Installation Manual SRR-70

Similar documents

HOME-F Installation Manual

Installation Manual Sectional door with rear springs (LF 70) Conform TÜV / CE EN

manual GB rev.0 Feb-09 RS200 Hardware system for residential (garage) overhead doors Built-in height 200mm, springs in front

Installation, Operating and Maintenance Instructions Retractable Door / Art.-Nr.:

Spring break device. Sep-10

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

Northern Sales & Distribution Centre

Instructions for Fitting, Operating and Maintenance

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only

Porte 150 Users Manual Swing Gate Opener 24V DC

OPERATOR SHAFT-120. Installation and Operating Manual CONTENTS GENERAL INFORMATION SAFETY INSTRUCTIONS OPERATOR UNIT OPERATOR INSTALLATION

Operating, Safety. Maintenance Manual. for. Roller Shutter & Sectional. Overhead Doors

INSTRUCTION MANUAL MAGNA RAIL

contents OPERATOR Maintenance SHAFT-120 Installation and Operating Manual DoorHan, 2012

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Roof access hatch installation instructions

c-go 24V/6A 24V/8A 24V/12A

A Assembly Instructions Space Capsule, Art-No

SPARE PARTS CATALOGUE SECTIONAL & UP & OVER DOORS

A Assembly Instructions Trampoline Piccolo Art with Special Installation Frame

OPERATING INSTRUCTIONS

Exchange of rollers from the XTS-Mover

PrioVino Premier. Translation of Original Operating Instructions. Status: August First edition January 2018 / PrioVino GmbH

CONGRATULATIONS on YoUR NEW GARAGE DooR! Toll free: DooR (3667) creativedoor.com

ASSEMBLY INSTRUCTIONS L-LINE KTG ZMA0304GB

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator

USER INSTRUCTIONS FOR SLIDING DOORS

A. This Section includes the following types of sectional overhead doors:

KeContact P20. User manual

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

insulated sectional 2180mm (h) x 2550mm (w) Opening Size: 2140mm (h) x 2500mm (w) suits single car garage

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

Industrial doors. An important part in your building?

INSTRUCTION & INSTALLATION

c-go 12V/10A 12V/20A Power supply and battery charger Instruction manual

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

DC Master 24/ A

Planned Maintenance Program

DEMOUNTABLE BODY INSPECTION PROCEDURE Follow Detailed Instructions Inside for Each Step

SELECT SINGLE PAGES WEB:Select web 3/2/12 08:25 Page 1 GRP

MCS. MCS Metering Guidance V1.0. Gemserv Ltd 10 Fenchurch Street, London. EC3M 3BE.

Austin. Aluminium Sectional Doors

Cable break device. Cable break device. Cable break device 9.1

RF60. Catalogue. Sectional door PS60. Inside installation

A Assembly Instructions Trampoline 2012 Art

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D.

SAFET Y PRODUCTS. TT-Series Safety Edge Product Manual


Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

CP-LIFT. Plazma lift 1. LIST OF ITEMS: 2. INSTALLATION and ADJUSTMENTS: Dimention of the lift: L: 1375 mm W: 965 mm D: 236 mm

Relay Retrofit Program Cutting Tool Safety Guide

AIR FILTER MODEL NO: AF1000 OPERATION & MAINTENANCE INSTRUCTIONS PART NO:

Automatic concealed bollards 275 H600 and 275 H800 with pit

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

KFM-P 2040 INCLINE BELT CONVEYOR

OPERATIONAL INSTRUCTION OVERVIEW MAINTENANCE CHECKLIST

Heavy Duty Sprayer Owners Manual Model MS-O

Reflection. Aluminium Sectional Doors

LP 9-20 E PAC. Crowder Supply Co., Inc Roslyn St., Commerce City, CO Toll Free:

28W WORK LAMP Model: CTL28 Part No:

HEAVY DUTY TROLLEY JACK. Operation Manual

KTF-P 2010 CHAIN CONVEYOR

TR10A091 RE /

OPERATING MANUAL C-1350 CABLE PUSHER. Copyright 2003 by CBS Products (KT), Ltd

Installation and operating manual. Garage Door Opener Direct Drive 3/4 HP / 1 HP. synoris 550 compact / 800 compact V OCE-Rev.

A Assembly Instructions for Trampoline 2000, Art With Installation Frame, Art

A Assembly instructions Mini Rope End Swinger Art. Nr

MBF-P 2040 PLASTIC MODULAR BELT CONVEYOR

CORDLESS TACKER MODEL NO: CCT48 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS0414

Installation manual ASTER AUTOMATION FOR SWING GATES 11_16

User manual Pipe notcher Type: AL 1-2E

Operating manual. Custom made gearboxes

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080

Relay Retrofit Program for REX 521 Cutting Tool Safety Guide

Timber Sectional Doors

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

ELECTRIC HOIST MODEL NO: CH2500B, CH4000B OPERATION & MAINTENANCE INSTRUCTIONS PART NO: , LS1010

Angle seat valve with diaphragm actuator VZXA-...-M

Angle seat valve with piston actuator VZXA-...-K

Stripping and rebuilding motorsport engines (pre-competition)

Angle seat valve with piston actuator VZXA-...-K

AIR-SUSPENSION. Designed for: Alko Chassis

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

PURE SINE WAVE DC TO AC POWER INVERTER

SECTION HVAC POWER VENTILATORS

Model NTX7 Series Automatic Battery Charger User s Manual Rev. 1.0 October 17, 2006

Service - Safety Manual

flinkey QUICK START GUIDE FLINKEY BOX AND FLINKEY IQ

Auxiliary Air Suspension. Installation Manual L.AL.02. AL-KO Chassis June 2009

OPERATING INSTRUCTIONS

Service - Safety Manual

Assembly Instructions Maxi Cheops Pyramid Art B to set into concrete

SECTION CENTRIFUGAL HVAC FANS

Floating Headers - 4-1/8, 4-1/2, 6. with RTS88 and PT21 for double doors ONLY. Installation instructions

GUF-P MINI BELT CONVEYOR

maintenance of the winch. All information in this publication is based on the latest production information available at the time of printing.

INSTALLATION INSTRUCTION FOR: TORSION SPRING COUNTERBALANCE ASSEMBLY FOR RESIDENTIAL SECTIONAL DOORS

OPERATIONAL INSTRUCTION OVERVIEW REQUIRED MAINTENANCE CHECK LIST

Servicing & Maintenance Manual

Transcription:

Installation Manual SRR-70

Contents 1. Symbols 3 2. General warnings 3 2.1 Safety requirements for assembly and first use 3 3. Terms and conditions 3 4. Area of application 3 5. Guidelines 4 6. Fixing material building 4 7. System summary 4 7.1 Pre-assembled rail set 5 8. Fasteners/ tools 6 9. Assembly 7 10. Handover 37 10.1 First use 37 11. Electric operator (optional) 37 11.1 To adjust the operator 37 12. Disassembly 37 12.1 Disposal 37 13. Maintenance 38 2

1. Symbols Danger Attention Additional manuals 2. General warnings This manual has been prepared for use by qualified personnel and therefore not by trainees or do it yourselfers In case of doubt about the assembly and/or maintenance, please contact DOCO International To avoid severe personal injury, carefully read and observe all indications and warnings in this manual. - This manual describes the assembly, use and maintenance of your residential system /door SRR70; this may be supplemented by other manuals, for instance the spring break device manual and operator manual (if applicable.) - This residential system has been designed in accordance with the latest European standards; however you have to check yourself whether this standard corresponds with the local national standard. - All measurements are in millimetres unless otherwise specified. - After installation ensure that the CE marking label has been completed and attached. - Keep this manual in a safe place. - Subject to technical changes, without written notice. 2.1 Safety requirements for assembly and first use. - This residential system may only be mounted, connected and put into operation by qualified personnel. - Make sure that the power is switched off and remains switched off while electrical work is carried out! - Never bridge safety devices! - Adding or leaving out parts can affect the door operation in a negative way and therefore the safety of the installed sectional door. This is therefore strongly discouraged! - Some parts can contain sharp edges: use protective gloves. - All references to the door/component handing within this manual is always as viewed from inside looking out. - Never use the sectional door in case or visual damage on the safety devices. - When performing assembly/maintenance, always wear at least gloves and safety boots and during drilling/cutting wear safety goggles! - Make sure that you can always perform your work in a stable environment. - Secure the assembly/maintenance site with safety ribbon to keep others (children!) at a distance. - Maintenance must only be performed by a qualified company and/or qualified personnel. - Make sure there is enough light. - Only use appropriate tools, especially when tensioning the torsion springs. 3. Terms and conditions Our general conditions of delivery and payments are applicable on all our offers, agreements or subsequent revisions. A copy of our terms and conditions are available on request or can be downloaded from our website: www.doco-international.com. 4. Area of application This hardware set has been developed for installation in garages in the private sector - Maximum width 5000 mm - Maximum height 3000 mm - Weight door leaf maximum 165 kg - Maximum temperature range outside* : -20 degr until + 50 degr C - Relative humidity 20 90% - Lifetime : 25.000 cycles (unless the torsion springs have been calculated for this) * big differences in temperature between the inside and outside can cause deflection in the panel leafs (bi-metal effect). In particular dark coloured panels are susceptible to this problem and should be avoided. Care should be taken during manual handeling as there is a big risk of damage. 3

5. Guidelines DOCO International had carried out the Product Test of this door (Initial Type Testing = ITT) by the SP institute in Sweden, known as Notified Body No. 0402. Documents regarding this ITTr can, in consultation with DOCO, be transferred to the company which produces the door. This is necessary to complete a CE-dossier. NOTE: CE-approved only using the correct DOCO-components. It is the responsibility of the installation company to ensure that the chosen E-operator and panels conform to the product standard EN13241-1 and have carried out the necessary ITTr. If a wicket door is to be installed, it is the responsibility of the installation company to ensure that the complete door conforms to the product standard EN13241-1 and have carried out the necessary ITTr. 6. Fixing material building The necessary fixings to ensure the garage door to the building and/or ceiling, are not included! It is the responsibility of the installer to make sure that the building structure is safe/strong enough, to accept the door and its fixings. The installer is also responsible for using the correct fixing materials on the right foundation (stone, concrete, steel, wood). In the image section there will be therefore no specification included. 7. System overview 4

7.1 Pre assembled track sets overview SRR 70 system Horizontal kit SRR 70 (pair). Day light height (H) Vertical Kit SRR70 (Pair) Horizontal Kit SRR70 (Pair) Curve Kit SRR70 (pair) Bolt version Rivet version Bolt version Rivet version Rivet version Article Article Article Article Article 2000 44000-2000 44010-2000 43001-2000 43011-2000 2125 44000-2125 44010-2125 43001-2125 43011-2125 2250 44000-2250 44010-2250 43001-2250 43011-2250 2375 44000-2375 44010-2375 43001-2375 43011-2375 2500 44000-2500 44010-2500 43001-2500 43011-2500 2750 44000-2750 44010-2750 43001-2750 43011-2750 3000 44000-3000 44010-3000 43001-3000 43011-3000 44012 Curve Kit SRR 70 (pair) Vertical kit SRR70 (pair) Day light height (H) Vertical Kit SRR70 (Pair) Horizontal Kit SRR70 (Pair) Curve Kit SRR70 (pair) Bolt version Rivet version Bolt version Rivet version Rivet version Article Article Article Article Article 2000 44000-2000 44010-2000 47001-2000 47011-2000 2125 44000-2125 44010-2125 47001-2125 47011-2125 2250 44000-2250 44010-2250 47001-2250 47011-2250 24720-L 2375 44000-2375 44010-2375 47001-2375 47011-2375 & 2500 44000-2500 44010-2500 47001-2500 47011-2500 24720-R 2750 44000-2750 44010-2750 47001-2750 47011-2750 3000 44000-3000 44010-3000 47001-3000 47011-3000 5

6

44000-xxxx 44010-xxxx 24740-xxxx Alt: 225010-xxxx 7

8

44012 (pr) 9

43001-xxxx 43011-xxxx 10

11

24619 (pr) 12

13

14

24803 24801 15

16

17

25650 11000 11000-3 11001 11014 25018/25019 26018 Springmatrix Springmatrix 13023 25047 11000 11000-3 11001 11014 25650 13026/27 13026/27 18

19

13023 13026/27 25047 20

21

13024 22

25008/ 25010-E 25630 25110-x (3mm) 25111-x (4mm) 25051 25052 25056 25057 23

24

25

26

25003 (pr) 25003 27

28

29

30

31

32

Supprimer 25403 25407 285100 285101 33

25325 80301 (DE/EN/NL/FR) 80302 (SP/IT/PL/CZ) 34

35

36

10. Handover Handover the following documents to the end user: - This manual (assembly, maintenance and disassembly) - User guide - Service manual - Declaration of conformity (in accordance with EN-13241-1) - Inform the end user how to handle in case of malfunctions 10.1. First use The first use of the garage door has to be carried out by an installer. After that the users can be instructed. For more information refer to the user guide. 11 Electric operator (optional) Mount the operator according the supplier s manual. NOTE: In case of power failure it should be possible to unlock the door using the emergency release from the operator. The door leaf may only in that case, be operated with a handle. If there is no second entrance to the garage, we recommend an external release lock (art 60011) be fitted. Do not fit a pull cord, shoot bolt or lock to an electrically operated door. Ensure thtat the horizontal tracks are long enough for the electrically operator, this is with reference to the operator drawbar (see below). In the event that the tracks are too short, a longer horizontal track kit should be used. 37

11.1 Operator settings Adjustment to the operator should be carried out in accordance with the operator manufacturers manual. Please note that our hardware kits have been CE approved for use with the operators specified in our ITT report and enclosure B. Should a different operator be chosen, then the installer must carry out a peak force analysis in accordance with EN 12445 and EN 12453. 12 Disassembly The door should be disassembled in the reverse sequence to the assembly manual. 12.1 Disposal All parts of this garage door can be easily disposed of. Please consult your local authorities on this matter 13 Maintenance In accordance with EU standards, sectional overhead doors should be checked, from the first time of use, based on the indicated service by the installer. This inspection service has to be recorded written. This inspection service should be carried out by an approved installer cq company. Directly after installing: 1) lubricate the tracks (advice: PTFE spray) By Installer 2) lubricate bearings, and rollers (advice: PTFE spray) By Installer 3) lubricate pins of the hinges from intermediate- and side-hinges (advice: PTFE spray) By Installer 4) lubricate sealing rubbers (advice: special rubber grease or talcum powder By Installer After 3 months: 1) Re-tensioning springs ( relaxation springs) By Installer 2) visual inspection By Installer Every 6 months or every 750 door cycles: 1) remove debris from the door and surroundings By: user 2.lubricate the tracks (advice: PTFE spray) By: user 3.lubricate bearings, shafts and rollers (advice PTFE spray) By: user 4.lubricate pins of the hinges from intermediate- and side-hinges (advice: PTFE spray) By: user 5.lubricate sealing rubbers (advice: special rubber grease or talcum powder) By: user 6.clean the panels (advice: shampoo for car cleaning with water), do not use aggressive detergents By: user 7.wax the panels (advice: car wax) By: user Every 12 months or every 1500 door cycles : 1) check the cables, the end connections from the cable drums and bottom brackets on wear or damages By Installer 2.check the spring break devices in accordance with separate manual By Installer 3.check the balance of the door By Installer 4.check the pulley (if present) for wear or damages By Installer 5.check the rollers for wear and damages By Installer 6.check the closing forces of the main closing edge By Installer 7.check the suspension from the horizontal track to the ceiling By Installer 8.check the weather strips for wear or damages By Installer 9.check the bottom seal for wear or damages By Installer 10.check the rubber seals on the top panel for wear of damage By Installer 11.check the shaft coupler (if present) By Installer 12.lubricate the torsion springs By Installer 38

For your Residential and Industrial door solutions: www.doco-international.com 39