Responsible Unit: Facilities Management

Similar documents
PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

Owner s Manual Gantry Cranes

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

OVERHEAD CRANE SAFETY:

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

LOAD CHART & RIGGING PRACTICE EXERCISES

Policy Sponsor: Assistant Vice President. Responsible Unit: Facilities Management

WORKING WITH CRANES SAFELY

CRANE OPERATION INSTRUCTION AND GUIDELINES

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

Safe Operating Practices & Maintenance Manual

Crane & Hoist Safety Guidelines

Automotive Lifting Equipment

Cranes. OSHA Office of Training & Education 1

4 B High Do not allow anyone except the signal person in the working area

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Provided by: Operating, Maintenance & Parts Manual

While handling materials, employees must abide by the following requirements:

ESSENTIAL SAFETY RESOURCES

Crane Safety Resource Guide P AGE 1

OVERHEAD & GANTRY CRANE / RIGGING

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

Chapter 1 Safety and Operation

Presented by: Wadesboro, NC 28170

Ryko Solutions, Inc. Crane and Jib Safety Program

OPERATOR S MANUAL R-Series Roust-a-Bout

UNIVERSITY OF TOLEDO

MOBILE CRANES ONSHORE PROGRAM

CraneSafe. Certification. CraneSafe Certification. CraneSafe. Certification

Patriot Portable Material Hoist 850/1000/2000. Operator s Manual

SERIES 637. Rated Loads: 3/4, 1-1/2, 3, 6 tons (750, 1500, 3000 and 6000kg.) OPERATING, MAINTENANCE & PARTS MANUAL MANUALLY LEVER OPERATED CHAIN HOIST

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

CRANE, HOIST AND SLING SAFETY PROGRAM

Large Enclosure Safe Handling Requirements. Do not reposition until permanently installed.

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

OPERATIONS MANUAL LEVER CHAIN HOIST

HOIST ARMY TYPE HOIST IMPORTANT

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

Equipment Log Book. Unit #

Lbs Kgs Ft M

HitchHoist Assembly & Operating Instructions IMPORTANT NOTICE

Element 3: Musculoskeletal Hazards and Risk Control

4000-Lb. Adjustable Gantry Crane

Chapter 22 Mobile Cranes

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

MG12K24T60V4 Mechanical Grapple

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

General Instructions and Inspection Instructions for Crane

Maintenance Information

2000-Lb. Adjustable Gantry Crane

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Operating instructions ATLAS Climber - 700

WARNING WARNING WARNING. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD FALLING OR CRUSHING HAZARD

MATERIALS HANDLING MATERIALS HANDLING

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

CRANE & HOIST SAFETY PROGRAM

Star Swivel-Arm Hoist Installation and Operating Instructions

Free Standing Track. Owner s Manual. Use and Care Trouble Shooting

Hand Chain Hoists. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

440/880LB ELECTRIC HOIST STF-4488EH

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Installation and Maintenance Manual for SPANCO A Series Aluminum Gantry Cranes

Chicago Crane Operator Examination Study Guide

OPERATIONAL INSTRUCTION OVERVIEW MAINTENANCE CHECKLIST

OPERATING & INSTRUCTION MANUAL

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

General Information/Alloy Chain and Slings

HEALTH AND SAFETY MANUAL

Safelift Overhead Runway Beams & Rolling Beam Cranes

Crane, Hoist, and Sling Safety Program October 24, 2017

te. OPERATING AND HAND CHAIN HOIST MAINTENANCE INSTRUCTIONS IMPORTANT CAUTION

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

VP, Facilities and Construction Management

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Distributed by Kincrome Group

Capacity (tonnes) 0.25t. No. of Falls 1. Load Chain (mm) Load Chain Grade 80

A12000 ELECTRIC WINCH. Manual & Safety Instructions.

HOISTING APPARATUS Inspection Guidelines

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

Key Issues and Considerations when for. Working around Concrete Pumps, Concrete Pump Trucks, and Crane Lift Buckets

Low Profile Wrenches Operation and Maintenance Manual

Mounting Tools 2 Checking Clearances 3 Components 4-5 Mounting 6-21 Correct Method of Tensioning the Chain 22 Adjusting The Overall Dimension 23-24

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Health, Safety, Security and Environment

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

Planning Advisory Notice

TT1000 TROLLEY HOIST INSTRUCTIONS

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

WARNING WARNING CAUTION. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD

Owner s Manual & Safety Instructions

HexPro Series Low Profile Wrenches

2000-Lb. Telescoping GantryCrane

Transcription:

Policy Sponsor: Assistant Vice President Approval Date: January 2010 Mobile Overhead Cranes Safe Work Instructions Responsible Unit: Revisions: Service: Trade Services Shop: Mechanical & Welding Hazards Identified: Overloaded crane, malfunction controls, use of wrong control, failure of crane parts, unstable load, falling objects, load swinging, being struck by load, load striking other things or people, dust or other particles getting in eyes, erratic movement of crane, faulty slings or shackles, Personal Protective Equipment Required: Safety boots, hard hat, safety goggles or safety glasses, hearing protection, cut resistant safety gloves, Training Required: Before using this type of equipment employees must be properly trained and have acquired all required certification. The operator s manual, tool safety markings and instructions for manufacturer approved attachments must be reviewed regularly. Employees must also be trained in the proper use and maintenance of all required PPE before operating this equipment. These safe work practices must be followed at all times when using this equipment. 1. Always follow the manufacturer s instructions for proper use of this equipment. 2. Read and review the operator s manual on a regular basis. 3. Do not use this equipment for anything other than its intended / designed purpose.

4. Do not tamper with or attempt to modify this equipment in any way. 5. Always wear the required PPE. 6. Ensure that you are familiar with and apply all requirements of Part 7 of the Occupational safety General Regulations and of the Crane Operators Regulations. 7. Ensure that any load chart required by the manufacturer is available at the location of the crane. 8. Before using the crane ensure that it is suitable for the planned hoisting job; confirm it has appropriate travel, lift and capacity. 9. Inspect the crane both visually and physically before each use. 10. Always complete the FM Overhead Crane Pre-Use Inspection Checklist as part of each inspection. 11. Always check for damage and /or wear to the crane or any of its parts and that all functions operate properly. 12. Always confirm the weight of the load. 13. Check and confirm that the capacity of the crane, it must be posted on or near the crane. 14. Always check the load chain for damage or kinks and wire rope for kinks or any indication of fraying. 15. DO NOT EXCEED ANY SPECIFIED CAPACITIES. 16. Ensure that you have selected the right slings and rigging hardware for the lift. 17. Check the load limit indicated on each piece of rigging equipment. 18. Inspect the slings and hardware to be used during the lift for wear, fraying, stretch or any other damage. 19. Do not use slings if over 10% of the wires are broken in a rope lay or any length of the wire rope equal to 8 times the diameter of the rope. 20. Do not use damaged hardware.

21. Do not splice broken slings. 22. Remove damaged or defective slings, ropes or hardware form use immediately and tag them with at Do NOT USE. Ensure they disposed of as soon as possible. 23. Use softeners on sharp corners or edges to protect slings, etc. 24. Always check the hook; DO NOT use a hook if its shape is distorted. 25. Never operate an overhead crane using a wired or remote control unless you are completely familiar with all control functions. 26. Ensure that the function and direction of each control switch and/or button is clearly marked. 27. Before a lift ensure that the crane moves freely and that the carriage moves freely on the bridge. 28. Ensure that all slings are completely in place of the load hock and that the safety catch is closed. 29. Never place a load on the tip of the hook or hammer a sling into place. 30. Ensure that slings or other rigging parts cannot move as strain is applied to the load. 31. Avoid sudden or jerking movements as the crane travels. 32. Always bring the load chain or wire to a taut vertical position above the load before lifting. 33. Ensure that the crane is centered over the load before starting the lift to help prevent the load from swinging. 34. Restrict access to the lift area during a lift. 35. Ensure that the area to which the load is being moved is large enough to accommodate the load and is clear of all obstructions. 36. The crane operator should only follow instructions / directions from one person the designated signaller. 37. Ensure that the signaller and the operator know and understand the signals to be used.

38. Use some agreed upon signal to warn everyone in the lift are before starting the lift. 39. Ensure that the load is clear of any snag points before and during a lift. 40. Stop after the load clears ifs resting place to ensure it is balanced. 41. Always contain loose items in a caged container or solid box for lifting. 42. Do not lift loose items on an open pallet. 43. Do not use the load chain or wire rope as part of your sling. 44. Never lift a load over anyone. 45. Never lift a load any higher than is necessary to clear objects in your path of travel. 46. Do not, as an operator, get under the load. 47. Move any load smoothly. 48. Use a tag line to minimize motion of the load. 49. Do not let wire rope get out of the drum grooves and overlay itself. 50. Do not allow yourself to become distracted during a lift; concentrate on where you are going and what you are doing. 51. Always walk ahead of the load during travel 52. Do not under any circumstances leave a suspended load unattended. 53. Do not lift people with a crane. 54. Do not damage the hoisting equipment by exerting excessive side pulls. 55. Always set loads down on suitable blocking or support. 56. Do not put a load down on top of a sling. 57. Do not use the crane to pull a sling free of a load. 58. Do implement a lock out / tag out system if use of the crane must be restricted.

Standard Hand Signals For Controlling Overhead And Gantry Cranes HOIST. With forearm vertical, forefinger pointing up, move hand in small horizontal circle LOWER. With arm extended downward, forefinger pointing down, move hand in small horizontal circle. BRIDGE TRAVEL. Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. TROLLEY TRAVEL. Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. STOP. Arm extended, palm down, hold position rigidly. EMERGENCY STOP. Arm extended, palm down, move hand rapidly right and left. MULTIPLE TROLLEYS. Hold up one finger for block marked 1 and two fingers for block marked 2. Regular signals follow. MOVE SLOWLY. Use one hand to give any motion signal and place other hand motionless in front of hand giving the motion signal. (Hoist Slowly shown as an example.) MAGNET IS DISCONNECTED. Crane operator spreads both hands apart palms up.