MINI TONG (LITTLE JERK 2) MODEL 8071

Similar documents
Drill Pipe Connection Care and Handling

30,000 lb. HEAVY DUTY PPF 195 POST PULLER

1732-M2 Portable C-Frame Punch Driver

UNIVERSE 5-1/2 POWER TONG MODEL 01F05C MANUAL

OPERATION AND PARTS MANUAL

Micro24 TM Hose & Tube System

High Accuracy Mechanical Fuel meter FM-100

Operation & Service Manual

Operation & Technical Manual. Model: Ground Test Motor

FLOATING PISTON CYLINDER FPC-250 OPERATION MANUAL M-V1.16 SW-V0.00

: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

Stainless steel gas springs with stainless steel hand operated blocking valve. Allows the Gas spring to be stopped in any position by turning wheel.

Type A Packer Type Tubing & Casing Patches. Manual F625

Material Handling. Winches & Hoisting Equipment

O-Ring Face Seal Hose

Maximum Flow: 600 GPM (3800 LPM) Portable Base 1250 GPM (4800 LPM) Direct Mount. Maximum Pressure: 200 PSI (1380 Kpa, 13.8 BARS)

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

TECHNICAL INSTRUCTIONS

Please read all instructions before operation!!

Complete orbital coverage of all interior surfaces. Suitable for use in the food industry. Model Number Y Y Rated Pressure

Operation & Service Manual

Hose System Accessories FEATURING COMPONENTS THAT PROVIDE THE MOST FLEXIBILITY, RELIABILITY AND CONTROL FOR YOUR GAS SPRING SYSTEM

HPD Hydraulic Post Driver

USE AND MAINTENANCE MANUAL

5-2 FUEL SYSTEM AND THROTTLE BODY FUEL SYSTEM FUEL DELIVERY SYSTEM The fuel delivery system consists of the fuel tank, fuel pump, fuel filters, fuel f

JAN 18 Rev E

SERVICE BULLETIN for Series 250 Two-Way Shutoff Valved Nipples and Couplers Models 64 and 65

Industrial Warranty Procedures Engines Fiat Powertrain Technologies Limited Warranty Terms Effective date November 1 st, 2004 Revision August 21, 2007

These instructions were written for reference only and the use of a factory service manual is recommended.

SOFT HANDS MEGA SERIES AND STANDARD SERIES INSTRUCTION MANUAL NEW ZEALAND AND AUSTRALIAN SPECIFICATION MACHINES ONLY

Hand winch with worm gear Type WH 7 S in accordance with DIN EN 13157

OWNER S MANUAL. Model: TR-40-GAS ( ) (40 Gallon Lawn & Garden Trailer Sprayer w/5-nozzle Boom Assembly) Technical Specifications

Operating, Servicing, and Safety Manual Model # Hydraulic Bender

OPERATIONS MANUAL LEVER CHAIN HOIST

All of the control valves that we install the Mk. 16IQ positioner on are factory calibrated for proper operation prior to shipment.

SERVICE MANUAL No. I-0220

SW14.5TI INTEGRAL HYDRAULIC FLANGE SPREADING WEDGE. Repair Manual INNOVATION IN ITS MOST FUNCTIONAL FORM

These instructions were written for reference only and the use of a factory service manual is recommended.

ABACO MACHINES OPERATION MANUAL STONE/STEEL/GLASS/WOODS LIFTER (ASSGWL20) ABACO MACHINES (USA)

INSTRUCTION MANUAL. Portable Greasing System S1180, REV C GS

Sample Pro 3/4" Portable MicroPurge Pump. User's Guide P/N REV The World Leader in Air Powered Pumps

HPP06. Hydraulic Powerpack. HYCON A/S Juelstrupparken 11 DK-9530 Støvring Denmark

Installation, Operation and Maintenance Manual

EQUALIZER International Limited 10T(I) Integral Hydraulic Spreading Wedge Repair Instruction Manual

DualSeal 24 Hose System

DESIGN-AIRE SL-RSR-EC. Installation and Operations Manual

GTR 485 FUEL PUMP BASKET UPGRADE INSTALL GUIDE

For securing wire terminals, cables, connectors, and other samples for pull testing [36.8] 1.0 [25.4]

ABACO GLASS LIFTER (AGL38)

Operation & Service Manual

2. Remove front wheels.

INSTRUCTION MANUAL. Smart Pressure. Variable Pressure Diagnostic Smoke Machine. with UltraTraceUV Non-Contaminant Dye Solution Model No.

VLW18TE, VLW18TI HYDRAULIC VERTICAL LIFTING WEDGES. Operator Instruction Manual INNOVATION IN ITS MOST FUNCTIONAL FORM

DISPLACEMENT PUMP INSTRUCTIONS-PARTS LIST Rev. K. Model , Series A Model , Series B Model , Series A

180 Lake Ave North Paynesville, MN Phone: MASTER MANUFACTURING MASTER GARDNER

Internal Cutters. Manual E535

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Filling and Flushing the Hydrostatic System

VALVE AND PLUMBING KIT INSTRUCTIONS SMC 84Q & 2408 LOADERS NEW HOLLAND TRACTORS MODEL 2WD 4WD LESS CAB WITH CAB 1720 X X X 1920 X X X

OPERATION AND MAINTENANCE MANUAL

MECHlift ML 220 Bin Lifter

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

CS-SCB Sander Control Block Manual

Air / Hydraulic Pump Instructions. CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine.

USER S GUIDE KENDON STAND-UP MOTO LIFT. Stand-Up Lift Parts & Accessories

WARCO CHEMAG SERIES GH FILTERS

VW (Engine Code CJAA/CBEA) 2.0 Liter TDI Diesel EGR Cleaning Instructions. Always wear gloves and safety glasses when performing this service

OPERATION AND PARTS MANUAL

Installation Guidelines

VALVE AND PLUMBING KIT NEW HOLLAND 7310 LOADER NEW HOLLAND TRACTORS

Operating & Maintenance

10,000 lb. REGULAR DUTY PPF 203 POST PULLER

Service Manual. Balanced Piston First Stage

Caution. Do not operate your Micro Rain traveler without a serious overview of this manual. Keep children and unauthorized people away from traveler

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

CVS Rack and Pinion Pneumatic Actuator

Safety Clamp Operation Manual

AN ISO 9001 COMPANY. Barrel Pump BP Operation & Maintenance Guide FF - MM - 01 REV - 0. Sheet 1 of 5

ASSEMBLY MANUAL SMC 2491 LOADER VALVE AND PLUMBING KIT INSTRUCTIONS KUBOTA TRACTORS

Instruction Manual for Operation & Maintenance

ALU-29CF Portable Light NSN:

Hydrostatic Power Train

FX140 & FX140R Skidding Winch Parts Manual

Installation Instructions

This is the Unpacking Guide for the Optibike Pioneer Allroad electric bicycle. The Guide provides information required to remove the Allroad from the

O-Ring/Backup Ring Kit

Technical Manual. Table of Contents

OPERATION AND PARTS MANUAL

For securing wire terminals, cables, connectors, and other samples for pull testing [36.8] 1.0 [25.4]

LPK1550 Hydraulic Crimping Tool 15 ton

ABLT-H SERIES AIR BAG LIFT TABLES INSTRUCTION MANUAL

VW Passat (Engine Code CKRA) 2.0L TDI Diesel EGR Cleaning Instructions

LIFTING MAGNET OPERATING, MAINTENANCE, & PARTS MANUAL

WESCO INDUSTRIAL PRODUCTS, INC. Heavy Duty Scissors Lift Tables. Part Number: &

A POCKET BOOK on DOs and DON Ts for Operation and Maintenance of Jamalpur/Gottwald 140T DH Crane (Old Design)

BLISS PELLET MILL 200

HIGH VISCOSITY FILTER SYSTEMS

Technical Instructions

Service manual. English. F5 Corpus

Transcription:

8071N02 REV 01 MINI TONG (LITTLE JERK 2) MODEL 8071 OPERATION, MAINTENANCE AND SAFETY MANUAL Reviewed and Approved By:

Page 1 TABLE OF CONTENTS... PAGE 1. EQUIPMENT INFORMATION AND SPECIFICATION... 2 1.1 INTRODUCTION... 2 1.2 MINI TONG NAME AND SERIAL NUMBER TAG... 7 2. CALIBRATION PROCESS... 8 3. OPERATING SAFETY GUIDELINES... 9 4. OPERATION OF THE TONG... 10 4.1 ATTACH THE RETURN AND PRESSURE LINE TO THE POWER PACK...10 4.2 HOOK UP THE MINI TONG TO THE WINCH LINE OR JIB BOOM...11 4.3 ADJUST CLAMPING FORCE...11 4.4 ADJUST TORQUE VALUE...12 4.5 ADJUST THE VERTICAL POSITION OF THE MINI TONG...13 4.6 MAKING CONNECTIONS...13 5. MAINTENANCE INSTRUCTION... 15 5.1 LUBRICATION...15 5.2 CHANGING DIES...16 5.3 ADJUSTING LIFTING CYLINDER MANIFOLD...18 6. ORDERING PARTS PROCEDURE... 19 Table of Contents

Page 2 SECTION 1 EQUIPMENT INFORMATION AND SPECIFICATION 1.1 INTRODUCTION The Mini Tong (Little Jerk 2) was designed with rig floor and service shop safety in mind. Extensive industry operator input was obtained in its development to ensure that the tool was designed to be practical. This compact service tool provides a safe and easy way to make up and break out connections on small tools and pipes. The unit is easily handled and controlled and can be operated from a variety of power sources: LIFTING CYLINDER ASSEMBLY Size (LxWxH): 24 1/4 x 22 7/8 x 15 1/4 (616mm x 581mm x 400mm) HYDRAULIC CONTROLS Distance between jaws: 3 (76mm) Weight: 226 lbs (102kg) Maximum torque: 5,000 ft-lbs (6800Nm) Operating pressure (max): 2,900 psi (20000 KPa) TONG ASSEMBLY SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 3 Unit can be used in two different positions: Vertical Standard - Joined Tubing Mode (backup at the bottom, tong at the top). TONG - Coiled Tubing Mode (backup at the top, tong at the bottom). BACK UP LOCK NUT SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 4 It takes less than 2 minutes to convert the unit to the coiled tubing position: - Lower the unit to the floor and place it on its side. - Undo the locking nut until it hits the retaining ring. - Push on the nut (locking bolt) and compress locking bolt spring. - Holding locking bolt in this position, lift the Lifting Cylinder/Bracket up, free the bolt from the mounting plate. - Thread the Lifting Cylinder/Bracket assembly through the Crash Frame and attach to mounting plate on other side. - Screw the locking nut tight. Horizontal SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 5 Vertical SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 6 ` Little Jerk has a big advantage over conventional tongs, it can torque any connection between 1 11/16 and 3 1/2 OD without changing dies (In addition the two sides of the connection can have different OD s) Read carefully the remaining sections of the manual before you start using your Mini Tong. SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 7 1.2 MINI TONG NAME AND SERIAL NUMBER TAG There is a Serial Number Tag located at the back of the crash frame. It is very important to have the serial number handy when ordering spare parts or asking for technical information. SECTION1 EQUIPMENT INFORMATION AND SPECIFICATION

Page 8 SECTION 2 CALIBRATION PROCESS The Mini Tong assembly is calibrated to check the difference between the set values on the torque gauge and the actual torque. All results are recorded on the attached Calibration Certificate. Use calibration results for setting the torque value for connection (see attached Calibration Certificate). SECTION2 CALIBRATION PROCESS

Page 9 SECTION 3 OPERATING SAFETY GUIDELINES - Read manual before using the Mini Tong. - Try to operate Mini Tong with one person. - Follow the instruction written on the side of the Control Panel. - Do not grip the workpiece with less than the full length of the tong die. - Do not grip the workpiece with the dies placed on conical surface - Do not grip on irregular and bend sections. - Do not grip on hard surfaced areas. SECTION3 OPERATING SAFETY GUIDELINES

Page 10 SECTION 4 OPERATION OF THE TONG 4.1 Attach the return and pressure line to the hydraulic power pack, ENSURE RETURN HOSE IS FIRMLY ENGAGED TO AVOID BLOWING OUT THE RUPTURE DISK. KEEP PRESSURE AND FLOW TO RECOMMENDED PARAMETERS OPEN LOOP-CLOSED CENTER HYDRAULIC SYSTEM REQUIRED MAX PRESSURE 2900 PSI MAX FLOW 4 GPM FILTRATION 10 MICRON NOMINAL CLEANLINESS LEVEL OF 19/16 PER ISO 4406 SECTION4 OPERATION OF THE TONG

Page 11 4.2 Hook up the Mini Tong to the winch line or jib boom and bring it to the well center. 4.3 ADJUST CLAMPING FORCE - Reduce torque value to minimum. - Adjust clamping pressure to 800 PSI (recommended pressure for regular use, lower it down for very thin wall connections, turn it up for heavy-wallused once). - After initial setup clamp pressure will increase automatically with torque increase. SET TO 800 PSI WARNING WRONG ADJUSTMENT OF THE CLAMPING FORCE CAN DAMAGE THE TOOL SECTION4 OPERATION OF THE TONG

Page 12 4.4 ADJUST TORQUE VALUE - Using the torque adjustment knob and torque gauge, adjust torque to the required value (for lower torques correct the value according to Calibration Certificate). SET AS REQUIRED. SECTION4 OPERATION OF THE TONG

Page 13 4.1 ADJUST THE VERTICAL POSITION OF THE MINI TONG - Use the winch line for rough adjustment. - Use the lift handle and lifting cylinder to do precise adjustment Place one tong close to the connection on the pin side, this will place second tong farther from the connection on the box side. 4.2 MAKING CONNECTIONS - Using the green painted handles pull the Tong towards the connection until the two centralizing plates collapse completely. SECTION4 OPERATION OF THE TONG

Page 14 - Keep Tong aligned with the connection and at the same time move the back up clamp control lever with your thumb. This will activate clamping cylinder on the backup tong and clamp one side of the connection. PUSH LEVER WITH THUMB - Move the tong torquing lever to the break out position to rotate the tong. - Move the tong clamping lever to the clamp position (keep handle in this position during the torquing operation) and clamp the tong on the other side of the connection. - Move the tong torquing lever to the make up position and torque the connection. If 30 of rotation is not enough to make the connection, try to take another bite (open tong jaws, rotate the tong, clamp the tong jaws, torque again.) Connection has been torqued to the value set on the torque gauge (Remember about corrections from the Calibration Certificate for the low torques). - Open the tong, then backup and remove unit from the connection. SECTION4 OPERATION OF THE TONG

SECTION 5 MAINTENANCE INSTRUCTIONS The Mini Tong must be maintained and serviced on a regular basis to ensure a long, trouble free life. Failure to do so can result in unsafe operating conditions and lead to a premature breakdown of parts. 5.1 LUBRICATION - Close backup and tong arms. - Grease pins through arm grease nipples. - Grease main bearing. - Oil top & bottom centralizing plates. - Grease torque cylinder pins. SECTION5 MAINTENANCE INSTRUCTIONS

Page 16 5.2 CHANGING DIES - Close backup completely. - Insert screwdriver through hole in backup body. - Press bottom v-plate in so screwdriver can pass through the hole. - Do the same with the top v-plate. - Undo the bolts and nuts from all three dies. SECTION6 ORDERING PARTS

Page 17 - Knock the used dies out. - Put in new set of dies and secure them with bolts and nuts. - REMOVE SCREWDRIVER BEFORE OPENING BACKUP OR DAMAGE TO MINI TONG WILL RESULT - Open backup jaws and follow the same procedure for tong. No screwdriver is needed for tong die replacement. SECTION6 ORDERING PARTS

Page 18 5.3 ADJUSTING LIFTING CYLINDER MANIFOLD - ADJUSTING THE COUNTERBALANCE VALVE - Loosen the adjustment screw lock nut on the Counterbalance Valve. - Turn adjusting screw all the way out. - Move the cylinder to the fully raised position - Slowly turn adjusting screw in until cylinder starts to creep down, turn back out until the cylinder stops. Turn out another ½ turn and lock. - ADJUSTING THE LOWERING SPEED - Move cylinder to the fully raised position. - Loosen the adjustment screw lock nut on Lowering Flow Control Valve. - Turn adjusting screw all the way in. - With the Lifting Cylinder Control Valve in the lowering position slowly turn adjusting screw out until desired lowering speed is achieved, then lock. - ADJUSTING THE LIFTING SPEED - Move cylinder to the fully lowered position. - Loosen the adjustment screw lock nut on Lifting Flow Control Valve. - Turn adjusting screw all the way in. - With the Lifting Cylinder Control Valve in the lifting position slowly turn adjusting screw out until desired lifting speed is achieved, then lock. SECTION6 ORDERING PARTS

SECTION 6 ORDERING PARTS PROCEDURE Please supply the following information when ordering parts: Size, Model and Serial Number of Unit Description of Part Part Number from Parts List Parts List Number and Revision Threaded Connections, if applicable Maximum Operating Temperature, if applicable Orders may be placed by telephone, fax, email or written request. A Purchase Order Number and Shipping Instructions must be provided at the time an order is placed. Our terms of payment are Net 30 Days from date of invoice. All parts are sold, F.O.B. Edmonton. For additional information please contact: Mailing address: National Oilwell Varco Downhole Tools 3620 93 St. Edmonton, Alberta Canada, T6E 5N3 Telephone Number: (780) 944-3929 Fax Number: (780) 436-3492 E-Mail: dhpsales@nov.com

` SECTION6 ORDERING PARTS

SEE NOTE ON LAST PAGE SEE NOTE ON LAST PAGE

NOTE: Pressure Relief Valve (Item 28 Inlet Manifold Sub-assembly) is factory set to 2900 psi for protection of the Intensifiers (Item 30 Tong/Back Up Assembly (SHT 2). Rupture Disk (Item 26 Inlet Manifold Sub-assembly) is included as a protective device for protection of the Intensifiers (Item 30 Tong/Back Up Assembly (SHT 2) if the return line is not hooked up (the Intensifiers will be irreparably damaged!). MINI TONG (LITTLE JERK 2) MODEL 8071 OPERATION, MAINTENANCE, AND SAFETY MANUAL