Wingate Creek Mine. Lockout Procedures. 14 Dragline

Similar documents
Four Corners Mine. Lockout Procedures. 15 Dragline

2. Crane standing on firm, horizontal ground.

Ground bearing pressure 0.98 kg/cm 2. Main boom (No xx) max. length Fixed jib (No xx)

PRAIRIE MINES AND ROYALTIES PAINTEARTH MINE MARION 8200 DRAGLINE ELECTRICAL UPGRADES

Ground bearing pressure. Main boom (No xx) max. length Fixed jib (No xx)

D R A G L I N E EXAMPLE. ( operations manual ) + building instructions examples

Technical data Hydraulic crawler crane HS 835 HD

Technical data Hydraulic crawler crane HS 895 HD

1900AL Electric Mining Shovel Product Overview

Ground bearing pressure 1.1 kg/cm 2 2 HS 855 HD

Technical data Hydraulic crawler crane HS 885 HD

GPA 13.8 kv Semi-Annual Slip Ring PM, Sav 10-41

E-150 MKI - Single Pivot Gravity Davit

Technical data Hydraulic crawler crane HS 875 HD

Construction Machine HS enus HS

Technical data Hydraulic crawler crane HS 845 HD

Doc #: 2100-AD Revision: - 4 Meter White Spot Panel Replacement. Author(s): David Sprayberry, Larry Reddell, Tammie Lavoie, Miranda Saucedo

Technical data Hydraulic crawler crane HS 8040 HD

Trimline Car and Sling

Construction Machine HS 8130 HD. enus HS

LIFTING CHARTS - Crawler Cranes AMERICAN MODEL TON CAPACITY

RATED CAPACITY PC - D28 TIDD PC25 RATED CAPACITY MANUAL PC - D28 OCTOBER 2013 REV A PC25

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

Equipment Log Book. Unit #

John Deere. MODEL: 350C Crawler Loader, Bulldozer JD-O-OMT79469

Appendix D Glossary of Common Crane Terms

Glossary of Crane and Rigging Terms

ILLUSTRATED PARTS BOOK CYCLONE Walk Behind Blower S-WB [E]

Construction Machine HS 8300 HD. enus HS

CHAIN SAW PARTS CATALOG MODEL CS-6700 TYPE 1E SERIAL NUMBER & UP

Hazardous Energy Control Procedure Appendix

BP OIL -- TOLEDO REFINERY

While handling materials, employees must abide by the following requirements:

SIDEWINDER DRILLING RIG 219 LA SALLE, TEXAS

Altec LMAP. (Load Moment and Area Protection) Telescopic Boom Cranes. Calibration

DATA PD LK..., LP... Product PD Air Compressors. Function. Technical Features

Hydraulic Crawler Crane

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

This specification describes the minimum requirements for a hoist maintenance safeguard (HMS) system for mine hoists.

SPECTRACOOL Slim Fit Air Conditioners (Surface-Mount Units Only) Quick Start Operation Guide

Right Hand Assist for Swing Arms (RHA SA) Page 1

TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE MANUAL

North America Phase Converters & Electrical Supply

Exercise 1-1. Lockout/Tagout Procedure EXERCISE OBJECTIVE DISCUSSION. Become familiar with the Industrial Controls Training System.

ILLUSTRATED PARTS BOOK 43cc Cultivator S-CV-43 SCV43 SCV43.1

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

CHAINSAW PARTS CATALOG. CS-4400 Type 1E: & UP. ECHO, INCORPORATED 400 Oakwood Road Lake Zurich, Illinois MODEL: SERIAL NUMBERS. 43.

Miniature Circuit Breakers

COUNTER SHAFT NUT LOCKING PLATE 1 $ HOIST DRUM CLUTCH EYE BOLTS 1 $ LEFT DRUM CLUTCH THREADED PIN 2 $ 138.

Main product assortment includes:

CRANE & HOIST SAFETY PROGRAM

ILLUSTRATED PARTS BOOK 43cc Cultivator P-CV-43 PCV43 PCV43.1

CRAWLER CRANE. Dimensions. Specifications. Unit: mm. Notes: Dimensions shown in ( ) are with crawlers fully retracted.

ARTICULATED MOBILE CRANE Annual Report

Illustrated Parts Manual

TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE MANUAL

DS 2400 D (EPA 3) Brushcutter. Documents DS 2400 D (EPA 3) Motor. Starter assy and clutch. Air filter. Transmission. Carburetor.

12 CB30M SERIES UNITS INCLUDING ECB29 ELECTRIC HEAT

ARTICULATED MOBILE CRANE Annual Report

Doc #: 2100 AD Revision:

Explorac 100 Reverse circulation drill rig for exploration drilling

DRILLING DEPTH GUIDELINES DRILL ROD Hole Depth METRIC Hole Depth U.S. Width mm 7,5 ft. Height mm 11,9 ft

ALL TERRAIN CRANE GA-1500N

PN: 6410T0022 Rev. 8/18/2014 Revision D Albany RR300 Stainless Mechanical Install & Owner s Manual

2300XPC Electric Mining Shovel - DC Drive Product Overview

ROUGH TERRAIN CRANE TR-500M

Implementation of Safety Initiatives

r PARTS LIST Type 1 WARNING

2300XPC. Electric Mining Shovel DC Drive Product Overview

Surface Regulations and Policies

TRUCK CRANE TG-500M JAPANESE SPECIFICATIONS NISSAN DIESEL KC-KG530TN TG-500M MITSUBISHI KC-KS509S TG-500M Control No.

ALL TERRAIN CRANE AR-1600M

4100XPC. Electric Mining Shovel DC Drive Product Overview

LIFTING CHARTS - Crawler Cranes AMERICAN MODEL TON CAPACITY

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone.

NDA-25B MKI Fast Rescue Boat Davit

ELECTRICAL AREA CONTROLLED ACCESS PROCEDURE SP-18 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-18

1500 Hour PM Inspection

1-3 MANUAL STARTERS EXERCISE OBJECTIVE. Examine and describe the operation of manual motor starters. DISCUSSION

ABS Components Air Compressors Air Dryers & Cartridges Air Tanks. Air Disc Brakes Bearings Brake Pads Brake Rotors Brake Shoes & Kits Camshafts & Kits

Maintainability Design Checklist

2800XPC. Electric Mining Shovel DC Drive Product Overview

SHOVEL EKG-12A. Standard bucket capacity. Working bucket load t Working weight of the machine t

ROUGH TERRAIN CRANE TR-250M

TRUCK CRANE TL-250M JAPANESE SPECIFICATIONS. OUTLINE Jib which swings from and stores under the boom NISSAN DIESEL KC-KG520SN TL-250M

Cable and Hose Reels / Balancer Program 0402

ROUGH TERRAIN CRANE TR-500M

LS-308H II. HYLAB Series. Lattice Boom Crawler Crane

ROUGH TERRAIN CRANE TR-160M

ROUGH TERRAIN CRANE GR-500N

HMIS Top Drive System

LIFTING CHARTS - Crawler Cranes AMERICAN MODEL TON CAPACITY

ALL TERRAIN CRANE GA-1000N

Ex. 1-1 Nacelle Familiarization and Safety Discussion

ROUGH TERRAIN CRANE TR-250M

4100XPC. Electric Mining Shovel AC Drive Product Overview

ROUGH TERRAIN CRANE GR-250N

5200 ITH Specifications and Features

ON & OFF THE ROAD OR RAIL REACHNG NEW HEIGHTS AND WORKING HARDER THAN EVER.

Ground bearing pressure 1.14 kg/cm 2. Main boom (No xx) max. length High reach (1311.xx and 1008.xx) 83 m Luffing jib (No xx) max.

Transcription:

Wingate Creek Mine Lockout Procedures BE Revision Log Rev. No. Requested By Approved By Revised By Rev. Date 0 Initial Issue R. Barefield R. Barefield 12.03.08 1 Operations/Maint. Facility Mngt. R. Barefield 12.09.08

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: AC Blower Motor Change Out Other (describe): Dragline bucket and ropes NO N/A Under Voltage YES Lock and Tag Main MG Set High Voltage YES Lock and Tag Local Breaker at MCC YES Lock and Tag Place bucket on ground, release tension on ropes Knockout MG sets at Open Under Voltage Breaker and apply Open Main MG Set HV Disconnects and apply Lock and Tag, Done Open Local Breaker Tag 240vAC N/A Visual 240vAC Back Control Room Transformer Room Visual, Three phase Disconnect open 480vAC Local. Close local Breaker AC Blower Motor Close Main MG Set HV Disconnects Line Voltage Close Under Voltage Breaker Control power to start MG sets Start MG sets at local Start Stop station MG sets running Operators, Oilers, Dragline Mechanics, all Electricians, Mechanics 14_dl_lockout_manual-2.doc Page 2 of 14

(LOCK REQUIRED / Oiler/Operator, Electrician) PURPOSE FOR S: Adding Oil to Bearings on MG Sets x Other (describe): Dragline bucket and ropes NO N/A ECB YES Lock and Tag Under Voltage YES Lock and Tag Main MG Set High Voltage YES Lock and Tag Place bucket on ground, release tension on ropes Knockout MG sets at Open ECB Breaker Tag Open Under Voltage Breaker and apply Open Main MG Set HV Disconnects and apply Lock and Tag, Done 240vAC N/A Visual 480vAC 240vAC Machine House Machine House Under Rear Machine Visual, Three phase Disconnect open Close Main MG Set HV Disconnects Close Under Voltage Breaker Control power to start MG sets Close ECB Breaker Power to transformers Start MG sets at local Start Stop station MG sets running Operators, Oilers, Dragline Mechanics, all Oiler/Operator, Electricians 14_dl_lockout_manual-2.doc Page 3 of 14

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Dragline Collector Ring Work Other (describe): Dragline bucket, shoes and ropes NO N/A from Sub to Dragline YES Birdie Back Feed YES Lock and Tag Place bucket and shoes on ground, release tension on ropes Excitation at Knockout MG sets at Pull Jacks at Sub, hang birdie, Done by Electricians Open Back Feed Isolation Disconnect Tag, Done by Electricians 240vAC N/A Visual Sub Visual at Jacks Under Rear Machine. Remove Lock and Tag from Back Feed N/A Isolation Disconnect Close Back Feed Isolation Disconnect on Line Voltage Dragline Remove Birdie, close jacks at Sub to Dragline Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 4 of 14

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Hoist, Drag and Swing DC Motor Change Out x Electrical Mechanical Chemical Other (describe): Dragline bucket and ropes NO N/A Under Voltage YES Lock and Tag MG Set High Voltage YES Lock and Tag AC Blower motors YES Lock and Tag Place bucket on ground or secure swing brake with chain, release tension on ropes Knockout MG Sets at Open Under Voltage Breaker and apply Open Main MG Set HV Disconnect with Kirk Key and apply Open House Exciter Excitation Breaker, (HSEB) and apply Open AC Blower Motor Breaker and apply Lock and Tag 240v AC N/A Visual 240vAC 480vAC Machine House Under Rear Machine Upstairs Control Room Visual, 3 phase disconnect open Grey box with outside handle 480vAC Local. 14_dl_lockout_manual-2.doc Page 5 of 14

Close AC Blower Motor Breaker AC Blower Motor Close House Exciter Excitation Breaker, HSEB Breaker Close Main MG Set HV Disconnect with Kirk Key Close Under Voltage Breaker Start MG Sets at local Start Stop Station Check Rotation House Exciter 4160v power to MG Set starters, Done by Electrician Control power to start MG Sets MG Sets DC Motor Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 6 of 14

(LOCK REQUIRED / ELECTRICIANS, MECHANICS) PURPOSE FOR S: Drag Cable Change Out by Mechanics X Electrical X Mechanical Chemical Thermal X Pneumatic Hydraulic X Other (describe): Stored energy in cable, drag drum Dragline bucket and ropes NO N/A Under Voltage YES Lock and Tag Main MG Set High Voltage YES Lock and Tag Brake Supply Valves YES Lock and Tag (in order) Place bucket on ground, release tension on ropes Knockout MG Sets at Open Under Voltage Breaker and apply Open Main MG Set HV Disconnect and apply Lock and Tag, Done Close Brake Supply Valve and apply Lock and Tag LOCKOUT LOCATION 240vAC N/A Visual 240vAC Air Machine House Under Rear Machine Drag Cable Drum ENERGY ISOLATION VERIFICATION TEST Visual, Three Phase Disconnect open Visual, Valves closed Open Brake Supply Valve Drag Cable Drum Close Main MG Set HV Disconnect 4160v power to MG set starters Close Under Voltage Breaker Control power to start MG sets Start machine at local Start Stop station MG sets 14_dl_lockout_manual-2.doc Page 7 of 14

Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 8 of 14

Boom Inspection (LOCK REQUIRED / Oiler/Operator) PURPOSE FOR S: Go up Boom for Inspection x Other (describe): Dragline bucket, shoes and ropes NO N/A ECB YES Lock and Tag Place bucket and shoes on ground, release tension on ropes Knockout MG Sets at Open ECB Breaker Tag 240vAC N/A Visual 480vAC Machine House. Close ECB Breaker Power to Transformers Start MG Sets at Local Start Stop Station MG Sets running Operators, Oilers, Dragline Mechanics, all Oiler/Operator 14_dl_lockout_manual-2.doc Page 9 of 14

Maintenance Work with MG Sets Running (LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Maintenance work on Dragline with MG sets running, Dump Rope Work. Due to the nature of bucket and cable work, which may require several moves of the bucket to complete the task, a single employee may be designated to lockout Generator Excitation for the bucket repair crew. The names of each member of the bucket repair crew shall be on this tag. The operator must remain in the operator when Generator Excitation is not locked out. If an excitation breaker is opened then a lock and properly labeled tag including all names of crew members shall be applied by a designated employee.. x Electrical Mechanical Chemical Other (describe): Dragline bucket and ropes NO N/A ECB YES Lock and Tag Place bucket on ground, release tension on ropes Open ECB Breaker Tag 480vAC Machine House. Close ECB Breaker Power to Transformers Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 10 of 14

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Power Cable Re-Route, NOT FOR REPAIR DAY See SHP 3160 Electrical Policy for power cable handling guidelines. Other (describe): power from Sub to Dragline YES Birdie Bucket must be in air to remove cable Excitation at Knockout MG sets at Pull Jacks at Sub, hang birdie, Done by Electricians 480vAC Operator Controls Visual 240vAC Operator Controls Visual Sub Visual, jacks open. Remove Birdie, close jacks at Sub to Dragline Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 11 of 14

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Repair Day Other (describe): Dragline bucket, shoes and ropes NO N/A ECB YES Lock and Tag Under Voltage YES Lock and Tag Main MG Set High Voltage YES Lock and Tag Place bucket and shoes on ground or secure swing brake with chain, release tension on ropes Knockout MG sets at Open ECB Breaker Tag Open Under Voltage Breaker and apply Open Main MG Set HV Disconnects and apply Lock and Tag, Done 240vAC N/A Visual 480vAC 240vAC Machine Room Machine Room Under Rear Machine Visual, Three Phase Disconnect open Close Main MG Set HV Disconnects Line Voltage Close Under Voltage Breaker Control power to start MG sets Close ECB Breaker Power to transformers Start MG sets at local Start Stop station MG sets running Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 12 of 14

(LOCK REQUIRED / ELECTRICIANS) PURPOSE FOR S: Dragline Temporary Power Back Feed Protection Other (describe): MG Sets, Operator Controls NO Back Feed YES Lock and Tag 7200v Sub YES Birdie LOCKOUT LOCATION ENERGY ISOLATION VERIFICATION TEST Knock out Control Knock out MG Sets at 240vAC N/A Visual Pull jacks, hang birdies, Done by Electrician Sub Hang Birdie Visual, jacks open. Before plugging in Generator, Open Back Feed Isolation Disconnect and apply Back Feed Isolation Disconnect Visual, breaker Power Cable must be Disconnected from J Box if Flot Crews are to handle or move Power Cable Plug in Generator 480vAC N/A N/A Disconnect Generator, Close Back Feed to Dragline Isolation Disconnect Pull birdies, set jacks Operators, Oilers, Dragline Mechanics, all Electricians 14_dl_lockout_manual-2.doc Page 13 of 14

(LOCK REQUIRED / Oiler/Operator) PURPOSE FOR S: Work on Auxiliary Equipment such as Air Compressor, Blowers and Fans, Exciter Set Induction Motors, Oil Pumps, Service Winches and Air Conditioners, etc. NOTE: Lockout of the MG Sets or Generator Excitation DOES NOT deenergize any of the above equipment; they must be locked out separately. x Thermal x Pneumatic x Hydraulic x Other (describe): Dragline bucket and ropes NO N/A ECB YES Lock and Tag Local Breaker YES Lock and Tag Place bucket on ground, release tension on ropes Knockout MG Sets at Open ECB Breaker Tag Open Local Breaker Tag 240vAC N/A Visual 480vAC Machine House 120vAC to 480vAC Local. Close Local Breaker Auxiliary Equipment Close ECB Breaker Power to Transformers Start machine at local Start Stop station Local power Operators, Oilers, Dragline Mechanics, all Mechanic, Electricians, Oiler, Operator 14_dl_lockout_manual-2.doc Page 14 of 14