Provincial Railway Guides Section:

Similar documents
Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

49 CFR Part 229. Locomotive Safety Standards THE REGULATION

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

Federal Railroad Administration, DOT CFR section Description Guideline PART 179

HOLY SPIRIT RCSRD NO.4 BUS DRIVER S GUIDE

New West Partnership Deliverables July 2011/2012 Reporting

Service and operate a diesel-electric main line locomotive

Part Inspection, Repair, and Maintenance

PART A STATEMENT OF PRINCIPLES

LIFT TRUCK POLICY AND PROGRAM

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials

Service and operate an electric main line locomotive

The Road to Safety and Compliance Starts with You! ISRI DOT Self-Audit Checklist

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

Dangerous Goods. Transport Tanks

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

Powered Industrial Truck Safety Program

Section 11: Vehicle Inspection, Repair and Maintenance

UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011

RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1

Fuels Safety Division. Propane Code Adoption Document Amendment

ELD Mandate Survival Guide

National Safety Code. SAFE Companies Revised 2010 Audits. Regulations for Light Truck Carriers

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY

The following document was obtained from the State of Indiana. This document may have changed since it was obtained. Please refer to the State's

Driver Vehicle Inspection Reports (DVIR) Guide

Steam Traction Engine Operations in Saskatchewan Final Findings and Path Forward

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

West Tennessee Safety Management Maintenance Council Meeting June 13, Inspections

EROAD Inspect DVIR. Addendum to the EROAD ELD User Manual

Health, Safety, Security and Environment

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

NSC DAILY VEHICLE TRIP INSPECTION

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

SAN JACINTO COLLEGE COMMERCIAL TRUCK DRIVING 2018 CLASS SCHEDULE

NZQA registered unit standard version 4 Page 1 of 5

INSTRUCTOR GUIDE TOPIC: APPARATUS RESPONSE LEVEL OF INSTRUCTION: TIME REQUIRED: TWO HOURS MATERIALS: APPROPRIATE AUDIO-VISUAL MATERIALS

NON-ROAD DIESEL ENGINE EMISSION REGULATION BYLAW CONSOLIDATED

How to Prepare for a DOT Audit

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels

SOUTH AFRICAN HERITAGE RESOURCES AGENCY VEHICLE USAGE POLICY

Knowledge Evaluation

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035

MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33

REFERENCE SYLLABUS. Special Steam-powered Traction Engine Operator s Certificate of Competency

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

(1) The location where the train is originally assembled ( initial terminal ); (2) A location where the train consist is changed other than by:

CHAPTER 403. HAZARDOUS MATERIAL TRANSPORTATION

DeForest Area School District Administrative Regulation TITLE: TRANSPORTING STUDENTS IN OTHER THAN A SCHOOL BUS. NUMBER: AR 6.

Natural Gas for Transportation Codes & Standards Issues

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

FMCSA Brake Regulations 101

ZLogs Help. Tablet Applications. Contents. ZLogs Help

SECTION 11 POWERED INDUSTRIAL TRUCKS

SEMPEO SQA Unit Code H Carrying out routine servicing of mechanical equipment

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

SAN JACINTO COLLEGE COMMERCIAL TRUCK DRIVING CLASS SCHEDULE

Powered Industrial Trucks Workgroup The workgroup met on to discuss the applicability of the proposed rule for general industry on Powered

Risk Management of Rail Vehicle Axle Bearings

Recordkeeping Requirements of the Federal Motor Carrier Safety Regulations

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

RADIATION CONTROL - RADIATION SAFETY REQUIREMENTS FOR PARTICLE ACCELERATORS NOT USED IN THE HEALING ARTS

ELD Compliance Standard & Best s 2016 Safety Issues Update

National Truck & Bus Driver Trainers Conference

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Railway Locomotive Inspection and Safety Rules

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

Georgia Drycleaner Compliance Calendar

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

FABER BURNER ROUTINE MAINTENANCE

Fleet Safety. Latest revised date: October 26, 2011 Page 1 of 6 Prepared by: Department of Health & Safety S-008

Managing Electrical Safety on Boats

IMO fuel oil consumption data collection system

TEMPORARY REVISION NUMBER

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

Dangerous Goods. Transport Tanks

UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE STANDARD FOR SPARK ARRESTERS FOR INTERNAL COMBUSTION ENGINES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

TRUCKINGTRUTH.COM T T. Daniel B s Pre-Trip Inspection Checklist

CITY OF MINNEAPOLIS GREEN FLEET POLICY

Air Brake and Train Handling Rules

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

Rule No. 1. Scope Definitions Periodicity of technical inspections Technical inspection Inspection requirements...

BC Pilot Car Load Movement Guidelines. Task Force on Vehicle Weights and Dimensions Policy. December 14, 2016

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Title: IICL Owner / Intermodal Equipment Provider Best Practices

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Second Class Chief Statutes and Rules

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

INSPECTION AND MAINTENANCE CHECKLIST

Transcription:

It is a railway s responsibility to ensure the safe operation of locomotives in service with their railway and ensure locomotives do not suffer catastrophic failures or undesired events resulting in death, injury, environmental damage, property damage, or any other loss. As part of a railway s Safety Management Plan, it is expected that the railways utilize the latest version of the following rules as the basis for developing an operation, maintenance and inspection plan for their locomotives: Railway Locomotive Inspection and Safety Rules Railway Freight and Passenger Train Brake Inspection and Safety Rules. The objective of this guideline is to provide provincial common carrier and industrial railways with the expectations with respect to locomotives that are designated as low usage locomotives (LUL). This guideline is intended to establish an alternative timeframe and inspection schedule based on hours of service and used in conjunction with the Railway Locomotive Inspection and Safety Rules. It is expected that provincially regulated railways adopt and comply with the Railway Freight and Passenger Train Brake Inspection and Safety Rules for all locomotives. This guideline does not modify or alter the testing, inspection and maintenance requirements outlined in the Railway Freight and Passenger Train Brake Inspection and Safety Rules. PART A GENERAL INTRODUCTION: Annual Inspections means the documented inspection conducted by a locomotive inspector utilizing the Ninety-Two and Annual Inspection form. Calendar Year means from January 01 to December 31. Forty-Five Day Safety Inspection means the documented inspection conducted by a locomotive inspector utilizing the Forty Five Day Safety Inspection Form. Pre Trip Safety Inspection means an inspection completed by a locomotive operator or locomotive inspector prior to operation of a locomotive. Hour Meter means an electric meter that records the running time of a locomotive. Locomotive means a railway locomotive intended for the propulsion or control of railway cars or equipment. Locomotive Inspector means a person deemed competent by the railway company to perform inspections of locomotives. Log Book means a document used to record daily running hours of a locomotive. 1 of 13

SCOPE Low Usage Locomotive means a locomotive with a running time of less than 1100 hours per calendar year. High Usage Locomotive means a locomotive with a running time that exceeds 1100 hours per calendar year. Railway means the railway as defined the Railway Act Running Time means the time the locomotive engine runs. Ninety-Two Day Safety Inspection means the documented inspection conducted by a locomotive inspector utilizing the Ninety Two Day Inspection Form. The scope outlines the responsibilities of a railway when developing a locomotive inspection safety plan and designating a locomotive to be either a low usage locomotive (LUL) or high usage locomotive (HUL). RAILWAY REQUIREMENT A railway is required to: I. Establish the type of inspection program to be used for a locomotive. A locomotive must either be designated as a low usage locomotive (LUL) with less than 1100 hours per year or a locomotive with more than 1100 hours per year which must then be designated as high usage locomotive (HUL). II. III. Inspect and repair of all locomotives to ensure safe operation. All components, appurtenances and control apparatuses of all locomotives must be designed and maintained to perform their intended function. Ensure that locomotive inspectors are trained to perform inspections of locomotives. Locomotive inspectors must demonstrate to a railway company by means of oral or written examination and on-the-job performance, a knowledge and ability concerning the inspection of railway locomotives. Application This guideline applies to all railways under the jurisdiction of The Railway Act (Saskatchewan). Any railway that chooses to designate a Low Usage Locomotive that designated locomotive must remain on provincially regulated track, and any other railway who utilizes any portion of federally regulated track must comply with the federal rules for locomotive inspection and operation. 2 of 13

PART B Locomotive Safety Assurance Scope This part outlines the inspection requirements of a low usage locomotive and high usage locomotive to ensure safe railway operations. Inspection Forms Appendix C and Appendix D of this document contain recommended inspection forms for 45-day safety inspections and 92-day / Annual safety inspections. These forms outline the recommended scope and content of the inspections to be completed and documented at the specified intervals. A railway may modify the scope and content of the inspections by adding items they believe are appropriate for the specified time frames. A railway may only reduce the scope of items contained within the attached inspections forms after receiving written approval from a provincial railway inspector approving the alternative inspection plan. Application for Low Usage Locomotives (LUL) A railway as part of their ongoing maintenance must: a. Conduct pre trip inspection prior to operation of locomotive; b. Conduct annual inspections; c. Equip each low usage locomotive with an electric hour meter; d. Use a log book to record daily running time; e. Audit the inspection report as part of the SMP audit requirement; f. Must use the approved Locomotive Inspection Form as a minimum; Application for High Usage Locomotives (HUL) A railway as part of their ongoing maintenance must: a. Conduct pre trip inspection prior to operation of locomotive; b. Conduct 45 day inspections; c. Conduct 92 day inspections; d. Conduct annual inspections; e. Audit inspection reports in accordance to the SMP requirement. f. Must use the approved Locomotive Inspection Form as a minimum; Pre Trip Inspections It is the responsibility of the railway to establish their pre-trip inspection protocols and requirements. This includes designating who is responsible for conducting pre-trip inspections, establishing the scope and 3 of 13

content of pre-trip inspection and establishing any documentation requirements and policies for pre-trip inspections. It is recommended that railways utilize the 45-day inspection form as a guide for developing a pre-trip inspection protocol and it is also recommended that at least one pre-trip inspection be documented a minimum of once every 45 days. Out-of-Service More Than 30 Days If a locomotive is to be put out of service for more than 30 days an inspection is required prior to locomotive going back into service. Exceeding 1100 Hours in Less Than One Calendar Year If a LUL exceeds 1100 hours in a year, the locomotive will automatically revert to operating under HUL inspection guidelines for the remainder of the calendar year. Switching Between LUL and HUL Inspections A locomotive designated as an LUL can only switch to HUL once during any calendar year; When a locomotive is designated as an HUL unit, the locomotive will continue to operate under the HUL inspection criteria for the remainder of the calendar year. PART C Compliance with Federal Rules This guide does not exempt any railway designated as a Railway Company or Local Railway Company under federal legislation from following any federal rules as set out by Transport Canada including Rule TC- O-0-184 Railway Freight and Passenger Train Brake Inspection and Safety Rules and Rule TC-O-0-187 Railway Locomotive Inspection and Safety Rules. 4 of 13

APPENDIX A LOGBOOK The following format is recommended for documentation for the hours of service for LUL units in a log book to be retained in the cab of a locomotive. COMPANY NAME UNIT NUMBER - 1234 UNIT TYPE - GP-38-2 YEAR - 2017 Meter Start Hour Reading Meter End Hour Reading Total Daily Time logged Previous Time Logged Total Time Logged July 1 250 251 1 2 3 July 4 251 254 3 3 6 July 10 254 255 1 6 7 July 14 255 257.5 2.5 7 9.5 July 20 257.5 260.5 3.0 9.5 12.5 APPENDIX B SMP SECTION The follow information must be added to the SMP section of the railway: a) List of the locomotive unit number and designation of either low usage locomotive (LUL) or high usage (HUL) for each locomotive. b) Provide the instruction of what happens if a LUL exceeds the 1100 hour annual limit. c) State each locomotive must be designated as either a LUL or HUL at the beginning of each calendar year. d) List the inspection requirements for LUL. e) List the inspection requirements for HUL. f) State the inspection requirements for locomotives that have been out of service for more than 30 calendar days. g) State the position in the company responsible for monitoring the hours of Locomotive unit. 5 of 13

APPENDIX C 45 DAY LOCOMOTIVE INSPECTION FORM Locomotive Number 1 Couplers and Draft Gear INSPECTION ITEM CONDITION FOUND INITIAL 2 Hoses Glad Hands 3 Journals - Springs Spring Hanger 4 Brake Shoes Rigging and Adjustment 5 Wheel Condition 6 Traction Motor Cable Securement 7 Emergency Fuel Cut Off - All Positions 8 Fuel Tanks Gauges - Sight Glass 9 Pollution Tanks 10 Spitter Valve / Blow Down Valve (Test If Applicable) 11 Hand Rails Steps Walkways 12 Hand Brake 13 Engine Compartment Condition (Free of Oil Contamination) 14 Governor Oil Level Free of Leaks 6 of 13

15 Check Compressor 175 POP Valve Seal 16 Compartment Filters 17 Exhaust Manifold Carbon Buildup Leaks 18 Inspect Exhaust Stack Carbon Build Up - Spark Arrestor 19 Windows Doors Wipers Seats 20 Fire Extinguisher - 30 Days and annual certification 21 All Lights Bell - Horn 22 Gauge Condition 23 Up to Cab Cards 24 Control Stand Serviceability 25 Safety Control device Function Test (Dead Man) 26 Cab Heater - Blowers 27 All High / Low Voltage Electrical Covers / Ground Relay Protection seals 7 of 13

COMMENTS: Inspectors Primary Employer: Inspectors Printed Name: Inspectors Signature: 8 of 13

APPENDIX D 92 DAY (Items 1 33) & ANNUAL (Items 1-45) LOCOMOTIVE INSPECTION FORM Locomotive Number Inspection Type (92 Day or Annual) INSPECTION ITEM CONDITION FOUND INITIAL 1 Check locomotive for fire & hazards 2 Inspect safety appliances 3 Check lights for defects 4 Test bell & horn function 5 Check power knockdown switch 6 Test air brake gauges (self-test) 7 Verify control stand isolation 8 Test all electrical meters 9 Test operation of the protective alarm 10 Test ground relay protection (re-seal) 11 Perform and record insulation test (LV- HV-AC) 12 Verify that all seals & cut out switches are sealed 13 Test operation of engine protective device &governor low oil shutdown if equipped 9 of 13

14 Check car body & door for sealing and defective hardware 15 Ensure all electrical panels are secure 16 Check compressor safety valve 175 psi seal 17 Perform a functional brake test 18 Examine/test locomotive hand brake and lube if required 18 Inspect exhaust spark arresting equipment if equipped 19 Check engine & rotation equipment 20 Clean & clear main generator aspirator pit if equipped 21 On turbo charged engines if equipped inspect educator tube 22 Clean out exhaust retention traps 23 Inspect wheels, trucks & associated parts 24 Inspect exterior of traction motor 25 Check condition of all traction motor ground cables 26 Check /add lubrication traction motor drive gear case 27 Check traction motor support bearings condition and lubricate 28 Check journal boxes & lubricate 10 of 13

29 Inspect foundation brake gear 30 Take & record all wheel measurements 31 Inspect coupler & draft gear assembly 32 Inspect & ensure fuel tank, pumps, gauges and related parts are free from leaks 33 Check air dryer operations & service if equipped 34 Wheel ensure wheel measurements form is completed and report the defects all wheel dimensions must be to AAR standards 35 Traction motor side bearings or support bearings check for water or ice ensure TM wick cover bolts are tight & locking tabs in place 36 Traction motor support bearing lubricate if required 37 Lubricate traction motor drive gear cases if required 38 Record Side Bearing Clearance Front Left Front Right Rear Left Rear Right 39 Journal - Check for Water, Ice or Metal Particles. Lubricate To Prescribed Levels 40 Coupler Qualify Coupler and Draft 11 of 13

Gear Assembly (Bushings, Carrier, Wear Plate, Uncoupling Device) Measure Coupling Height. Front Rear 41 Inspect Cab Seats and Ensure They Are In Good Condition Repair If Required 42 Test Electrical Meters 43 Insulation Test Perform and Record For LV HV AC Circuit TL High Voltage 44 Calibrate air flow meter if equipped 45 Inspect Exhaust Spark Arrestor Device (If Equipped) And Exhaust manifold For Leaks Ensure Carbon Material Is Not Building Up 12 of 13

COMMENTS Inspectors Primary Employer: Inspectors Printed Name: Inspectors Signature: 13 of 13