POWER SESSION. DP3 Class Power System Solutions for Dynamically Positioned Vessels

Similar documents
DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

Optimizing Energy Efficiency for DP Vessels for Variable Operational Risks

New Enhanced Safety Power Plant Solution for DP Vessels Operated in Closed Ring configuration.

Kevin Duffin - Martime Assurance & Consulting John Flynn- Stena Drilling

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

Ekip Link logic- zone discrimination protection system

Summary of Revision, IEEE C , Guide for Breaker Failure Protection of Power Circuit Breakers

A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

RISK, FMEA AND RELIABILITY. Machinery System for DP Vessels with Increased Efficiency and Reliability

Basics of Paralleling

Power Solutions Manager Generac Power Systems, Inc.

BREAKER FAILURE PROTECTION

T-Line Generator Control, Protection and Monitoring

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Fuel Efficient Power Plant Featuring Variable Speed Generation Systems for DP Drilling Units

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

DG SYNCHRONIZING &AMF PANEL

Appendix A. Power Management System Test Guidelines

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Standards, Procedures and Policies for Grid Connection

POWER. Improving Engine Utilization in DP Vessels

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN)

Dual Power. Protection. Protection

TD-2306B-001, Interconnecting Large 2-20MW Generation Systems. Employees involved with generation interconnection on electric distribution circuits.

Wang Bin & Michael Ho, TIIAE Power management system

RT2DB Excitation and voltage regulation system for synchronous generators

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Unit Protection System for Pumped-Storage Power Stations

PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

Optimization of Power and Station Keeping Installations by a Total System Design Approach

KD LV Motor Protection Relay

Standby Power Systems

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Power Voltage Transformers for Air Insulated Substations

Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems

Close-Open (Short-Circuit) Time Results Interpretation

A21M. Introduction: Functional Overview: Key Protection & Control Functions:

LOW VOLTAGE WIND CONVERTERS. ABB wind turbine converters ACS880, 800 kw to 8 MW

34 th Hands-On Relay School

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Marine Technology Society

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Guide for Primary Injection Testing WL Circuit Breakers. Document No. : 11-C

Direct On Line (DOL) Motor Starter. Direct Online Motor Starter

SECTION V SWITCHBOARD I 4 Engine/Gen Control Cubicles II 1 Synchronizing System III 1 Ground Detection Network IV 1 600V Feeder Section V 2

DP Conference, Houston October 17-18, Challenges related to propulsion equipment and their interface to the Dynamic Positioning System

Distributed Energy Resources

Functional Decomposition of a Medium Voltage DC Integrated Power System

2.0 CONSTRUCTION 3.0 OPERATION. SA-1 Generator Differential Relay - Class 1E 2.5 TRIP CIRCUIT

Large Scale Solar Integration

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

3. OPERATION 2.1. RESTRAINT CIRCUIT 2.6. INDICATING CIRCUIT 2.2. OPERATING CIRCUIT 2.7. SURGE PROTECTION CIRCUIT 2.3.

SINAMICS SM150. 4/2 Overview. 4/2 Benefits. 4/2 Design. 4/6 Function. 4/8 Selection and ordering data. 4/8 Options

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Design Considerations for a Reference MVDC Power System

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

MORE EFFICIENT DIESEL ELECTRIC POWER PLANT FOR DREDGES

The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

SINAMICS GM150 IGCT version

TIME REQUIREMENT GUIDE (TRG)

Offshore Wind Connections HVDC for Offshore Grids

HIGH POWER RECTIFIER SYSTEMS

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Application Note RESIDUAL BUS MAIN-TIE-MAIN AUTOMATIC TRANSFER SCHEME USING THREE GE 850 RELAYS

Power Management Control of Electrical Propulsion Systems

Air-insulated switchgear UniGear type ZS1

Very high efficiency up to 93% Adjustable output voltage

Advanced Protective Relay Training

FINHRM FINHRM5 FINHRMA FINHRMAC

WIND ENERGY DENMARK

SPEN, Rasmus Larsson, High Voltage Breakers Innovative breaker solutions Substation design

ABB Softstarter Benefits Charnchanok Thongprad

Application Note. Common Bussing AC Drives. For 650 and 690+ series drives APP-AC-03

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

Accidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies

Small Electrical Systems (Microgrids)

MEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices

Electronic Circuit Breaker ESS20

Breakout Session 1 Report-out presentations

Improving Breaker Failure Protection for Generator Applications

The modular energy storage system for a reliable power supply

Power Systems Trainer

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Course Semester Subject Code Subject Name B.E EEE(M) V UAEE507 MARINE ELECTRICAL TECHNOLOGY UNIT-I

Design considerations for generator set mounted paralleling breakers

Selective Coordination

TYCHO BRAHE HYBRID FERRY CASE STORY

EMPAC Metal enclosed capacitor bank for wind applications

Electromagnetic Industries LLP

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

Testing Renewable Power Plants on High-Voltage-Ride-Through Capability

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Transcription:

Return to Session Menu DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 POWER SESSION DP3 Class Power System Solutions for Dynamically Positioned Vessels Stig Settemsdal and Damir Radan

Integrated Systems & Solutions DP3 Class Power System Solution for Dynamically Positioned Vessels Stig Settemsdal & Damir Radan

Design Background Power systems configured and operated in a closed ring was a new requirement from several clients before development start. Focus on high fault integrity and improved fuel economy. IMO resolution 645: Bus-tie breakers should be open during equipment class 3 operations unless equivalent integrity of power operation can be accepted according to 3.1.3 Challenge: Build in sufficient protection and safety in the power system design in order to achieve the necessary fault integrity as required by IMO and class. Slide 3

Outline 1. Design Principles for DP3 Traditional power system New fault tolerant power system based on self sustained islands 2. Advanced Protection Functionality Protection scheme with zone protection Protection system considering hidden faults IEC 61850 Based protection and Interlocking 3. Generator Performance Controller - GPC Dynamic study 4. Some Extended Functionality Enhanced Fault Ride Through Capability Blackout recovery 5. Operational efficiency and flexibility Fuel savings Engine maintenance costs Operational flexibility Slide 4

Traditional Power system Fault integrity based on: Segregated top-level of the power system according to fire and flooding segregation RUNNING RUNNING RUNNING OPEN OPEN OPEN OPEN OPEN OPEN Slide 5

New fault tolerant power system Fault integrity based on: Limited amount of interconnections on lower level distribution and advanced protection scheme on top level RUNNING RUNNING CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED Slide 6

Advanced Protection Functionality Traditional scheme Protection of Ring Main Units Time Graded Selectivity Gen t = 1,0 s I> t = 0,6 s t = 0,3 s t = 0 s I> I> I> Advantages: No cross connections, no communication links Disadvantages: Relatively high fault clearing times dynamic stability No hidden faults considered Slide 7

Advanced Protection Functionality Closed Ring scheme Differential-protection topology combined with other protection I L Gen 1 IEC 61850 I L Gen 1 I L 87 BB I> I> 87 BB I> I> I> I> I> I> I L Advantage: Un delayed (Immediate) fault clearing All protection included (O/C 50/51 and directional 67) Disadvantage: No as pilot wires are substituted with FO links IEC 61850 Slide 8

Advanced Protection Functionality Closed Ring scheme Protection scheme with zone protection all over Busbar Differential Current and Ground Fault Current Protection ti Bus-tie Cable Differential and Ground Fault Current Protection Transformer Protection Transformer 4th Winding Protection Breaker Failure Protection Breaker Trip Coil Supervision CT & VT extended monitoring VT fuse failure monitoring Slide 9

Advanced Protection Functionality Closed Ring scheme Protection system considering hidden faults Generator protection: backup: 50/51// Generator protection: 87 // Bus-bar protection: back-up: 67 Bus-bar protection: 87 Sub-section protection: back-up: 50BF Bus-tie protection: backup: 67 Bus-tie protection: 87 Drilling and distribution protection: 50/51 Utilities protection: 50/51 Thruster protection: 50/51 Slide 10

Advanced Protection Functionality Closed Ring scheme Circuit Breaker Monitoring and Supervision Breaker Trip Coil Supervision Circuit supervision with two binary inputs: - Detects interruptions in the trip circuit and loss of control voltage - Supervises response of CB using the position of the circuit breaker auxiliary contacts 50 BF Breaker Failure to Trip Supervision Slide 11

Advanced Protection Functionality Closed Ring scheme IEC 61850 Based protection and Interlocking Goose 1 ms Slide 12

Generator Performance Controller - GPC Generator Performance Controller shown together with protection devices in the overall system topology Functions included in the various GPC Levels: PMS interface (Level 0,1,2) Alarms & Monitoring (Level 0,1,2) Monitoring of Generator (Level 1,2) Enhanced fault ride through gen. (Level 1,2) Monitoring of Diesel Engine (Level 2) Power Meter PMS PMS GPC 3 GPC 4 S7-mEC S7-mEC Power Meter Power Meter PMS PMS PMS PMS GPC 1 GPC 2 Power Ruggedcom switch (2) RS900 SWBD Section B 7UT612 (2) Bus bar section GPC 5 GPC 6 S7-mEC S7-mEC Power S7-mEC S7-mEC Meter Meter 7SJ80 (1) Thruster Ruggedcom switch (2) RS900 SWBD Section A 7UT612 (2) Bus bar section 7SJ64 (6) Cable-tie, Bus coupler, Thruster, Drilling, Distribution 7SD80 (2) Cable-tie 7UM62 (2) Gen 3, Gen 4 Ruggedcom switch (2) RS900 SWBD Section C 7UT612 (2) Bus bar section Power Meter Fiber Optical Profibus DP Electrical Connection 7SJ80 (1) Thruster 7SJ64 (6) Cable-tie, Bus coupler, Thruster, Drilling, Distribution 7SD80 (2) Cable-tie FO Protection interface 7SD80 (2) Cable-tie 7SJ64 (6) Cable-tie, Bus coupler, Thruster, Drilling, Distribution 7SJ80 (1) Thruster 7UM62 (2) Gen 5, Gen 6 Slide 13

Generator Performance Controller - GPC Power Management System Profibus DP LEVEL 0 GPC Module: GATE PMS Interface and Measurements LEVEL 1 LEVEL 2 GPC Module: FADER G FAult DEtection (FADER) for Generator GPC Module: FADER D Generator AND Diesel FAult DEtection (FADER) GPC Module: EFORT (Enhanced Fault Ride Through) Improves response during and after short-circuit faults GPC Module: COMMAND (system re-structure) - Change modes, start new gen-sets, trip faulty gens, split system - Minimize RISK of blackout - Minimize Loss of propulsion - FMEA based Slide 14

Generator Performance Controller - GPC GPC Module EFORT - Example: The uncontrolled load recovery makes large stress to the generator: Voltage can go over 120% and frequency over 110% Trip of essential consumers Exciter can be over-stressed due to overvoltage uncontrolled Very high torque change at shaft and engine coupling GPC module EFORT can minimize i i these responses and keep voltage overshoot below 120% Slide 15

Generator Performance Controller - GPC Typical AVR with optimized settings on controller GPC EFORT command to AVR after short circuit sensed Slide 16

Generator Performance Controller - GPC Generator diagnosis (Example): Generator under-producing HIGH EASY TO DETECT (values out of limits) Overexcitation AVR tripping area AVR shall TRIP (values out of limits) Slide 17

Generator Performance Controller - GPC Generator diagnosis (Example): Generator over-producing HIGH Increase in voltage from 1.02 to 1.04 (out of limit set on 1.025) FAULT: AVR blocked HIGH Active load = 0.3 p.u. Change in reactive power, ti tripping i healthy generator on negative kvar must be avoided

Generator Performance Controller - GPC Generator diagnosis (Example): Generator under-producing LOW DETECTION MORE DIFFICULT (values within the limits) Within Gen capability curves Not recommended to operate generators with faults, If online, gen provide false level of security Gen might not respond adequately on disturbances and short-circuit faults Slide 19

Fault Ride Through of Gen-sets - Bolted short-circuit 2 gen-sets online - equally loaded Direct online (DOL) motor Slide 20 Torsional oscillation on the shaft due to torque deviation due to Pm and Pe are not in balance < still under 1 p.u. torque

Fault Ride Through of Gen-sets - Bolted short-circuit 2 gen-set online - un-equally loaded GPC module EFORT Enabled Gen-set are pulled-in by very large synchronous torque this is the reason why large power oscillation (close to 4 p.u.) exists after the fault Pull-in torque is lower power oscillations after the fault reduced torque deviation at the shaft Amplitude of torque deviations at the, over > 2 p.u. shaft is reduced, under < 1 p.u. Slide 21

Fault Ride Through of Gen-sets Operating gen-sets with asymmetric (unequal) load sharing increases the risk of high oscillations after a serious fault e.g. when engine at fixed load bias GPC module EFORT Enhanced Fault Ride Through reduces over-excitation from AVR after the fault is cleared and protects gen-set from damage even if operated with asymmetric load sharing or with minor fault Gen-set fault should be detected while gen-set operates within normal steady state (class) limits of voltage, reactive power, active power and frequency, etc. Operating faulty gen-set online increases the risk of non adequate response of the system and risk of further fault propagation (e.g. fail to trip bus-tie/coupler breaker on short-circuit) GPC module FADER Fault Detection and Response detects fault on gen-set while system is within limits, and thus reduces any chance of gen-set running over- or under-excited or engines over- or under-producing Slide 22

DP3 - Synch-check redundancy Synchronization of generators and Bus-ties Request for breaker Close Local Request for breaker Close PMS Ctrl power Sync 7SJ64 Interlock Check Synch-check check Synch-check Synch-check Initiate Sync Deif and Woodward Synch-check Woodward SPM-D Synch-check DEIF Breaker Closing coil Slide 23

Fault Ride Through of VSD Fault Ride Through of VSD s by enabling Kinetic Buffering Kinetic Buffering Energy Recovery from rotating mass of the load Example for 6 pulse VSD Slide 24

Fault Ride Through of VSD Simulations results With Kinetic Energy Recovery Keep DC volt >80% Slide 25

Blackout Recovery - Sub-section or section Fast Blackout Recovery No Start-up Inrush at transformers Ready for Black Start PMS 0 RPM Diesel PMS Gen START RMP nom Engine is running 0 V Diesel AVR Start 11kV Blackout Slide 26 Sub-section is ON

Fuel consumption calculations One Case of fuel consumption calculation: Wind speed under 11 m/s for 90% of the time Propulsion load = 2/3 capacity (Fire & Flood) (from DP capability) Preliminary calculations of fuel consumptions based on weather data is done Weather dependant power load (kw) is the most uncertain factor in calculations Based on typical engine fuel curve data and efficiency i of a Siemens generators Fuel consumption study will be done by 3rd party during the next half year Slide 27

Fuel consumption calculations Case Calculation: Potential for fuel savings Slide 28

Fuel consumption calculations FUEL CONSUMPTION FUEL RATES AND SAVINGS Yearly rate Rate - day average Savings Savings per year Savings per 20 years Rate % [tonns/year] [tonns/day] [tonns/year of Max mode] [USD of Max mode] [USD of Max mode] [% of max mode] Siemens DP3 Closed Ring Min 2 online Dynpos ER 14994,9 41,08 574,35 $ 413 528,7 $ 8 270 573,8 96,31 % Siemens DP3 Closed Ring Min 2 online - DYNPOS AUTRO 15175,1 41,58 394,11 $ 283 758,9 $ 5 675 177,2 97,47 % DP3 Closed Ring Min 3 online - DYNPOS AUTRO 15565,0 42,64 4,25 $ 3 059,4 $ 61 188,3 99,97 % Open section bus-ties (2+2+2) 15569,2 42,66 0,00 $ - $ - 100,00 % FUEL CONSUMPTION Run Hours Total GENERAL MAINTENENCE COSTS Running hours Overhaul Overhaul per engine: interval for 20 interval for 25 assume all 6 000 running 000 running engines have hours of engine hours of engine equal hours Engine use RISK OF SOOT ACCUMULATION IN ENGINES Running hours under 30% load Run Hours under 30% load - of maximum [hours/year] [hours/year] [years between overhaul] [years between overhaul] [% of Max mode] [hours] [% of max mode] Siemens DP3 Closed Ring Min 2 online - Dynpos ER 19079,4 3179,9 6,3 7,9 69,09 % 1661 31,41 % Siemens DP3 Closed Ring Min 2 online - DYNPOS AUTRO 23950,8 3991,8 5,0 6,3 86,73 % 1661 31,41 % DP3 Closed Ring Min 3 online - DYNPOS AUTRO 27840,6 4640,1 4,3 5,4 100,82 % 5289 100,00 % Open section bus-ties (2+2+2) 27614,8 4602,5 4,3 5,4 100,00 % 5289 100,00 % Slide 29

Fuel consumption calculations Fuel savings of up to 3,7% 400 k USD per year 8 mil. USD per 20 years Engine running hours potential to decrease by up to 30% Maintenance intervals extended for 2 to 2,5 years in average per engine Engine operating under 30% load potentially reduced by up to 80% Potentially no need for engine Soot blow-off off (!?) Avoid asymmetric load sharing (No fixed load) Reduced risk of blackout Lower risk of engine failure to start Reduced risk of blackout Higher operational flexibility Slide 30

Operational Flexibility Enhanced Operational Flexibility Open bus (3-split) Closed bus Dynpos AUTRO & ER Example: Not allowed mode in 3-split Dynpos AUTRO Slide 31

Conclusions ADVANTAGES OF DP3 CLOSED RING SOLUTION Enhances system integrity to faults - Less consequences of failures compared to standard DP notations Flexible operation according to all class rules, e.g. DP2, DP3 and DPS Enhanced vessel station keeping capability with closed ring (max loss of 1/6 of plant, excluding Buscoupler faults, fire and flooding) high propulsion availability (all thrusters) assures optimal use of trust Reduced fuel consumption up to 3,7% Reduced exhaust gas emissions to environment due to lower fuel consumption Reduced operating hours up to 30% and 80% lower running hours under 30% load reduced maintenance cost for engines and generators No need for soot-blow of increased availability of engines applies especially for Dynpos ER Increased HSE - Possible to do maintenance of engines/generators with no other engines operating in the same engine room (1 engine room with no running engines) Enhanced fault ride through capabilities for generators and VSDs e.g. reduced risk of generator damage and reduced risk of tripping essential consumers on voltage over-shooting Slide 32

We are happy to answer your questions! Slide 33