TELETOM PREINSTALLATION MANUAL

Similar documents
INSTALLATION INSTRUCTIONS

ELVORON HOME ELEVATOR

SECTION HVAC POWER VENTILATORS

RETRACTABLE CEILING COLUMN

Home Elevator. Planning Guide

5. Contractor Information 3M Model 2300 Series System Layout Checklist

Elvoron Home Elevator

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

A-dec 311 Dental Chair and Related Systems

330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING

PROPER ELECTRICAL CONNECTIONS

203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING

OPERATING INSTRUCTIONS AND SERVICE MANUAL COUNTDOWN TIMER. MODEL MP-3905 WITH MP-2002 Control

INSTRUCTIONS 360 Y-DROP

Owners Installation, Operation, and Safety Manual

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Section 02: Pre-Installation Procedures

INSTALLATION INSTRUCTIONS

OPERATING INSTRUCTIONS AND SERVICE MANUAL BMX DISPLAY. MODEL MP-3913 WITH MP-2002 Control

PowerAir Compressor Installation

Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings

VACUUM AIR TUBE mm (4.5") DIA. TUBE SYSTEM OPERATOR UNIT (OVERHEAD DELIVERY) 15160, 15161, OR CUSTOMER UNIT (UNDERGROUND)

OPERATING INSTRUCTIONS AND SERVICE MANUAL FOOTBALL SCOREBOARD MODEL MP-3455 WITH MP-3000 CONTROL

OPERATING INSTRUCTIONS AND SERVICE MANUAL MODEL MP-3903 TIMER

Utility Distribution Systems Installation, Operation, and Maintenance Manual

One Circuit Trac System TRAC SECTION, JOINERS & FEEDS T Series

Model SMD-302M. Modulating Smoke Damper. Application. Steel Airfoil Blades UL 555S Leakage Class II. Ratings. Size Limitations.

American Safe Room, Inc. Installation and Operation Manual for the ASR-101-BV 7-Bar Double Acting Automatic Blast Valve

7 Single Family Service

SMD-201M. Application. Modulating Smoke Dampers Steel 3V Blades UL 555S Leakage Class I. Ratings. Operational Rating. Size Limitations.

Installation Instructions X-Force UTV Lift (000 Series) Capacity 2,275 lbs (1,035 kg)

AIM LED LIGHT (wall mount)

Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

One Circuit Trac System TRAC SECTION, JOINERS & FEEDS T Series

ClassicSeries Compressor Installation

OPERATING INSTRUCTIONS AND SERVICE MANUAL BASEBALL SCOREBOARD MODEL MP-3310 WITH MP-2002 CONTROL

Installing Power Components

INSTALLATION INSTRUCTIONS

At Amico Labs we are dedicated to continued growth while producing products of outstanding quality, and providing excellent service.

Generator Fire Safety: Generator assemblies should be located outside the building.

DWYER INSTRUMENTS, INC. Phone: 219/ P.O. BOX 373 MICHIGAN CITY, IN 46361, U.S.A. Fax: 219/

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions

Owner's/Installation Manual

Installation Instructions Electric Heaters 5 20 kw

Table of Contents Next FLO-SAFE Manifold System Pre-Installation Kit Matrx Toll-Free: Technical Support: Fax: Rev.

INSTRUCTIONS 360 Y-DROP

Model ND-2 Specification

PEC 827E. 120 VAC AC Distribution Shelf. Critical Power Product Manual

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

TO BE USED FOR MAINTENANCE MICHIGAN DEPARTMENT OF TRANSPORTATION. 2 3/16" x 2 3/16" x 10 Ga. 12" 15.5" 1 1/2" x 1 1/2" x 12 Ga.

LLOYD INDUSTRIES INC.

10 Commercial, Industrial, Agricultural Services

91 (2311 mm) (1581mm) (1375 mm)

Installation Instructions Capacity 10,000 lbs. (100 Series Lift)

Vertex Plus, Vertex V60, Solus & Cardio Camera Site Planning Document

ELVORON HR DESIGN AND PLANNING GUIDE

Sentinel Field Satellite Controller

Model SMD-301. Smoke Damper Steel Airfoil Blades UL 555S Leakage Class I. Application. Ratings. Size Limitations. Features

Pressure Switch SOR. Sifter ready to run: Adequate pressure to switch. Sifter not ready to run: Either loss of air pressure, or open guard.

A-dec 200 P RE-INSTALLATION GUIDE

SECTION VII METERING INSTALLATIONS

Installation Instructions Studio Makeup Station

Accessories Standard Service Fixture Kits

PDI PowerWave 2 Bus System

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

CENTRIFUGAL UPBLAST ROOF EXHAUSTERS Model VRBK

Preinstallation Worksheet 3M Detection Systems Please complete this form and fax it to 3M at

OPERATING INSTRUCTIONS AND SERVICE MANUAL PRODUCTION COUNTER. MODEL MP-3911 WITH MP-2002 Control

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

AUTO CHARGE D2 MODEL #: AUTOMATIC TRIPLE OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

LCD Annunciator Installation Instructions

Pre-Installation Guide Performer

Propeller Hooded Roof Fans

SPECIAL SPECIFICATION 1788 Surveillance Cabinet

READ AND SAVE THESE INSTRUCTIONS. Air Boss MP600M Vertical Air Flow Mist Precipitator Industrial Applications. TRION

B. Fabricate in accordance with ASHRAE handbooks and SMACNA duct manuals. A. Submit in accordance with Division-1 and Section

SMD-201. Application. Smoke Dampers Steel 3V Blades UL 555S Leakage Class I. Ratings. Operational Rating. Size Limitations.

INSTRUCTIONS 360 Y-DROP

Industrial Generator Set Accessories

Section R General Processing Unit Model GPU Operators Manual

INSTRUCTIONS 360 Y-DROP

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

OPTEVA 378 ENHANCED CASH RECYCLER TERMINAL FRONT LOAD LOBBY UNIT PLAN VIEW FRONT VIEW SIDE VIEW

Installation manual. Intake system and ventilation. Industrial engines DC09, DC13, DC16 OC16. 01:02 Issue 10 en-gb. Scania CV AB 2018, Sweden

AUTO CHARGE D PUMP PLUS

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series:

Industrial Generator Set Accessories

Industrial Generator Set Accessories

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

AUTO CHARGE DUAL MODEL #: AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL. Ph: Fax:

AUTO CHARGE 4000 MODEL #: LOW PROFILE CHARGER AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

YOUR FULL LINE SOURCE FOR PVC ELECTRICAL PRODUCT

ALVARADO (1029 mm) 25 (635 mm) 36.5 (927.1 mm)

AMENDMENT ELECTRIC SERVICE MANUAL 2014

Automatic Transfer Switch FT-10 Network Control Communications Module (CCM-T) Kit

INSTRUCTIONS 360 Y-DROP

SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System

ARION: 19 EIA-310E Standard Enclosure

Transcription:

TELETOM PREINSTALLATION MANUAL

MANUAL ORGANIZATION SAFETY CONTENTS SECTION 1 INTRODUCTION...1-1 DESCRIPTION...1-1 PRE-INSTALLATION RESPONSIBILITIES...1-2 BERCHTOLD RESPONSIBILITIES...1-2 OWNER RESPONSIBILITIES...1-3 STIFFNESS...1-3 SUPERSTRUCTURE DESIGN AND CONSTRUCTION RECOMMENDATIONS...1-4 WIRING...1-4 MEDICAL (AND OTHER) GASES...1-4 OPTIONAL TELEVAC SMOKE EVACUATION SYSTEM...1-5 TESTING...1-5 STORAGE AND HANDLING...1-5 PRE-INSTALLATION COMPONENTS...1-5 TELETOM EQUIPMENT MANAGEMENT SYSTEM COMPONENTS...1-6 SECTION 2 PRE-INSTALLATION STRUCTURAL REQUIREMENTS...2-1 INTRODUCTION...2-1 GENERAL SUPERSTRUCTURE DESIGN AND CONSTRUCTION RECOMMENDATIONS...2-1 GENERAL NOTES ON SUPERSTRUCTURE DESIGN...2-2 SINGLE MOUNT EQUIPMENT MANAGEMENT SYSTEMS...2-3 IDENTIFICATION...2-3 SUPERSTRUCTURE DESIGN LOADS...2-3 TYPICAL DESIGN AND CONSTRUCTION FOR TELETOM SINGLE MOUNT SUPERSTRUCTURE...2-4 MOUNTING MATERIALS AND DETAILS...2-6 CEILING OPENING AND SOFFIT ENVELOPE...2-8 TANDEM MOUNT EQUIPMENT MANAGEMENT SYSTEMS...2-11 IDENTIFICATION...2-11 SUPERSTRUCTURE DESIGN LOADS...2-11 TYPICAL TANDEM MOUNT SUPERSTRUCTURE DESIGN AND CONSTRUCTION...2-11 MOUNTING MATERIALS AND DETAILS...2-12 CEILING OPENING AND SOFFIT ENVELOPE...2-15 SECTION 3 PRE-INSTALLATION WIRING REQUIREMENTS...3-18 BERCHTOLD SUPPLIED ELECTRICAL COMPONENTS (STANDARD)...3-1 ELECTRICAL JUNCTION BOX...3-1 ELECTRICAL POWER OUTLETS...3-2 ADDITIONAL ELECTRICAL POWER SUPPLIES...3-3 OWNER PRE-INSTALLATION WIRING REQUIREMENTS (STANDARD)...3-3 WIRING RUNS...3-3 ELECTRICAL JUNCTION BOX INSTALLATION...3-3 WIRING CONNECTIONS...3-5 HIGH VOLTAGE CONDUIT...3-5 LOW VOLTAGE ELECTRICAL REQUIREMENTS...3-5 COMBINATION BOOM & LIGHT / FLAT PANEL 3-6 iv TELETOM Pre-Installation Guide

MANUAL ORGANIZATION SAFETY SECTION 4 PRE-INSTALLATION REQUIREMENTS FOR MEDICAL GASES...4-1 BERCHTOLD SUPPLIED MEDICAL GAS RISER...4-1 PNEUMATIC BRAKE GAS SPECIFICATIONS...4-1 OWNER PRE-INSTALLATION MEDICAL GAS RISER REQUIREMENTS...4-1 MEDICAL GAS PIPING...4-2 MEDICAL GAS RISER INSTALLATION...4-2 SECTION 5...5-2 TELEVAC SMOKE EVACUATION SYSTEM...5-2 BERCHTOLD SUPPLIED TELEVAC MOTOR...5-2 OWNER PRE-INSTALLATION TELEVAC PRE-INSTALLATION REQUIREMENTS...5-2 TELEVAC VACUUM MOTOR INSTALLATION...5-3 VIDEO EQUIPMENT...5-4 OWNER PRE-INSTALLATION VIDEO REQUIREMENTS...5-4 TELETOM Pre-Installation Guide v

MANUAL ORGANIZATION SAFETY 400/600 Series Anesthesia Boom viii TELETOM Pre-Installation Guide

e. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures. SINGLE MOUNT EQUIPMENT MANAGEMENT SYSTEMS (TS) CAUTION The owner or the owner s contractor has the final responsibility for the strength and rigidity of the superstructure. BERCHTOLD Corporation does not warrant or certify superstructure designs. An inadequate superstructure will affect the ability of the TELETOM unit to perform in the manner intended. An inadequate superstructure design can also result in damage to the equipment. Equipment warranty service charges related to an inadequate superstructure design or installation are at the customer s expense. Refer to Owner Responsibilities on page 1-3 for a description of the owner s design and construction responsibilities. Identification TELETOM single mount units are identified by a 500-series or 700-series model number and a TS prefix. TELETOM units with integrated light(s) or monitor arms have a TC prefix. The 500 Series units have zero, one, or two fixed arms. The 700 Series models have either one articulating arm or one fixed arm above one articulating arm Superstructure Design Loads Table 2-1 shows the weight and moment for TELETOM single mount Equipment Management Systems. The data shown are for the heaviest unit and the highest rotational moment. Designing for the heaviest model with the highest torque will provide adequate support for the heaviest unit, but will not significantly add to the cost of the installation of the lightest unit. This design margin also increases flexibility for future product upgrades. The installed weights and moments shown in Table 2-1 include both the weight of the TELETOM components and the maximum equipment load. Table 2-1. Single Mount TELETOM Weights and Moments Static Standard Weight Moment Lb (Kg) Ft Lb (N M) 801 (363) 4071 (5520) The superstructure must be strong enough to support the weight and rigid enough to constrain rotation to less than 0.1 at the mounting plate. TELETOM Pre-Installation Guide 2-3

Typical Design and Construction for TELETOM Single Mount Superstructure FIGURE 2-1 shows the design and the construction materials recommended for a successful TELETOM Equipment Management System single mount Installation. Other constructions are possible. However, the use of other designs and construction materials should be considered only after consultation with a structural engineer. Structural Concrete Slab Normal Weight ƒ c = 3000PSI (20684 kpa) TELEVAC Smoke Evacuation System (See Section 5) TYP ¼ 6mm See Figure 2-3 12-3/16 (310mm) 2 (51mm) F See Figure 2-4 TELEVAC Hose to TELETOM Max. Length 10 (3m) TYP ¼ 6mm 5 (127mm) ₁₆ (8mm) ₁₆ (8mm) 16 (406mm) Soffit Envelope (Figure 2-6) ~23.25 Square X ~6 Deep (590mm Square X 150mm Deep) E Finished Ceiling D 45º Min. 60º Max. 60 (1.5mm) Maximum C See Figure 2-5 for Ceiling Opening Clearance for Electrical and Medical Gas Options (8mm) ₁₆ (TYP Top & Bottom) See Figure 2-3 B 5 (127mm) Minimum Edge Distance A 5-½ (140mm) Minimum 2 (51mm) 2 (51mm) 8 (203mm) 2 (51mm) FIGURE 2-1 Recommended TELETOM Single Mount Superstructure Design and Construction Materials 2-4 TELETOM Pre-Installation Guide

FIGURE 2-2 shows the design and the construction materials recommended for a successful installation of a TELETOM Equipment Management System with lights and monitor arms installed. Other constructions are possible. However, the use of other designs and construction materials should be considered only after consultation with a structural engineer. 5-½ (140mm) Minimum 60 (1.5mm) Maximum Structural Concrete Slab Normal Weight ƒ c = 3000PSI (20684 kpa) TELEVAC Smoke Evacuation System (See Section 5) TYP ¼ 6mm See Figure 2-3 12-3/16 (310mm) 2 (51mm) F See Figure 2-4 TELEVAC Hose to TELETOM Max. Length 10 (3m) ¼ 6mm TYP 5 (127mm) ₁₆ (8mm) ₁₆ (8mm) 16 (406mm) 2 (51mm) B 2 (51mm) A 5 (127mm) Minimum Edge Distance ₁₆ (8mm) (TYP Top & Bottom) See Figure 2-3 C See Figure 2-5 for Ceiling Opening Clearance for Electrical and Medical Gas Options D 45º Min. 60º Max. E Soffit Envelope (Figure 2-6) ~23 Square X ~6 Deep (584mm Square X 150mm Deep) Finished Ceiling 2 ½ (64mm) 8 (203mm) 2 (51mm) FIGURE 2-2 Recommended Super Structure Design and Construction Materials for TELETOM Units with Light(s) or Monitor Arm(s) TELETOM Pre-Installation Guide 2-5

Mounting Materials and Details The following information describes the materials used and provides important details on installation techniques and processes. See General Notes on Superstructure Design on page 2-2 for materials specifications and testing recommendations. A. L-angle Superstructure Brackets (4 required) 4 x 4 x 3/8 X 12 (102mm x 102mm x 10mm x 305mm) long with two Ø1/2 x 4 (Ø13mm x 102mm) embedded expansion anchors Leave 5 (127mm) from the center of each mounting bolt clear for wrenching. B. Standard pipe Ø6 (Ø152mm) 1. The pipe must be welded to the BERCHTOLD supplied TELETOM mounting plate (C) and to the owner supplied superstructure mounting plate (F). Do not attach supplemental supports to the pipe. The supports will not constrain the rotational forces when attached to the pipe. This could lead to a failure of the Equipment Management System to operate as intended. Drifting of the Equipment Management System could result in injury to personnel. 2. Do not attach any supplemental supports to the pipe. The supports will not constrain the rotational force when attached to the pipe. Refer to FIGURE 2-3 for important details on the support of the TELETOM mounting plate. C. TELETOM Mounting Plate (Supplied by BERCHTOLD, and installed by the owner or the owner s contractor) 1 x 15 x 15 (25mm x 381mm x 381mm) with six Ø7/8 (Ø22mm) threaded rods spaced in a 10 (252mm) bolt circle D. L-angle Support Braces (4 required) 3 x 3 x 1/4 (76mm x 76mm x 6mm) 1. BERCHTOLD recommends that the L-angle support braces be welded to both the superstructure brackets (A-FIGURE 2-1 or FIGURE 2-2) and to the TELETOM mounting plate (C). 2. Support braces (D) must be welded to the TELETOM mounting plate (C). 3. Support braces or kickers must be attached only at the corners, and they must be at 90 angles to one another (see FIGURE 2-3). 2-6 TELETOM Pre-Installation Guide

Legend: A= 15 (381mm) B= 12.2 (310mm) C= 8.27 (210mm) D= 1.37 (35mm) E= 3.37 (85.7mm) F= 3.48 (88.5mm) G= 0.75 (19mm) H= 8.58 (218mm) J= 8 (204mm) K= 6.77 Ø (172mm Ø) L= 60 M= 6.5 (165mm) N= 0.5 (12.7mm) P= 10 Ø (252mm Ø) B.C. R=.906 Ø (23mm Ø) S=.875 Ø (22.2mm Ø) Threaded Rod 1/4 (6mm) 90 90 No No FIGURE 2-3 TELETOM Mounting Plate and Support Attachments 4. The installed TELETOM mounting plate must be level to within 0.1. 12-3/16 (310mm) E. The bottom of the TELETOM mounting plate (C) must be installed as shown in FIGURE 2-1 or FIGURE 2-2 For typical single mount installations as shown in FIGURE 2-1, the bottom of the TELETOM mounting plate must be flush with the bottom of the finished ceiling For single mount installations with light(s) or monitor arms shown in FIGURE 2-2, the bottom of the TELETOM mounting plate must be 2-1/2 (64mm) above the underside of the finished ceiling. TELETOM Pre-Installation Guide 2-7

F. Base plate (see FIGURE 2-4) 1/2 x 20 x 20 (13mm x 406mm x 406mm) with four Ø1/2 x 4 (Ø13mm x 102mm) embedded expansion anchors 2 (51mm) 16 (406mm) 2 (51mm) 2 (51mm) Note: Thickess = 1/2 (13mm) 2 (51mm) 16 (406mm) Ø1/2 (13mm) 7000000005_012a FIGURE 2-4 Typical Superstructure Base Plate Ceiling Opening and Soffit Envelope The TELETOM Equipment Management System owner or the owner s contractor must ensure that the ceiling opening will accommodate the mounting plate and any and all accessories installed on it. FIGURE 2-5 shows the dimensions of various combinations of optional components that might be involved. Consult the customer drawings to determine which accessories will be included with your unit. Customers typically order multiple TELETOM Equipment Management Systems to be installed in different rooms/areas for different purposes. Each of these booms may be equipped differently and, thus, require different numbers and types of optional components. It is important that the mounting requirements for each different installation be evaluated individually. 2-8 TELETOM Pre-Installation Guide

NOTE: Screws, bolts, washers, nuts, etc. required to mount BERCHTOLD supplied J- boxes and gas valves are included in preinstallation deliveries 18.7 (475mm) 4.75 (121mm) 1/4 (8mm) 16 (406mm) 17 (432mm) Alternative (or Additional) Mounting Location for Electrical Junction Box 1.4 (40mm) 9.1 (232mm) 1 (25mm) 2.5 (64mm) Finished Ceiling Single Mounts 3 5 (76mm) 127mm) 8 (203mm) Threaded Rod 1 (25mm) 8 (203mm) 5 (127mm) 14 (356mm) Finished Ceiling Single Mounts with Lights or Monitor Arms 020904-02_1 FIGURE 2-5 TELETOM Equipment Management System Mounting Plate and Accessory Dimensional Information BERCHTOLD provides a soffit cover to provide a finished look at the ceiling above the TELETOM Equipment Management System. The soffit is 23 square and, thus, will cover an envelope approximately 3.5 (90mm) outside of each edge of the mounting plate (FIGURE 2-6). TELETOM Pre-Installation Guide 2-9

18 (457mm) 1/4 (8mm) 16 (406mm) 17 (432mm) Additional or Alternative Mounting Location for Electrical Junction Box Soffit Envelope 23.25 (590mm) Square Finished Ceiling and Soffit Envelope for Single Mounts (Solid Lines) ~6 (~150mm) ~6 (~150mm) 020904-01_1 5 (128mm) 2.5 (64mm) 2.5 (64mm) Finished Ceiling and Soffit Envelope for Single Mounts with Lights or Monitor Arm (Dotted Lines) FIGURE 2-6 TELETOM Equipment Management System Soffit Envelope The owner or the owner s contractor should take care not to include any non-equipment Management System equipment or systems within the soffit envelope. 2-10 TELETOM Pre-Installation Guide

A pre-installation inspection (before the finished ceiling is installed) may help detect interference potentials while they can be most easily resolved. TANDEM MOUNT EQUIPMENT MANAGEMENT SYSTEMS (TT OR TB) CAUTION The owner or the owner s contractor has the final responsibility for the strength and rigidity of the superstructure. BERCHTOLD Corporation does not warrant or certify superstructure designs. An inadequate superstructure will affect the ability of the TELETOM unit to perform in the manner intended. An inadequate superstructure design can also result in damage to the equipment. Equipment warranty service charges related to an inadequate superstructure design or installation are at the customer s expense. Refer to Owner Responsibilities on page 1-3 for a description of the owner s design and construction responsibilities. Identification TELETOM tandem mount units are identified by a 500 or 700 series model number with at TT or TB prefix. Superstructure Design Loads Table 2-2 shows the weight and moment for TELETOM tandem mount Equipment Management Systems. The data shown are for the heaviest unit and the highest rotational moment. Designing for the heaviest model with the highest torque will provide adequate support for the heaviest unit, but will not significantly add to the cost of the installation of the lightest unit. This design margin also increases flexibility for future product upgrades. The installed weights and moments shown in Table 2-2 include the weight of the TELETOM, any CHROMOPHARE or monitor arm components, and the maximum equipment load. Table 2-2. Tandem Mount TELETOM Weights and Moments Standard Weight Moment Lb (Kg) Ft Lb (N M) 1108 (503) 6240 (8460) The superstructure must be strong enough to support the weight and rigid enough to constrain rotation to less than 0.1 at the mounting plate. Typical Tandem Mount Superstructure Design and Construction FIGURE 2-7 shows the design and the construction materials recommended for a successful TELETOM Equipment Management System tandem mount Installation. Other constructions are TELETOM Pre-Installation Guide 2-11

possible. However, the use of other designs and construction materials should be considered only after consultation with a structural engineer. Check Customer Drawing for Critical Orientation Information See Figure 2-8 C F See Figure 2-9 Smoke Evacuation System (See Section 5) TELEVAC A F B See Figure 2-9 TELEVAC Hose to TELETOM Max. Length 10 (3m). See Figure 2-10 for Ceiling Opening Clearance for C Electrical and Medical Gas Options D 45 Min. 60 Max. E Finished Ceiling Soffit Envelope (Figure 2-11) ~25.5 Square X ~6 Deep (~650mm Square X ~150mm Deep) FIGURE 2-7 Recommended TELETOM Tandem Mount Superstructure Design and Construction Materials Mounting Materials and Details The following information describes the materials used and provides important details on installation techniques and processes. 2-12 TELETOM Pre-Installation Guide

See General Notes on Superstructure Design on page 2-2 for materials specifications and testing recommendations. A. L-angle Superstructure Brackets (4 required) 4 x 4 x 3/8 X 12 (102mm x 102mm x 10mm x 305mm) long with two Ø5/8 x 4 (Ø16mm x 102mm) embedded expansion anchors Leave 5 (127mm) from the center of each mounting bolt clear for wrenching. B. Standard pipe Ø6 (Ø152mm) 1. The pipe must be welded to the BERCHTOLD supplied TELETOM mounting plate (C) and to the owner supplier superstructure top plate (F). Do not attach supplemental supports to the pipe. The supports will not constrain the rotational forces when attached to the pipe. This could lead to a failure of the Equipment Management System to operate as intended. Drifting of the Equipment Management System could result in injury to personnel. 2. Do not attach any supplemental supports to the pipe. The supports will not constrain the rotational force when attached to the pipe. Refer to FIGURE 2-8 for important details on the support of the TELETOM mounting plate. CAUTION Orientation of the TELETOM Tandem Mounting Plate is critical for installation and operation. Refer to your layout drawings for the proper orientation. C. TELETOM Tandem Mounting Plate (Supplied by BERCHTOLD, and installed by the owner or the owner s contractor). 1 x approximately Ø22-7/8 (25mm x approximately Ø580mm) with twelve 7/8 (22mm) threaded rods in two Ø 10 (Ø 252mm) bolt circles (6 rods per circle see FIGURE 2-8). D. L-angle Support Braces (4 required) 4 x 4 x 3/8 (102mm x 102mm x 10mm) 1. BERCHTOLD recommends that the L-angle support braces be welded to both the superstructure brackets (A-FIGURE 2-8) and to the mounting plate (C). 2. Support braces (D) must be welded to the mounting plate (C). 3. Support braces must be attached near the support pipes, and they must be at 30 angles to a centerline drawn through both pipe mount locations on the plate (see FIGURE 2-8). TELETOM Pre-Installation Guide 2-13

M L N K A H J B C D G F E Legend: A = 5.6 (142mm) B= 7.67 (195mm) C = 8.58 (218mm) D = Ø 10 (Ø 252mm) B.C E = 6.69 (170mm) F = Ø.75 (Ø 19.4mm) with all thread rods and bolts installed. G = Ø.25 (Ø 6.35mm) H = 3.15 (80.5mm) J = 6.5 (165mm) K = Ø.91 (Ø 23mm) L = Ø 6.77 (Ø 172mm) M = Ø 22.83 (Ø 580mm) Mounting Plate Envelope N = Ø 18.50 (Ø 470mm) B.C. No ¼ (6mm) 30 (Typical) Yes No FIGURE 2-8 TELETOM Tandem Mounting Plate and Support Attachments 4. The installed TELETOM mounting plate must be level to within ± 0.1. E. The bottom of the TELETOM mounting plate (C-FIGURE 2-7) must be flush with finished ceiling. F. Superstructure base plate furnished by the owner (see FIGURE 2-9) 1/2 x 20 x 30 (13mm x 508mm x 762mm) with six Ø1/2 x 6 (Ø13mm x 152mm) embedded expansion anchors. 2-14 TELETOM Pre-Installation Guide

8 (203mm) 5.59 (142mm) 5.59 (142mm) 8 (203mm) Ø 0.625 (16mm) 8 204mm 20 (508MM) 8 204mm 11.18 (284mm) 30 (762mm) FIGURE 2-9 Typical Tandem Superstructure Base Plate 7000000005_007b Ceiling Opening and Soffit Envelope The TELETOM Equipment Management System owner or the owner s contractor must ensure that the ceiling opening will accommodate the tandem mounting plate and any and all accessories installed on it. FIGURE 2-10 shows the dimensions of various combinations of optional components that might be involved. Consult the customer drawings to determine which accessories will be included with your unit. Customers typically order multiple TELETOM Equipment Management Systems to be installed in different rooms/areas for different purposes. Each of these booms may be equipped differently and, thus, require different numbers and types of optional components. It is important that the mounting requirements for each different installation be evaluated individually. TELETOM Pre-Installation Guide 2-15

FIGURE 2-10 TELETOM Tandem Mount Equipment Management System Mounting Plate and Accessory Dimensional Information BERCHTOLD provides a soffit cover to provide a finished look at the ceiling above the TELETOM Equipment Management System. The soffit is 23.5 (600mm) square and, thus, will cover an envelope approximately 0.75 (20mm) outside the perimeter of the mounting plate (FIGURE 2-11). 2-16 TELETOM Pre-Installation Guide

0.7 (18mm) 25.5 (650mm) 22.8 (580mm) Soffit Envelope 3 5 (76mm) (127mm) 8 (203mm) Finished Ceiling Soffit Envelope 021604-01_1 FIGURE 2-11 TELETOM Tandem Mount Equipment Management System Soffit Envelope The owner or the owner s contractor should take care not to include any non-equipment Management System equipment or systems within the soffit envelope. This includes: Lighting fixtures HVAC delivery weirs Air return grills Sprinkler system heads Speakers Fire/smoke detector sensors A pre-installation inspection (before the finished ceiling is installed) may help detect potential interference while it can be most easily resolved. TELETOM Pre-Installation Guide 2-17

SECTION 3 SECTION 3 PRE-INSTALLATION WIRING REQUIREMENTS This section describes the wiring and electrical components used in a standard TELETOM Equipment Management System installation. Optional equipment and accessories have additional electrical capacity and pre-installation requirements. These additional requirements are described under the individual options and accessories in Section 5 of this manual. Refer to the order specifications to determine the TELETOM electrical components and options supplied for your unit(s). BERCHTOLD SUPPLIED ELECTRICAL COMPONENTS (STANDARD) BERCHTOLD supplies an electrical junction box for installation on the TELETOM mounting plate. Each TELETOM Equipment Management System may also include one or more power outlets. Refer to the owner s configuration drawings (provided by BERCHTOLD) for the type and quantity of circuits required. Electrical Junction Box BERCHTOLD supplies the electrical junction box that must be used for the TELETOM installation. The junction box includes field wirable terminal blocks for up to six circuits. It also has a built in grounding stud (FIGURE 3-1). The mounting plate has through holes to accept the junction box mounting screws at the correct position. The junction box will be sent prior to the shipment of the TELETOM unit. The box may arrive with the TELETOM mounting plate or as a separate delivery. TELETOM Pre-Installation Guide 3-1

SECTION 3 0.75 (19 mm) 4 (102 mm) 8 (203 mm) 1 2 A 1 2 B 1 2 C 1 2 D 1 2 E 1 2 F 8 (203 mm) Installation Bracket Knock Outs Included on All Four Sides 0.25 (6mm) Terminal Blocks Ground Stud 1/4-20 x 1-1/2 Socket Head Mounting Screw 3 (76mm) 3.75 (95mm) 1.25 (32 mm) 2 (51 mm) 6.5 (165 mm) FIGURE 3-1 TELETOM Junction Box 020204-02_1 Electrical Power Outlets The TELETOM Equipment Management System service column may carry multiple hospital grade receptacles. Standard receptacles are rated at 20 Amps, but other ratings can be supplied if specified. Receptacles are wired together in groups. There are a maximum of 3 receptacles per circuit and a maximum of 6 circuits per Equipment Management System. When the maximum number of circuits is ordered, two junction boxes are required to handle the house-to-boom wiring connections. When a more standard three or four circuits (for up to 12 outlets), only one junction box is required. Power for the receptacles is provided by UL approved 12 AWG, type XHHW, 3-wire cables inside the boom. Each group of three receptacles requires a separate 120 VAC, 50/60 Hz power supply line. 3-2 TELETOM Pre-Installation Guide

SECTION 3 Additional Electrical Power Supplies TELETOM Equipment Management System shelves can include two simplex receptacles per shelf. Up to three shelves on a single boom can include outlets (for a total of 6 shelving outlets). All of the shelf outlets are powered from a single 20 Amp, 120VAC, 50/60Hz supply on a single, dedicated circuit. TELETOM model 520 and all 700 series models include an electronic brake and/or an integral motor, which requires a single separate 120 VAC, 50/60 Hz power supply line capable of supplying 8.3 Amps. The TELEVAC Smoke Evacuation System, if ordered, requires a separate 12 Amp, 120 VAC, 50/60Hz power supply. However, this power supply is routed directly to the TELEVAC motor; it does not go through the junction box installed on the TELETOM Equipment Management System mounting plate. Each option or accessory may require a separate power supply line. Refer to the owner s configuration drawings (provided by BERCHTOLD) for the type and quantity of circuits required. OWNER PRE-INSTALLATION WIRING REQUIREMENTS (STANDARD) The owner must supply power to the TELETOM : 1. Power must be 120 VAC 56/60 Hz from a dedicated source. 2. The owner or the owner s contractor must complete all wiring and conduit runs before the TELETOM Equipment Management System can be installed. 3. Power must be able to be turned on at the time the equipment is installed so that electrical systems can be tested. The owner must make the electrical connections from the hospital power supply to the TELETOM Equipment Management System and any optional and accessory equipment. Wiring Runs The owner must run the wiring from the mains supply to the junction box on the TELETOM mounting plate. Wiring runs must comply with local electrical codes. Live electrical circuits can cause injury or death. Lock out and tag out power supplies to prevent work on live electrical circuits. Electrical Junction Box Installation The owner must install the BERCHTOLD supplied junction box on the TELETOM mounting plate. The junction box includes internal terminal blocks for wiring connections and exterior conduit guides on all four sides (FIGURE 3-2). TELETOM Pre-Installation Guide 3-3

15 (381mm) 8.27 (210mm) 6.5 (165mm) SECTION 3 15 (381mm) 8.58 (218mm) 8 (204mm) B A C D E F E C E F C FIGURE 3-2 Electrical Junction Box Installation on Single Mounting Plate The single mounting plate is shown, but the principle for installing the junction box on the tandem mounting plate is identical. As with the single mounting plate, the tandem mounting plate provides spaces for the installation of two junction boxes. See FIGURE 2-10 for the junction box mounting locations on the tandem mounting plate. Do this to attach the junction box to the mounting plate: 1. Align the junction box (A) with the opening on the mounting plate (B). Note that the mounting plate indents and mounting holes are sized differently for the electrical junction box and the gas valve bridge. The electrical junction box must be mounted in the area intended in order to insure a secure attachment. 2. Slide the mounting brackets (C) under the mounting plate until the holes in the brackets (D) align with the holes in the plate (E). 3. Insert ¼-20 x 1½ socket head screws (F) into the mounting plate, and tighten securely. 4. If necessary, repeat steps 1 through 3 and install the second electrical junction box on the opposite side of the mounting plate. 3-4 TELETOM Pre-Installation Guide

SECTION 3 Wiring Connections Terminal block illustrated below is provided by BERCHTOLD Corporation. Any code compliant connector can be substituted by customer. Grounding Stud FIGURE 3-3 Terminal Block Connectors in Electrical Junction Box High Voltage Conduit The contractor is responsible for running code compliant conduit between the mains supply and the TELETOM Equipment Management System junction box. The sizing and number of conduits is dependant on the number of cables involved. Cable information is included in the customer order file. Refer to local codes for conduit sizing and installation specifications. LOW VOLTAGE ELECTRICAL REQUIREMENTS TELETOM Equipment Management Systems can provide connectivity for low voltage applications such as telephone, data cables, video signals, and other applications. The cabling for the low voltage devices and connections is routed through an electrically isolated compartment in the electrical pod. Depending on the order configuration, some of the low voltage cables may be in place and only need termination at the site. For applications where low voltage cables will be installed in the field, BERCHTOLD will include flexible chase within the TELETOM Equipment Management System if the owner stipulates a requirement in the order documentation. The owner or the owner s contractor or a low voltage component supplier is responsible for terminating all low voltage applications. In addition, the owner or the owner s contractor is responsible for running code compliant conduit between the TELETOM Equipment Management System and the low voltage cable destination. COMBINATION BOOM & LIGHT/FLAT PANEL Please see the Chromophare Pre-Installation Guide. If a light is purchased, and an SK Box is provided. The contractor should route conduit from the mounting plate to the SK Box, to the wall control unit as described in the Chromophare Pre-Installation Guide. TELETOM Pre-Installation Guide 3-5

SECTION 3 For a Flat Panel installation, a fused terminal block is provided on the boom mounting plate. Mains power should be routed to the top of the boom using conduit per local code. LV Video cables may have to be routed in conduit, depending on local code application and point of termination. 3-6 TELETOM Pre-Installation Guide

SECTION 5 SECTION 4 PRE-INSTALLATION REQUIREMENTS FOR MEDICAL GASES Both single mount and tandem mount TELETOM Equipment Management Systems can supply medical gases through the service column(s). BERCHTOLD SUPPLIED MEDICAL GAS RISER BERCHTOLD supplies a medical gas riser for installation on the TELETOM mounting plate. Each riser is specially fabricated to the owner s medical gas specifications. The riser includes a valve bridge, DISS gas risers with single check valves, and testing caps. A compressed gas riser with an NTP fitting is available for installation on the valve bridge. However, because compressed air is not a medical gas, check local codes and regulation to determine if a compressed air riser can be mounted adjacent to medical gas risers. Medical gas is delivered through the service column via medical grade hoses. These hoses support working pressures of 200 PSI (1379 kpa). Hoses are rated for a maximum continuous operating temperature of 165 F (74 C), and they have a low temperature brittle point of -40 F (-40 C). Medical gas risers comply with NFPA 5.1.10.1.1 (2002). They are shipped in advance of the TELETOM equipment, and they must be attached to the mounting plate before installation of the equipment can begin. Oxygen outlets are cleaned for oxygen service per G-41 CGA pamphlet. This cleanliness should be maintained through installation. PNEUMATIC BRAKE GAS SPECIFICATIONS The customer must identify the gas to be used to operate the pneumatic braking system if one is included in the TELETOM Equipment Management System specifications. The gas can be N 2 or compressed air. The pneumatic brake system consumes 0.45 ft 3 (0.013 m 3 ) per cycle. When the Equipment Management System includes a pneumatic brake, it is delivered with a regulator installed and factory set for 100 psi (690 kpa) air. Air supplied to the regulator must be between 100 and 300 psi (690 and 2070 kpa). If compressed air is used, the owner or the owner s contractor is responsible for supplying the tubing and fittings to deliver the air from the gas riser to the regulator. N2 operated pneumatic brakes must be piped to high side line pressure. Pneumatic brakes cannot be operated by air supplies routed through a wall regulator. OWNER PRE-INSTALLATION MEDICAL GAS RISER REQUIREMENTS The owner must plumb the medical gases to the TELETOM Equipment Management System location, install the medical gas riser on the TELETOM mounting plate, and make the connections between the medical gas riser and the service column supply lines. Medical Gas Piping The owner must pipe the medical gases from the building supply to the TELETOM Equipment Management System prior to installation of the equipment. TELETOM Pre-Installation Guide 5-1

SECTION 5 1. Piping must be completed according to local and national code requirements. 2. An NFPA compliant blow down test must be performed. 3. Piping must be pressurized and leak tested per NFPA 99C (CSA Z305.1) Medical Gas Piping Systems. 4. Test results must be made available to BERCHTOLD installers for comparison testing. Medical Gas Riser Installation The owner must install the medical gas riser on the bottom of the TELETOM mounting plate. FIGURE 4-1 shows the medical gas mounting positions for single mount and tandem mount installations. Where only one valve bridge is needed, it can be mounted in either position. Where two valve bridges are needed, they must be mounted as shown. The gas valve bridge cannot be mounted in the positions reserved for the electrical junction box, even if no junction box is included. BERCHTOLD ships the installation screws, washers, and nuts along with the valve bridge(s). Medical gas risers are 8 high. The risers for vacuum lines are ½ OD. All pressure risers are ⅜ OD. 15 (381mm) 8.58 (218mm) 8 (204mm) 8.58 (218mm) 8 (204mm) 15 (381mm) 8.27 (210mm) 6.5 (165mm) 22.8 (580mm) 23.5 (600mm) 021704-03_1 6.5 (165mm) FIGURE 4-1. Medical Gas Valve Bridge Mounting Positions 5-2 TELETOM Pre-Installation Guide

SECTION 5 Do this to attach the medical gas riser to the mounting plate: The following description uses the single mounting plate for illustration. The parts and procedures are identical for the tandem mounting plate. 1. Place the bridge (A) under the mounting plate (B), and align the holes (FIGURE 4-2). 021704-01_1 B A C B A FIGURE 4-2. E Installing the Gas Riser on the Mounting Plate Note that the mounting plate indents and mounting holes are sized differently for the electrical junction box and the gas valve bridge. The medical gas valve bridge must be mounted in the area intended in order to insure an accurate fit and secure attachment. 2. Insert a bolt (C) through each mounting hole, and secure it with a washer (D) and nut (E). 3. Connect the appropriate house gas supply to the top of each riser. 4. Purge the gas lines and perform the leak test at least 24 hours prior to the scheduled beginning of the BERCHTOLD installation activities. BERCHTOLD installation personnel will connect the flexible tubing from the TELETOM Equipment Management System to the bottom of each riser. D TELETOM Pre-Installation Guide 5-3