Going the Distance - Solving Power Reach Issues With Diverse DAS Solutions

Similar documents
GE Critical Power. The Retrofit Case for Upgrading Legacy Power Systems at Telecom Central Offices

Battery Technology for Data Centers and Network Rooms: Site Planning

GE Industrial Solutions. EntellEon * Low-Voltage Power Panel. Simple. Responsive. Revolutionary.

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Long Runtime Solutions for Battery Backups

Choosing Household Wiring for Low EMF

Mini-Span ADSS Cable

Flywheel UPS Systems, kva

Cost Benefit Analysis of Faster Transmission System Protection Systems

4. SHIELDS. 4.1 Power Cable. 4.2 Electronic Cable Conductor Shield (Strand Shield) Outer Shield (Insulation Shield) 60

Zenith ZBTS/ ZBTSD/ZBTSCT

Network Remote Power using Packet Energy Transfer

Secondary DC Distribution

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

UNSHIELDED MULTI CONDUCTOR

Bridge Time UPS Batteries: A Scalable Alternative to Flywheels by

Contacts The moveable contact, which is the one affected by the armature is sometimes referred to as the hinge contact.

Pretest Module 24 Three-phase Service Entrance

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

21 Keep Residential Stairwells & Hallways Lit During Blackouts

Photovoltaic Solar Plan Review

A. General: Deliver, store and handle wire and cable in accordance with the manufacturer's instructions and as specified in Division 1.

Reference: Photovoltaic Systems, p References: Photovoltaic Systems, Chap. 7 National Electrical Code (NEC), Articles 110,

Lithium-ion battery systems for ABB UPS solutions Reliable, lightweight and compact UPS energy storage for critical applications

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Chapter 6. Batteries. Types and Characteristics Functions and Features Specifications and Ratings Jim Dunlop Solar

PowerWave Bus System. For More Information Use your QR Reader THE NEXT GENERATION OF FLEXIBLE POWER DISTRIBUTION

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

Chapter 6 Generator-Voltage System

Powershift. Take back the power with the industry s first intelligient plug-and-play dc power supply.

OPTIMIZATION OF DC PLANT TOPOLOGY USING AE 1000NX INVERTERS

Supply-Side PV Connections

Medium Voltage Power Cables

ULTRACAPACITORS FOR UNINTERRUPTIBLE POWER SUPPLY (UPS)

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

ELECTRICAL. CDTA Technical Training Center

Spring Test 10 due 05/11/2013

Off-grid Power for Wireless Networks. Training materials for wireless trainers

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

2016 Photovoltaic Solar System Plan Review List

Technical data sheet VH UL. Digital Energy Uninterruptible Power Supply. GE Digital Energy Power Quality

Infinity 1U 19 Converter Shelf Models: J L224-48V to +24V, L V to -48V

Volume 2 Charts, Formulas, and Other Useful Information

Installation and Construction Notes for EVSE4

A.C.E.S. Series ACES 3 & 6 MODULE PANELS. System Manual. Touch-Plate Lighting Controls. ACES 3 & 6 Module System Manual

Central Battery Systems

A/C Disconnects. Only $7.99 each In cases of (6) B222-60NF In cases of (10)

PART A General Conductor Requirements

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Section 10: Terminal Blocks

VaultFlex Battery Enclosures. from EnerSys and Purcell Systems. Two industry leaders team up to provide new synergy, efficiency and flexibility

Zone Selective Interlock Module. For GE Circuit Breakers

OCEAN COUNTY ARES EMERGENCY GENERATOR USE By WX2NJ. The following was taken from September and October Ocean County ARES Newsletters in 2012:

Put the Power in Your Hands

FACT SHEET Standard: Electrical Safety

Design Standards NEMA

MC122IG 12/2 WG MC Solid-Isolated Ground, Steel Armor. Features. Material, Color, and Finish. Dimensions and Weight.

Ampd Silo. Energy Storage System. Maintenance-free Li-ion energy storage for mission critical backup. Power to Empower

C&D VRLA Batteries Extended Run Time for Small UPS Machines

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Microgrids Outback Power Technologies

Section 02: Pre-Installation Procedures

Central Battery Systems

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MDS2 Series. Modular Distribution Systems. Introduction 8-Position Configuration Decision Tables

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers

PD404-AN V analog control 4 Channel x 500 W Dimmer & Switch Packs ANALOG 0-10 V. Serial Number

fiber optic cable Outdoor Cables

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

TC-THHN/THWN-2 Copper, PVC/Nylon Insulated

Table of Contents. 1 Introduction. 2 Power System Requirements. Preface... xi

TLE Series UPS 400/500 kw With eboost Technology

White Paper. Direct Current Load Banks for Battery Capacity Testing

DYNAMIC BOOST TM 1 BATTERY CHARGING A New System That Delivers Both Fast Charging & Minimal Risk of Overcharge

PowerMax. Power Distribution System. Operation Manual Version 1.0 Copyright 2003 Professional Sound Corporation Printed in the U.S.A.

Fuse / Circuit Breaker Panels

Assessing a Site for Installation of Consumption Monitoring

Terminal Blocks. Section 12. Control Catalog 12-1

Type HLT Self-Regulating Heater Cable For use in Ordinary and Hazardous (Classified) Locations

Special Specification 6058 Battery Back-Up System for Signal Cabinets

TLE Series UPS 160/200/225/250 kw with eboost Technology

TSE Series Central Chillers

T300MVi JK OEM POWER CELLS MEDIUM VOLTAGE VACUUM CONTACTOR. Reliability in motion. Reliability in motion

3M Products for Electrical Networks Wind Farm Capabilities. Leading Edge. Electrical Solutions for. Wind Farms

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals?

TC-THHN/THWN-2 Copper, PVC/Nylon Insulated

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

Southwire Company. Current Rating 70 AMPERE (60 DEG C), 85 AMPERE (75 DEG C), 95 AMPERE (90 DEG C) Ground Conductor Size

Service Entrance Methods

Powerterm L120C Single Output PSU/Battery Chargers Model C2199A-1 (12V/8A) or Model C2199A-2 (24V/6A)

PHOTOVOLTAIC ARRAY WIRING HANDBOOK FOR STANDARD NOMINAL 6, 12, 24, AND 48 VOLT SYSTEMS. (for SX-60 series or smaller and MSX-120 solar modules)

AMENDMENT ELECTRIC SERVICE MANUAL 2014

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

Mini Breakout Distribution Cable Multi-core ( Fibres)

TC-XHHW-2 Copper, XLPE Insulated, PVC Jacketed

PURE LEAD PLUS UPS APPLICATIONS. Valve Regulated Lead Acid Battery Designed for UPS Standby Power Applications Watts per Cell

CHAPTER V RESIDENTIAL WIRING

New Circuit Protection Platforms. March 2011 APEC

Transcription:

GE Critical Power Going the Distance - Solving Power Reach Issues With Diverse DAS Solutions

Paul Smith Technical Marketing Manager GE Critical Power Paul Smith (214) 385-9070 Paul.D.Smith@GE.com Terrell Moorer Product Manager GE Critical Power Terrell Moorer (469) 371-1858 Terrell.Moorer@GE.com Abstract All Distributed Antenna Systems (DAS), with various load, power-back-up and cellular performance requirements, are not created equal. Yet a powering system with multiple load locations, coupled with a centralized energy storage system, will typically provide uninterruptible power with the lowest total cost of ownership (TCO) when the initial system costs are considered along with the installation, maintenance and up-keep costs of the entire system. Remote or line powering options are all subject to reach limitations depending on the type and size of the load, wire gage and voltage variations. This paper looks at several different remote load scenarios and how to best power them with cost effective power systems. In addition, because energy storage in the form of batteries imposes constraints of its own with regards to reach, battery implications are also examined. The calculations used to determine the reach of different powering scenarios will be shown in detail, with examples and case studies as illustrations. Solutions will include current limited high voltage, Class 2 circuits and Safety Extra Low Voltage (SELV) solutions. Introduction The rapid growth in wireless data use is placing capacity burdens on the traditional large (macro) cell site capacity. The number of users within a cell s coverage area competing for bandwidth has prompted the growth of small cell and DAS. These systems provide similar capacity over much smaller areas, dramatically increasing the capacity of the overall system, especially in areas of highly concentrated users such as stadiums, convention facilities, campus, malls and resorts. The ability of small cells and DAS to increase system capacity relies on the placement of large numbers of small radio stations with small coverage areas. To meet consumers service expectations, these systems need to perform even during power outages, therefore, uninterrupted power supply is critical. The sheer number of these locations prompts telecommunication operators to look at ways to power these radios without having to deploy batteries, with the associated costs and maintenance issues, at every location. Powering Options Local Power Powering a small radio set with uninterruptable power requires a battery backup to power it during utility interruptions. The remote radio heads typically used by DAS or small cell architectures can be alternating current (AC), (110/240 volts (V)), or direct current (DC), (-48 V), powered. Local power requires the provision of an AC outlet and a suitable uninterruptible power supply (UPS). Small UPS Uninterruptible power supplies, either AC or DC, can be provided at each remote location. Figure 1. Local Power Small UPS 2 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Remote Power Provisioning of a larger UPS to power many remote radios from a central location offers many advantages including reduced maintenance costs associated with many battery locations. This applies to AC or DC UPSs. Installation Costs In the case of unprotected AC and DC wiring, local codes and the National Electric Code (NEC) require all power wiring to be installed in conduit. This is a labor intensive and costly process. NEC requirements also apply to local powering, where both AC and DC UPSs require an AC power source at each remote location. NEC installation standards allow conduit to be avoided in certain, power-limited cases. Power limited high voltage circuit A power delivery infrastructure using high voltage DC (+/-190 V) with a 100 volt-ampere (VA) power limit per circuit can be installed using an appropriate cable, without the use of a protective conduit. Because most remote radios do not accept +/-190 VDC directly, a down converter is used. The use of high voltage allows the delivery of power over greater distances with smaller cables. Figure 2. Remote Power Larger AC and DC UPS Figure 3. Remote Power Power Limited high voltage DC 3 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Single circuit A single power limited circuit can supply power up to a maximum of 100 watts (W). The distance over which it can supply a load is dependent on the size of the load, the resistance of the cable, the minimum UPS voltage and the minimum operating voltage of the load. When the high voltage converters are capable of operation at the battery end of discharge voltage, the operating voltages do not factor into the reach calculations. The single circuit is limited to 100 VA, but its reach can be extended by using heavier gage conductors or paralleling conductors. Figure 4. Single circuit 100 VA Limited high voltage DC Combined circuits To achieve a load power greater than 100 VA, multiple circuits also can be combined. Again, each circuit can use heavier gage wire or multiple conductors to achieve a greater reach. Figure 5. Parallel circuits Multiple 100 VA Limited high voltage DC circuits Power delivered to load per 100 W converter 100 90 80 70 60 50 40 30 20 10 3x22 AWG 2x22 AWG 20 AWG 22 AWG 24 AWG 26 AWG 0 0.62 3.10 6.2 9.3 12.45 Distance (Miles) Figure 6. Reach calculations for different wire gages Power delivered to load per converter circuit 4 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Power limited low voltage circuit A power delivery infrastructure using low voltage DC (-48 V) with a 100 VA power limit per circuit also can be installed using an appropriate cable, without the use of a protective conduit. Because many remote radios can accept -48 VDC directly, a down converter is not needed. This power delivery infrastructure is called a Class 2 power limited circuit in the NEC. Limited Power (Class 2) - Low Voltage circuits The single circuit is limited to 100 VA, but a single circuit can have its reach extended by using heavier gage conductors or paralleling conductors. NEC limits the wire gage to 12 American Wire Gage (AWG) maximum for Class 2 circuits. Figure 7. Remote Power Power Limited low voltage DC Figure 8. Single circuit Power Limited low voltage DC Class 2 circuits cannot have multiple circuits combined to increase the power available because there is no isolation at the remote end. This would violate the safety of a Class 2 circuit under line fault conditions, where multiple circuits could feed current to a fault. Figure 9. Parallel circuits violates Class 2 safety requirements 5 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Reach Calculations All power delivery infrastructures using copper wire are subject to Ohms Law. The amount of power available to each circuit is limited to 100 VA due to safety mandates. Losses in the cable will ensure that 100 VA or less always reaches the far end. In a power outage situation, the system operator and end customers expect service to continue until the capacity of the battery is exhausted. Therefore, the reach calculations must be done with the limiter input voltage at 42V, the end of discharge voltage commonly accepted for Valve Regulated Lead Acid (VRLA) batteries. This makes the maximum circuit current 100/42 = 2.38 Amperes (A). If the line resistance at maximum reach is RLM, then the voltage drop in the line will be 2.38 x RLM and the load voltage will be 42-2.38 x RLM. Typically, loads are specified with a minimum operating voltage and an operating power. If the minimum operating voltage is VLM, then VLM = 42-2.38 x RLM from which RLM can be calculated and the maximum line length computed for a given wire gage. Clearly the reach is very dependent on the input voltage 42 V for a VRLA battery at end of discharge. A second factor must also be considered. Because the input power to each circuit is limited by the limiter, not only does the voltage drop at increased distance, but the available power at the remote end decreases. We must consider which is the limiting factor, voltage or power, before a definitive reach can be calculated. The graphs in the following figures calculate reach based on both voltage and power and plot the lesser of the two, since the load will not function beyond this. Power delivered to Load (Watts) 100 90 80 70 60 50 40 30 20 10 0 Figure 10. Low Voltage Reach Calculation parameters Minimum Battery Voltage 42V Minimum Load Voltage 36V 14 AWG 16 AWG 18 AWG 20 AWG 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Distance (Feet) Figure 11. Reach calculations Power Limited low voltage DC 6 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

If we can boost the voltage of the limiter input, so that it is a constant higher voltage even during battery discharge, the reach calculations can be performed at this higher voltage and the reach extended. This is easily done with a DC / DC converter that can operate at inputs down to 42 V and provide a constant output voltage. The output voltage is typically chosen to be 57 V, which gives a marked improvement in reach while still providing a margin of safety below the maximum SELV voltage of 60 V. 100 Figure 12. Single circuit Power Limited low voltage DC with DC Boost converter For the wire with a 50 W (36 V) load, the reach using 42 V battery voltage is 1,263 feet. Using the 57 V converter boosted voltage; the reach is 4,421 feet, an increase of 250%. To compare the reach of a 12 AWG cable with and without the voltage booster, see Figure 14. Power delivered to Load (Watts) 90 80 70 60 50 40 30 20 Minimum Battery Voltage 57V Minimum Load Voltage 36V 14 AWG 16 AWG 18 AWG 20 AWG The results plotted in Figures 11 and 13 are calculated by the GE Power Express calculator tool available from the author(s) or your local GE Critical Power sales representative. 10 0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Distance (Feet) Figure 13. Reach calculations Power Limited low voltage DC with Boost Converter 100 90 Power delivered to Load (Watts) 80 70 60 50 40 30 20 with voltage booster without voltage booster 10 0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Distance (Feet) Figure 14. Reach calculations Power Limited low voltage DC with and without Boost Converter 7 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Larger Loads Several DAS system manufacturers are now using remote radios that require more than 100 W of input power. These cannot be used with Class 2 circuits because of the power limitation. Non - limited low voltage circuits If we remove the power limiter, the low voltage circuit can be used to power larger loads or span longer distances. However, the NEC now mandates that the circuit must be protected by running it in a conduit. This increases installation cost, but may be needed if the user must power larger loads and does not want to take the multi-circuit high voltage route. Class 2 circuits are limited to cables by the NEC. This limitation does not apply to unlimited or Secondary circuits, so larger wire gages are presented in the reach graph of Figure 15, which also compares the reach with and without the boost converter option. The boost converter can be seen to more than double the reach of each circuit type at a given power level. Power delivered to Load (Watts) Power delivered to Load (Watts) 1600 Minimum Battery Voltage 42V 1400 Minimum Load Voltage 36V 1200 1000 800 600 400 200 0 0 100 200 300 400 500 600 700 800 900 1000 Distance (Feet) 1600 1400 Minimum Battery Voltage 57V 1200 Minimum Load Voltage 36V 1000 800 600 400 200 0 0 100 200 300 400 500 600 700 800 900 1000 Distance (Feet) 2 AWG 6 AWG 8 AWG 10 AWG 2 AWG 6 AWG 8 AWG 10 AWG Figure 15. Reach calculations Secondary low voltage DC with various wire gages 8 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Tools Reach Calculators Below are screen shots of the GE Reach Calculator tools for Class 2 and Secondary circuits for some typical loads and applications. In both illustrations, the use of the voltage booster is assumed (57 V minimum input). These calculators are available upon request from GE Critical Power representatives. Power Express Reach Calculator Step 1 What is the minimum input voltage at the source? 57 Volts 41.25 Volts is recommened for traditional systems 57 Volts is recommended for systems with converter boost in the limiter Step 2 What is the minimum input voltage required at the remote load? 38 Volts Step 3 How many Watts are needed at 48 Volts in the remote device? 86 Watts Step 4 What wire gauge do you use in your network for remote power? 12 Gauge Results of Colculations The one way distance from the 96.6W power source to the remote cabinet is: 1071 Feet VA Limit Figure 16. Reach Calculator Power Express Plus, Class 2 Circuits Secondary Circuit Reach Calculator Case #1 Case #2 Step 1 What is the minimum input voltage at the source? 57 Volts 57 Volts 41.25 Volts is recommened for traditional systems 57 Volts is recommended for systems with converter boost in the limiter Step 2 What is the minimum input voltage required at the remote load? 36 Volts 36 Volts Step 3 How many Watts are needed at 48 Volts in the remote device? 1600 Watts 350 Watts Calculated: Minimum usuable Breaker size (for power required) 60 Amp 15 Amp Step 4 Select Wire Gauge 8 Gauge 8 Gauge Calculated: Max Breaker size Allowed (for wire gauge selected) 45 Amp 45 Amp Results of Colculations The one way distance from the power source to the remote cabinet is: 120 Feet VA Limit 1,597 Feet Voltage Limit Figure 17. Reach Calculator Secondary Circuits 9 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Input Voltage range Input Power Reach (Class 2) Reach (Secondary) Low Power 1 38-60 V DC 86 W 1,071 ft. 2,455 ft. Low Power 2 38-60 V DC 80 W 1,683 ft. 2,639 ft. Med Power 1 36-75 V DC 350 W - 1,597 ft. 8 AWG Med Power 2 36-75 V DC 500 W - 1,118 ft. 8 AWG High Power 1 21-60 V DC 1,100 W - 508 ft. 8 AWG High Power 2 21-60 V DC 1,600 W - 120 ft. 8 AWG Figure 18. Typical Remote DC Power requirements Hybrid Fiber Cable When the power circuit does not need to be installed in a conduit, as is the case when the circuit is power limited (100 VA), this opens the door for routing the power cables in the same raceway as the fiber cable. In fact, fiber optic cables are now available with built-in power conductors. (hybrid fiber cable). This means that both power and fiber can be installed in a single operation, connecting each remote to the central communications and power location. These cables can be used with high or low voltage, power limited power circuits and are available with differing fiber types, counts and copper wire gages as shown in the example data sheet in Figure 19. Applications Remote application of Low-Voltage power Security networks IP enable appliances Wireless Access Points Copper/Fiber Composite Cable Rugged easy to use composite cable consiting of flexible stranded Copper conductors and integrating communications links utilizing fiber optic technologies. The breakout design privides additional protection for both the copper and fifer channels by individually protecting each with insulated jackets and all-dielectric strength members. For applications requiring remote low-voltage power and high speed communications, these designs provide an efficient single-installation option where space is of a premium and devices are not easily accessed. Features Rugged Riser rated constructions Water-blocked Flexible stranded Copper (, 14 AWG, 16 AWG, 18 AWG available) High-speed fiber optics UL 13, UL 1666 rated NEC 725 classified CL2R-OF classified 4 Fiber fiber sub-unit - 900um tight buffer - aramid - PVC jacket copper sub-unit core wrap tape Integrated outer jacket Cable Components 12 Fiber Copper sub-unit strength member fiber sub-unit - 900um tight buffer - aramid - PVC jacket core wrap tape ripcord Integrated outer jacket Figure 19. Example Hybrid Fiber Cable 10 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Cost Considerations It is important to understand all the factors that affect the cost of a DAS installation. The initial cost of equipment and installation are key parts of this, but the cost of operating and maintaining the installation are equally important. Materials - In a centralized power scenario we use a larger power plant and batteries in place of many small plants. In this case the larger power plant is typically more cost effective. Some of this cost advantage will be offset by the cost of power limiters if these are used to provide Class 2 protected circuits. - Materials used to connect the power to the remotes will also vary. The cost of conduit material can be eliminated by the use of Class 2 power circuits. Installation - Installation costs are dramatically affected by the specifics of a DAS configuration. However, one of the most significant parts of the installation cost can be power. Providing an AC drop (typically with ¾ conduit) to each remote location can be very costly when there are many remotes. - Typical job estimates show that the cost of running power cable in conduit can be three to four times the cost of installing a Class 2 cable. With a DAS system consisting of 50 remotes, each requiring an average of 200 feet of cabling, this difference is significant. Conduit Installation Class 2 Cable installation 50 x 200 ft. = 10,000 ft. 50 x 200 ft. = 10,000 ft. Est. $11 / ft. Est. $3 / ft. Total $110,000 Total $30,000 - The remote will always require the installation of a fiber optic cable for data communications, so the use of a hybrid fiber cable will not impact the cost of installing that fiber if a Class 2 circuit protector is used. In this case, power installation is free because it costs no more to install the hybrid fiber cable. The cost of a hybrid fiber cable will be higher from a material standpoint, but probably no more than the combined cost of individual fiber and copper cables. Operation - Operational costs of each powering scenario are similar, since the power used by the remote does not vary significantly, whether it s AC or DC. Maintenance - Maintenance costs are difficult to quantify; each operator and situation will require different maintenance. However, maintenance of many small battery installations will be much more difficult and costly than maintaining a single, large, centralized battery system. 11 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

Summary There are many ways to power DAS and small cell equipment. The main driver for alternatives to a UPS for each and every remote is the sheer number of systems required and the costs incurred in installation, operation and maintenance. When the required user experience dictates the use of UPSs, elimination of the costs associated with battery proliferation is a key consideration. Each of the powering scenarios discussed has advantages and disadvantages, and the user must decide which is most appropriate for the particular installation. See Figure 20 for an abbreviated summary of these factors for each of the scenarios discussed. Power Architecture Battery Conduit Reach Max Power Relative Cost Advantages Disadvantages Local Power @ remote Many AC N/A 2,455 ft. 5 Simple Architecture, reserve can be specific to remote unit High Cost, battery proliferation, ac drop for each remote High Voltage Remote Central 1 None Long miles 2,639 ft. 4 Single battery location, low cost cable and installation, combine circuits for additional power Converters at both ends of span Low Voltage Remote Limited Power Central 1 None Medium Kft. 1,597 ft. 8 AWG 2 Single battery location, low cost cable and installation, limiter only at source, no converters Limited reach, cannot parallel circuits for additional remote power Low Voltage Remote Limited Power with voltage booster Central 1 None Long x2 Kft. 1,118 ft. 8 AWG 3 Single battery location, low cost cable and installation, limiter only at source, better reach Needs source boost converter, cannot parallel circuits for additional remote power Low Voltage Remote No Power Limiter, with voltage booster Central 1 DC Medium 100 s ft. 508 ft. 8 AWG 4 Single battery location, Higher Power at remote Larger Cables, Conduit installation cost Figure 20. Power Scenario summary table 12 of 12 Going the Distance Solving Power Reach Issues with Diverse DAS solutions

GE Critical Power 601 Shiloh Road Plano, TX 75074 +1 888 546 3243 www.gecriticalpower.com *Registered trademark of the General Electric Company. The GE brand, logo, and lumination are trademarks of the General Electric Company. 2015 General Electric Company. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions. DET-810, Rev. 05/2015