Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Similar documents
TTC Phase I increases to $1.59B; Phase II (DTX) estimated $ B. CHSRA Business Plan grade separates 16 th & Mission Bay Dr (trenching)

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study

Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae

Citizen Working Group (CWG) Meeting #2 Summary Notes

Waco Rapid Transit Corridor (RTC) Feasibility Study

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

This Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn

Draft Results and Open House

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Caltrain Business Plan

State Avenue Corridor Bus Rapid Transit (BRT)

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

Recommended Vision for the Downtown Rapid Transit Network

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Draft Results and Recommendations

Agenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

METRO Orange Line BRT American Boulevard Station Options

What is the Peninsula Corridor Electrification Project (PCEP)?

Bicycle Advisory Committee CORRESPONDENCE. as of March 13, 2017

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Caltrain Modernization EMU Procurement

Welcome. Green Line in Your Community

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

VTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you.

Click to edit Master title style

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

VAN NESS AVENUE BUS RAPID TRANSIT

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

DART Priorities Overview

Leadership NC. November 8, 2018

Doran Street and Broadway/Brazil Grade Separation Project

Caltrain Downtown Extension Project (DTX)

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

The Engineering Department recommends Council receive this report for information.

Service Quality: Higher Ridership: Very Affordable: Image:

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

Rapid Transit Implementation Working Group #4 February 9, 2017

High Speed Rail Conference

San Francisco Transportation Plan Update

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

What is the Connector?

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

Transportation Sustainability Program

METRO Light Rail Update

Mobility Corridor Updates. Transit & Active Transportation Projects

CalMod Program EMU Procurement Update

DRAFT Subject to modifications

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

IMPROVEMENT CONCEPTS

Caltrain Downtown Extension Study Ridership Forecast Summary

DOWNTOWN CONCORD SPECIFIC PLAN

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Rail~Volution 2012 R. Gregg Albright

Mobility Corridor Updates. Transit & Active Transportation Projects

4.0 TIER 2 ALTERNATIVES

Through Vision Zero SF we commit to working together to prioritize street safety and eliminate traffic deaths in San Francisco. VISION ZERO UPDATE

Mississauga Bus Rapid Transit Preliminary Design Project

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

STH 60 Northern Reliever Route Feasibility Study Report

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

December 1, Robert Doty, Manager Peninsula Rail Program California High Speed Rail Authority 925 L Street, 1425 Sacramento, CA 95814

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Troost Corridor Transit Study

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Restoration of Historic Streetcar Services in Downtown Los Angeles

Mobility Management: Caltrain

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

FREQUENTLY ASKED QUESTIONS

Train Operations Analysis of Two versus Three Mainline Tracks for the San Francisco Downtown Rail Extension

PROJECT BACKGROUND 3

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Speaker Information Tweet about this presentation #TransitGIS

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

1 Downtown LRT Connector: Draft Concept

THE FUTURE OF VANCOUVER S VIADUCTS

TORONTO TRANSIT COMMISSION REPORT NO.

Metro Green Line to LAX Alternatives Analysis. March 2012

San Francisco Transportation Plan

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

Reston Transportation Strategy July 9, 2018

A Transit Plan for the Future. Draft Network Plan

Subway Vision 6/9/2017

San Francisco to San Jose Preliminary Alternatives Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Transcription:

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016

CITIZEN WORKING GROUP (CWG) MEETING AGENDA Railyard Alternatives & I-280 Boulevard Feasibility Study 2 2 I. WALKING TOUR OF STUDY POINTS OF INTEREST I. WHAT QUESTIONS WILL THE CWG HELP ANSWER? I. UPCOMING CWG MEETINGS

WHY ARE WE HERE? Railyard Alternatives & I-280 Boulevard Feasibility Study 3 The Citizen Working Group is a body tasked with attending meetings and workshops to better understand the intricacies of the study, providing a public forum, and based on discussions in the working group, aiding in informing recommendations for the second phase of the RAB study. This process is vital for allowing a thorough assessment of the varying priorities and needs as we evaluate the community impact as part this project s feasibility. We re not here to pick an alternative, but to assess the existing conditions of the area and the possibilities for its future that are being studied.

Railyard Alternatives & I-280 Boulevard Feasibility Study 4 WHAT QUESTIONS WILL THE CWG HELP US ANSWER? How do we get High Speed Rail and Caltrain to TTC? How do we provide reliable travel times for all modes? How do we provide (better) access to public amenities (e.g, UCSF, Medical Center, parks, etc.)? Are we ok with trenching streets (16 th and Mission Bay Drive)? Is there an opportunity to improve additional infrastructure (e.g., 22 nd Street Station, re-connecting the street grid, etc.)? Should we continue to have a rail storage yard within the downtown core? What opportunities are there for housing, open space, and employment in freed areas? How does a boulevarded I-280 from Mariposa north benefit the neighborhoods? What are the tradeoffs?

CITIZEN WORKING GROUP (CWG) FUTURE MEETING TOPICS Railyard Alternatives & I-280 Boulevard Feasibility Study 5 5 NEXT MEETING (TBD) August 25 or 29, September 8 or 19 Start with an overview of the 4th/King station Select a Chair for the CWG Review analysis from planning Phase One Discuss updates provided on the rail alignments and Transbay Transit Center loop options since last public meeting 3rd MEETING (Sept-Oct TBD): Explore Railyard needs, I-280 boulevarding, and possible land use scenarios as well as updates since last public meeting 4th Meeting (Oct-Nov TBD): Explore draft alternatives, benefits, and costs in preparation for fall public workshop 5th Meeting (Dec-Jan TBD): Review public meeting and share modifications/updates to draft alternatives, benefits, and costs

Railyard Alternatives & I-280 Boulevard Feasibility Study 6 THERE ARE FIVE STUDY COMPONENTS 6 Each component is being studied individually, as well as combined with others. We are studying the potential to remove the last 1.2 miles of I-280 as an option for Component 4, though none of the other component options being studied require its removal

Railyard Alternatives & I-280 Boulevard Feasibility Study 7 WHY IS THE CITY STUDYING THIS? Visioning future transportation possibilities and new opportunities to reconnect our neighborhoods. In the next decade, Caltrain will electrify, High Speed Rail will come to the City, and construction will begin on a new tunnel connecting Caltrain and High Speed Rail to the new Transbay Transit Center (TTC). The particular route that the underground tunnel takes is the big question, as the decision will influence other major transportation and land use planning decisions in the surrounding area. For example, the current rail alignment will likely require a long grade-separation at 16 th Street (think 16 th Street in a trench) that would have a significant impact on pedestrians, vehicles, bicyclists, and the livability of the surrounding neighborhoods. The route alignment is a once in a 100-year decision that will impact our entire region, and we want to make sure we get it right by studying all the possibilities for the area.

Railyard Alternatives & I-280 Boulevard Feasibility Study 8 WHAT IS THE PLANNING PROCESS?

Railyard Alternatives & I-280 Boulevard Feasibility Study 9 WHERE ARE WE IN THE PROCESS? Building off the preliminary concepts shared earlier this year, San Francisco Planning is currently determining the feasibility of (a) various route alignments for the area, (b) preliminary boulevard layout options, (c) traffic operations, and (d) land use scenarios. This feasibility study will simply allow us to understand what is possible and at what cost. Phase I, completed in January of 2016, considered 25 years of reports on the five components being studied and identified options that warranted further analysis. Phase II, the project s current phase, will further develop these options into more complete alternatives and will compare their cost and impacts.

HOW ABOUT FUNDING? Railyard Alternatives & I-280 Boulevard Feasibility Study 10 10 Currently, all of the options and alignments being studied in the area would require new committed funding sources. These could include Federal, State, and regional sources as well as revenue from developments made possible by the alternative chosen. The study will undertake an economic analysis, and cost estimates for all the options and alternatives being studied that will be presented to the Citizens Working Group and at the public meeting being planned for this fall.

Railyard Alternatives & I-280 Boulevard Feasibility Study 11 WALKING TOUR POINTS OF INTEREST RELATED TO THE STUDY A 1. Start: At corner of 16 th Street & Mississippi. Look at grade crossing of 16 th Street & Caltrain Tracks END 4 2. Walk south on Mississippi, east on 17 th Street, south of Pennsylvania Ave and east on Mariposa Street to the underpass of I-280 and the overpass of Caltrain. This is located right over the Caltrain Tunnel 1 portal. 3 3. Following the same path back to 16 th Street, continue on 7 th Street to the intersection of 7 th & Mission Bay Drive. This is the second grade crossing in the City. START 1 2 4. Following Mission Bay Drive through the circle and using Channel Street, El Dorado Street, through the new Mission Bay Kids Park, and east on China Basin Street to 3 rd Street End: 1275 Third Street (Fire Station 30) Community Room CWG meeting space Walking tour includes some hills, covers more than 1 mile, and takes about an hour at a good pace. A. 4 th /King Railyard The second CWG meeting will start with an overview of the 4 th /King station.

Railyard Alternatives & I-280 Boulevard Feasibility Study 12 TRANSPORTATION PLANNING IN THE AREA - CITY OF SAN FRANCISCO PLANNED 16 TH STREET The Eastern Neighborhoods Transportation Implementation Planning Study (EN TRIPS) classifies 16 th Street as a High Priority Corridor Here s a look at EN TRIPS with 22 Fillmore BRT lanes (proposed)

Railyard Alternatives & I-280 Boulevard Feasibility Study 13 A VIEW FROM 16 TH STREET & CALTRAIN TRACKS Each time a train travels through the at-grade crossings of Caltrain (16 th Street and 7 th /Mission Bay Drive) it closes the intersection for approximately 60-100 seconds. Caltrain will be increasing the number of trains from 5 trains to 6 trains per peak hour per direction (2020/2021). They also want to move to longer trains currently they are 6-car trains, Caltrain would like to go to 8-cars. High Speed Rail plans to add an additional 4 trains per peak hour per direction. Each train will be 2x the length of the existing Caltrain trains. That means a total of up to 20 trains traveling through the area per peak hour. Currently, during peak hours, the queue of traffic, as depicted below, does not clear in one cycle after the gate closure. Caltrain is installing the CBOSS/PTC (Communications Based Overlay Signal System/Positive Train Control) which may allow for gate closure time to decrease. To what extent has yet to be determined. 8:30am looking east from 16 th /Vermont towards Caltrain tracks 8:30am looking west from 16 th /Mississippi 8:30am looking south up Mississippi

Railyard Alternatives & I-280 Boulevard Feasibility Study 14 EXAMPLES OF GRADE-SEPARATED ROADS Potential Grade-Separation of 16 th Street Potential Grade-Separation of Mission Bay Drive Source: CHSRA (2010), developed when HSR was to have it s own tracks. That has changed and HSR will share the tracks with Caltrain. Existing Grade-Separation Near West Oakland Bart Station at 7 th Street Existing Grade-Separation at Cesar Chavez