ROOF INSPECTION GUIDE

Similar documents
PRE-PLANNING & DELIVERY GUIDE

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

INSTALLATION & USER S GUIDE

Pre-Planning Delivery Guide

General Faucet Installation Instructions

C.O.I.S. Technical Data Sheet CAD Operation Installation Specification

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

PSS INSTALLATION INSTRUCTIONS

Installation Guide Contigo 6100

SUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS

EDBRO RIGID INCLINOMETER

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)

Mobile Delineator Safe Work Practice Template with Application for Approval

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

START-UP DRIP IRRIGATION SYSTEM

Gearbox Installation Manual

IMPORTANT SAFETY INSTRUCTIONS

LED Driver Feedback Signs

Mud Hole Management Guideline

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES

ABTQ-103 rev 01 Last review:

72 Mustang Mach 1 tachometer cluster and gauge conversion

ACCESSORY DWELLING UNITS (ADU)

Effective Date: 10-January Table of Contents

Project Description ABSTRACT

DriveCam Unit Installation Instructions

Installation Guide Contigo 6150 & 6151

City of San Luis Obispo Zoning Regulations December 2013

XJ 4-Link Rear Long Arm Instructions

Installation instructions: 13 Pin Electrical system for towing hitch

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

PARKING POLICY JULY 2012

- No object may be left inside the vehicle;

Lake Sands District Pinewood Derby Saturday, March 21 st, 2009 Bay Senior High School Gym (Just west of Tommy Oliver Stadium)

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

SWP200 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!

Motorized Pulley 320L, 320M & 320H, Ø in. (321 mm)

Lake Sands District Pinewood Derby Official Rules By: Mark Gilland

RICHARD L. OREAIR & CO. Safety Management System

Auxiliary Power Unit (APU) Owner s manual D

EDBRO TRAILER INCLINOMETER

NIEVS PROJECT. First Registration Support Document Version 1.0

Lake Sands District Pinewood Derby Official Rules

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

Parts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ

CAUTION: Do not install damaged parts!!!

Mandatory Maintenance Vehicle Owner

Advanced 3 Million Wireless USB Limousine Underbody Kit

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

FOOD TRUCK VENDOR INSTRUCTIONS

Open Street Cam User Manual

INSTRUCTION MANUAL 9500/12000 LBS. D9500SC / D9500SR / D9500SRD D12000SC / D12000SR / D12000SRD MODEL:

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation

Rejuvenation Instructions

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Texas Christian University Policy

WJ 6.5 Critical Path Lift Kit Installation Instructions

Parts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Mini H1 Twin Kit - Installation Instructions

Audi 8L A3 and B5 A4 ColorMFA Install Guide ColorMFA from AutoPilot. Instructions from Clusters by Litke and pinout from Drive2

Installation, Operation & Maintenance Manual. SunWize Power & Battery Power Ready System

BioWave Hydro DI-9200 User Manual

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

E+ Battery Care Guide

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS

Thank you for purchasing a SledLites.com HID system for your snowmobile. Please read all warnings and complete manual prior to installing.

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

You have a Chiller, Now What?

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

BRITISH MICROLIGHT AIRCRAFT ASSOCIATION TECHNICAL INFORMATION LEAFLET NO: 117 ISSUE 1 JANUARY 2016

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ

D-Sub adaptor Cable clamps for metric cable entries Cable clamps for PG cable entries Further Accessories

Signature Series Vehicles C6 A6 Installation Guidelines

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual

CHECK OUT OUR WEBSITE SOME TIME FOR PLENTY OF ARTICES ABOUT SELF DEFENSE, SURVIVAL, FIREARMS AND MILITARY MANUALS.

EnergyBar 6. Setup Guide

Track Lateral Stability

The MODUM Fire Escape Ladder

03-06 TJ Long Arm Upgrade Instructions

GLOBAL LIFT CORP Owner s Manual

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Session 2017: Sections: Class Location: Days / Time: Instructor:

REMOTE GREASING KIT FOR MORGANS SERIES 2

Heavy Duty Limit Switches

BHC-P-11.1 Temporary Works

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

PARKING AND VEHICULAR RULES

HANDLING AND STORAGE PRACTICE

;THI~~Sf\-FEJY _.:.. ;'..»...

Transcription:

INSURANCE INSTITUTE FOR BUSINESS & HOME SAFETY ROOF INSPECTION GUIDE COMMERCIAL ROOF-MOUNTED BALLASTED PHOTOVOLTAIC (PV) WIND PROTECTION ON LOW-SLOPED ROOFS Use the fllwing guidance t cnduct baseline and pst-event inspectins.

Phtvltaic Wind Prtectin Guidance Large-scale cmmercial PV arrays are becming increasingly cmmn, with significant grwth in bth rf-munt and grund-munt systems. Rf-munted systems n large flat rfs are particularly attractive as they ccupy largely unused space n the rf f a building. This dcument addresses wind-related cncerns fr ballasted rf-munted cmmercial PV arrays with rigid panels installed n built-up (BUR) r membrane rfs. Ballasted PV system designs must cnsider bth wind uplift and mvement due t wind lads. Mst systems are engineered based n wind lads derived frm small-scale mdel tests that are frequently peer-reviewed. Hwever, there is n cnsensus n perfrmance criteria regarding hw much uplift r sliding is acceptable. Cnsequently, the amunt f PV mvement allwed may vary greatly. When a PV array is first installed, a baseline inspectin shuld be cnducted and the lcatin f key elements shuld be clearly identified. Fllwing a strng wind event with wind speeds exceeding the greater f 70 mph r 70% f the design wind speed f the building prvided by ASCE 7-10 r later steps shuld be taken t identify and address any change r damage that may have ccurred due t the wind event. While this dcument fcuses n wind-related issues, IBHS strngly recmmends business wners with rf-munted PV arrays pre-plan fr fire, including pre-planning with the lcal fire department. Design Cnsideratins Rf-munted ballasted PV arrays are nt recmmended in hurricane-prne areas. In additin t increased vulnerability t uplift and slippage due t greater wind lads, the ballast weight needed t resist wind lads in hurricane-prne regins can exceed the building s riginal rf design lads unless the rf was designed t handle this type f PV system. Grund-munted PV systems are preferred fr hurricane-prne regins, fllwed by rf-munted structurally attached installatins. Ensure the rf deck can supprt the increased PV arrays lads, including live lads such as rain, snw (including snw drifts), etc. Ensure the PV array being installed has been designed using wind lads frm either ASCE 7-16, SEAOC PV2-2012, r a mdel-scale wind tunnel study that meets the requirements f ASCE 49-12. Insurance and Damage Cnsideratins Wh wns the PV system? Wh insures the system prperty and liability? Wh is liable if the PV system damages the building and/r cntents, directly r indirectly? What is cnsidered PV array and rf cver damage? When are repairs cnsidered necessary? What are the expectatins f maintenance after a strm? Wh will cnduct the inspectin and make necessary repairs? Wh is physically and financially respnsible fr returning the ballast/array back t its riginal lcatin? ROOF INSPECTION GUIDE 2

Initial Inspectin Create a Baseline fr the Rf Cver s Physical Cnditin Rf Cver Cnditin Phtgraph and dcument the rf cver prir t any wrk being dne fr a PV array installatin and review the rf cnditin findings in detail with the manufacturer/installer. Pay special attentin when dcumenting the cnditin f the fllwing aspects f the rf system: Fr built-up (BUR) and mdified bitumen rf cvers, check fr bubbles, ripples, and tears, and ensure aggregate stnes are well embedded in asphalt fr BURs. Fr fully adhered single-ply (SPM) membranes, check the quality f the adhesin, lking fr ripples, tenting and tears. Fr mechanically attached SPM membranes, make sure plates and screws are prperly recessed and nt backing ut and that the membrane is well sealed arund the plates and des nt have tears. Nte insulatin r cver bard cnditin arund crickets and any ther rf discntinuities. Als nte any depressins, standing water, and grwth f mld r vegetatin. Check cnditin f draining system interir drains and gutters. Examine transitins t vertical surfaces curbs, parapets, etc. Walk the rf with the installers verifying the rf cnditin, including presence f existing rf-munted equipment. Nte needed buffer znes between the array elements and ther equipment. Identify whether the PV system will restrict the flw f water t any interir drains. CLIPS WIRE AND/OR WIRE MANAGEMENT SYSTEM PV PANEL AND FRAME CONDUIT COMBINER BOX BALLAST BAY SLIPSHEET STRAPPED, BALLAST BLOCKS NOTE: These drawings are fr illustrative purpses nly. There is a wide range f ballasted designs that include features similar t thse shwn here. ROOF INSPECTION GUIDE 3

PV Installatin CREATE A BASELINE FOR THE PV INSTALLATION PV ARRAY Precisely mark the lcatin with paint r a waterprf marker, including: Entire array lcatin. Deflectr lcatins. Each ballast lcatin. Slip sheet lcatins. Any ther tuch pint f the array t the rf cver. Cnnectr bxes. BALLAST Inspect and dcument the cnditin f the ballast (cncrete blcks and capstnes can deterirate ver time). Nte whether ballast items are strapped t the ballast bays. IBHS recmmends strapping. ARRAY STRUCTURAL INTEGRITY Inspect the metal frame f the PV panels and the supprt system t ensure there is n defrmatin. Check individual panel securement: Inspect clips/screws hlding panels. Lk fr clips that are disldged and/r nt hlding panels prperly. Electrical Cnnectrs BOXES, WIRING, AND CONNECTIONS Dcument the lcatin, cnditin, and securement methds f electrical equipment. Ensure ends f flexible cnduit and wiring are well secured t the array structural frame. NOTE: This drawing is fr illustrative purpses nly. There is a wide range f ballasted designs that include features similar t thse shwn here. ROOF INSPECTION GUIDE 4

Pst-Event Inspectin Recrd Damage Caused During Wind Events Rf Cver Cnditin ROOF COVER, ROOF DECK, AND DRAINAGE Nte any changes in the rf cver, including rf cver tears in all areas, paying clse attentin t: Rf edges. Seams (fasteners and plates). Areas near rf-munted equipment. Nte any insulatin bard depressins. Identify and immediately crrect any drainage system blckage r damage. Recrd any structural deck depressins. PV Installatin Rf cver tear created by PV array during IBHS testing f PV arrays Inspect fr signs f uplift and sliding mvement. Damage may nt be initially evident, but it can be additive ver time. With each strm, re-inspect and dcument the findings: Lcatin f individual ballast supprts. PV arrays ften d nt mve unifrmly; certain prtins may have significant mvement, while thers have little t n mvement. Array damage. Ballast mvement and displacement f any ballast blcks. Slip sheet lss, mvement, and tears. Inspect the physical cnditin f the ballast. Lk fr any deteriratin r crumbling f the cncrete blcks/capstnes. This type f ballast can deterirate due t nrmal weathering. Determine array structural integrity by lking fr: Frame defrmatin. PV panel damage. Examine individual panel securement. Inspect clips, screws, and blts hlding panels. Lk fr bent clips. Lk fr blts and clips that are disldged r nt hlding panels prperly. Electrical Cnnectrs BOXES, WIRING, AND CONNECTIONS Displacement f cnnectr bxes/pwer distributin equipment. Lse cnduit and wiring. Lse cnnectins. Obvius signs f damage t the electrical wires such as frays, nicks r cuts. Flexible cnduit r wires that n lnger prvide slack fr additinal mvement in a future event. System cmpnents that are encraching needed buffer areas arund ther equipment. Ballast Bay Frame Slar Panel Frame Slar Panel Frame Undamaged Clip Illustratin f an undamaged clip and a bent clip Ballast Bay Frame Bent Clip ROOF INSPECTION GUIDE 5