Mexico, where the author lives, is that it is a pretty arid state. Average rainfall in the southern end of the state is about 9 10 inches per year, but most of this rain comes in the form of heavy thunderstorms during the July October rainy season. This year, the author was unfortunate enough to have downpours of 4.5 inches and 1.5 inches hit his home in two successive weeks. Two significant roof leaks occurred on his 18-year old flat roofed home and neither could be located nor fixed, even after significant patching. The house will have to be re-roofed after all of the solar equipment is removed. That solar equipment consists of a large solar hot water collector system and a 4 kw PV system covering most of the roof area. On Tuesday, October 4 th, the local utility reinstalled the KWH meter and the house became grid powered after 16 years of off-grid PV operation. The end of an era? No, hopefully, just a temporary, 2 3 month interruption, until the roof is repaired. For Additional Information If this article has raised questions, do not hesitate to contact the author by phone or e-mail. E-mail: jwiles@nmsu.edu Phone: 505-646-6105 A PV Systems Inspector/Installer Checklist will be sent via e-mail to those requesting it. A color copy of the 143-page, 2005 edition of the Photovoltaic Power Systems and the National Electrical Code: Suggested Practices, published by Sandia National Laboratories and written by the author, may be downloaded from this web site: (http://www.nmsu.edu/~tdi/roswell-8opt. pdf.) A black and white printed copy will be mailed to those requesting a copy via e-mail if a shipping address is included. The Southwest Technology Development web site (http://www.nmsu.edu/~tdi) maintains all copies of the previous Perspectives on PV articles. Copies of Code Corner written by the author and published in Home Power Magazine over the last 10 years are also available on this web site. Draft proposals for the 2008 NEC being developed by the PV Industry Forum may be downloaded from this web site: http://www.nmsu.edu/~tdi/pdf-resources/ 2008NECproposals2.pdf The author makes 6 8 hour presentations on PV Systems and the NEC to groups of 40 or more inspectors, electricians, electrical contractors, and PV professionals for a very nominal cost on an as-requested basis. A schedule of future presentations can be found on the SWTDI web site. John Wiles works at the Southwest Technology Development Institute (SWTDI) at New Mexico State University. SWTDI has a contract with the US Department of Energy to provide engineering support to the PV industry and to provide that industry, electrical contractors, electricians, and electrical inspectors with a focal point for code issues related to PV systems. He serves as the secretary of the PV Industry Forum that submitted 40 proposals for Article 690 in the 2008 NEC. He provides draft comments to NFPA for Article 690 in the NEC Handbook. This work was supported by the United States Department of Energy under Contract DE-FC36-05GO15149. 24 IAEI NEWS January.February 2006 www.iaei.org