August 2, 2010 Public Meeting

Similar documents
Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

KANSAS CITY STREETCAR

Parking Management Element

Public Meeting. June 15, :30 7:30 p.m.

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

Needs and Community Characteristics

I-26 Fixed Guideway Alternatives Analysis

Rapid Transit and Land-Use Integration a Reality

West Broadway Transit Study. Community Advisory Committee September 17, 2015

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Waco Rapid Transit Corridor (RTC) Feasibility Study

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

METRO Light Rail Update

Draft Results and Open House

Restoration of Historic Streetcar Services in Downtown Los Angeles

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis

Click to edit Master title style

Community Advisory Committee. October 5, 2015

appendix 4: Parking Management Study, Phase II

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

Transportation Demand Management Element

I-26 Fixed Guideway Alternatives Analysis

Kendall Drive Premium Transit PD&E Study

Tempe Streetcar. March 2, 2016

Draft Results and Recommendations

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Develop ground transportation improvements to make the Airport a multi-modal regional

Miami Streetcar Efficient Transportation. A Discussion on Future Transportation Opportunities

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Leadership NC. November 8, 2018

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

The Engineering Department recommends Council receive this report for information.

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Letter EL652 City of Mercer Island. Page 1. No comments n/a

METRO Orange Line BRT American Boulevard Station Options

Restoration of Historic Streetcar Services in Downtown Los Angeles

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Kenosha-Racine-Milwaukee (KRM)

Proposed Program of Interrelated Projects

PAWG Meeting #3a Tier 1 Evaluation

Making Mobility Better, Together

FREQUENTLY ASKED QUESTIONS

Recommended Vision for the Downtown Rapid Transit Network

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

A Transit Plan for the Future. Draft Network Plan

2030 Multimodal Transportation Study

Multnomah County Commission December 15, 2016

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

TRAVEL DEMAND FORECASTS

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis

Public Meeting. March 21, 2013 Mimosa Elementary School

GROWTH & DEVELOPMENT. Residents enjoying the newly opened Brickell City Centre on Nov. 3, 2016.

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Sales and Use Transportation Tax Implementation Plan

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

April 2010 April 2010 Presented by Alan Eirls

Charlotte Area Transit System: Moving Forward John Lewis CATS Chief Executive Officer

DRAFT Subject to modifications

Midtown Corridor Alternatives Analysis Key Issues Memo

San Francisco Transportation Plan Update

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Rail~Volution 2012 R. Gregg Albright

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Executive Summary. Phase 2 Evaluation Report. Introduction

ANDERSON PROPERTY SITE ANALYSIS

Strategic Plan Performance Metrics & Targets

Sustainability SFMTA Path to Platinum

DRAFT Evaluation Scores. Transit

Regional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015

PROJECT BACKGROUND 3

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

THE WAY WE MOVE LRT FOR EVERYONE

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Metro Reimagined. Project Overview October 2017

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

Hillsborough County MPO Transit Study. Transit Concept for 2050 October 17, 2007

PUBLIC TRANSPORTATION

STH 60 Northern Reliever Route Feasibility Study Report

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

Green Line Long-Term Investments

Halifax Commuter Rail: A Fresh Concept

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

4.0 TIER 2 ALTERNATIVES

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

GO ENHANCE RTS STUDY PROJECT BRIEFING

THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner

The TDM Plan for Fort Washington Office Park NOVEMBER 1 6, 2017 FORT WASHINGTON OFFICE PARK STAKEHOLDERS

Transcription:

Public Meeting

LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis procedures: Mode and alignment alternatives Ridership demand Costs and impacts Potential funding strategies

1997 - LYMMO implementation Background 2006 - City of Orlando adopted the Downtown Transportation Plan 2007 City of Orlando completed the Transit Circulator Expansion Report 2008 FTA earmark ($8.2 million) approved for East-West Circulator expansion 2010 - PB Americas, Inc. (PB) under contract to perform the LYMMO Expansion AA Study

Study Area Focus on downtown Orlando and surrounding area Includes all of Downtown Community Redevelopment Agency (CRA) area Includes residential areas such as Parramore, Thornton Park and College Park Includes two major hospital areas Florida Hospital Orlando Health Potential connections to Mills Park and SODO

Circulator Options from 2007 Study Goal is to expand LYMMO service in Central Orlando to key destinations North/South route from Florida Hospital to Orlando Health East/ West route from the Citrus Bowl to Thornton Park Potential third route connecting Courthouse with new Events Center Service to four SunRail stations Florida Hospital LYNX Central Station Church Street Amtrak Station

Study Activities

Study Schedule Phase 1 (March to August 2010) Conduct data collection Conduct technical, project advisory and public meetings Prepare preliminary alternative corridor analysis Submit LYMMO Alternatives Analysis Initiation Package Phase 2 (September 2010 to April 2011) Conduct transit rider/non-rider surveys Screen mode options (BRT vs. streetcar) Refine alignment analysis Neighborhood approach to public involvement Identify preferred alternative Prepare funding analysis Prepare Alternatives Analysis Report Phase 3 (May 2011 to 2013+) Submit FTA Small Starts or Very Small Starts Funding Application Obtain earmark funding September 2011 Engineering and environmental assessment - 2011/2012 Based on funding availability, final design/construction for the first expanded LYMMO line to be coordinated with SunRail - 2013+

Gap Analysis Prior studies contained useful data to provide a foundation for the Alternatives Analysis (AA), but did not identified local modal preference, alignment, ridership projection or financial plan Further planning needed to address FTA AA and New Starts/Small Starts application requirements Need improved analytical tools to meet FTA guidance Define the purpose and need for expanding LYMMO Enhance better FTA rating on land use and economic development Enhance coordination and collaboration with FTA and key local stakeholders

Transit Mode Options Bus Rapid Transit Streetcar Rubber tire vehicles Potential higher capacity, streamlined vehicles Enhanced stations Segregated right-of-way or mixed traffic operation Steel wheel vehicles/in-laid track Modern or vintage trolley versions Enhanced stations Segregated right-of-way or mixed traffic operation

Existing Conditions The Existing Conditions Report summarizes the existing transportation and development conditions within the study area Roadways Transit Service Traffic Parking Pedestrian/Bicycle Facilities Land Use and Environmental Economic Development

Roadways Existing Conditions Street system built out in study area Multiple roadway jurisdictions (City of Orlando, Orange County, FDOT) and access standards At-grade rail crossings create bottlenecks (Anderson St. only grade separation of CSX tracks) Brick streets present issues of ride quality for enhanced transit

Transit Service Existing Conditions LYMMO has 13 stations and 8 additional stops 25 LYNX bus routes operate through central Orlando Boarding and alighting data at all bus stops in study area evaluated In early July, origin/destination survey of LYMMO riders were conducted for typical weekday and Saturday LYNX Central Station to/from History Center/Library station had the highest ridership SunRail is scheduled to begin in 2013 Other private transit service includes taxi cabs/vehicle for hire and pedicabs Amtrak also serves central Orlando

Traffic Existing Conditions New weekday peak period traffic counts at over 50 intersections in study area (more counts this fall) SYNCHRO model used to analyze 2010 traffic operations Greatest congestion during PM peak hour 6 intersections overcapacity 585 crashes within the study area between 2005 to 2009

Existing Conditions Traffic Growth in Study Area

Parking Existing Conditions Overview of existing parking based on the 2009 Orlando Downtown Parking Study Supplemental on-street parking data were collected near Florida Hospital, Antique Row, Uptown, Mills Park, Orlando Health and SODO The City has enough parking supply to meet current peak parking demands On-street parking is utilized during the peak hours and in the evenings when metered parking is free

Existing Conditions Pedestrian and Bicycle Facilities Analysis based in part on the Downtown Orlando Transportation Plan and the LRTP Bicycle and Pedestrian Plan Sidewalks are present on most study area streets; exclusive bicycle facilities are less common Limited sidewalk width poses some constraints on premium transit stop development Recent Gertrude s Walk grant application

Existing Conditions Land Use and Environment Land uses include municipal, commercial, office, mixed-use, institutional, education, parks and residential, with higher intensity in Downtown Majority of the historic resources are found within the central city area Natural environment limited to the various lakes and associated parks within the study area

Existing Conditions Economic Development 37 development/redevelopment projects slated for the downtown area 6 added areas within the study area are target locations for redevelopment (Florida Hospital, Mills Park, Mills Avenue, Centroplex, Citrus Bowl, and Orlando Health) Florida s economy may not return to average levels for up to four years. Redevelopment and new development may be limited for the short-term, given the economic outlook through 2013

Existing Conditions Population & Employment Growth in Study Area Year 2008 Year 2030 ++ 00% - Increase over 2008 Source: City of Orlando, Growth Management Plan Year 2040

Market Analysis Identify travel markets that would be served by the LYMMO expansion Feeder-distributor for commuter rail and regional transit bus routes Diversion of existing transit riders using local bus service Feeder-distribution for Amtrak passengers Central area parking to/from sporting and entertainment venues, and other central locations Central area residents to/from central area employment, shopping, dining, entertainment, etc. Central area employment to/from businesses, shopping, dining, entertainment, etc. Central area school employees and students to/from home, shopping, dining, entertainment, etc.

Draft Goals & Objectives Goal #1: Improve Mobility and Transit Accessibility Throughout Central Orlando Objectives: 1. Improve travel circulation by connecting major activity centers in area 2. Provide an effective connection to existing and future regional transit services, including SunRail 3. Improve transit level of service between existing and future major trip destinations 4. Support development of a pedestrian environment with increased transit use, and more walking in central city area 5. Accommodate travel demand associated with special events through alternative modes

Draft Goals & Objectives Goal #2: Assure Equitable Transportation Options for the Community Objectives: 1. Provide additional services for the transit dependent population 2. Provide equitable transportation services and benefits to all users 3. Provide equitable sharing of costs for transit improvements among those who benefit from them

Draft Goals & Objectives Goal #3: Enhance the Quality of the Environment Objectives: 1. Promote transit improvements that are consistent with adopted growth management plans 2. Manage parking demand within Downtown and other activity centers to promote sustainability 3. Improve air quality by reducing automobile emissions and pollutants 4. Minimize encroachment on sensitive residential areas and environmental features

Draft Goals & Objectives Goal #4: Enhance the Social Integrity of the Urban Community Objectives: 1. Improve neighborhood accessibility and connectivity with enhanced transit service 2. Provide transit improvements in a manner to not bisect communities

Draft Goals & Objectives Goal #5: Promote Economic Development and New Development/Redevelopment Opportunities Objectives: 1. Serve existing and future high-density land uses (e.g. mixed-use, residential, commercial, office and institutional use) with improved transit 2. Provide transit investments supportive of the City s redevelopment/ development and land use plans 3. Encourage transit-oriented development projects by the public and private sector that would promote transit use

Draft Goals & Objectives Goal #6: Develop Transportation Options That Are Financially Viable Objectives: 1. Determine the ability of local agencies to fund the estimated local share of capital costs 2. Determine the ability of local agencies and the private sector to fund estimated operating and maintenance (O&M) costs 3. Develop transit improvements in the most cost-effective manner 4. Maximize the economic benefits gained from transit capital investments 5. Implement transit improvements in a timely manner

Initial Alternative Framework Alternative North-South East-West No-Build No-Build No-Build TSM TSM TSM Build #1 BRT Full Corridor TSM Build #2 Streetcar Full Corridor TSM Build #3 Streetcar Part Corridor TSM Build #4 TSM BRT Full Corridor Build #5 TSM Streetcar Full Corridor Build #6 TSM Streetcar Part Corridor Build #7 BRT Full Corridor BRT Full Corridor Build #8 Streetcar Full Corridor Streetcar Full Corridor No-Build = Only Programmed Transit Improvements; TSM (Transportation Systems Management) = Added Local/Express Bus Improvements; Build = Expanded LYMMO System

Public Involvement Public Involvement Plan (PIP) Outreach Objectives Solicit public input (i.e., neighborhood, homeowner/ condominium and business associations) Provide opportunities for the publicat-large to comment on the study Develop easily accessible communication/public involvement programs Comply with FHWA/FTA Title VI Program

Contact Information Alan Danaher Project Manager PB Americas, Inc. 407.587.7835 danaher@pbworld.com Ginger Corless Public Outreach/Urban Design HHI Design 407.838.2559 (office) 407.616.5500 (cell) gcorless@hhidesign.com