I aaunited. Relocating your household water meter 2018/2019. ~ \:, Utilities. &~Ing life f\ow smoothly

Similar documents
Code of Practice on Leakage for Domestic Customers

Water leaks. What you need to do. dwrcymru.com PAB 0093

Citizens Advice financial capability

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

EDF Energy s small business products and services

Our Mobility Scooter Policy: A guide to taking mobility scooters on our trains

Introducing. chip and PIN

Application for a New / Augmented Connection

Scooter Policy A guide to accessing our trains with a mobility scooter

Note: it is a criminal offence to give false information in this application.

Green Drive Nov 2020

Dropped Crossing Service

Freedom. Value. A Assist. Safety. Wheelchair & Scooter Breakdown Cover For Complete Peace of Mind. Round the clock cover 24/7, 365 Days a Year.

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

ELECTRICAL ORDER FORM

Charges Scheme 2017/18

The University of Kansas VEHICLE RENTAL. Guidelines for Users at the Lawrence Campus. Revised spring

Please Read Carefully

CHAPTER 2 HOW TO APPLY FOR ELECTRICITY

reflect energy: the ability to do work

Getting prepared. Power cut and resilience advice for businesses

Low Emission Zone Vehicle Registration Form

Take a fresh look at solar things you should consider when purchasing a solar system

About you Please enter your details below

Code of Practice on Services for Prepayment Meter Customers. Using your Keypad

Repairing your vehicle

Power cut We can offer you extra support during a power cut

ELECTRICAL ORDER FORM

Scooter and Wheelchair Travel Pass. Information and Application Form

E N D - O F - L E A S E

It s time to prepare for your next GM driving experience... END-OF-LEASE GUIDE

What do I need to do when my parts are delivered via Truck Freight Delivery? When the shipment arrives, verify you have received all your items.

Marina Bay Sands Guidelines for Electrical and Wiring Service

ELECTRICAL ORDER FORM

MARKET OFFER POWERSHOP

ELECTRICAL ORDER FORM

Wholesale Developer Services Charges

2.1. Ease of payment One does not have to stop to pay cash at the toll plazas and thus can save time too.

Electrical Safety Slide Show Presenter s Notes

PLEASE MAIL OR FAX ORDERS TO: SourceOne Events Inc.

Producing your own energy? Great Decision. ComEd.com/Interconnection. Let s connect you to our smart grid.

5.1 Design and Install Dispenser Transfer Systems Performance Based Skill Assessments 2019

Application for Steam Service

ELECTRICAL ORDER FORM

Presenter s Notes SLIDE 1

THE PETROLEUM REGULATION ACTS (NI) 1929 & 1937

You won t find a more comprehensive plan, with better value, than MonsterCare. Guaranteed.

ELECTRICAL ORDER FORM

Decals are sold on a graduated scale:

Village of Lombard Automated Red Light Enforcement Program. OPTION I. Pay the Fine

The Vehicle Identity Check (VIC) Scheme

Contact us. Or write to us at: Ulster Bank Ireland Limited Card Products Merchant Central Sales PO Box 6846 Dublin 2

Downtown Juneau Parking Meters: Frequently Asked Questions

Service & Part Specials

Our charging statement for Scotland 2018/19. Non-primary and other charges. 03/04/2018 non-primary charging statement 2018/19 version 5 Page 1

FOR FURTHER INFORMATION: CONTENTS. Introduction 2. Importing Vehicles to Australia 2. Application for Import 3. Australian Compliance Plates 4

LCWSD Fax Number - (803) Hydrant Use Policy

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

It is strongly recommended that you do not ship your vehicle until after you receive your Import Approval

Welcome! Think carpool, then think bigger! Questions? Contact our Vanpool team!

CN is offering our Fleet Integration Program for grain shippers who are using privately owned, covered hopper cars for

Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Electric Vehicle Homecharge Scheme

Fixed prices for servicing and maintenance.

Leakage Code of Practice Commercial Customers

Norfolk Safety Camera Partnership Annual Community Speed Watch Coordinators Meeting Date: 28 th March 2018 WELCOME TO EVERYBODY

Grid connected rooftop solar and the end of the solar bonus feed-in tariff where to get advice.

JET METER INSTRUCTIONS

You are just TWO signatures away from savings on your fuel bill.

Water Leak Detection in an Irrigation System

Enhanced Road Assessment (ERA) Frequently Asked Questions

Making the most of your solar panels

Epwin Group Limited MyMiles Guidelines

INSTRUCTIONS AND WARRANTY FOR THE STAND AID MODEL 1501 STAND AID SERIAL #

How To Start Your Own Trucking Company

Changing your vehicle

Who qualifies How it works Questions & Answers. Ignition Interlock. Program

360 o Excavator. pre use check sheet page 1/5. How to use this check sheet:

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Power cut. Powering your business is our priority

Power Off & Save Pilot Programme

Dean Heritage Centre Art Gallery/Exhibition Agreement

Frequently Asked Questions. June v4

IN THE EAST LIVERPOOL MUNICIPAL COURT COLUMBIANA COUNTY

ELECTRICAL ORDER FORM MAIL OR FAX TO

Monthly promotions. October 2018 Puget Sound Energy bill inserts and information. Download inserts

Connection Application

You are just TWO signatures away from savings on your fuel bill.

CHCA TRANSPORTATION GUIDE

ELECTRIC WATER PUMP (EWP ) KIT INSTALLATION INSTRUCTIONS

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY STATE INDUSTRIAL PERMIT INSPECTION FORM. Permit No.: 4369-WR-1 Inspection Date: September 7,2006

SW20 Coolant System Maintenance.

Witham (Specialist vehicles) Ltd For sale by Tender - 13th September pm Direct From UK Ministry of Defence

Trouble Shooting Guide for Hubbell Systems

Articulated Dumper. pre use check sheet page 1/5. How to use this check sheet:

INSTRUCTIONS AND WARRANTY FOR THE STAND AID MODEL 1501 STAND AID SERIAL #

APPLICATION FOR OBSTRUCTION PERMIT

RENEWAL FORM AS A PRODUCER OF BATTERIES AND ACCUMULATORS FORM E YEAR 2017

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

FUNCTIONAL SKILLS COMMUNICATION READING LEVEL 1. Practice Exam 1 (for example script A) Exam date. Source Booklet

Transcription:

Relocating your household water meter 2018/2019 I aaunited ~ \:, Utilities &~Ing life f\ow smoothly Moving your water meter is no ordinary piece of DIY. It s a precise job that has to follow certain rules to keep everything flowing smoothly. This leaflet explains all the do s and don ts. It also contains an application form which you need to return to us. Remember, it s illegal to tamper with a water meter, or move it without our permission, so please don t get started until we ve given you the nod! Your options in a nutshell: It s sometimes possible to get a private plumber to move your meter. On other occasions, we may insist on doing the work. It all depends on where the meter is currently located, and where you want to move it to. Here are the options: If your water meter is inside your home, and you want to move it to another position inside your home, you can either ask us to move it, or arrange for a water industry approved plumber to move it for you. If your water meter is outside, and you want to move it inside, the work must be done by United Utilities. If you want to move a meter from inside your home to an outside location, this is also a job for us, not a private plumber. Whatever your needs, before you do anything else, please don t forget to complete the form included with this leaflet, enclosing a cheque for the appropriate amount. Getting your plumber to do the work If you decide to use a plumber to move your meter from one internal position to another, we will need to inspect the job when it s completed to make sure everything is still working fine. Once we are happy with the work, we ll reseal the meter, so that it s good to go. We charge a modest fee for this inspection (see table on the next page for more details) which has to be paid in advance. If the work is not up to scratch (e.g. the meter has been moved to an unsuitable location, it can t be easily read, has been installed the wrong way round, or has been damaged) we ll advise you on what needs to be done. We ll try to resolve any problems there and then, but if further work is needed, we may need to charge you. Please be aware that if there is a leak while your plumber is working on the meter, we are not liable for any damage incurred so it s vital you employ someone with the right credentials and experience. No one wants the headache and expense of a soggy floor. To find your nearest water industry approved plumber please visit watersafe.org.uk The key rules Any accredited plumber should be familiar with the key do s and don ts of moving a meter from one internal location to another. For the record, here are the ten key rules: Your meter must be positioned where it will measure all the water being used in your home. It needs to be placed as closely as possible to the incoming supply pipe. The meter and stop tap must be easily accessible for maintenance and reading. The meter should never be completely boxed in, and enough space must be left around the meter to allow it to be replaced. All our water meters will need replacing eventually nothing lasts forever! The meter face should be visible at all times so we can read it easily, and so can you. The meter must be installed with the directional arrow (stamped on the side of the meter) facing the directional flow of water into the property. Don t remove your meter from its old position until the new meter position is ready. An obvious one, but worth mentioning! Only use standard compression fittings to install the meter. The water meter and adjacent pipework must not be exposed to any source of heat (e.g. a blow torch) which could damage the internal workings of the meter or we may end up charging you for a new meter. All pipework must be clean and free from copper filings before the meter is installed. Any filings or other particles getting into the water pipe can damage the meter and may also damage other fittings in your home. If the meter is being moved from inside your home to an outside location, or from outside to inside, United Utilities must do all the work. This is NOT a job for a private plumber! This installation must be done according to the diagram shown on the following page. For further information unitedutilities.com/meters 0345 672 2999 Opening hours: 8am - 8pm Mon to Fri; 8am - 4pm Sat United Utilities Metering Windermere House Lingley Mere Business Park Great Sankey Warrington WA5 3LP

Outlet Servicing valve (/) Drain tap Water Reg. G11.4 To be installed at lowest point on pipework after meter 300mm minimum length between stop valve outlet and servicing valve inlet Flow Water meter must be installed with directional arrow pointing from inlet to outlet 1010101010mm Earth bonding strip Stop valve ) Inlet 15mm/22mm copper pipe

Outside work If your relocation plans require any outside work at all (e.g. moving a meter from inside to outside, or outside to inside), the whole project must be handled by United Utilities. We ll carry out a survey before getting work underway, to find a suitable location for your meter. As part of the service, we ll check that there are no sneaky leaks on your underground supply pipe (the pipe that connects your home to the public water mains) so that you don t end up paying for wasted water. Meter defeater Occasionally, it may not be possible to move your meter. For example, if you want your meter moving outside but your property is served by a water supply pipe that also feeds several neighbouring properties, we may have to deliver an apologetic no. In these circumstances, we will write to you to let you know if there are any other options available. Any payments that you have already submitted, excluding the survey fee, will be refunded if your meter cannot be moved. Charges This table shows our charges (including VAT) for helping you move your meter. Remember, even if you are getting a private plumber to do the work, we will still need to inspect the finished job for which we charge. A helping hand for customers with additional needs We have a scheme which provides support for customers who have difficulties with everyday tasks, due to infirmity or disability. We can help with everything from reading a water bill to answering the door to officials. If you are on this scheme and have a water meter, we may be able to move it from outside to inside your home for free depending on your circumstances. Please call us on 0345 672 2888 to find out more. What to do next Please complete the application form overleaf it only takes a few minutes. You ll see that the form asks for some basic details about your water meter, and for confirmation of who you want to do the work (United Utilities or a private plumber). It also reminds you to enclose a cheque for the relevant amount. Once we ve received your form and payment, we will write with confirmation that the relocation can go ahead. If our engineers are to do the work, we will contact you to arrange a suitable date and time for the initial survey. If you re struggling to complete the form, or have a question that is not covered in this leaflet, please do give us a ring on 0345 672 2999. I I I I Meter location From Meter location To Survey fee Relocation fee Inspection fee Internal New internal position (relocated by your plumber) n/a n/a 70.60* Internal or external New internal position (relocated by us) 70.60* 308.41* n/a External Internal Internal New external location at property boundary (must be relocated by us) New external location in boundary box (must be relocated by us) New external location in a existing boundary box (must be relocated by us) 70.60* 729.89* n/a 70.60* 541.93* n/a 70.60* 272.80* n/a *All prices quoted include VAT at the standard rate and are correct as at 1st April 2018.

Relocating your household water meter application form 2018/2019 I aaunited ~ \:, Utilities &~Ing life f\ow smoothly Please fill in the application form and return it to us. Remember to enclose a cheque made payable to United Utilities for the survey or inspection fee. Title (please tick) Mr Mrs Miss Ms Other (please state) Full name Address (including postcode) Daytime telephone number Evening telephone number Mobile telephone number Email Customer account number (shown on top of your bill) Water meter serial number (if visible, this can be found on top of the meter) Meter reading (use black/white digits only) Date of reading Where is the water meter currently fitted? Where do you want the water meter to be moved to? Internal (inside your property) Internal (inside your property) External (outside your property) External (outside your property) Please note: Water meters cannot be moved from outside your property to inside unless the conditions we specify are met We must carry out all the work on your water meter if it is fitted outside your property Please tick ONE box: I would like United Utilities to carry out the work to move my water meter. I enclose a cheque for 70.60 for the meter relocation survey and I understand that it may not always be possible for a water meter to be moved and that the fee is non-refundable. I request permission to have my water meter relocated privately. I understand that this is subject to the work being inspected by United Utilities and that I may be charged if remedial work is required. I enclose a cheque for 70.60 for United Utilities to inspect the water meter once it has been moved. I understand that the fee is non-refundable. Please return this form to: United Utilities, Metering, Windermere House, Lingley Mere Business Park, Lingley Green Avenue, Great Sankey, Warrington WA5 3LP. For office use only Work order Signature Print name Raised Date

Are you moving the NO water meter yourself? YES (internal to internal only) Complete and return the application form and survey fee of 70.60 Complete and return the application form and inspection fee of 70.60 We will survey the water meter and advise you if the water meter can be moved and where it can be moved to. We will send you an acceptance note and details of the exact cost of the work. Call us on 0345 672 2999 when the work is complete. Complete and return the acceptance note and enclose payment for the relocation fee. We will make an appointment to move the water meter. We will inspect the water meter and let you know if any remedial work is required.

About us United Utilities is the North West s water company. We keep the taps flowing and toilets flushing for seven million customers every day. From Crewe to Carlisle, we work hard behind the scenes to help your life flow smoothly. United Utilities Water Limited, Haweswater House, Lingley Mere Business Park, Lingley Green Avenue, Warrington WA5 3LP. Registered in England and Wales. Registered Number 2366678. 02/18/SD/6239